Items with Index Term: production planning

Number of items: 92.

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Acosta, D (1986) Application of production planning methods to improve productivity: Issues from the Venezuelan construction industry. PhD thesis, University of California, Berkeley, USA.

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.

Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Dal Borgo, Eleonora (2017) Sustainable production planning optimisation for project-based enterprises. PhD thesis, Università degli Studi di Udine, Italy.

Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(4), pp. 365-383. ISSN 01446193

De Athayde Prata, B; Pitombeira-Neto, A R and De Moraes Sales, C J (2015) An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, 141(10): 04015029, ISSN 0733-9364

De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.

El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771

Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193

Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364

Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.

Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kono, J (2018) Improving the sustainability performance of building materials: An approach from life cycle thinking. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lehtovaara, J; Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: Exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(4), pp. 254-277. ISSN 01446193

Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193

Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.

Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Shehadeh, A and Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5): 04025039, ISSN 0733-9364

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175

Simu, K and Lidelöw, H (2019) Middle managers' perceptions of operations strategies at construction contractors. Construction Management and Economics, 37(6), pp. 351-366. ISSN 01446193

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Viana, D D; Formoso, C T and Bataglin, F S (2022) Requirements for developing production planning and control systems for engineer-to-order industrialized building systems. Construction Management and Economics, 40(7-8), pp. 638-652. ISSN 01446193

Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988

Yang, Z.; Lu, W.; Wu, L. and Xu, J. (2026) Analysis of workflow variability in modular integrated construction manufacturing using cooperative game theory. Journal of Construction Engineering and Management, 152(8): 04026115, ISSN 0733-9364

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364

Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364

This list was generated on Sun Aug 23 02:16:59 2026 UTC.