Items with Index Term: resource levelling
Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2): 04024195, ISSN 0733-9364
Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364
Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364
El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364
El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364
Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364
Harris, R B (1990) Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2), pp. 331-350. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364
Hiyassat, M A S (2001) Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3), pp. 192-198. ISSN 0733-9364
Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Seibert, J E and Evans, G W (1991) Time-constrained resource leveling. Journal of Construction Engineering and Management, 117(3), pp. 503-520. ISSN 0733-9364
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364
Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364
Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364
Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175