Items with Index Term: contracting party
Abhayantha, K I L; Perera, B A K S; Perera, H A H P and Palliyaguru, R S (2025) Management of environmental risks in highway construction projects in Sri Lanka. Construction Innovation, 25(3), pp. 867-892. ISSN 1471-4175
Adams, C D (1995) Procurement of microtunnelling projects. PhD thesis, University of Manchester, UK.
Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364
Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988
Al Mousli, M H and El-Sayegh, S M (2016) Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12(5), pp. 353-366. ISSN 1745-2007
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.
Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.
Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364
Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X
Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Cao, N and Cheung, S O (2025) The value of voluntary participation in construction dispute mediation. Engineering, Construction and Architectural Management, 32(2), pp. 1229-1253. ISSN 0969-9988
Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387
Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988
Chan, A P C; Chan, D W M; Chiang, Y H; Tang, B S; Chan, E H W and Ho, K S K (2004) Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), pp. 188-198. ISSN 0733-9364
Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364
Chan, K-W (2010) The transaction costs and the choice of contractual arrangements in the construction industry in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599
Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499
Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.
Coggins, J; Elliott, R F and Bell, M (2010) Towards harmonisation of construction industry payment legislation: A consideration of the success afforded by the East and West coast models in Australia. Construction Economics and Building, 10(3), pp. 14-35. ISSN 2204-9029
Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.
Daouk, M E (2024) The future of Approved Inspectors: liable or not liable? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 25-31. ISSN 17514304
Deep, S; Gajendran, T and Jefferies, M (2023) Antecedents of "power" and "dependence" in the context of collaborations in construction projects: A systematic literature review. Construction Innovation, 23(5), pp. 1279-1299. ISSN 1471-4175
Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.
Dorée, A G (1996) Tendering practice of Dutch municipalities. PhD thesis, University of Twente, Netherlands.
Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Enshassi, A; Ayyash, A and Choudhry, R M (2016) BIM for construction safety improvement in Gaza Strip: Awareness, applications and barriers. International Journal of Construction Management, 16(3), pp. 249-265. ISSN 1562-3599
Enshassi, A; Mohamed, S and El Karriri, A (2010) Factors affecting the bid/no bid decision in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 15(2), pp. 118-142. ISSN 1366-4387
Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.
Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Hanna, A S; Thomas, G and Swanson, J R (2013) Construction risk identification and allocation: Cooperative approach. Journal of Construction Engineering and Management, 139(9), pp. 1098-1107. ISSN 0733-9364
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364
Hartman, F; Snelgrove, P and Ashrafi, R (1997) Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4), pp. 379-387. ISSN 0733-9364
Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364
Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988
Issa, R R A; Olbina, S and Zuppa, D (2018) Model for developing trust on US construction projects. Built Environment Project and Asset Management, 8(1), pp. 5-23. ISSN 2044-124X
Jafari, D M (2012) Resolution of multiparty construction disputes under the Singapore international arbitration legal framework. PhD thesis, National University of Singapore, Singapore.
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364
Ke, Y; Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects. Construction Economics and Building, 16(3), pp. 20-37. ISSN 2204-9029
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029
Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304
Le, Y; Shan, M; Chan, A P C and Hu, Y (2014) Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector. Journal of Construction Engineering and Management, 140(9): 05014007, ISSN 0733-9364
Lee, C Y and Chong, H Y (2021) Influence of prior ties on trust and contract functions for BIM-enabled EPC megaproject performance. Journal of Construction Engineering and Management, 147(7): 04021057, ISSN 0733-9364
Lee, C Y; Chong, H Y and Wang, X (2018) Enhancing BIM performance in EPC projects through integrative trust-based functional contracting model. Journal of Construction Engineering and Management, 144(7): 06018002, ISSN 0733-9364
Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988
Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364
Ling, F Y Y; Tan, P C; Ning, Y; Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(2), pp. 169-189. ISSN 0969-9988
Ma, Q; Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(6), pp. 519-535. ISSN 01446193
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mewomo, M C; Aigbavboa, C and Lesalane, P (2018) An examination of the key drivers of amendments to the standard forms of contract in the South African construction industry. Journal of Construction in Developing Countries, 23(1), pp. 115-124. ISSN 1823-6499
Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180
Miller, C J M; Packham, G A; Pickernell, D G and McGovern, M (2004) Building for the future: The potential importance of the construction industry in welsh economic development policy. Construction Management and Economics, 22(5), pp. 533-540. ISSN 01446193
Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451
Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364
Motiar Rahman, M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering, Construction and Architectural Management, 9(2), pp. 131-151. ISSN 0969-9988
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364
Ning, Y and Ling, F Y Y (2013) Reducing hindrances to adoption of relational behaviors in public construction projects. Journal of Construction Engineering and Management, 139(11): 4013017, ISSN 0733-9364
Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.
Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.
Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), pp. 247-259. ISSN 1562-3599
Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099
Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193
Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.
Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X
Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029
Rouhparvar, M; Babaei, F and Navidi, H (2025) Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study. International Journal of Construction Management, 25(8), pp. 899-910. ISSN 1562-3599
Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.
Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(2), pp. 157-171. ISSN 01446193
Tembo, C K (2018) Risk allocation on building projects in the Zambian construction industry. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Wong, K. K. W.; Chan, J. H. L. and Ng, T. S. T. (2025) KPIs for engineering and construction contract of new engineering contract in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 29-40. ISSN 1751-4304
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193
Wubet, W A; Burrow, M and Ghataora, G (2023) Risks affecting the performance of Ethiopian domestic road construction contractors. International Journal of Construction Management, 23(4), pp. 639-647. ISSN 1562-3599
Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599
Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.
Zhang, Y (2012) An investigation on cooperative behaviors in the Chinese construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, Y (2018) An investigation of trust between parties in construction claims using reciprocity theory of social exchange. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, Y; Chen, Y; Wang, Y and Li, H (2021) Dual-attribution model of trust development between contracting parties in construction projects: Psychological perspective. Journal of Construction Engineering and Management, 147(11): 04021161, ISSN 0733-9364
Zhang, Y; Wang, Y and Yao, H (2022) How does the embeddedness of relational behaviours in contractual relations influence inter-organisational trust in construction projects? Engineering, Construction and Architectural Management, 29(1), pp. 222-244. ISSN 0969-9988
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, L and Cheung, S O (2022) Equity gap in construction contracting: Identification and ramifications. Engineering, Construction and Architectural Management, 29(1), pp. 262-286. ISSN 0969-9988
Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.
Zuppa, D; Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), pp. 211-236. ISSN 0969-9988
ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175