Items with Index Term: quality control
Abdullahi, U; Bustani, S A; Hassan, A and Rotimi, F E (2019) Assessing quality management practice in Nigerian construction industry. Journal of Construction Business and Management, 3(2), pp. 17-25. ISSN 2521-0165
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.
Ahmed, S M; Sang, L P and Torbica, Ž M (2003) Use of quality function deployment in civil engineering capital project planning. Journal of Construction Engineering and Management, 129(4), pp. 358-368. ISSN 0733-9364
Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531
Althaqafi, Torky (2015) Using stakeholder theory to explain the development and operation of safety culture and systems to improve safety performance in the construction industry in Saudi Arabia. PhD thesis, University of Adelaide, Australia.
Anagnostou, G (2008) Quality in the apartment building industry a case study in Greece. PhD thesis, University College London, UK.
André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.
Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364
Bai, Y (2007) Intelligent painting process planner for robotic bridge painting. Journal of Construction Engineering and Management, 133(4), pp. 335-342. ISSN 0733-9364
Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364
Bai, Y and Bernold, L E (2001) Quality control parameters for robotic bridge painting. Journal of Construction Engineering and Management, 127(2), pp. 142-148. ISSN 0733-9364
Banihashemi, S; Assadimoghadam, A; Hajirasouli, A; LeNguyen, K and Mohandes, S R (2025) Parametric design in construction: A new paradigm for quality management and defect reduction. International Journal of Construction Management, 25(13), pp. 1534-1551. ISSN 1562-3599
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Barlow, P L (2015) Assessment of subcontractor quality on California hospital construction projects through third-party inspections. PhD thesis, University of Florida, USA.
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364
Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364
Bijleveld, Frank (2015) Professionalising the asphalt construction process: Aligning information technologies, operators' knowledge and laboratory practices. PhD thesis, University of Twente, Netherlands.
Bijleveld F R, D e A G (2013) Method-based learning: A case in the asphalt construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218
Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.
Bostan, B. B.; Çavka, H. B.; Citipitioglu, A. M. and Pehlivan, D. Z. (2026) Retrospective BIM performance analysis based on construction big data. Engineering, Construction and Architectural Management, 33(7), pp. 5991-6013. ISSN 0969-9988
Briggs, B (2021) An improved earned value management method integrating quality and safety. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Brooks, T and Spillane, J (2016) Does inappropriate quality control demotivate workers? A critical review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165
Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364
Campbell, J M (2008) Safety hazard and risk identification and management in infrastructure management. PhD thesis, University of Edinburgh, UK.
Cattaneo, S and Mola, F (2012) Assessing the quality control of self-consolidating concrete properties. Journal of Construction Engineering and Management, 138(2), pp. 197-205. ISSN 0733-9364
Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364
Chew, M Y L; Conejos, S and Azril, F H B (2019) Design for maintainability of high-rise vertical green facades. Building Research & Information, 47(4), pp. 453-467. ISSN 0961-3218
Chew, M Y L and De Silva, N (2004) Factorial method for performance assessment of building facades. Journal of Construction Engineering and Management, 130(4), pp. 525-533. ISSN 0733-9364
Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success factors for iso9000 implementation. Journal of Construction Engineering and Management, 129(6), pp. 599-609. ISSN 0733-9364
Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364
Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364
Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599
Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Dai, F and Lu, M (2013) Three-dimensional modeling of site elements by analytically processing image data contained in site photos. Journal of Construction Engineering and Management, 139(7), pp. 881-894. ISSN 0733-9364
Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364
Del Solar, P; Del Río, M; Villoria, P and Nadal, A (2016) Analysis of recurrent defects in the execution of ceramic-coatings cladding in building construction. Journal of Construction Engineering and Management, 142(4): 04015093, ISSN 0733-9364
Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304
Delgado-Hernandez, D J and Aspinwall, E M (2005) Improvement tools in the UK construction industry. Construction Management and Economics, 23(9), pp. 965-977. ISSN 01446193
Delgado-Hernandez, D J; Cruz-Cruz, C C and Vences-García, P Y (2017) Improvement management tools in the construction industry: Case study of Mexico. Journal of Construction Engineering and Management, 143(4): 05016024, ISSN 0733-9364
Derrington, P A (1981) Controlling the quality of professional performance in architectural practice. PhD thesis, University of California, Berkeley, USA.
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364
Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.
Donato, V; Lo Turco, M and Bocconcino, M M (2018) BIM-QA/QC in the architectural design process. Architectural Engineering and Design Management, 14(3), pp. 239-254. ISSN 1745-2007
Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771
Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988
Echezona, O N (2011) Client perception of engineering and construction services management in present-day Iraq: An exploratory study and assessment. PhD thesis, Walden University, USA.
Egwim, C N; Alaka, H; Toriola-Coker, L O; Balogun, H; Ajayi, S and Oseghale, R (2023) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), pp. 1323-1342. ISSN 1726-0531
Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364
Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364
Erkoreka, A; Flores-Abascal, I; Escudero, C; Martin, K; Millan, J A and Sala, J M (2020) Flat roof hygrothermal performance testing and evaluation. International Journal of Building Pathology and Adaptation, 38(1), pp. 148-175. ISSN 23984708
Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364
Fan, C L (2020) Defect risk assessment using a hybrid machine learning method. Journal of Construction Engineering and Management, 146(9): 04020102, ISSN 0733-9364
Farrell, L M (2001) Financial agency issues in mortgage underwriting and real estate valuation. Journal of Financial Management of Property and Construction, 6(2), pp. 119-137. ISSN 1366-4387
Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.
Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007
Firth, S K; Lomas, K J and Wright, A J (2010) Targeting household energy-efficiency measures using sensitivity analysis. Building Research & Information, 38(1), pp. 25-41. ISSN 0961-3218
Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.
Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218
Forcada, N; Macarulla, M; Gangolells, M and Casals, M (2016) Handover defects: Comparison of construction and post-handover housing defects. Building Research & Information, 44(3), pp. 279-288. ISSN 0961-3218
Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364
Georgiou, J; Smith, J and Love, P (2003) Building registration: Training and housing quality. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ghosh, A; Abawajy, J and Chowdhury, M (2024) Redefining the construction managerial landscape to facilitate Industry 4.0 implementation: Scientometric mapping of research frontiers. Construction Innovation, 24(3), pp. 657-683. ISSN 1471-4175
Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180
Gilly, B A; Touran, A and Asai, T (1987) Quality control circles in construction. Journal of Construction Engineering and Management, 113(3), pp. 427-439. ISSN 0733-9364
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364
Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029
Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988
Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364
Ha, S K; Jang, J G; Park, S H and Lee, H K (2015) Advanced spray multiple layup process for quality control of sprayed FRP composites used to retrofit concrete structures. Journal of Construction Engineering and Management, 141(1): 04014060, ISSN 0733-9364
Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364
Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.
Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.
Hassanain, M A; Al-Zahrani, M; Abdallah, A and Sayed, A M Z (2019) Assessment of factors affecting maintenance cost of public school facilities. International Journal of Building Pathology and Adaptation, 37(5), pp. 528-546. ISSN 23984708
Hernandez, W (2017) Development of a sustainable quality assurance program for transporation infrastructure. PhD thesis, University of Rhode Island, USA.
Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.
Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(2), pp. 112-128. ISSN 1557-8771
Jackson, B J (2000) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. PhD thesis, Colorado State University, USA.
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.
John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364
John, S T; Sarkar, P and Davis, R (2023) A long-range wide-area network system for monitoring early-age concrete compressive strength. Journal of Construction Engineering and Management, 149(1): 04022148, ISSN 0733-9364
Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X
Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218
Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364
Kakitahi, J M; Alinaitwe, H M; Landin, A and Mudaaki, S P (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 22-42. ISSN 17514304
Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X
Kale, S and Arditi, D (2010) Innovation diffusion modeling in the construction industry. Journal of Construction Engineering and Management, 136(3), pp. 329-340. ISSN 0733-9364
Kamari, M and Ham, Y (2025) Advancing 3D object detection and segmentation in construction jobsites using an open vocabulary approach. Journal of Construction Engineering and Management, 151(10): 04025141, ISSN 0733-9364
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218
Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.
Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599
Kashiwagi, D T; Halmrast, C T and Tisthammer, T (1996) Intelligent procurement of construction systems. Journal of Construction Procurement, 2(1), pp. 56-65. ISSN 1358-9180
Kazar, G; Doǧan, N B; Ayhan, B U and Tokdemir, O B (2022) Quality failures-based critical cost impact factors: Logistic regression analysis. Journal of Construction Engineering and Management, 148(12): 04022138, ISSN 0733-9364
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.
Kelly, D and Koo, H J (2024) Challenges managing large historic building renovations: Lessons learned from detroit, Michigan. Journal of Construction Engineering and Management, 150(2): 05023015, ISSN 0733-9364
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Khesal, T; Saghaei, A; Khalilzadeh, M; Rahiminezhad Galankashi, M and Soltani, R (2019) Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology, 17(1), pp. 183-203. ISSN 1726-0531
Khoshbakht Iradmoosa, Maryam (2019) Building performance studies for higher education campus buildings: Energy use, occupant satisfaction and thermal comfort. PhD thesis, Griffith University, Australia.
Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X
Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364
Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364
Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988
Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364
Laganakou, G (2020) What feasible macro-scale interventions could stimulate a sustainable growth in the UK housing retrofit industry? An examination of the potential impact from supply-chain innovations on low energy retrofit of pre-1919 housing. PhD thesis, University of Northampton, UK.
Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.
Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599
Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(3), pp. 210-219. ISSN 0969-9988
Leaman, A and Bordass, B (2001) Assessing building performance in use 4: The probe occupant surveys and their implications. Building Research & Information, 29(2), pp. 129-143. ISSN 0961-3218
Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364
Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599
Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364
Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364
Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364
Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(2), pp. 128-139. ISSN 0961-3218
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, Y; Yao, F; Ji, Y; Tong, W; Liu, G; Li, H X and Hu, X (2022) Quality control for offsite construction: Review and future directions. Journal of Construction Engineering and Management, 148(8): 03122003, ISSN 0733-9364
Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.
Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364
Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364
Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Mallon, J C and Mulligan, D E (1993) Quality function deployment: a system for meeting customers' needs. Journal of Construction Engineering and Management, 119(3), pp. 516-531. ISSN 0733-9364
Malmberg, F (2007) Introduction of a new form of quote evaluation: A case study in southern Sweden. Construction Management and Economics, 25(6), pp. 661-669. ISSN 1466433X
Martinez-Miranzo, D.; Rizo-Maestre, C.; Gomez-Donoso, F. and Cazorla, M. (2026) Mixed reality for construction house evaluation and quality assessing. Journal of Construction Engineering and Management, 152(10): 04026173, ISSN 0733-9364
Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531
McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Meijer, F and Visscher, H (2017) Quality control of constructions: European trends and developments. International Journal of Law in the Built Environment, 9(2), pp. 143-161. ISSN 1756-1450
Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364
Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Moon, S; Zekavat, P R and Bernold, L E (2015) Dynamic control of construction supply chain to improve labor performance. Journal of Construction Engineering and Management, 141(6): 05015002, ISSN 0733-9364
Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364
Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364
Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.
Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364
Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.
Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.
Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.
Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.
Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.
Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218
Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Perera, H P; Perera, B A K S and Palihakkara, A D (2023) Financial and economic risk management in coastal land reclamation projects. Construction Innovation, 23(4), pp. 878-897. ISSN 1471-4175
Pham Van, B and Peansupap, V (2024) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2536-2562. ISSN 0969-9988
Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X
Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364
Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364
Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175
Pokharel, H K (2023) Improving quality: Exploring ceramic water filters in developing communities. PhD thesis, University of Rhode Island, USA.
Praticò, F G; Antonio, C and Domenico, T (2012) Influence of dispersion and location on pay adjustment in construction engineering. Journal of Construction Engineering and Management, 138(10), pp. 1125-1130. ISSN 0733-9364
Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364
Prego, F J; Solla, M; Núñez-Nieto, X and Arias, P (2016) Assessing the applicability of ground-penetrating radar to quality control in tunneling construction. Journal of Construction Engineering and Management, 142(5): 06015006, ISSN 0733-9364
Ramaswamy, S D and Pertusier, E M (1986) Construction of barrettes for high-rise foundations. Journal of Construction Engineering and Management, 112(4), pp. 455-462. ISSN 0733-9364
Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599
Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X
Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.
Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.
Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.
Rounds, J L and Chi, N Y (1985) Total quality management for construction. Journal of Construction Engineering and Management, 111(2), pp. 117-128. ISSN 0733-9364
Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: Trust the theories. Construction Management and Economics, 33(2), pp. 117-125. ISSN 01446193
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364
Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364
Saha, S; Greville, C J and Mullins, T A (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(2), pp. 1-13. ISSN 2204-9029
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.
San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Sandanayake, M; Yang, W; Chhibba, N and Vrcelj, Z (2022) Residential building defects investigation and mitigation: a comparative review in Victoria, Australia, for understanding the way forward. Engineering, Construction and Architectural Management, 29(9), pp. 3689-3711. ISSN 0969-9988
Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364
Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.
Schultz, C S; Jørgensen, K; Bonke, S and Rasmussen, G M G (2015) Building defects in Danish construction: Project characteristics influencing the occurrence of defects at handover. Architectural Engineering and Design Management, 11(6), pp. 423-439. ISSN 1745-2007
Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364
Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X
Shammas-Toma, M; Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(4), pp. 353-364. ISSN 01446193
Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364
Sharma, N and Laishram, B (2025) Understanding the relevance and impact of the cost of quality in the construction industry: A systematic literature review using prisma. Construction Innovation, 25(6), pp. 1707-1726. ISSN 1471-4175
Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Singh, A; Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(1), pp. 75-90. ISSN 2044-124X
Spottiswoode, B H and MacKellar, D C R (2013) The role and effect of technical review panels. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 103-108. ISSN 17514312
Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364
Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531
Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175
Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364
Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364
Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.
Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Suresh, S; Olayinka, R; Chinyio, E and Renukappa, S (2017) Impact of knowledge management on construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 27-43. ISSN 17514304
Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531
Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364
Tang, W; Duffield, C F and Young, D M (2006) Partnering mechanism in construction: An empirical study on the Chinese construction industry. Journal of Construction Engineering and Management, 132(3), pp. 217-229. ISSN 0733-9364
Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599
Turner, J P (1992) Constructability for drilled shafts. Journal of Construction Engineering and Management, 118(1), pp. 77-93. ISSN 0733-9364
Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364
Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.
Vahidi, A (2025) Towards circular concrete: The implementation of circular concrete in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193
Van Den Bossche, N; Blommaert, A and Daniotti, B (2023) The impact of demographical, geographical and climatological factors on building defects in Belgium. International Journal of Building Pathology and Adaptation, 41(3), pp. 549-573. ISSN 23984708
Van Hove, M Y C; Deurinck, M; Lameire, W; Laverge, J; Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in flanders. Building Research & Information, 51(2), pp. 203-222. ISSN 0961-3218
Vora, C; Aryal, A; Willoughby, S and Wang, C (2024) Investigating stakeholder perception and developing a decision framework for robot adoption in construction. Journal of Construction Engineering and Management, 150(4): 04024012, ISSN 0733-9364
Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364
Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007
Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193
Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364
Wang, Y (2022) Monitoring, modelling and analysis of occupants' operation of windows, use of air purifiers and smart air quality control in low-energy residential buildings. PhD thesis, University College London, UK.
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218
Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193
Whitaker, R (2022) The influence of end user requirements to inform built asset design. PhD thesis, Leeds Beckett University, UK.
Wong, M K (2006) A study of capacity predictions for driven piles by dynamic pile testing. PhD thesis, University of Hong Kong, Hong Kong.
Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.
Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175
Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988
Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364
Xu, S; Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(6), pp. 2224-2247. ISSN 0969-9988
Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364
Yap, J B H and Cheah, S Y (2020) Key challenges faced by Chinese contractors in Malaysian construction industry: Empirical study. Journal of Engineering, Design and Technology, 18(3), pp. 705-726. ISSN 1726-0531
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zeni, K S and Kikwasi, G J (2023) Factors affecting maintenance cost of public buildings: Case study of Tanzania buildings agency and national housing corporation. International Journal of Building Pathology and Adaptation, 41(5), pp. 926-941. ISSN 23984708
Zhang, S; Jiang, P; Zhang, Z and Wang, C (2021) Webgis-based collaborative construction quality control of rcc gravity dam using sensing devices. Journal of Construction Engineering and Management, 147(3): 06020004, ISSN 0733-9364
Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364
Zhou, S; Mosca, L and Whyte, J (2023) How the reliability of external competences shapes the modularization strategies of industrialized construction firms. Construction Management and Economics, 41(7), pp. 608-619. ISSN 01446193
al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029
Up a level