Items with Index Term: tunnel

Number of items: 203.

Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.

Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.

Adams, C D (1995) Procurement of microtunnelling projects. PhD thesis, University of Manchester, UK.

Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Bataineh, M; Abourizk, S and Parkis, H (2013) Using simulation to plan tunnel construction. Journal of Construction Engineering and Management, 139(5), pp. 564-571. ISSN 0733-9364

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Alarcón, L F; Rodríguez, A and Mourgues, C (2012) Impact of machine-failure costs on equipment replacement policies: Tunneling company case study. Journal of Construction Engineering and Management, 138(6), pp. 767-774. ISSN 0733-9364

Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364

An, J; Luo, Q; Wang, Z; Pan, S; Qin, H and Yan, D (2026) An integrated resilience-based failure risk assessment method of highway tunnel operation and maintenance systems for fire accidents. Journal of Construction Engineering and Management, 152(4): 04026013, ISSN 0733-9364

Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.

Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.

Babrauskas, V; Lucas, D; Eisenberg, D; Singla, V; Dedeo, M and Blum, A (2012) Flame retardants in building insulation: A case for re-evaluating building codes. Building Research & Information, 40(6), pp. 738-755. ISSN 0961-3218

Bashat, I M; Gab-Allah, A A and Amer, M I (1995) Construction of ameria caisson in Egypt. Journal of Construction Engineering and Management, 121(1), pp. 13-19. ISSN 0733-9364

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Bittner, R B and Schmitt, R L (2011) Construction engineering process and knowledge requirements for fostering creative design solutions on infrastructure projects. Journal of Construction Engineering and Management, 137(10): 0000303, ISSN 0733-9364

Caetano, I.; Pinto, D.; Amândio, M.; Silva, J.; Sanhudo, L.; Azenha, M.; El Sibaii, M.; Granja, J.; Patrício, H.; Ganhão, F. and Poças Martins, J. (2026) Algorithmic workflow for digitising inspection data in railway tunnel maintenance. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364

Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.

Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988

Castelblanco, G; Guevara, J; Mesa, H and Sanchez, A (2021) Semantic network analysis of literature on public-private partnerships. Journal of Construction Engineering and Management, 147(5): 02041, ISSN 0733-9364

Chang, T; Chi, S and Im, S B (2022) Understanding user experience and satisfaction with urban infrastructure through text mining of civil complaint data. Journal of Construction Engineering and Management, 148(8): 04022061, ISSN 0733-9364

Chen, L; Gao, K; Ma, G; Ma, H and Sun, Z (2025) Experimental study on pulse elimination of concrete pumping. Journal of Construction Engineering and Management, 151(1): 04024189, ISSN 0733-9364

Chivatá Cárdenas, Ibsen (2012) Integrating knowledge for managing risk in infrastructure projects: The case of tunnel works. PhD thesis, University of Twente, Netherlands.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364

Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

De La Fuente, A; Casanovas-Rubio, M D M; Pons, O and Armengou, J (2019) Sustainability of column-supported RC slabs: Fiber reinforcement as an alternative. Journal of Construction Engineering and Management, 145(7): 04019042, ISSN 0733-9364

Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304

Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.

Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology, 17(3), pp. 554-571. ISSN 1726-0531

Drews, F (2018) Designing meta-organisations: an empirical study of boundary setting in large infrastructure projects. PhD thesis, University of Manchester, UK.

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364

Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.

Feng, Z; Chao, Q; Tan, C and Yang, Y (2023) Using bargaining model with loss aversion and a risk of breakdown to determine compensation for buyback of early terminating BOT highway projects. Journal of Construction Engineering and Management, 149(5): 04023024, ISSN 0733-9364

Gage, S A and Graham, J M R (2000) Static split duct roof ventilators. Building Research & Information, 28(4), pp. 234-244. ISSN 0961-3218

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Gandy, C A (2024) Social equity in transportation infrastructure management: Quantitative methods for assessing and improving the distribution of public investments. PhD thesis, Carnegie Mellon University, USA.

Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.

Ghiasi, V; Ghiasi, S and Prasad, A (2012) Evaluation of tunnels under squeezing rock condition. Journal of Engineering, Design and Technology, 10(2), pp. 168-179. ISSN 1726-0531

Gkountis, I and Zayed, T (2015) Subway infrastructure condition assessment. Journal of Construction Engineering and Management, 141(12): 04015042, ISSN 0733-9364

Gogate, N G; Shelake, A G and Band, P (2024) Selection of most significant risk factors for Indian tunnel projects: An integrated fuzzy-based MCDM approach. International Journal of Construction Management, 24(2), pp. 161-176. ISSN 1562-3599

Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364

Harkola, J (1995) Diffusion of construction technology: In a Japanese firm. PhD thesis, Stanford University, USA.

Haynes, W A (2002) An exploration of the nexus of the public and private sectors in the project management organizations for two boston megaprojects: The central artery/tunnel project and the Boston Harbor cleanup. PhD thesis, Northeastern University, USA.

Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X

Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364

Hu, W; Dong, J; Hwang, B G; Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: Two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(8), pp. 2079-2105. ISSN 0969-9988

Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Ioannou, P G (1987) Geologic prediction model for tunneling. Journal of Construction Engineering and Management, 113(4), pp. 569-590. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364

Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jenny, R J (1983) Compressed air use in soft ground tunneling. Journal of Construction Engineering and Management, 109(2), pp. 206-213. ISSN 0733-9364

Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599

Kakoto, T and Skibniewski, M (1991) Engineering decision support of automated shield tunneling. Journal of Construction Engineering and Management, 117(4), pp. 674-690. ISSN 0733-9364

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kalowski, J (2008) Community consultation: Lessons from Sydney. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 65-69. ISSN 17514312

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. I: Principles and case study. Journal of Construction Engineering and Management, 133(5), pp. 344-353. ISSN 0733-9364

Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. II: Consideration of uncertainty. Journal of Construction Engineering and Management, 133(5), pp. 354-363. ISSN 0733-9364

Keyser, A (2012) Funding model for bulk raw water infrastructure in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 55-64. ISSN 17514312

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364

Kitamura, A and Takeuchi, Y (1983) Seikan tunnel. Journal of Construction Engineering and Management, 109(1), pp. 25-38. ISSN 0733-9364

Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364

Koops, L S W (2017) Creating public value: Optimizing cooperation between public and private partners in infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.

Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.

Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029

Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.

Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364

Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364

Li, K Y K and Chan, A T (2004) Management of radon in tunnel drilling. Journal of Construction Engineering and Management, 130(5), pp. 699-707. ISSN 0733-9364

Li, X and Chen, X (2012) Using grouting of shield tunneling to reduce settlements of overlying tunnels: Case study in Shenzhen metro construction. Journal of Construction Engineering and Management, 138(4), pp. 574-584. ISSN 0733-9364

Liang, R; Zhang, J; Wu, C; Sheng, Z and Wang, X (2019) Joint-venture contractor selection using competitive and collaborative criteria with uncertainty. Journal of Construction Engineering and Management, 145(2): 04018123, ISSN 0733-9364

Lingard, H; Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(6), pp. 886-906. ISSN 0969-9988

Liu, J; Li, J; Guo, D; Cui, Q; Yang, L and Wu, H (2025) Reliability evaluation of a shield tunnel waterproofing system in the life cycle stage based on a combination weighting method and cloud model. Journal of Construction Engineering and Management, 151(6): 04025068, ISSN 0733-9364

Liu, Y (2021) From best practices to next practices: project-based learning in the development of large infrastructure. PhD thesis, Delft University of Technology, Netherlands.

Liu, Y; Amini-Abyaneh, A; Hertogh, M; Houwing, E J and Bakker, H (2021) Collaborate to learn and learn to collaborate: A case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), pp. 809-830. ISSN 0969-9988

Love, P E D; Veli, S; Davis, P; Teo, P and Morrison, J (2017) See the difference in a precast facility: Changing mindsets with an experiential safety program. Journal of Construction Engineering and Management, 143(2): 05016021, ISSN 0733-9364

Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.

Luo, Y; Hu, D; Yao, Q; Wang, J; Chen, X; Li, H and Shi, M (2025) Blasting and sliding parameter optimization for efficient autonomous construction rock debris sliding transportation in an inclined shaft. Journal of Construction Engineering and Management, 151(11): 04025162, ISSN 0733-9364

Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.

Mahamulkar, S; Lad, V H; Patel, K A; Patel, D A and Jha, K N (2022) Development of a framework for selection of a tunnel lining formwork system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364

Malge, A M and Pawar, P M (2021) Wind tunnel and numerical study of multi-storey vertical axis wind turbines with different configurations. Journal of Engineering, Design and Technology, 19(6), pp. 1358-1372. ISSN 1726-0531

Malhotra, M; Sahu, V; Srivastava, A and Misra, A K (2020) Experimental and numerical investigation of the effect of pre-existing utility tunnel on the bearing capacity of shallow footing in sandy soils. Journal of Engineering, Design and Technology, 18(3), pp. 513-529. ISSN 1726-0531

Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364

Meaker, T A (1994) The role of intervention in strategic change. PhD thesis, City, University of London, UK.

Melbourne, R E (1996) Advance base construction by civilian contractors in war zones. PhD thesis, University of Southern California, USA.

Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599

Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.

Merdinger, C J (1949) A history of civil engineering. PhD thesis, University of Oxford, UK.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mohamed, Y (2002) A framework for systematic improvement of construction systems. PhD thesis, University of Alberta, Canada.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Muller, M (2018) Lessons from transforming a South African special-purpose vehicle into a project implementation agency. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 189-196. ISSN 17514304

Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.

Najafi, M (1993) Evaluation of a new microtunneling propulsion system. DEng thesis, Louisiana Tech University, USA.

Ng, M F; Tummala, V M R and Yam, R C M (2003) A risk-based maintenance management model for toll road/tunnel operations. Construction Management and Economics, 21(5), pp. 495-510. ISSN 01446193

Nicholls, R (1992) Construction of grout-impregnated fabric-reinforced pipes. Journal of Construction Engineering and Management, 118(2), pp. 283-302. ISSN 0733-9364

Nichols, S (2021) Opération béton: Constructing concrete in Switzerland. DSc thesis, ETH Zürich, Switzerland.

Noorzai, E; Gharouni Jafari, K and Moslemi Naeni, L (2022) Lessons learned on selecting the best mass housing method based on performance evaluation criteria in Iran. International Journal of Construction Education and Research, 18(2), pp. 123-141. ISSN 1557-8771

Noorzai, E and Golabchi, M (2020) Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height. Journal of Engineering, Design and Technology, 18(4), pp. 883-903. ISSN 1726-0531

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Osei-Kyei, R and Chan, A P C (2018) Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel. Construction Innovation, 18(3), pp. 371-391. ISSN 1471-4175

O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364

Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988

Panella, Fabio (2023) Automating inspection of tunnels with photogrammetry and deep learning. PhD thesis, University College London, UK.

Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X

Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364

Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. PhD thesis, University of Oxford, UK.

Prego, F J; Solla, M; Núñez-Nieto, X and Arias, P (2016) Assessing the applicability of ground-penetrating radar to quality control in tunneling construction. Journal of Construction Engineering and Management, 142(5): 06015006, ISSN 0733-9364

Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation. PhD thesis, Queensland University of Technology, Australia.

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice. PhD thesis, University of Colorado at Boulder, USA.

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.

Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.

Shaofeng, L; Jincai, F; Pinghua, Z and Xiang, L (2018) Stability analysis of two parallel closely spaced tunnels based on convergence-confinement principle. Journal of Construction Engineering and Management, 144(6): 04018041, ISSN 0733-9364

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364

Shin, Y J; Farrokh, E; Jung, J and Kang, H (2025) Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management, 151(6): 04025042, ISSN 0733-9364

Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364

Song, J; Fan, S; Lin, W; Mottet, L; Woodward, H; Davies Wykes, M; Arcucci, R; Xiao, D; Debay, J E; ApSimon, H; Aristodemou, E; Birch, D; Carpentieri, M; Fang, F; Herzog, M; Hunt, G R; Jones, R L; Pain, C; Pavlidis, D; Robins, A G; Short, C A and Linden, P F (2018) Natural ventilation in cities: The implications of fluid mechanics. Building Research & Information, 46(8), pp. 809-828. ISSN 0961-3218

Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.

Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193

Stefańska, A; Sutkowska, M; Krawczyk, J; Kurcjusz, M; Chudzińska, A; Poćwierz, M and Dixit, S (2025) Ccc2023_possibilities of obtaining energy from aerodynamic phenomena occurring in selected housing estates in warsaw, Poland. International Journal of Construction Management, 25(12), pp. 1463-1476. ISSN 1562-3599

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.

Su, Y; Wang, J; Shou, W; Wu, P; Wu, C and Xu, S (2026) Intentions prediction for human–robot collaboration in utility tunnel maintenance. Engineering, Construction and Architectural Management, 33(15), pp. 1-21. ISSN 0969-9988

Sun, Y.; Lin, K.; Wang, J.; Zhu, F.; Wang, L. and Lu, L. (2026) Risk assessment of mountain tunnel entrance collapse based on pso-LSTM surface settlement prediction. Engineering, Construction and Architectural Management, 33(3), pp. 2586-2605. ISSN 0969-9988

Sun, R; Yan, Q; Zhang, C; Qiao, M and Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4): 04025020, ISSN 0733-9364

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Tong, R; Zhao, H; Zhang, N; Li, H; Wang, X and Yang, H (2021) Modified accident causation model for highway construction accidents (acm-hc). Engineering, Construction and Architectural Management, 28(9), pp. 2592-2609. ISSN 0969-9988

Touran, A (1997) Probabilistic model for tunneling project using Markov chain. Journal of Construction Engineering and Management, 123(4), pp. 444-449. ISSN 0733-9364

Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364

Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364

Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364

Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364

Wang, R and Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6): 04025043, ISSN 0733-9364

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Winch, G M (2000) Innovativeness in British and French construction: The evidence from transmanche-link. Construction Management and Economics, 18(7), pp. 807-817. ISSN 01446193

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364

Xie, H (2012) Improving dynamic project control in tunnel construction. PhD thesis, University of Alberta, Canada.

Xie, W; Zhao, T; Wang, H and Tang, J (2017) Construction techniques used to automatically pass standard box girders through special passenger-line tunnels. Journal of Construction Engineering and Management, 143(5): 05016027, ISSN 0733-9364

Xin, Z.; Dong, J.; Zeng, H.; Xiong, Z.; Wang, B.; Yan, J. and Wang, Z. (2026) Key parameters and integrated techniques for mechanized tunnel construction via drilling and blasting method. Journal of Construction Engineering and Management, 152(9): 04026148, ISSN 0733-9364

Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988

Yang, C Y; Xu, M X and Chen, W F (2007) Reliability analysis of shotcrete lining during tunnel construction. Journal of Construction Engineering and Management, 133(12), pp. 975-981. ISSN 0733-9364

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364

Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007

Yin, Y; Wang, J; Zou, B; Zhang, J; Su, Y and Sun, Q (2023) Evaluation of controlled blasting quality for rock-mass tunneling based on multiple indices. Journal of Construction Engineering and Management, 149(1): 04022155, ISSN 0733-9364

You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.

Yu, G; Li, Z; Zeng, R; Jin, Y; Hu, M and Sugumaran, V (2025) Predicting structure performance of urban critical infrastructure: An augmented attention-based LSTM model. Engineering, Construction and Architectural Management, 32(6), pp. 3914-3936. ISSN 0969-9988

Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X

Zetterlund, M; Norberg, T; Ericsson, L O and Rosn, L (2011) Framework for value of information analysis in rock mass characterization for grouting purposes. Journal of Construction Engineering and Management, 137(7), pp. 486-497. ISSN 0733-9364

Zhang, C; Chen, K; Yang, J; Fu, J; Wang, S and Xie, Y (2022) Reuse of discharged soil from slurry shield tunnel construction as synchronous grouting material. Journal of Construction Engineering and Management, 148(2): 04021193, ISSN 0733-9364

Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364

Zhang, W R; Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(4), pp. 399-409. ISSN 0969-9988

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, X; Wang, M; Zhou, B and Wang, X (2018) Influence of factors on collapse risk of loess tunnel: A multi-index assessment model. Journal of Engineering, Design and Technology, 16(5), pp. 734-749. ISSN 1726-0531

Zhang, X; Zhang, Z; Sun, W; Hu, J; Zhang, L and Zhu, W (2025) The mechanical deformation characteristics of the internal structure of large diameter shield tunnel in different construction stages. Engineering, Construction and Architectural Management, 32(4), pp. 2190-2209. ISSN 0969-9988

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhang, X Q; Kumaraswamy, M M; Zheng, W and Palaneeswaran, E (2002) Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong. Journal of Construction Engineering and Management, 128(2), pp. 155-163. ISSN 0733-9364

Zhang, Y; Liu, L; Song, Z; Zhao, Y and He, S (2024) Enhancing tunnel boring machine penetration rate predictions through particle swarm optimization and elman neural networks. Journal of Construction Engineering and Management, 150(9): 04024116, ISSN 0733-9364

Zhang, Y; Ren, X; Zhang, J and Ma, Z (2024) A method for deformation detection and reconstruction of shield tunnel based on point cloud. Journal of Construction Engineering and Management, 150(3): 04024006, ISSN 0733-9364

Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364

Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599

Zhou, L; Wang, C; Niu, P; Zhang, H; Zhang, N; Xie, Q; Wang, J; Zhang, X and Liu, J (2025) A morphology-euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase. Engineering, Construction and Architectural Management, 32(10), pp. 6509-6535. ISSN 0969-9988

Zhou, B; Xue, Y; Li, M; Li, Z; Zhang, X and Tao, Y (2018) Longitudinal jet ventilation calculation and application of long highway tunnel. Journal of Engineering, Design and Technology, 16(2), pp. 256-269. ISSN 1726-0531

Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sun Aug 23 03:58:22 2026 UTC.