Items with Index Term: movement
Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.
Abadi, M; Huang, J; Yeow, J; Mohandes, S R and Zhang, L (2025) Towards a complex push-to-pull dynamics in circular construction supply chains: A systematic literature review. Engineering, Construction and Architectural Management, 32(2), pp. 912-938. ISSN 0969-9988
Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Ahankoob, A; Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(4), pp. 588-599. ISSN 1562-3599
Ahmad, S; Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(3), pp. 457-470. ISSN 2044-124X
Ahmadi, S Y; Lather, J I; Wittich, C E and Madson, K (2025) Current and future trends for resilient inland waterway transportation systems during flood disruptions. Journal of Construction Engineering and Management, 151(6): 04025046, ISSN 0733-9364
Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988
Akanmu, A; Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: Analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(9), pp. 2577-2590. ISSN 0969-9988
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193
Al-Khiami, M. I.; Lindhard, S. M. and Wandahl, S. (2026) Cross-cultural analysis of movement patterns and work-related musculoskeletal disorders in Danish and Kuwaiti construction: Implications for targeted exoskeleton design. International Journal of Construction Management, 26(8), pp. 1690-1706. ISSN 1562-3599
Al-Khiami, M. I. and Lindhard, Sø M. (2026) On-site evaluation of back-support exoskeleton effectiveness in construction: A multiple case study of physical performance, ergonomic comfort, and user acceptance among masonry workers. Journal of Construction Engineering and Management, 152(10): 04026167, ISSN 0733-9364
Al-Wareh, M (1979) Investigation of the design procedures for buildings of quality in modern architecture, with notes on the relevant contemporary situation in Syria. PhD thesis, University of Sheffield, UK.
Ali, F M M and Jones, K (2013) Negotiating community resilience in the city in a time of political change and deficit reduction. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 9-22. ISSN 1759-5916
Ali, H M and Ruddock, L (2000) The impact of portfolio strategy onthe 'style' performance of UK property companies. Journal of Financial Management of Property and Construction, 5(3), pp. 123-133. ISSN 1366-4387
Aliero, B A (1994) Utilisation of environmental impact assessment technique in the assessment of impact of human interference on natural ecology of estuaries: a case study of Mersey Estuary. PhD thesis, University of Salford, UK.
Aljawder, Maan Mubarak Ali Ahmed Mubarak (2014) A contingent approach to project management and organisation: An empirical analysis. PhD thesis, University of Sydney, Australia.
Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.
Alshahrani, A Y (2020) Interpretive investigation into the implementation of sustainable business models within Saudi housing construction industry. PhD thesis, University of Salford, UK.
Alvanchi, A; Baniassadi, F; Shahsavari, M and Kashani, H (2021) Improving materials logistics plan in road construction projects using discrete event simulation. Engineering, Construction and Architectural Management, 28(10), pp. 3144-3163. ISSN 0969-9988
Alzahrani, A (2017) The social value of urban design in mixed use developments in London. PhD thesis, University of Nottingham, UK.
Alzahrani, Sami Salem (2015) Developing a project management maturity model to initiate sustainable project performance and modernisation in the Kingdom of Saudi Arabia. PhD thesis, University of Adelaide, Australia.
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
Appell, H (2020) Workers of Europe unite!? Explaining the form of European labor organization: The construction industry. PhD thesis, Freie Universitaet Berlin, Germany.
Apu, N and Das, U (2020) Tectonics and earthquake potential of Bangladesh: A review. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 295-307. ISSN 1759-5916
Arif, M; Bendi, D; Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: An exploratory study. Construction Innovation, 12(2), pp. 133-155. ISSN 1471-4175
Aroke, O M (2022) Measuring attention, working memory and visual perception to reduce the risk of injuries in the construction industry. PhD thesis, George Mason University, USA.
Arslan, M; Cruz, C; Roxin, A M and Ginhac, D (2018) Spatio-temporal analysis of trajectories for safer construction sites. Smart and Sustainable Built Environment, 7(1), pp. 80-100. ISSN 2046-6099
Asefi, Maziar (2007) Transformable architectural structures: Background, development, evaluation and design. PhD thesis, University of Liverpool, UK.
Askarizad, R; Dadashpour, A; Faghirnavaz, J; He, J and Safari, H (2023) Organizing worn-out neighborhoods with the new-urbanism approach using mixed methods in rudsar, Northern Iran. Smart and Sustainable Built Environment, 12(1), pp. 128-155. ISSN 2046-6099
Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364
Austrin, T B (1978) Industrial relations in the construction industry: Some sociological considerations on wage contracts and trade unionism (1919-1973). PhD thesis, University of Bristol, UK.
Azman, M A; Hon, C K H; Xia, B; Lee, B L and Skitmore, M (2021) Product diversification and large construction firm productivity: The effect of institutional environments in Malaysia. Engineering, Construction and Architectural Management, 28(4), pp. 994-1013. ISSN 0969-9988
Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364
Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988
Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.
Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304
Banks, N A (2006) “The last bastion of discrimination”: The New York city building trades and the struggle over affirmative action, 1961–1976. PhD thesis, Columbia University, USA.
Bateman, G L (2021) A holistic model of emergency evacuations in large, complex, public occupancy buildings. PhD thesis, Imperial College London, UK.
Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599
Beaney, W D (2006) An examination of sectoral mobility in the UK labour force. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Beaney, W D (2007) A principal components analysis of labour sectoral transfers. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Behrens, M (2002) Learning from the enemy? Internal union restructuring and the imitation of management strategies. PhD thesis, Cornell University, USA.
Belayutham, S and Ibrahim, C K I C (2019) Barriers and strategies for better safety practices: The case of construction SMEs in Malaysia. Construction Economics and Building, 19(1), pp. 20-39. ISSN 2204-9029
Besiktepe, D; Bayhan, H G and Valdes-Vasquez, R (2025) Diversity, equity, and inclusion practices among select contractors: Insights from social media analysis and interviews. International Journal of Construction Education and Research, 21(3), pp. 382-407. ISSN 1557-8771
Bhattacharya, A; Metcalf, A R; Nafchi, A M and Mousavi, E S (2021) Particle dispersion in a cleanroom–effects of pressurization, door opening and traffic flow. Building Research & Information, 49(3), pp. 294-307. ISSN 0961-3218
Bijleveld, F R; Miller, S R and Dorée, A G (2015) Making operational strategies of asphalt teams explicit to reduce process variability. Journal of Construction Engineering and Management, 141(5): 04015002, ISSN 0733-9364
Blay, K; Agyekum, K and Opoku, A (2019) Actions, attitudes and beliefs of occupants in managing dampness in buildings. International Journal of Building Pathology and Adaptation, 37(1), pp. 42-53. ISSN 23984708
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Boussabaine, A H and Elhag, T (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(6), pp. 745-755. ISSN 01446193
Bowers, H J (2000) Public policy: Affirmative action, social equity, and employment patterns in Michigan's construction industry, 1966-1997. DPA thesis, Western Michigan University, USA.
Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.
Brett, R; Dainty, A R J and Fernie, S (2024) Direct employment of construction workers: Skill and productivity in site practice. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Bulsara, M A; Hingu, A D and Vaghasiya, P S (2016) Energy loss due to unbalance in rotor–shaft system. Journal of Engineering, Design and Technology, 14(2), pp. 277-285.
Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771
Cai, J (2020) Data-driven approach to holistic situational awareness in construction site safety management. PhD thesis, Purdue University, USA.
Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364
Cardellino, P; Araneda, C and García Alvarado, R (2018) Interventions in the classroom–the influence of spatial organisation on educational interaction in Uruguay. Architectural Engineering and Design Management, 14(6), pp. 413-426. ISSN 1745-2007
Carlsson, V (2017) SME contractors on the stage for energy renovations? A dramaturgical perspective on SME contractors’ roles and interactions with house owners. PhD thesis, Chalmers University of Technology, Sweden.
Carswell, A T and Smith, S (2009) The greening of the multifamily residential sector. Journal of Engineering, Design and Technology, 7(1), pp. 65-80. ISSN 1726-0531
Chase, V M (2022) Damming sustainability: How social and environmental networks influence the construction and management of large dams in the Amazon basin. PhD thesis, University of Massachusetts Boston, USA.
Chawathe, T; Devkar, G and Yesudasan, L (2024) Investigating the application of lean tools in the design of healthcare facilities. Architectural Engineering and Design Management, 20(4), pp. 868-890. ISSN 1745-2007
Chen, L; Gao, K; Ma, G; Ma, H and Sun, Z (2025) Experimental study on pulse elimination of concrete pumping. Journal of Construction Engineering and Management, 151(1): 04024189, ISSN 0733-9364
Chen, X; Chang-Richards, A Y; Yiu, T W; Ling, F Y Y; Pelosi, A and Yang, N (2024) A multivariate regression analysis of barriers to digital technologies adoption in the construction industry. Engineering, Construction and Architectural Management, 31(11), pp. 4281-4307. ISSN 0969-9988
Cheung, Esther (2009) Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. PhD thesis, Queensland University of Technology, Australia.
Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Chi, J D (2022) Cross-industry adoption and sustainability practices in facility management. PhD thesis, University of Maryland, USA.
Chiang, Y H; Choy, L H T and Li, J (2012) Public expenditure and property cycle: The case in Shanghai. Journal of Construction in Developing Countries, 17(1), pp. 87-101. ISSN 1823-6499
Chinazzo, G. and Wang, N. (2026) How buildings shape occupant movement: A systematic review and framework. Buildings & Cities, 7(1), pp. 504-522. ISSN 2632-6655
Chinowsky, P S; Molenaar, K and Bastias, A (2007) Measuring achievement of learning organizations in construction. Engineering, Construction and Architectural Management, 14(3), pp. 215-227. ISSN 0969-9988
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364
Clawson, Bobie Sue Anna (2024) The influence of walking surface types on gait parameters, kinematics and worker perceptions in relation to slips, trips, and fall incidents in the construction industry. PhD thesis, Indiana University of Pennsylvania, USA.
Congress, S S C (2018) Novel infrastructure monitoring using multifaceted unmanned aerial vehicle systems: close range photogrammetry (UAV-CRP) data analysis. PhD thesis, University of Texas at Arlington, USA.
Connelly, J (2001) Developing guidelines for adopting an environmental orientation for construction and related organisations within the supply chain in the construction industry. PhD thesis, Heriot-Watt University, UK.
Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Creagh, R; McGann, S; Jancey, J; Blackford, K; Tye, M; Tindall, R and Sal Moslehian, A (2025) Workplace circulation design and movement: a case study of three Australian campus buildings. Architectural Engineering and Design Management, 21(4), pp. 665-680. ISSN 1745-2007
Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Cruywagen, J H H (2015) Towards the establishment of a relevant tender price index for the South African building industry. PhD thesis, University of Pretoria, South Africa.
D'Orazio, M; Bernardini, G and Di Giuseppe, E (2024) Improving sustainable management of university buildings based on occupancy data. Journal of Construction Engineering and Management, 150(1): 04023154, ISSN 0733-9364
Daoud, R M (2000) An evaluation of the role of the Palestine economic council for development and reconstruction (PECDAR) in palestine's infrastructure development since the 1993 Oslo accords. PhD thesis, Walden University, USA.
Darragh, A J R (2001) Patterns of injury among residential construction workers before and after a safety intervention program, 1994-1998. PhD thesis, Colorado State University, USA.
De Carli, B (2016) Micro-resilience and justice: Co-producing narratives of change. Building Research & Information, 44(7), pp. 775-788. ISSN 0961-3218
Deakin, M (2000) The development of property asset management: Towards a pro-investment form. Journal of Financial Management of Property and Construction, 5(1-2), pp. 15-31. ISSN 1366-4387
Denowitz, R M (1982) Industries and environments: A comparative study of housebuilding in two suburban areas. PhD thesis, University of Chicago, USA.
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Dey, A; Islam, S T; Paul, B; Bandyopadhyay, S; Sengupta, P; Sanyal, N; Mondal, K P; Jubaer, A and Mitra, R (2022) Waterlogging mitigation and safe water supply: Lessons learnt from low-lying areas of basirhat municipality, India. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 386-403. ISSN 1759-5916
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Dhawan, K; Tookey, J; Fredriksson, A and Tetik, M (2026) Decarbonising construction logistics: The role of supplier-led distribution and integrated warehousing. Construction Innovation, 26(9), pp. 21-48. ISSN 1471-4175
Diederichsen, Francisco Toledo Barros (2017) Professional education of construction workers: The construction site and social emancipation. PhD thesis, Universidade de São Paulo, Brazil.
Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Dowse, G (2003) Qualitative residential market forecasts: The Auckland experience. Journal of Financial Management of Property and Construction, 8(3), pp. 193-201. ISSN 1366-4387
Duan, P; Zhou, J and Goh, Y M (2023) Safety risk diagnosis based on motion trajectory for construction workers: An integrated approach. Journal of Construction Engineering and Management, 149(11): 04023116, ISSN 0733-9364
Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.
Duarte, Carolina Mendonça de Moraes (2022) Innovation management in construction and development companies. PhD thesis, Universidade Estadual de Campinas, Brazil.
Duckles, B M (2009) The green building industry in California: From ideals to buildings. PhD thesis, University of Arizona, USA.
Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007
Egbu, C O (1999) Mechanisms for exploiting construction innovations to gain competitive advantage. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Ejidike, C C; Mewomo, M C and Anugwo, I C (2024) Assessment of construction professionals' awareness of the smart building concepts in the Nigerian construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1491-1504. ISSN 1726-0531
El-Deeb, K (2024) Energy performance assessment of venetian blinds in south-oriented residential spaces in hot arid desert climates. Construction Innovation, 24(6), pp. 1460-1482. ISSN 1471-4175
El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193
El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elder, John (2007) The history of the master builders association of NSW: The first hundred years. PhD thesis, University of Sydney, Australia.
Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.
Embry, E (2023) Building change: A multi-level analysis of resilience through sustainability, health, and entrepreneurship in the built environment. PhD thesis, University of Colorado at Boulder, USA.
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Ertemir, D Y and Edis, E (2023) Sustaining modern heritage buildings: Visual defect categorisation guides for the general condition survey of rendered-painted facades. International Journal of Building Pathology and Adaptation, 41(3), pp. 606-624. ISSN 23984708
Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.
Faghih, S A M and Kashani, H (2018) Forecasting construction material prices using vector error correction model. Journal of Construction Engineering and Management, 144(8): 04018075, ISSN 0733-9364
Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007
Farajmandi, M; Ali, M; Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(9), pp. 2615-2641. ISSN 0969-9988
Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.
Faruk, M; Ormerod, M; Newton, R and MacLennan, H (2010) A toolkit to measure attributes that support or hinder pedestrian movement on pedestrian crossings. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.
Fernie, S; Leiringer, R and Thorpe, T (2006) Change in construction: A critical perspective. Building Research & Information, 34(2), pp. 91-103. ISSN 0961-3218
Fernie, S and Thorpe, A (2007) Exploring change in construction: Supply chain management. Engineering, Construction and Architectural Management, 14(4), pp. 319-333. ISSN 0969-9988
Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.
Fisher, N (1990) The use of structured data analysis as a construction management research tool: 1. The technique. Construction Management and Economics, 8(4), pp. 341-362. ISSN 01446193
Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(6), pp. 493-500. ISSN 01446193
Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.
Gasparro, K E (2019) Crowdfunding our cities: Three perspectives on stakeholder dynamics during innovative infrastructure delivery. PhD thesis, Stanford University, USA.
Ge, X J and Lam, K-C (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(2), pp. 57-70. ISSN 2204-9029
Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: A case of Sri Lanka. Construction Management and Economics, 39(8), pp. 704-721. ISSN 01446193
Gharehbaghi, K; Farnes, K and Hurst, N (2025) A novel method of refining the performance of rail systems: An evaluation of system dynamics using discrete event simulation. Smart and Sustainable Built Environment, 14(2), pp. 536-556. ISSN 2046-6099
Giles, C; Irizarry, J and Gheisari, M (2010) Does gender make a difference? An analysis of motivational factors in sustainability practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive. PhD thesis, University of Edinburgh, UK.
Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099
Graversen, H (2022) Interchanges: Construction of the U.S. Interstate highway system and artistic practice, 1956-1984. PhD thesis, University of Chicago, USA.
Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193
Green, S D (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5(4), pp. 376-386. ISSN 0969-9988
Greenberg, D G (1978) Fixing things: A phenomenological study of ten persons. PhD thesis, Union Institute and University, USA.
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Griffey, T (2011) Black power's labor politics: The united construction workers association and Title VII law in the 1970s. PhD thesis, University of Washington, USA.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Gruneberg, S (2010) Does the Bon curve apply to infrastructure markets? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Gummerson, R J; Hall, C and Hoff, W D (1980) Capillary water transport in masonry structures: Building construction applications of Darcy’s law. Construction Papers, 1(1), pp. 17-27. ISSN 0144-8587
Gunning, J G and McCallion, E M (2007) TQM in large Northern Ireland contracting organisations. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Guo, J; Xiang, P; Liu, Q and Luo, Y (2024) Transportation infrastructure network optimisation based on computer simulation using Sichuan province, China as an example. Engineering, Construction and Architectural Management, 31(7), pp. 2740-2769. ISSN 0969-9988
Gupta, R; Gregg, M; Manu, S; Vaidya, P and Dixit, M (2019) Customized performance evaluation approach for Indian green buildings. Building Research & Information, 47(1), pp. 56-74. ISSN 0961-3218
Guy, G B and Kibert, C J (1998) Developing indicators of sustainability: US experience. Building Research & Information, 26(1), pp. 39-45. ISSN 0961-3218
Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364
Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.
Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.
Hadiwattege, C; Senaratne, S; Sandanayake, Y and Fernando, N G (2018) Academic research in emerging knowledge-based economies: The case of Sri Lankan construction industry. Built Environment Project and Asset Management, 8(4), pp. 415-428. ISSN 2044-124X
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.
Hamidane, H; Ababneh, A; Messabhia, A and Xi, Y (2020) Modeling of chloride penetration in concrete structures under freeze-thaw cycles. International Journal of Building Pathology and Adaptation, 38(1), pp. 127-147. ISSN 23984708
Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364
Han, Y.; Shen, L. and Yang, J. (2026) Minor adjustments lead to significant improvements: Influence mechanism of construction safety sign information transmission efficiency in the Mandarin context based on information coding processing. Engineering, Construction and Architectural Management, ISSN 0969-9988
Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.
Han, Y; Yan, X and Piroozfar, P (2023) An overall review of research on prefabricated construction supply chain management. Engineering, Construction and Architectural Management, 30(10), pp. 5160-5195. ISSN 0969-9988
Harison, J C (1993) Laboring class, dangerous class, insurgent class: The Paris building trades, 1830-1871. PhD thesis, University of Iowa, USA.
Hasanzadeh, S; Esmaeili, B and Dodd, M D (2017) Impact of construction workers' hazard identification skills on their visual attention. Journal of Construction Engineering and Management, 143(10): 04017070, ISSN 0733-9364
Hasanzadeh, S; Esmaeili, B and Dodd, M D (2018) Examining the relationship between construction workers' visual attention and situation awareness under fall and tripping hazard conditions: Using mobile eye tracking. Journal of Construction Engineering and Management, 144(7): 04018060, ISSN 0733-9364
Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531
Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387
Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988
He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364
Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387
Henson, L L (1980) Use of the Delphi technique: University community involvement in the creation of a library building program at Florida Institute of Technology. PhD thesis, Florida State University, USA.
Hide, G (2010) Producing a programme under the NEC form of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 59-64. ISSN 17514312
Hindman, D P; Timko, P D and Nussbaum, M A (2013) Mechanical response of unbraced wood composite I-joist to walking loads. Journal of Construction Engineering and Management, 139(11): 4013023, ISSN 0733-9364
Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364
Ho, C M F (2011) Ethics management for the construction industry: A review of ethical decision-making literature. Engineering, Construction and Architectural Management, 18(5), pp. 516-537. ISSN 0969-9988
Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.
Hu, W; Dong, J; Hwang, B G; Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: Two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(8), pp. 2079-2105. ISSN 0969-9988
Hua, Y; He, J; Gong, J and Zhao, J (2020) Hazardous area risk-based evacuation simulation and analysis of building construction sites. Journal of Construction Engineering and Management, 146(5): 04020047, ISSN 0733-9364
Hwang, J.; Bagh, S. and Han, K. (2026) Toward automated SLAM-to-BIM for digital twin applications: BIM-assisted 360-degree camera-based visual SLAM using reference point-based bundle adjustment. Journal of Construction Engineering and Management, 152(10): 04026161, ISSN 0733-9364
Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2015) Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Hyari, K H; El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), pp. 97-113. ISSN 1823-6499
Hyde, R A (1999) Educating engineers for environmentally sensitive practice. PhD thesis, University of Toronto, Canada.
Ibem, E O; Aduwo, E B; Afolabi, A O; Oluwunmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) procurement adoption and users’ experience in the Nigerian construction sector. International Journal of Construction Education and Research, 17(3), pp. 258-276. ISSN 1557-8771
Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029
Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364
Irizarry, J (2011) Application of methods analysis to steel erection tasks: Identification of factors affecting labor performance. International Journal of Construction Management, 11(4), pp. 31-47. ISSN 1562-3599
Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Jayesh, M P (2020) Inter-state migration for employment in India: a study on construction workers in Kerala. PhD thesis, Indian Institute of Technology Delhi, India.
Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193
Jervis, E K (2015) Lowering CO2 emissions: a framework for overcoming institutional pressures and diffusing low carbon strategy throughout the construction supply chain. PhD thesis, University of Liverpool, UK.
Ji, Guohua (2007) Building under the planned economy: A history of China's architecture and construction 1949-1965. DBA thesis, ETH Zürich, Switzerland.
Jiang, H (2012) The development of a scenario independent method for evaluating the evacuation complexity of a building. PhD thesis, University of Greenwich, UK.
Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364
Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.
Jimoh, R and van Wyk, J (2013) Ideological leaning and praxis of housing co-operatives in South Africa: Matters arising. Construction Economics and Building, 13(2), pp. 54-66. ISSN 2204-9029
Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.
Jin, R; Zou, P X; Li, B; Piroozfar, P and Painting, N (2019) Comparisons of students' perceptions on BIM practice among Australia, China and UK. Engineering, Construction and Architectural Management, 26(9), pp. 1899-1923. ISSN 0969-9988
Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.
Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kalyviotis, N (2022) Balancing economic, social and environmental value in transport infrastructure business models. PhD thesis, University of Birmingham, UK.
Kashiwagi, D T and Mayo, R E (2001) Best value procurement in construction using artificial intelligence. Journal of Construction Procurement, 7(2), pp. 42-59. ISSN 1358-9180
Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology, 17(6), pp. 1250-1265. ISSN 1726-0531
Kazin, M (1983) Barons of labor: The san francisco building trades, 1896-1922. PhD thesis, Stanford University, USA.
Keath, M (1983) The development of school construction systems in Hertfordshire 1946-64. PhD thesis, University of Greenwich, UK.
Key, M A (2016) Regulating sustainable development: An enabling model for consistent collaboration between planning and building control services in England. DProf thesis, University of Salford, UK.
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Khanzadi, M; Nasirzadeh, F; Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(1), pp. 2-19. ISSN 1471-4175
Kibert, C J and Coble, R J (1995) Integrating safety and environmental regulation of construction industry. Journal of Construction Engineering and Management, 121(1), pp. 95-99. ISSN 0733-9364
Kilby, A and McCabe, S (2008) Human resource management (HRM) in construction: An exploration of issues and practice. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kim, S; Makhmalbaf, A and Shahandashti, M (2025) Forecasting the architecture billings index (abi) using machine learning predictive models. Engineering, Construction and Architectural Management, 32(8), pp. 5371-5393. ISSN 0969-9988
Kim, J (2007) Health insurance and workers' retention in the construction industry. PhD thesis, University of Utah, USA.
Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kohler, N (2018) From the design of green buildings to resilience management of building stocks. Building Research & Information, 46(5), pp. 578-593. ISSN 0961-3218
Kranz, C N (2021) Optimizing compost incorporation for stormwater infiltration, runoff quality, and vegetation establishment in post-construction soils. PhD thesis, North Carolina State University, USA.
Kruger, E and Alli, N (2012) Aesthetic design considerations for bridges and road structures. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 71-76. ISSN 17514312
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.
Lam, K C; Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(4), pp. 359-374. ISSN 1466433X
LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364
Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364
Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(1), pp. 7-23. ISSN 1466433X
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175
Li, Q; Syal, M; Turner, N and Arif, M (2013) Constructors and innovation credits in green building projects. Construction Innovation, 13(3), pp. 320-338. ISSN 1471-4175
Li, R; Niu, Z; Liu, C and Wu, B (2024) The co-movement effect of managers' psychological factors on the BIM adoption decision in SMEs: A study based on fsqca. Engineering, Construction and Architectural Management, 31(4), pp. 1454-1472. ISSN 0969-9988
Li, X; Han, S; Gül, M; Al-Hussein, M and El-Rich, M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. Journal of Construction Engineering and Management, 144(1): 04017093, ISSN 0733-9364
Liao, L; Gan, C; Yang, J and Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6): 04025050, ISSN 0733-9364
Liaros, S (2022) A network of circular economy villages: Design guidelines for 21st century garden cities. Built Environment Project and Asset Management, 12(3), pp. 349-364. ISSN 2044-124X
Lindhard, S M; Lassen, A H; Cheng, Y; Musso, M; Wang, G and Bai, S (2025) The potential of exoskeletons in construction: barriers and challenges. Construction Innovation, 25(4), pp. 1231-1249. ISSN 1471-4175
Liu, C; Ji, W; Abourizk, S M and Siu, M F F (2019) Equipment logistics performance measurement using data-driven social network analysis. Journal of Construction Engineering and Management, 145(5): 04019033, ISSN 0733-9364
Liu, C and Zhu, R (2017) Measuring output structures of multinational construction industries using the world input-output database. International Journal of Construction Management, 17(1), pp. 1-12. ISSN 1562-3599
Liu, D and Li, C (2025) Construction hazard-recognition training for generation Z students: A comparison study based on eye-movement data. Engineering, Construction and Architectural Management, 32(6), pp. 4029-4050. ISSN 0969-9988
Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.
Liu, Y; Habibnezhad, M; Shayesteh, S; Jebelli, H and Lee, S (2021) Paving the way for future EEG studies in construction: Dependent component analysis for automatic ocular artifact removal from brainwave signals. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007
Longzhen, Z and Feng, S (2023) Pedestrian evacuation method based on improved cellular automata in emergencies. Engineering, Construction and Architectural Management, 30(8), pp. 3645-3673. ISSN 0969-9988
Lord, W; Liu, A; Tuuli, M M and Zhang, S (2010) A modern contract: Developments in the UK and China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 151-159. ISSN 17514312
Luck, R (1998) Studying the effect of systematization on design activity. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Löwstedt, M and Räisänen, C (2014) Social identity in construction: Enactments and outcomes. Construction Management and Economics, 32(11), pp. 1093-1105. ISSN 01446193
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Maftei L, H C (2013) Accounting for users: Design team work in immersive virtual reality environments. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. PhD thesis, University of Alberta, Canada.
Mang, P and Reed, B (2015) The nature of positive. Building Research & Information, 43(1), pp. 7-10. ISSN 0961-3218
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Marcellus-Zamora, K A (2015) An evaluation of material stocks and flows found during construction and demolition activities in the Philadelphia region of the United States. PhD thesis, Drexel University, USA.
Maria, C and Hollander, J B (2025) Urban façades and human stress: Evaluating façades' texture and layout. Building Research & Information, 53(8), pp. 1039-1057. ISSN 0961-3218
Marques, Vania de Lourdes (2015) A model for stakeholder management in construction companies. PhD thesis, Universidade Federal Fluminense, Brazil.
Marsh, R; Larsen, V G and Kragh, M (2010) Housing and energy in Denmark: Past, present, and future challenges. Building Research & Information, 38(1), pp. 92-106. ISSN 0961-3218
Mawdesley, M J; Al-jibouri, S H and Yang, H (2002) Genetic algorithms for construction site layout in project planning. Journal of Construction Engineering and Management, 128(5), pp. 418-426. ISSN 0733-9364
McArthur, J (2023) Enrolment, technical mediation, and the obligatory passage point: a socio-technical examination of the Canada Green Building Council. PhD thesis, University of Edinburgh, UK.
McCaffer, R; McCaffrey, M J and Thorpe, A (1983) The disparity between construction cost and tender-price movements. Construction Papers, 2(2), pp. 17-27. ISSN 0144-8587
McFarland, T C; Ryu, J; Haas, C T and Abdel-Rahman, E M (2024) Crafting safe and efficient masonry practices: Quantitative assessment of postural characteristics in movement strategies. Journal of Construction Engineering and Management, 150(2): 04023159, ISSN 0733-9364
McWilliam, R C (2002) The evolution of British standards. PhD thesis, University of Reading, UK.
Meduri, A (2025) Multi-modal sensor based high frequency non linear model predictive control for robots. PhD thesis, New York University Tandon School of Engineering, USA.
Meng, X (2014) The role of facilities managers in sustainable practice in the UK and Ireland. Smart and Sustainable Built Environment, 3(1), pp. 22-34. ISSN 2046-6099
Menzies, J L and Orr, S C (2014) Internationalization to China: A model for Australian architectural, engineering and construction firms. International Journal of Construction Education and Research, 10(3), pp. 201-221. ISSN 1557-8771
Merdinger, C J (1949) A history of civil engineering. PhD thesis, University of Oxford, UK.
Mikhailitchenko, Serguei (2008) The Australian housing market: Price dynamics and capital stock growth. PhD thesis, Griffith University, Australia.
Ming, C S; Runeson, G and Skitmore, M (1996) Changes in profit as market conditions change: An historical study of a building firm. Construction Management and Economics, 14(3), pp. 253-264. ISSN 01446193
Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364
Mitkees, L; Heidarinejad, M; Sabatino, M and Stephens, B (2024) Occupant thermal comfort and indoor environmental conditions in Mies van der Rohe's S.R. Crown hall. Building Research & Information, 52(3), pp. 249-272. ISSN 0961-3218
Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364
Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.
Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.
Murray, M D; Tookey, J E and Chan, A P (2001) Respect for people: Looking at KPIs through 'younger eyes'! In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Musgrave, E C (1988) The building industries of eastern brittany, 1600-1790. PhD thesis, University of Oxford, UK.
Naples, L M (1996) Outcomes-based evaluation for educational programs in engineering: A focus on the construction industry's needs. PhD thesis, Carnegie Mellon University, USA.
Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364
Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099
Navab-Kashani, R; Gay, L F and Bayat, A (2015) Productivity improvement of sewer CCTV inspection through time study and route optimization. Journal of Construction Engineering and Management, 141(6): 04015009, ISSN 0733-9364
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499
Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.
Newton, P W (2013) Regenerating cities: Technological and design innovation for Australian suburbs. Building Research & Information, 41(5), pp. 575-588. ISSN 0961-3218
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988
Nikoopayan Tak, M S; Bhattacharya, A; Metcalf, A R and Mousavi, E (2023) Cleanroom air quality: Combined effects of ventilation rate and filtration schemes in a laboratory cleanroom. Building Research & Information, 51(6), pp. 717-729. ISSN 0961-3218
Nilsson, S (2003) Durability of district heating pipes. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Nobe, M C (2007) Values and construction waste recycling: An application of the cognitive hierarchy to construction management education. PhD thesis, Colorado State University, USA.
Noghabaei, M; Han, K and Albert, A (2021) Feasibility study to identify brain activity and eye-tracking features for assessing hazard recognition using consumer-grade wearables in an immersive virtual environment. Journal of Construction Engineering and Management, 147(9): 04021104, ISSN 0733-9364
O'Brien, S (2022) Critical infrastructure organisation management: an analysis of the transition to the Industry 4.0 era. PhD thesis, University of Cambridge, UK.
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Ogunba, O A; Dabara, D I and Gbadegesin, J T (2023) Sustainable real estate management practice: Exploring the priority of operational stage for actualizing sustainable built environment goal in Sub-Saharan Africa. International Journal of Construction Management, 23(10), pp. 1746-1755. ISSN 1562-3599
Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988
Ogunseiju, O R; Gonsalves, N; Akanmu, A A; Abraham, Y and Nnaji, C (2024) Automated detection of learning stages and interaction difficulty from eye-tracking data within a mixed reality learning environment. Smart and Sustainable Built Environment, 13(6), pp. 1473-1489. ISSN 2046-6099
Ohland, M W (1996) Engineering by design: A methodology for designing creative engineering activities. PhD thesis, University of Florida, USA.
Okunola, A; Akanmu, A and Afolabi, A O (2025) Assessment of active back-support exoskeleton for carpentry task: Muscle activity and range of motion. Journal of Engineering, Design and Technology, 23(6), pp. 1797-1814. ISSN 1726-0531
Okunola, A; Akanmu, A A and Yusuf, A O (2025) Comparison of active and passive back-support exoskeletons for construction work: Range of motion, discomfort, usability, exertion and cognitive load assessments. Smart and Sustainable Built Environment, 14(3), pp. 582-598. ISSN 2046-6099
Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.
Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis. PhD thesis, University of Alberta, Canada.
Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.
Osaily, Y (2021) Guidance for advancing demolition project management in the UK. PhD thesis, University of Bath, UK.
Osaily, Y; Copping, A; McCann, S and Uddin, T (2019) Exploring the value of demolition contractor involvement at the design stage of construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ostwald, M J (2010) Ethics and the auto-generative design process. Building Research & Information, 38(4), pp. 390-400. ISSN 0961-3218
Oswald, D; Smith, S and Sherratt, F (2015) Doing the 'funky chicken' to communicate on multinational projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Oswald, D; Wade, F; Sherratt, F and Smith, S D (2019) Communicating health and safety on a multinational construction project: Challenges and strategies. Journal of Construction Engineering and Management, 145(4): 04019017, ISSN 0733-9364
Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: Implications for project selection. Construction Management and Economics, 37(5), pp. 243-256. ISSN 01446193
Ouyang, Y and Luo, X (2024) Effects of physical fatigue on construction workers' visual search patterns during hazard identification. Journal of Construction Engineering and Management, 150(9): 04024120, ISSN 0733-9364
Owusu-Manu, D G; Asiedu, R O; Edwards, D J; Donkor-Hyiaman, K; Abuntori, P A and El-Gohary, H (2019) An assessment of mortgage loan default propensity in Ghana. Journal of Engineering, Design and Technology, 17(5), pp. 985-1017. ISSN 1726-0531
Oztemir, A E (2003) Skill-driven optimization of construction operations. PhD thesis, Arizona State University, USA.
Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.
Patil, K; Ayer, S K; Bhandari, S; Hallowell, M R and Perry, L A (2025) Bringing reality to virtual reality: The role of environmental richness in improving construction practitioners' VR experience. Construction Innovation, 25(7), pp. 358-383. ISSN 1471-4175
Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.
Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.
Pavitt, T C and Gibb, A G F (2003) Interface management within construction: In particular, building facade. Journal of Construction Engineering and Management, 129(1), pp. 8-15. ISSN 0733-9364
Petrescu, D; Petcou, C and Baibarac, C (2016) Co-producing commons-based resilience: Lessons from R-Urban. Building Research & Information, 44(7), pp. 717-736. ISSN 0961-3218
Pheng, L S and Chuan, C J (2001) Just-in-time management of precast concrete components. Journal of Construction Engineering and Management, 127(6), pp. 494-501. ISSN 0733-9364
Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193
Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. PhD thesis, University of Oxford, UK.
Pilechiha, P; Norouziasas, A; Ghorbani Naeini, H and Jolma, K (2022) Evaluation of occupant's adaptive thermal comfort behaviour in naturally ventilated courtyard houses. Smart and Sustainable Built Environment, 11(4), pp. 793-811. ISSN 2046-6099
Plaut, J M; Dunbar, B; Wackerman, A and Hodgin, S (2012) Regenerative design: The lenses framework for buildings and communities. Building Research & Information, 40(1), pp. 112-122. ISSN 0961-3218
Pretorius, F; so, W M and Chau, K W (2005) An analysis of variable rate residential mortgage prepayment in Hong Kong using aggregate data. Journal of Financial Management of Property and Construction, 10(3), pp. 147-158. ISSN 1366-4387
Pryke, S D (2005) Towards a social network theory of project governance. Construction Management and Economics, 23(9), pp. 927-939. ISSN 01446193
Pérez-Valcárcel, J; Aragón, J; Muñiz, S; Freire-Tellado, M and Mosquera, E (2024) Transportable temporary homes with folding roof. Architectural Engineering and Design Management, 20(2), pp. 337-357. ISSN 1745-2007
Qi, T.; Liu, D.; Guo, Y.; Zhou, X.; Zhao, X.; Huang, X.; Wang, Y.; Jiang, Y.; Lu, L. and Wang, Z. (2025) Toward efficient and agent-scalable indoor pathfinding: Intelligent navigation-ability-driven indoor map generation using building information model. Architectural Engineering and Design Management, 21(5), pp. 1000-1021. ISSN 1745-2007
Quigley, D; Heaney, G and Odeyinka, H (2012) Factors of sustainability in building design: Establishing their relative significance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Rad, H N and Khosrowshahi, F (1999) Visualization of the impact of time on internal flooring. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364
Rashid, K M and Behzadan, A H (2018) Risk behavior-based trajectory prediction for construction site safety monitoring. Journal of Construction Engineering and Management, 144(2): 04017106, ISSN 0733-9364
Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364
Razia, B; Larkham, P and Thurairajah, N (2019) Risk assessment and risk engagement in the construction industry within conflict zones. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175
Rich, Jeffrey R (1993) Victorian building workers and unions 1856-90. PhD thesis, Australian National University, Australia.
Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364
Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning. PhD thesis, University of Florida, USA.
Rodriguez-Ramos, W E and Francis, R L (1983) Single crane location optimization. Journal of Construction Engineering and Management, 109(4), pp. 387-397. ISSN 0733-9364
Rogers, M D (2014) Power and narrative in project management: lessons learned in recognising the importance of phronesis. DMan thesis, University of Hertfordshire, UK.
Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364
Runeson, G (1997) Ignorantes Procedite: a critical evaluation of the movement for methodological renewal. Journal of Construction Procurement, 3(3), pp. 68-77. ISSN 1358-9180
Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193
Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364
Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.
Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531
Sai Bharadwaj, B and Chennupati, S K (2023) Pli cancellation in ecg signal using intrinsic time scale decomposition with adaptive gain control. Journal of Engineering, Design and Technology, 21(6), pp. 1725-1745. ISSN 1726-0531
Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364
Sandri, O.; Holdsworth, S. and Turner, M. (2026) The "last place where we can be men": Understanding women's marginalisation in the construction industry through a community of practice lens. Engineering, Construction and Architectural Management, 33(15), pp. 203-224. ISSN 0969-9988
Sandweiss, E T (1991) Construction and community in South St. Louis, 1850-1910. PhD thesis, University of California, Berkeley, USA.
Satirasetthavee, D and Herabat, P (2007) Integration of the component of financial statement in highway maintenance planning. Construction Management and Economics, 25(9), pp. 925-936. ISSN 1466433X
Sattineni, A (2014) A decision support framework for site safety monitoring using RFID and BIM. PhD thesis, University of Salford, UK.
Sayce, S; Ellison, L and Parnell, P (2007) Understanding investment drivers for UK sustainable property. Building Research & Information, 35(6), pp. 629-643. ISSN 0961-3218
Sayed, Ahmed Yehia Abdel Aziz El (2025) Design of novel formwork system and development of numerical model for comparison between formwork systems. PhD thesis, The American University in Cairo, Egypt.
Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(3), pp. 233-248. ISSN 0969-9988
Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988
Seward, D W (2002) Automating the construction workplace: Positioning and navigational factors. Construction Innovation, 2(3), pp. 167-189. ISSN 1471-4175
Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531
Shakantu, M W (2004) An investigation into building material and waste logistics: The case of Cape Town. PhD thesis, Glasgow Caledonian University, UK.
Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988
Shi, X; Fu, K; Qiao, Y; Santos, J and Yuan, Z (2026) Accident cause analysis for lifting prefabricated components of assembled buildings based on hybrid simulation technology from human factor perspective. Engineering, Construction and Architectural Management, 33(1), pp. 578-601. ISSN 0969-9988
Shi, X; Qiao, Y; Zhao, X; Liu, Y; Liu, C; Huang, R and Cui, Y (2025) Improving emergency evacuation capacity for subway stations based on agent-based modelling. Construction Innovation, 25(6), pp. 1865-1881. ISSN 1471-4175
Shiplee, H; Peacop, D and Payne, R (2013) Delivering London 2012: Site-wide logistics. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 165-178. ISSN 17514312
Shuler, S and Nobe, M D (2007) Edge cracking in residential development hot mix asphalt pavements. International Journal of Construction Education and Research, 3(3), pp. 179-197. ISSN 1557-8771
Siew, R Y J (2015) Predicting the behaviour of Australian ESG reits using Markov chain analysis. Journal of Financial Management of Property and Construction, 20(3), pp. 252-267. ISSN 1366-4387
Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.
Silva, Vanessa Gomes da (2003) Sustainability assessment of office buildings in Brazil: Guidelines and methodological basis. PhD thesis, Universidade de São Paulo, Brazil.
Sing, T F (2001) Is property stock market efficient in the weak form? Singapore's evidence. Journal of Financial Management of Property and Construction, 6(1), pp. 3-18. ISSN 1366-4387
Sischarenco, E (2017) Italian entrepreneurs of the construction business in a time of economic recession: Ideas, strategies and movements. PhD thesis, University of St. Andrews, UK.
Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Soltani, A R (2004) A multi-objective intelligent transportation system in construction sites. PhD thesis, University of Salford, UK.
Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Somasundaram, T and Davies, B J (2014) Collaboration to improve evacuation centre operations in Queensland. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 305-317. ISSN 1759-5916
Song, J (2005) Tracking the location of materials on construction projects. PhD thesis, University of Texas at Austin, USA.
Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.
Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Teebken, J (2024) Disrupt and unlock? The role of actors in urban adaptation path-breaking. Buildings & Cities, 5(1), pp. 162-181. ISSN 2632-6655
Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: A case study of movement continuity. Construction Management and Economics, 29(2), pp. 131-144. ISSN 1466433X
Teo, M M M and Loosemore, M (2009) A grounded theory of protest movement continuity. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Teo, More Mei Melissa (2009) An investigation of community-based protest movement continuity against construction projects. PhD thesis, University of New South Wales, Australia.
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364
Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), pp. 219-228. ISSN 0969-9988
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Tse, R Y C; Ganesan, S and So, H M (1998) Property cycles in Hong Kong: Causes and impacts. Journal of Financial Management of Property and Construction, 3(2), pp. 2-26. ISSN 1366-4387
Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.
Van Linden, S and Van Den Bossche, N (2021) Comparative study on the feasibility of watertight face-sealed building joints under simulated wind-driven rain conditions. Building Research & Information, 49(7), pp. 748-762. ISSN 0961-3218
Wang, Z.; Li, J.; Yan, X.; Li, H. and Li, J. (2026) Dynamic collision risk warning in construction sites for nonlinear movements: A visual-spatial fusion multimodal prediction method. Journal of Construction Engineering and Management, 152(10): 04026170, ISSN 0733-9364
Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364
Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364
Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.
Wang, Y (1998) An analysis of the technical efficiency in Hong Kong's construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Wearne, Samuel Claude (2024) Dynamics of place & discourse: Empirical, methodological, and theoretical research into socio-cultural transformations toward sustainability. PhD thesis, University of Technology Sydney, Australia.
Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599
Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects. PhD thesis, University of Calgary, Canada.
Welch, G P (2015) Right-of-way: Equal employment opportunity on the trans Alaska oil pipeline, 1968-1977. PhD thesis, Duke University, USA.
Wen, Jing (2022) Assessing the impact of immersive storytelling in attracting female students to construction education using social cognitive career theory. PhD thesis, University of Florida, USA.
White, T G (1975) Ergonomic analysis of human factors affecting optimum performance of mobile crane drivers. PhD thesis, University of Surrey, UK.
Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193
Williams, T P (1994) Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management, 120(2), pp. 306-320. ISSN 0733-9364
Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.
Winch, G M (2000) Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155. ISSN 0961-3218
Winfield, M (2020) Construction 4.0 and ISO 19650: A panacea for the digital revolution? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 175-181. ISSN 17514304
Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X
Wong, J T Y; Hui, E C M; Seabrooke, W and Raftery, J (2005) A study of the Hong Kong property market: Housing price expectations. Construction Management and Economics, 23(7), pp. 757-765. ISSN 01446193
Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988
Yan, Z; Liang, J; Bai, Y; Cao, L and Zhao, G (2021) Response of asphalt pavement structure layer and particle movement velocity based on particle flow theory. Journal of Construction Engineering and Management, 147(12): 04021170, ISSN 0733-9364
Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.
Yang, Z; Yuan, Y; Zhang, M; Zhao, X and Tian, B (2019) Assessment of construction workers' labor intensity based on wearable smartphone system. Journal of Construction Engineering and Management, 145(7): 04019039, ISSN 0733-9364
Ying, F; Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(3), pp. 261-275. ISSN 0969-9988
Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175
Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Yuan, H and Shen, X (2024) Optimizing floor plans of accessible restrooms in elderly long-term care facilities: a path planning approach. Architectural Engineering and Design Management, 20(4), pp. 891-910. ISSN 1745-2007
Zadeh Kazemi, M (2022) Essays on sustainability reporting quality, sustainability-oriented innovation, disruptive technologies and resilience in the construction sector: The case of the UAE. PhD thesis, Brunel University, UK.
Zarrinmehr, S (2016) A computational model for simulation, visualization and evaluation of mandatory and optional building occupancy scenarios. PhD thesis, Texas A&M University, USA.
Zekri, M M and Razali, M N (2020) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction, 25(1), pp. 5-39. ISSN 1366-4387
Zeng, R; Chini, A and Ries, R (2021) Innovative design for sustainability: Integrating embodied impacts and costs during the early design phase. Engineering, Construction and Architectural Management, 28(3), pp. 747-764. ISSN 0969-9988
Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218
Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988
Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364
Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988
Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988
Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364
Zhu, Q; Zhou, T; Xia, P and Du, J (2022) Robot planning for active collision avoidance in modular construction: Pipe skids example. Journal of Construction Engineering and Management, 148(10): 04022114, ISSN 0733-9364
Zimmerman, A and Kibert, C J (2007) Forum: Informing LEED's next generation with the natural step. Building Research & Information, 35(6), pp. 681-689. ISSN 0961-3218
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988
Ågren, R and Wing, R D (2014) Five moments in the history of industrialized building. Construction Management and Economics, 32(1-2), pp. 7-15. ISSN 01446193
Up a level