Items where Author is "Liu, M"
Yong, G; Liu, M and Lee, S (2026) Pose-aware image captioning for ergonomic problem and solution identification. Journal of Construction Engineering and Management, 152(5): 04026043, ISSN 0733-9364
Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988
Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988
Wu, S; Liu, M; Zhao, D and Cao, T (2025) How optimal trust–dependence nexus facilitates relational behavior in contractor–subcontractor collaboration: A configurational analysis. Engineering, Construction and Architectural Management, 32(4), pp. 2771-2791. ISSN 0969-9988
Liu, M; Luo, X and Lu, W Z (2025) Impact of mandatory reporting around the world on environmental disclosure strategies in the architecture, engineering, and construction industry: A linguistic perspective. Journal of Construction Engineering and Management, 151(10): 04025144, ISSN 0733-9364
Sun, M; Liu, M; Guan, J; Zhu, F and Zhang, Z (2025) Influence of the fit between the receiving and giving of helping behavior on construction professionals' workplace well-being: Self-determination perspective. Journal of Construction Engineering and Management, 151(12): 04025192, ISSN 0733-9364
Cui, C; Xie, T; Liu, Y; Liu, M; Cao, H and Li, H (2025) Public perceived efficacy of emergency infrastructure project: Antecedents in a triadic reciprocal determinism. Engineering, Construction and Architectural Management, 32(8), pp. 5291-5310. ISSN 0969-9988
Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364
He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S and Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4): 04025008, ISSN 0733-9364
Wu, Z; Wang, Y and Liu, M (2024) Job stress and burnout among construction professionals: The moderating role of online emotions. Engineering, Construction and Architectural Management, 31(12), pp. 4831-4851. ISSN 0969-9988
Zhang, X; Liu, M; Le, Y; Wei, J; Zhu, Y and Li, Y (2023) Deconstructing organizational capabilities of megaproject owners: Dimensions and levels. Journal of Construction Engineering and Management, 149(7): 04023055, ISSN 0733-9364
Huang, C; Wang, Z K; Li, B; Wang, C; Xu, L S; Jiang, K; Liu, M; Guo, C X; Zhao, X F and Yang, H (2023) Discretized cell modeling for optimal layout of multiple tower cranes. Journal of Construction Engineering and Management, 149(8): 04023068, ISSN 0733-9364
Li, S and Liu, M (2023) Reasonable kitchen space for urban residences: Based on an investigation in Beijing. Building Research & Information, 51(8), pp. 881-896. ISSN 0961-3218
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Hu, Y; Liu, M; Le, Y and Skitmore, M (2022) External consultant involvement for organizational capability building in complex construction projects: A perspective from interorganizational learning process. Journal of Construction Engineering and Management, 148(1): 04021181, ISSN 0733-9364
Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988
Liu, M; Zhu, Y; Wei, J; Le, Y and Zhang, X (2022) Impact of institutional pressures on external program manager involvement: Evidence from large projects in China. Journal of Construction Engineering and Management, 148(9): 04022079, ISSN 0733-9364
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
Liu, Y; Jarvamardi, A; Zhang, Y; Liu, M; Hsiang, S M; Yang, S; Yu, X and Jiang, Z (2021) Comparative study on perception of causes for construction task delay in China and the United States. Journal of Construction Engineering and Management, 147(3): 04020176, ISSN 0733-9364
Zhang, X; Le, Y; Liu, Y and Liu, M (2021) Fostering ambidextrous innovation in infrastructure projects: Differentiation and integration tactics of cross-functional teams. Journal of Construction Engineering and Management, 147(6): 2060, ISSN 0733-9364
Wang, D; Wang, X; Liu, M; Liu, H and Liu, B (2021) Managing public-private partnerships: A transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(4), pp. 1038-1059. ISSN 0969-9988
Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364
Abbsaian-Hosseini, S A; Liu, M and Hsiang, S M (2019) Social network analysis for construction crews. International Journal of Construction Management, 19(2), pp. 113-127. ISSN 1562-3599
Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.
Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364
Liu, M; Han, S and Lee, S (2016) Tracking-based 3D human skeleton extraction from stereo video camera toward an on-site safety and ergonomic analysis. Construction Innovation, 16(3), pp. 348-367. ISSN 1471-4175
Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364
Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193
Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364
Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364
Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364
Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364
Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364
Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.
Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364
Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364
Up a level