Items with Index Term: cost control
Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599
Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364
Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management, 33(4), pp. 3308-3331. ISSN 0969-9988
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Tabtabai, H (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(1), pp. 19-30. ISSN 01446193
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Allouche, E N; Ariaratnam, S T and MacLeod, C W (2003) Software for planning and cost control in directional drilling projects. Journal of Construction Engineering and Management, 129(4), pp. 446-453. ISSN 0733-9364
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Arshad, H; Qasim, M; Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), pp. 19-34. ISSN 1823-6499
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Batarseh, Sana (2025) An approach to adjusting design build for the modern construction industry. PhD thesis, Arizona State University, USA.
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.
Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193
Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599
Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Cheng, E W L; Li, H; Shen, L Y and Fong, P S W (2002) Ranking of construction information for various functions of the general contractors: A preliminary study. Journal of Construction Research, 3(1), pp. 181-191. ISSN 1609-9451
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X
Conejos, S; Ubando, A and Lin Chew, M Y (2022) Design for maintainability tool for nano-façade coating applications on high-rise façades in the tropics. Built Environment Project and Asset Management, 12(1), pp. 70-95. ISSN 2044-124X
Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.
Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Ebekozien, A; Aigbavboa, C; Samsurijan, M S and Thwala, W D (2025) Developing a framework for mitigating pilfering: a case study of selected Nigeria's construction sites via soft system methodology. International Journal of Construction Management, 25(6), pp. 672-681. ISSN 1562-3599
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
El-Khatib, A and Salhieh, S M (2026) Interconnected success factors for offsite modular construction in developing economies: A fuzzy-DEMATEL approach. International Journal of Construction Management, 26(3), pp. 445-469. ISSN 1562-3599
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193
Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364
Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531
Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.
Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.
Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364
Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.
Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Hwang, B G; Shan, M; Zhu, L and Lim, W C (2020) Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), pp. 437-449. ISSN 1562-3599
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Jaafari, A and Mateffy, V K (1986) Games people play with cost control in Australia. Journal of Construction Engineering and Management, 112(4), pp. 566-581. ISSN 0733-9364
Jackson, G (2003) Contingency for cost control in project management: A case study. Construction Economics and Building, 3(1), pp. 1-12. ISSN 2204-9029
Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei darussalam. Built Environment Project and Asset Management, 11(5), pp. 870-887. ISSN 2044-124X
Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364
Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364
Kaiser, M J (2006) Offshore decommissioning cost estimation in the gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp. 249-258. ISSN 0733-9364
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193
Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364
Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.
Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988
Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364
Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364
Liu, L and Zhu, K (2007) Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management, 133(1), pp. 91-95. ISSN 0733-9364
Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988
Liu, Y; Chang, R D; Zuo, J; Xiong, F and Dong, N (2023) What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), pp. 805-832. ISSN 0969-9988
Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364
Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X
Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.
Luo, L; Wu, X; Hong, J and Wu, G (2022) Fuzzy cognitive map-enabled approach for investigating the relationship between influencing factors and prefabricated building cost considering dynamic interactions. Journal of Construction Engineering and Management, 148(9): 04022081, ISSN 0733-9364
Luu, T V; Kim, S Y; Cao, H L and Park, Y M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), pp. 373-386. ISSN 1466433X
Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Macdonald, R N (2013) A strategy for materials price risk mitigation. PhD thesis, University of Alabama, USA.
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364
Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X
Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Miners, T W (1969) Communications and cost control in the building industry with special reference to the role of the quantity surveyor. Dr thesis, University of Pretoria, South Africa.
Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Moselhi, O; Li, J and Alkass, S (2004) Web-based integrated project control system. Construction Management and Economics, 22(1), pp. 35-46. ISSN 01446193
Moshtaghian, F; Golabchi, M and Noorzai, E (2020) A framework to dynamic identification of project risks. Smart and Sustainable Built Environment, 9(4), pp. 375-393. ISSN 2046-6099
Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nguyen Van, T; Nguyen Hieu, T and De Troyer, F (2016) Managing pile foundation and land cost for high-rise buildings in the early design stages. Architectural Engineering and Design Management, 12(3), pp. 151-169. ISSN 1745-2007
Oduyemi, O I (2015) Life cycle costing methodology for sustainable commerical office buildings. PhD thesis, University of Derby, UK.
Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X
Olugboyega, O; Edwards, D J; Windapo, A O; Omopariola, E D and Martek, I (2021) Development of a conceptual model for evaluating the success of BIM-based construction projects. Smart and Sustainable Built Environment, 10(4), pp. 681-701. ISSN 2046-6099
Omotayo, T; Olanipekun, A; Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(4), pp. 509-528. ISSN 2044-124X
Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.
Oyegoke, A S; Powell, R; Ajayi, S; Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(2), pp. 141-160. ISSN 1366-4387
Oyenubi, A. and Oyeyipo, O. O. (2026) Cost-carbon trade-offs in green infrastructure: A case of Nigeria. Journal of Engineering, Design and Technology, 24(3), pp. 805-830. ISSN 1726-0531
Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.
Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599
Peer, S (1987) Principles of an integrated construction company mis with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(3), pp. 199-209. ISSN 01446193
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364
Piroozfar, P A E and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(1), pp. 65-81. ISSN 1745-2007
Poh, P S H and Malcolm W. Horner, R (1995) Cost-significant modelling: Its potential for use in south-east Asia. Engineering, Construction and Architectural Management, 2(2), pp. 121-139. ISSN 0969-9988
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.
Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364
Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.
Roberts, J (1987) The business roundtable construction industry cost effectiveness task force. Construction Management and Economics, 5(2), pp. 95-100. ISSN 01446193
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193
Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. PhD thesis, University of Salford, UK.
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988
Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.
Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364
Short, C A; Barrett, P; Dye, A and Sutrisna, M (2007) Impacts of value engineering on five capital arts projects. Building Research & Information, 35(3), pp. 287-315. ISSN 0961-3218
Sims, B L (1999) Program assessment of the mechanical contractors association of America's Construction Continuing Education Project Management Course. PhD thesis, Purdue University, USA.
Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029
Smallwood, J J and Cumberlege, R (2016) Construction management and quantity surveying students perceptions towards production analysis and measuring quantities for construction purposes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Sözen, Z and Kucediluk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(2), pp. 215-220. ISSN 01446193
Tansey, P; Spillane, J P and Meng, X (2014) Linking response strategies adopted by construction firms during the 2007 economic recession to Porter's generic strategies. Construction Management and Economics, 32(7-8), pp. 705-724. ISSN 01446193
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364
Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364
Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587
Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.
Tripathi, K K and Jha, K N (2019) An empirical study on factors leading to the success of construction organizations in India. International Journal of Construction Management, 19(3), pp. 222-239. ISSN 1562-3599
Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X
Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099
Wang, G (1998) Study of construction project cost control information system. Unpublished PhD thesis, Tongji University, China.
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Whitely, Owen (2025) Strategies for reducing cost overruns on government-funded infrastructure projects in Jamaica. DBA thesis, Walden University, USA.
Winch, G and Campagnac, E (1995) The organization of building projects: An Anglo/French comparison. Construction Management and Economics, 13(1), pp. 3-14. ISSN 01446193
Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.
Xiao, L.; Fan, P.; Shen, G. Q.; Ma, G.; Jia, J. and Zheng, X. (2026) Leveraging deep reinforcement learning to facilitate the transition from knowledge diversity to knowledge creation in construction project teams. Journal of Construction Engineering and Management, 152(10): 04026175, ISSN 0733-9364
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Yap, J B H and Cheah, S Y (2020) Key challenges faced by Chinese contractors in Malaysian construction industry: Empirical study. Journal of Engineering, Design and Technology, 18(3), pp. 705-726. ISSN 1726-0531
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
Up a level