Items with Index Term: design and construction

Number of items: 760.

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abdirad, H; Dossick, C S; Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: Perception and response patterns. Building Research & Information, 49(2), pp. 161-178. ISSN 0961-3218

Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175

Abdullah, M R and Egbu, C (2011) The application of analytical hierarchy process (AHP) as a decision tool in choosing the type of industrialised building system (IBS) for housing projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abid, M S (1995) Reconstruction for low-income communities in earthquake zones: an investigation for the implementation of community-managed housing reconstruction programmes in low-income countries located in earthquakes zones. PhD thesis, Loughborough University, UK.

AboMoslim, S and Russell, A (2014) Screening design and construction technologies of skyscrapers. Construction Innovation, 14(3), pp. 307-345. ISSN 1471-4175

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

Adeyeye, K; Pasquire, C; Bouchlaghem, D and Chandler, J (2006) Exploring the efficacy of digital tools for the design and construction of hybrid buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adjei, K O; Abudu, H D; Nana-Addy, E and Musonda, I (2025) The motivation for occupants’ adoption of hidden emergency exits in buildings. Engineering, Construction and Architectural Management, 32(13), pp. 133-147. ISSN 0969-9988

Afful, A E; Ayarkwa, J; Acquah, G K K and Osei-Asibey, D (2023) Enablers of incorporating indoor environmental quality (IEQ) principles into buildings. Smart and Sustainable Built Environment, 12(1), pp. 38-59. ISSN 2046-6099

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708

Ahern, E (2022) A framework for improving the process of building certification to enhance energy efficiency: the case of Ireland. DProf thesis, Anglia Ruskin University, UK.

Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364

Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Nahyan, M T; Sohal, A S; Fildes, B N and Hawas, Y E (2012) Transportation infrastructure development in the UAE: Stakeholder perspectives on management practice. Construction Innovation, 12(4), pp. 492-514. ISSN 1471-4175

Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.

Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(7), pp. 771-782. ISSN 1466433X

Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.

Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.

Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.

Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia. PhD thesis, University of Washington, USA.

Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Aldridge, G; Pasquire, C; Gibb, A and Blismas, N G (2001) Methods for measuring the "unmeasurable": Evaluating the benefits of pre-assembly and standardization in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Alhusban, A A; Alhusban, S A and Alhusban, M A (2022) How the COVID 19 pandemic would change the future of architectural design. Journal of Engineering, Design and Technology, 20(1), pp. 339-357. ISSN 1726-0531

Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.

Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175

Allam, A S; Bassioni, H; Ayoub, M and Kamel, W (2024) A framework for obtaining a BIM-compatible design solution based on quantitative decisions on building performance. International Journal of Construction Management, 24(11), pp. 1176-1190. ISSN 1562-3599

Almeida, Laura (2019) Energy-related occupant behaviour in green and non-rated buildings. PhD thesis, Western Sydney University, Australia.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.

Alshawi, M and Underwood, J (1996) Improving the constructability of design solutions through an integrated system. Engineering, Construction and Architectural Management, 3(1-2), pp. 47-67. ISSN 0969-9988

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Alzahrani, H; Arif, M; Kaushik, A; Goulding, J and Heesom, D (2021) Artificial neural network analysis of teachers' performance against thermal comfort. International Journal of Building Pathology and Adaptation, 39(1), pp. 20-32. ISSN 23984708

Alzahrani, H; Arif, M; Kaushik, A K; Rana, M Q and Aburas, H M (2023) Evaluating the effects of indoor air quality on teacher performance using artificial neural network. Journal of Engineering, Design and Technology, 21(2), pp. 604-618. ISSN 1726-0531

Amarachukwu Nnadozie, N and Wilkinson, S (2021) Building code amendment and building resilience: Perspective of building code users in New Zealand. Built Environment Project and Asset Management, 11(4), pp. 643-659. ISSN 2044-124X

Ammar, M (2016) Aerial construction: Robotic fabrication of tensile structures with flying machines. DSc thesis, ETH Zürich, Switzerland.

An, X; Ren, S; Wang, L and Huang, Y (2025) Evolutionary game analysis of collaborative application of BIM platform from the perspective of value co-creation. Engineering, Construction and Architectural Management, 32(7), pp. 4458-4474. ISSN 0969-9988

Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.

Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.

Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007

Anderson, A; Dossick, C S and Osburn, L (2020) Curriculum to prepare AEC students for BIM-enabled globally distributed projects. International Journal of Construction Education and Research, 16(4), pp. 270-289. ISSN 1557-8771

Andersson, R; Buser, M and Bosch, P (2019) Improving renovation waste management in Sweden: The role of the demolition company. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312

Angelides, D and Xenidis, Y (2005) A methodology for the development of a european approach concerning performance and risks of built systems. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Anumba, C J; Issa, R R A; Pan, J and Mutis, I (2008) Ontology-based information and knowledge management in construction. Construction Innovation, 8(3), pp. 218-239. ISSN 1471-4175

Anumba, C J; Pan, J; Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(1), pp. 78-94. ISSN 0969-9988

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry. PhD thesis, KTH Royal Institute of Technology, Sweden.

Aouad, G F; Hinks, J; Cooper, R; Sheath, D M; Kagioglou, M and Sexton, M (1998) An information technology (IT) map for a generic design and construction process protocol. Journal of Construction Procurement, 4(2), pp. 132-151. ISSN 1358-9180

Arafat, G H (1991) Concept evaluation in structural design utilizing multiattribute utility theory and a knowledge-based approach. PhD thesis, Wayne State University, USA.

Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312

Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Asigri, E O; Afram, S O and Ameyaw, C (2021) Fire safety design attributes of students' housing facilities in KNUST Ghana. African Journal of Built Environment Research, 5(1), pp. 41-58. ISSN 2414-0236

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.

Austin, S; Baldwin, A; Baizhan, L I and Waskett, P (2000) Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(2), pp. 173-182. ISSN 01446193

Austin, S A; Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(3), pp. 249-258. ISSN 0969-9988

Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.

Baborska-Narożny, M and Stevenson, F (2019) Service controls interfaces in housing: Usability and engagement tool development. Building Research & Information, 47(3), pp. 290-304. ISSN 0961-3218

Bahrami, S (2021) Product information quality: A sustainability challenge in design and construction. PhD thesis, Lund University, Sweden.

Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: Lessons from the grenfell tower fire. Smart and Sustainable Built Environment, 12(3), pp. 488-506. ISSN 2046-6099

Baldissera, P and Delprete, C (2020) From PBL to innovation: A decennial case-study from an HPV student team. Journal of Engineering, Design and Technology, 18(4), pp. 773-786. ISSN 1726-0531

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bandara, C; Dissanayake, D M P P; Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(5), pp. 515-527. ISSN 2044-124X

Banihashemi, S; Assadimoghadam, A; Hajirasouli, A; LeNguyen, K and Mohandes, S R (2025) Parametric design in construction: A new paradigm for quality management and defect reduction. International Journal of Construction Management, 25(13), pp. 1534-1551. ISSN 1562-3599

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.

Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364

Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(2), pp. 41-56. ISSN 2204-9029

Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599

Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.

Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599

Beatham, S (2003) Development of an integrated business improvement system for construction. EngD thesis, Loughborough University, UK.

Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.

Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708

Bennett, J (1983) Project management in construction. Construction Management and Economics, 1(3), pp. 183-197. ISSN 01446193

Benster, N A (1970) A study and assessment of water penetration and rapid deterioration in existing dwellings-developed as a guide to future building design, production and maintenance management. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Bentivegna, V; Curwell, S; Deakin, M; Lombardi, P; Mitchell, G and Nijkamp, P (2002) A vision and methodology for integrated sustainable urban development: Bequest. Building Research & Information, 30(2), pp. 83-94. ISSN 0961-3218

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Betts, M; Cher, L; Mathur, K and Ofori, G (1991) Strategies for the construction sector in the information technology era. Construction Management and Economics, 9(6), pp. 509-528. ISSN 01446193

Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771

Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Björk, B (2002) A formalised model of the information and materials handling activities in the construction process. Construction Innovation, 2(3), pp. 133-149. ISSN 1471-4175

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Boes, H and Holmen, E (2003) Changing supplier-customer interfaces in design-construct contracts? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967. EdD thesis, Stanford University, USA.

Bologna, R and Del Nord, R (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(2), pp. 109-118. ISSN 0961-3218

Bond, S (2015) Residents' perceptions of risk towards residential property in Canterbury NZ subsequent to the earthquakes. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 234-267. ISSN 1759-5916

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218

Borer, J (2020) Object oriented design of safety critical programmable equipment systems. Journal of Engineering, Design and Technology, 18(5), pp. 1081-1089. ISSN 1726-0531

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X

Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Boyd, D (2021) A critical inquiry into the hyperreality of digitalization in construction. Construction Management and Economics, 39(7), pp. 549-564. ISSN 01446193

Boyd, D and Gichuhi, F (2003) Studying site meetings in projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Boyd, P; Larsen, G D and Schweber, L (2014) Perspectives on the specification of building integrated photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Boyes, G (2021) Towards BIM/GIS interoperability: a theoretical framework and practical generation of spaces to support infrastructure Asset Management. PhD thesis, University College London, UK.

Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.

Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175

Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X

Bridge, C and Carnemolla, P (2014) An enabling BIM block library: An online repository to facilitate social inclusion in Australia. Construction Innovation, 14(4), pp. 477-492. ISSN 1471-4175

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies. PhD thesis, Purdue University, USA.

Brown, V (2004) Making home: A study of recent self-build projects in the UK. PhD thesis, De Montfort University, UK.

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Buhl, H; Andersen, M and Harty, J (2020) Construction industry 4.0: Entangling colliding practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364

Burke, R D; Parrish, K and El Asmar, M (2018) Environmental product declarations: Use in the architectural and engineering design process to support sustainable construction. Journal of Construction Engineering and Management, 144(5): 04018026, ISSN 0733-9364

Burr, K L and Jones, C B (2010) The role of the architect: Changes of the past, practices of the present, and indications of the future. International Journal of Construction Education and Research, 6(2), pp. 122-138. ISSN 1557-8771

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364

Cadman, D M (2009) Developing sustainability in the design and construction process. PhD thesis, Lancaster University, UK.

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Cambra-Rufino, L.; Solís-García, G.; Carrasco Pérez, A.; López Maestro, M.; De la Cruz Bértolo, J.; Moral Pumarega, M. T.; Pallás Alonso, C. R. and Piris Borregas, S. (2026) The physical environment of neonatal intensive care units: A descriptive survey in Spain. Architectural Engineering and Design Management, 22(2), pp. 325-339. ISSN 1745-2007

Capra, M (2010) Collaborative mixed reality environments: an application for civil engineering. PhD thesis, University of Nottingham, UK.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Carpenter, N and Bausman, D C (2016) Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10): 05016009, ISSN 0733-9364

Carpenter, W J (2004) Design and construction in architectural education: 1963-2003. PhD thesis, Birmingham City University, UK.

Carter, K and Fortune, C (2003) Procuring sustainable projects: A grounded approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Carvalho, P F M (2023) Tectonics and material transformations: Exploring concrete in architecture through digital fabrication processes. PhD thesis, Universidade do Porto, Portugal.

Castle, C M (1999) Construction project networks: A study of internet-based interorganizational information systems in the building industry. DDes thesis, Harvard University, USA.

Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chavan, A. P.; Ghosh, S. and McCuen, T. (2026) Use of virtual reality in construction education: USA educators' perspectives. International Journal of Building Pathology and Adaptation, 44(4), pp. 849-866. ISSN 2398-4708

Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. PhD thesis, University of Salford, UK.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364

Chen, L; Lu, Q and Zhao, X (2022) A semi-automatic image-based object recognition system for constructing as-is IFC BIM objects based on fuzzy-maut. International Journal of Construction Management, 22(1), pp. 51-65. ISSN 1562-3599

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cheung, S-O; Lam, K-C; Wong, S-S and Wong, S-H (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(2), pp. 65-72. ISSN 2204-9029

Chew, M Y L (2021) Façade inspection for falling objects from tall buildings in Singapore. International Journal of Building Pathology and Adaptation, 41(6), pp. 162-183. ISSN 23984708

Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.

Chohan, A H; Che-Ani, A I; Bhai Khan, S; Awad, J; Jawaid, A and Mohd Tawil, N (2015) A model of housing quality determinants for affordable housing. Journal of Construction in Developing Countries, 20(1), pp. 117-136. ISSN 1823-6499

Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Choudhry, R M; Gabriel, H F; Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), pp. 1-18. ISSN 1823-6499

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988

Chun, M I; Harty, C and Schweber, L (2015) Comparative study of user-centred design approaches. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.

Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.

Cohen, L (1972) A study of the effect of legal requirements on the design and construction of public school buildings in Pennsylvania. EdD thesis, Temple University, USA.

Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.

Collins, H J (2007) Identity and interpretation of the built environment: a case study of interpretation of symbolic artefacts in the organisational built environment and it's effect on the identity forming process. PhD thesis, University of Strathclyde, UK.

Connaughton J, W S (2013) Improving collaboration in construction: An opportunity for action research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Conradie, D C U (2001) The use of software systems to implement case-based reasoning enabled intelligent components for architectural briefing and design. SkoglDr thesis, University of Pretoria, South Africa.

Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029

Consoli, G G S (2004) Conducting an ethno-methodological study for the comparison of private and public prison delivery processes in Australia. Journal of Construction Procurement, 10(1),

Consoli, G G S (2006) Correctional management attitudes to private prison design and construction briefs in Australia. Journal of Construction Research, 7(1), pp. 99-109. ISSN 1609-9451

Coulter III, C (1968) A systems analysis of the corps of engineers approach to design and construction. PhD thesis, Texas A&M University, USA.

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Daniel, C and Neufville, E K (2025) An autogluon-enabled robust machine learning model for concrete tensile and compressive strength forecast. International Journal of Construction Management, 25(13), pp. 1636-1647. ISSN 1562-3599

Danso, A. K.; Edwards, D. J.; Adjei, E. K.; Adjei-Kumi, T.; Owusu-Manu, D. G.; Fianoo, S. I. and Thwala, W. D. (2026) Analysis of the underlying factors affecting BIM-LCA integration in the Ghanaian construction industry: A factor analysis approach. Construction Innovation, 26(3), pp. 871-891. ISSN 1471-4175

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218

Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364

Day, A (1996) The maquette, the model and the computer: Organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 15-28. ISSN 0969-9988

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Den Otter, A and Emmitt, S (2007) Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), pp. 408-419. ISSN 0969-9988

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364

Devapriya, K A K and Ganesan, S (2002) Technology transfer through subcontracting in developing countries. Building Research & Information, 30(3), pp. 171-182. ISSN 0961-3218

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.

Ding, G K C (2007) Life cycle energy assessment of Australian secondary schools. Building Research & Information, 35(5), pp. 487-500. ISSN 0961-3218

Ding, G K C (2007) The evaluation of environmentally sustainable residential development using a building sustainability index. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Disney, O; Roupé, M and Johansson, M (2023) Driving circularity with total BIM: An integrated approach to data-driven design. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.

Dossick, C; Osburn, L and Neff, G (2025) Innovation through practice: The messy work of making technology useful for architecture, engineering and construction teams. Engineering, Construction and Architectural Management, 32(7), pp. 4887-4899. ISSN 0969-9988

Dreicer, G K (1993) The long span. Intercultural exchange in building technology: Development and industrialization of the framed beam in Western Europe and the United States, 1820-1870. PhD thesis, Cornell University, USA.

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Duckles, B M (2009) The green building industry in California: From ideals to buildings. PhD thesis, University of Arizona, USA.

Duke, A K (2001) A telepresence environment for concurrent life-cycle design and construction. PhD thesis, Loughborough University, UK.

Dulaimi, M F and Kumaraswamy, M M (2000) Procuring for innovation: The integrating role of innovation in construction procurement. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dulaimi, M F; Ling, F Y Y; Ofori, G and De Silva, N (2002) Enhancing integration and innovation in construction. Building Research & Information, 30(4), pp. 237-247. ISSN 0961-3218

Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007

Eberhardt, L C M; Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(2), pp. 93-113. ISSN 1745-2007

Edirisinghe, R; London, K A; Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet? Engineering, Construction and Architectural Management, 24(6), pp. 1119-1154. ISSN 0969-9988

Eksteen, B and Krause, S (2002) Constructing new automotive production facilities in a mature brownfield site. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.

El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.

El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364

El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.

El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.

Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175

Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.

Farghaly, K; Collinge, W; Mosleh, M H; Manu, P and Cheung, C M (2022) Digital information technologies for prevention through design (ptd): A literature review and directions for future research. Construction Innovation, 22(4), pp. 1036-1058. ISSN 1471-4175

Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.

Farrow, B and Burt, R (2020) Service learning: Aligning university mission with design and construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Faulkenberry, L M (1993) Impact of emerging contract employment patterns on training, competitiveness, and company operation in the electrical construction industry. EdD thesis, Texas A&M University, USA.

Faulkner, A C and Day, A K (1986) Images of status and performance in building team occupations. Construction Management and Economics, 4(3), pp. 245-260. ISSN 01446193

Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.

Fetterhoff III, O G (2004) Comparative evaluation of strategic construction-market forecasting methodologies. PhD thesis, University of Florida, USA.

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fischer, M A and Adams, H (2011) Engineering-based decisions in construction. Journal of Construction Engineering and Management, 137(10), pp. 751-754. ISSN 0733-9364

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Florez, L; Castro, D and Irizarry, J (2013) Measuring sustainability perceptions of construction materials. Construction Innovation, 13(2), pp. 217-234. ISSN 1471-4175

Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.

Foroughi Sabzevar, M (2022) An AR-QR code approach to improve access of crews to design and construction information on construction sites. PhD thesis, Drexel University, USA.

Foroughi Sabzevar, M; Gheisari, M and Lo, J (2025) Analyzing the pros and cons of paper-based 2D drawings in construction: a survey of U.S. construction professionals. International Journal of Construction Management, 25(4), pp. 428-438. ISSN 1562-3599

Forsythe, P (2008) Modelling customer perceived service quality in housing construction. Engineering, Construction and Architectural Management, 15(5), pp. 485-496. ISSN 0969-9988

Francis, Annes Elsa (2025) Transforming stadiums into environmentally sustainable community infrastructure: A holistic perspective. PhD thesis, Griffith University, Australia.

Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

Freer, D R (2000) Vital considerations for the design and construction of new student housing communities. EdD thesis, University of California, Los Angeles, USA.

Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.

Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(6), pp. 553-567. ISSN 1466433X

Ganah, A A M (2003) The use of computer visualisation in communicating constructability information in UK. Journal of Engineering, Design and Technology, 1(2), pp. 151-167. ISSN 1726-0531

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X

Gann, D M; Salter, A J and Whyte, J K (2003) Design quality indicator as a tool for thinking. Building Research & Information, 31(5), pp. 318-333. ISSN 0961-3218

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.

Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531

Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.

Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.

Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364

Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.

Gorse, C; Dickinson, I; Platten, A; Walker, C and Hobday, J (2009) Disseminating sustainable practice: An evaluation of the impact of virtual site. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gorse, C; Sutton, R; Johnston, D and Miles-Shenton, D (2011) Heat loss through the building fabric: Low carbon construction practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gosling, J; Naim, M; Sassi, P; Iosif, L and Lark, R (2008) Flexible buildings for an adaptable and sustainable future. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Goulden, S; Erell, E; Garb, Y and Pearlmutter, D (2017) Green building standards as socio-technical actors in municipal environmental policy. Building Research & Information, 45(4), pp. 414-425. ISSN 0961-3218

Graham, P (2000) Building education for the next industrial revolution: Teaching and learning environmental literacy for the building professions. Construction Management and Economics, 18(8), pp. 917-925. ISSN 01446193

Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218

Griffith, A; King, A and Knight, A (2003) Examining the dynamics of novation from the principal contractor's and architect's perspectives. Construction Economics and Building, 3(1), pp. 13-18. ISSN 2204-9029

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Grilo, L; Melhado, S; Silva, S A R; Edwards, P and Hardcastle, C (2007) International building design management and project performance: Case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(1), pp. 5-16. ISSN 1745-2007

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Grosse, E (2018) A gestalt perspective on co-creation: Action research in architectural practice. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X

Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Habibi, S (2022) Role of BIM and energy simulation tools in designing zero-net energy homes. Construction Innovation, 22(1), pp. 101-119. ISSN 1471-4175

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hadikusumo, B H W (2001) Virtually real construction site processes: hazard identification and accident precaution planning using design-for-safety-process (DFSP) tool. PhD thesis, University of Hong Kong, Hong Kong.

Hadipriono, F C (1982) Institutional and procedural methods for preventing failures of long span structures. DEngr thesis, University of California, Berkeley, USA.

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hampton, D; Jin, J S and Clark, E A (1990) Foundation construction within wastewater-treatment plant. Journal of Construction Engineering and Management, 116(4), pp. 564-573. ISSN 0733-9364

Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.

Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.

Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

Hasso, M H (1996) Strategic systems model for the management of United States international engineering and construction growth. PhD thesis, Worcester Polytechnic Institute, USA.

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.

Hayne, G; Kumar, B and Hare, B (2017) Design hazard identification and the link to site experience. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 85-94. ISSN 17514304

Haynes, W A (2002) An exploration of the nexus of the public and private sectors in the project management organizations for two boston megaprojects: The central artery/tunnel project and the Boston Harbor cleanup. PhD thesis, Northeastern University, USA.

Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.

Hedborg, S and Rosander, L (2024) Self-organizing in urban development: Developers coordinating between construction projects. Construction Management and Economics, 42(2), pp. 114-128. ISSN 01446193

Henderson, J R; Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(3), pp. 290-306. ISSN 0969-9988

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction. PhD thesis, University of Michigan, USA.

Heylighen, A; Martin, W M and Cavallin, H (2007) Building stories revisited: Unlocking the knowledge capital of architectural practice. Architectural Engineering and Design Management, 3(1), pp. 65-74. ISSN 1745-2007

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Holt, L (1989) Project management excellence: The Shell Stanney case. Construction Management and Economics, 7(3), pp. 217-234. ISSN 01446193

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach. PhD thesis, University of Washington, USA.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hussien, A (2017) ARGILE: a conceptual framework combining augmented reality with agile philosophy for the UK construction industry. PhD thesis, Liverpool John Moores University, UK.

Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364

Hwang, S (2022) Framework for implementing integrated service-learning. International Journal of Construction Management, 22(7), pp. 1260-1273. ISSN 1562-3599

Ibbs, C W (1986) Future directions for computerized construction research. Journal of Construction Engineering and Management, 112(3), pp. 326-345. ISSN 0733-9364

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.

Invernizzi, D C; Locatelli, G and Brookes, N J (2020) Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance. Construction Management and Economics, 38(10), pp. 947-963. ISSN 01446193

Inyim, P (2015) Time, cost, and environmental impact analysis for sustainable design at multiple building levels. PhD thesis, Florida International University, USA.

Ioannou, P G (1987) Geologic prediction model for tunneling. Journal of Construction Engineering and Management, 113(4), pp. 569-590. ISSN 0733-9364

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Isah, A D; Muhammad, I B and Katun, I (2018) Optimizing architects’ building materials’ specification strategy through knowledge management principles. Construction Innovation, 18(4), pp. 394-411. ISSN 1471-4175

Isiadinso, C; Anumba, C J; El-Rimawi, J and Bhamra, T (2006) Design for deconstruction lessons from the manufacturing industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Ismail, S; Che Ibrahim, C K I; Belayutham, S and Mohammad, M Z (2022) Analysis of attributes critical to the designer's prevention through design competence in construction: The case of Malaysia. Architectural Engineering and Design Management, 18(3), pp. 325-343. ISSN 1745-2007

Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708

Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.

Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jaselskis, E; Ruwanpura, J; Becker, T; Silva, L; Jewell, P and Floyd, E (2011) Innovation in construction engineering education using two applications of internet-based information technology to provide real-time project observations. Journal of Construction Engineering and Management, 137, pp. 829-835. ISSN 0733-9364

Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364

Jayaram, S and Gonzalez, E (2011) Design and construction of a low-cost economical thermal vacuum chamber for spacecraft environmental testing. Journal of Engineering, Design and Technology, 9(1), pp. 47-62. ISSN 1726-0531

Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.

Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007

Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.

Jesumoroti, C; Olanrewaju, A and Khor, S C (2024) Defects in Malaysian hospital buildings. International Journal of Building Pathology and Adaptation, 42(5), pp. 835-856. ISSN 2398-4708

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 189-216. ISSN 1823-6499

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, X; Shen, G; Luo, L and Zhou, X (2025) Influence of policies on stakeholders to drive the success of modular integrated construction in Hong Kong. Engineering, Construction and Architectural Management, 32(5), pp. 2814-2843. ISSN 0969-9988

Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364

Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana. PhD thesis, University of Bath, UK.

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Johnston, D and Miles-Shenton, D (2009) Airtightness of UK dwellings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Johnston, M; Guaralda, M and Sawang, S (2014) Sustainable innovation for Queensland's housing design: A case study. Construction Economics and Building, 14(4), pp. 11-31. ISSN 2204-9029

Jones, A M (1990) Design and construction for traditional house building. PhD thesis, Aston University, UK.

Jung, Y; Oh, H and Jeong, M M (2019) An approach to automated detection of structural failure using chronological image analysis in temporary structures. International Journal of Construction Management, 19(2), pp. 178-185. ISSN 1562-3599

Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Kagioglou, M; Cooper, R; Aouad, G and Sexton, M (2000) Rethinking construction: The generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(2), pp. 141-153. ISSN 0969-9988

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Kapogiannis, G and Sherratt, F (2018) Impact of integrated collaborative technologies to form a collaborative culture in construction projects. Built Environment Project and Asset Management, 8(1), pp. 24-38. ISSN 2044-124X

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988

Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029

Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.

Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.

Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khanh, H D; Minh, N V and Tu, N T (2026) Measuring the overall impact of barriers to BIM adoption in prefabricated construction using a fuzzy synthetic evaluation approach. Construction Economics and Building, 26(1), ISSN 2204-9029

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, I (1994) Data representations in an integrated architectural design environment: Unified data organisation and management. PhD thesis, University of Strathclyde, UK.

Kim, S and Hammad, A (2024) Decision support system (DSS) for selecting sustainable insulation material using Pareto search and novel fuzzy-modified technique for order of preference by similarity to ideal solution (TOPSIS) approach. International Journal of Construction Management, 24(7), pp. 734-747. ISSN 1562-3599

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

King, A P; Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: A contractor's perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kissi, E; Babon-Ayeng, P; Aigbavboa, C; Duah, D; Danquah-Smith, E and Tannor, R A (2023) Examining green road construction components: The case of Ghana. Built Environment Project and Asset Management, 13(5), pp. 682-699. ISSN 2044-124X

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Koch, C and Bertelsen, N H (2011) The devil in the detail: The story of a sustainable trail blazer. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery. PhD thesis, Pennsylvania State University, USA.

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.

Kramer, S W and Sommer, J (2013) An initial look at motivations & personality traits of American construction professionals working for international firms. International Journal of Construction Education and Research, 9(1), pp. 39-60. ISSN 1557-8771

Kristiansen, K (2010) Taking care of caretaking. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kumar Dhar, T; Sk. Maruf Hossain, M and Rubayet Rahaman, K (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(2), pp. 140-157. ISSN 2046-6099

Kübler, O (2006) Applied decision-making in civil engineering. DSc thesis, ETH Zürich, Switzerland.

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X

Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364

Lam, P T I; Wong, F W H; Chan, A P C; Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(2), pp. 216-238. ISSN 1471-4175

Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099

Larsen, G D and Whyte, J (2013) Safe construction through design: Perspectives from the site team. Construction Management and Economics, 31(6), pp. 675-690. ISSN 1466433X

Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304

Lau, E and Lew, V (2011) Empowerment and job characteristics of knowledge workers: The case of Hong Kong construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Laufer, A and Cohenca, D (1990) Factors affecting construction-planning outcomes. Journal of Construction Engineering and Management, 116(1), pp. 135-156. ISSN 0733-9364

Lavy, S; Kiss, C W and Fernandez-Solis, J L (2015) Linking design and energy performance in U.S. Military hospitals. Architectural Engineering and Design Management, 11(1), pp. 41-64. ISSN 1745-2007

Lawther, P M (2000) Predictive cost modelling: Investigation utilising a qualitatively biased research methodology. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. PhD thesis, University of Salford, UK.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials. PhD thesis, University of Wisconsin - Madison, USA.

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175

Leiringer, R (2001) Developing an effective model to support construction companies entering the public-private partnership projects' market. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193

Leu, S-S (1992) Object-oriented representation model of construction technology information. PhD thesis, University of Michigan, USA.

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Leyland, M R (2016) Patronage and the architectural profession: the country house in nineteenth-century Northamptonshire. PhD thesis, University of Leicester, UK.

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, M and Yang, J (2014) Analysis of interrelationships between critical waste factors in office building retrofit projects using interpretive structural modelling. International Journal of Construction Management, 14(1), pp. 15-27. ISSN 1562-3599

Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.

Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312

Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007

Lim, S H and Chan, T K (2020) Enhancing student motivation and learning with monetary prizes in a construction management undergraduate subject. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Lin, Solomon Tung Kit (2021) Brim-based structural life cycle assessment of bridges: Incorporating finite element analysis and real-time sensor measurements. PhD thesis, Monash University, Australia.

Ling, F Y Y; Pham, V M C and Hoang, T P (2009) Strengths, weaknesses, opportunities, and threats for architectural, engineering, and construction firms: Case study of Vietnam. Journal of Construction Engineering and Management, 135(10), pp. 1105-1113. ISSN 0733-9364

Lingard, H C; Cooke, T and Blismas, N (2012) Designing for construction workers' occupational health and safety: A case study of socio-material complexity. Construction Management and Economics, 30(5), pp. 367-382. ISSN 1466433X

Lisø, K R; Aandahl, G; Eriksen, S and Alfsen, K H (2003) Preparing for climate change impacts in norway's built environment. Building Research & Information, 31(3-4), pp. 200-209. ISSN 0961-3218

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, R (2012) BIM-based life cycle information management: Integrating knowledge of facility management into design. PhD thesis, University of Florida, USA.

Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218

Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364

Lopez, R; Mascione, D and Liu, H J (2017) Management of issues in the delivery of airport infrastructure within Western Australia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 207-217. ISSN 17514304

Lu, K.; Deng, X. and Zhai, X. (2026) Openbim-based simulation of building operational carbon under different information availability. Smart and Sustainable Built Environment, 15(5), pp. 1751-1780. ISSN 2046-6099

Luck, R (2007) Using artefacts to mediate understanding in design conversations. Building Research & Information, 35(1), pp. 28-41. ISSN 0961-3218

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Luiten, G T and Tolman, F P (1997) Automating communication in civil engineering. Journal of Construction Engineering and Management, 123(2), pp. 113-120. ISSN 0733-9364

Ma, G; Wu, M; Jia, J and Yang, W (2021) Two-level quality decision support system for building structural damage prediction and maintenance solution recommendation in the operation and maintenance phase. Journal of Construction Engineering and Management, 147(6): 04021044, ISSN 0733-9364

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings. PhD thesis, Illinois Institute of Technology, USA.

Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.

MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

MacLaren, A J W; Wilson, M; Simmonds, R; Hamilton-Pryde, A; McCarthy, J and Milligan, A (2017) Educating students for the collaborative workplace: Facilitating interdisciplinary learning in construction courses. International Journal of Construction Education and Research, 13(3), pp. 180-202. ISSN 1557-8771

Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.

Maftei, L and Harty, C (2016) Challenging design perceptions in immersive virtual reality environments. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599

Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916

Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.

Marinelli, M; Petroutsatou, K; Fragkakis, N and Lambropoulos, S (2018) Rethinking new public infrastructure value for money in recession times: The Greek case. International Journal of Construction Management, 18(4), pp. 331-342. ISSN 1562-3599

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X

Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175

Mattar, S G (1983) Segmental post-tensioned dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(3), pp. 276-285. ISSN 0733-9364

McCain, M L (1986) Skill and deskilling in the English building trades in the nineteenth-century. PhD thesis, Georgetown University, USA.

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.

Merdinger, C J (1949) A history of civil engineering. PhD thesis, University of Oxford, UK.

Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988

Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Mimendi Cruz, Jose Leonel (2021) Digital workflow for the design, construction and management of natural bamboo pole structures. PhD thesis, University College London, UK.

Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.

Mitchell, A; Frame, I; Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(3), pp. 297-311. ISSN 0969-9988

Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.

Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364

Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvemeent in UK design and build projects: A call for change. Construction Management and Economics, 19(6), pp. 559-562. ISSN 01446193

Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.

Morgan, C; Foster, J A; Poston, A and Sharpe, T R (2017) Overheating in Scotland: Contributing factors in occupied homes. Building Research & Information, 45(1-2), pp. 143-156. ISSN 0961-3218

Morris, P W G (1972) A study of selected building projects in the context of theories of organization. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.

Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(8), pp. 845-857. ISSN 1562-3599

Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(2), pp. 100-114. ISSN 1745-2007

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.

Murtaza, I; Rashid, M U and Asad, M (2024) Construction safety challenges and opportunities at design stage for building industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 3-15. ISSN 17514304

Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.

Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193

Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364

Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Nguyen, B K (2012) Developing a framework for assessing sustainability of tall-building projects. PhD thesis, University of Sheffield, UK.

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Nicolini, D; Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(1), pp. 37-47. ISSN 01446193

Nidhin, B K S N; Domingo, N; Bui, T T P and Wilkinson, S (2025) Construction stakeholders' knowledge on zero carbon initiatives in New Zealand. International Journal of Building Pathology and Adaptation, 43(3), pp. 512-527. ISSN 2398-4708

Nikyema, G A B (2020) Barriers to the adoption of green building materials and technologies in developing countries: The case of Burkina Faso. PhD thesis, Clemson University, USA.

Nobe, M C and Greenwell, C (2016) Moving operations and maintenance practices of existing buildings beyond sustainability: A case study of the lenses framework during post occupancy. International Journal of Construction Education and Research, 12(2), pp. 122-141. ISSN 1557-8771

Noguchi, M (2004) A choice model for mass customisation of lower-cost and higher-performance housing in sustainable development. PhD thesis, McGill University, Canada.

Nordby, A S; Berge, B; Hakonsen, F and Hestnes, A G (2009) Criteria for salvageability: The reuse of bricks. Building Research & Information, 37(1), pp. 55-67. ISSN 0961-3218

Norell, M; Stehn, L and Engström, D (2020) Architectural design of vertical extensions of buildings: A risk perspective on complexity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ntshwene, K; Essah, E A and Dixon, T J (2014) Investigating the level of awareness of building assessment tools in the construction industry of Botswana. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Oladapo, O and Liyanage, C L (2010) Control of healthcare associated infections: A concerted effort. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.

Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531

Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E (2007) Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in abu dhabi, united arab emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159. ISSN 1745-2007

Othman, A A E (2012) A study of the causes and effects of contractors' non-compliance with the health and safety regulations in the South African construction industry. Architectural Engineering and Design Management, 8(3), pp. 180-191. ISSN 1745-2007

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Owolabi, A (2004) Development of an integrated product information management system. EngD thesis, Loughborough University, UK.

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Oyuga, J O; Gwaya, A and Njuguna, M B (2023) Investigation of the current usage of BIM capabilities by large-sized building contractors in Kenya based on theory of innovation diffusion. Construction Innovation, 23(1), pp. 155-177. ISSN 1471-4175

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Parfitt, M K; Syal, M G; Khalvati, M and Bhatia, S (1993) Computer-integrated design drawings and construction project plans. Journal of Construction Engineering and Management, 119(4), pp. 729-742. ISSN 0733-9364

Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.

Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364

Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.

Paulson, B C (2003) Design and construction for the rest of us. Journal of Construction Research, 4(2), pp. 115-127. ISSN 1609-9451

Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pekeriçli, M K (2010) A lifecycle information management solution for built environment facilities. PhD thesis, University of Reading, UK.

Pereira, N J G (2023) The impact of human errors on the performance to failure of concrete bridges. PhD thesis, Universidade do Minho, Portugal.

Perry, J G (1985) The development of contract strategies for construction projects. PhD thesis, University of Manchester, UK.

Petcherdchoo, A (2004) Maintaining condition and safety of deteriorating bridges by probabilistic models and optimization. PhD thesis, University of Colorado at Boulder, USA.

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.

Pinti, Lidia (2019) BIM-based facility management: Embedded information management for maintenance: Building information modelling and database integration for the Italian public administration. PhD thesis, Politecnico di Milano, Italy.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Piroozfar, P A E and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(1), pp. 65-81. ISSN 1745-2007

Pirzadeh, P and Lingard, H (2017) Exploring the dynamic social interactions that underpin work health and safety related design decision-making. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Pirzadeh, P; Lingard, H and Blismas, N (2020) A multilevel socio-technical perspective on work health and safety related design decision making. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Pirzadeh, Payam (2018) A social network perspective on design for construction safety. PhD thesis, RMIT University, Australia.

Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.

Ponton, H (2021) Social interactions in construction design team meetings. PhD thesis, Northumbria University, UK.

Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451

Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Poston, A; Emmanuel, R and Thomson, C (2010) Developing holistic frameworks for the next generation of sustainability assessment methods for the built environment. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Rad, A A; Asnaashari, E; Knight, A and Hurst, A (2010) ICT utilization in administrative tasks in Iranian construction organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Raisbeck, P (2009) Considering design and PPP innovation: A review of design factors in PPP research. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Raisbeck, P (2016) The architect as gleaner: Design practice as performance in the architectural office. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Rajendran, S; Gambatese, J A and Behm, M G (2009) Impact of green building design and construction on worker safety and health. Journal of Construction Engineering and Management, 135(10), pp. 1058-1066. ISSN 0733-9364

Rameezdeen, R; Gunarathna, N and Assistant, R (2003) Organisational culture in construction: An employee perspective. Construction Economics and Building, 3(1), pp. 19-30. ISSN 2204-9029

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Reinoso, E; Jaimes, M A and Torres, M A (2016) Evaluation of building code compliance in Mexico city: Mid-rise dwellings. Building Research & Information, 44(2), pp. 202-213. ISSN 0961-3218

Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Rogerson, R J; Giddings, B and Jefferies, M (2024) Constructing the future of the city centre: Realizing visions. Construction Management and Economics, 42(2), pp. 129-145. ISSN 01446193

Root, D; Fernie, S and Baldwin, A N (1999) The languages of product and service: Barriers to the integration of construction and design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.

Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.

Sacks, R; Whyte, J; Swissa, D; Raviv, G; Zhou, W and Shapira, A (2015) Safety by design: Dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(1), pp. 55-72. ISSN 01446193

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Saghatforoush, Ehsan (2014) Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Sal Moslehian, A; Kocaturk, T; Andrews, F and Tucker, R (2023) The nature of innovation in hospital building design: A mixed grounded theory study. Construction Innovation, 23(4), pp. 792-814. ISSN 1471-4175

Salehudin, Muhamad Syafiq Bin (2012) Developing sustainable resorts in developing countries: A proposed new generation rating framework for Malaysia. PhD thesis, University of New South Wales, Australia.

Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099

Salter, A and Torbett, R (2003) Innovation and performance in engineering design. Construction Management and Economics, 21(6), pp. 573-580. ISSN 01446193

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sarah Slaughter, E and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(3), pp. 269-280. ISSN 01446193

Sauer, A D (2013) Sustainable building codes: How the perceptions of building code officials influence their intent to adopt the international green construction code. PhD thesis, Indiana State University, USA.

Scanlon, Jane (2011) Sustainability governance in the delivery phase of infrastructure: Two case studies from the urban rail sector. PhD thesis, Western Sydney University, Australia.

Schexnayder, C and Anderson, S (2011) Construction engineering education: History and challenge. Journal of Construction Engineering and Management, 137, pp. 730-739. ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Scott, B O B (1995) Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(2), pp. 83-92. ISSN 0969-9988

Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988

Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.

Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364

Serag-Eldin, Gamil M (2010) A conflict management model for architectural design collaboration. PhD thesis, University of California, USA.

Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364

Seymour, D E and Rooke, J D (1998) Construction management research and the attempt to build a social science. Journal of Construction Procurement, 4(1), pp. 59-73. ISSN 1358-9180

Shabha, G; Barber, F and Laycock, P (2023) A qualitative assessment of the impact of smart homes and environmentally beneficial technologies on the UK 2050 net-zero carbon emission target. Smart and Sustainable Built Environment, 12(2), pp. 341-360. ISSN 2046-6099

Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.

Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shaofeng, L; Jincai, F; Pinghua, Z and Xiang, L (2018) Stability analysis of two parallel closely spaced tunnels based on convergence-confinement principle. Journal of Construction Engineering and Management, 144(6): 04018041, ISSN 0733-9364

Shapira, A; Shahar, Y and Raz, Y (2001) Design and construction of high multitier shoring towers: Case study. Journal of Construction Engineering and Management, 127(2), pp. 108-115. ISSN 0733-9364

Sharpe, T (2019) Ethical issues in domestic building performance evaluation studies. Building Research & Information, 47(3), pp. 318-329. ISSN 0961-3218

Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175

Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364

Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Simpeh, E and Smallwood, J (2018) Field diagnosis of challenges and facilitators to the adoption of green building principles in multi-purpose office facilities. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Singer, H and Özşahin, Ş (2022) Prioritization of laminate flooring selection criteria from experts' perspectives: A spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(6), pp. 911-926. ISSN 1745-2007

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988

Singhaputtangkul, N (2017) A decision support tool to mitigate decision-making problems faced by a building design team. Smart and Sustainable Built Environment, 6(1), pp. 2-18. ISSN 2046-6099

Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X

Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(1), pp. 57-69. ISSN 2204-9029

Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smith, S A (1986) Iron and steel in long-span construction 1847-1890: A study of change and innovation. PhD thesis, Imperial College London, UK.

Smyth, H; Anvuur, A M and Kusuma, I (2017) Integrated solutions for total asset management through "RIVANS". Built Environment Project and Asset Management, 7(1), pp. 5-18. ISSN 2044-124X

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X

Soibelman, L; Liu, L Y; Kirby, J G; East, E W; Caldas, C H and Lin, K Y (2003) Design review checking system with corporate lessons learned. Journal of Construction Engineering and Management, 129(5), pp. 475-484. ISSN 0733-9364

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180

Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531

Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.

Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364

Spottiswoode, B H and MacKellar, D C R (2013) The role and effect of technical review panels. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 103-108. ISSN 17514312

Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Stewart, P (2001) The role of e-commerce systems for the construction industry. Construction Economics and Building, 1(2), pp. 24-36. ISSN 2204-9029

Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007

Svatoš-Ražnjević, H; Boeva, Y; Kropp, C and Menges, A (2025) Trajectories from standard to incremental and pioneering innovation in timber construction: Multi-storey timber buildings in Germany, Austria, and Switzerland. Building Research & Information, 53(6), pp. 734-758. ISSN 0961-3218

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Taheriattar, Reza (2018) Sustainability and adaptable/flexible infrastructure. PhD thesis, University of New South Wales, Australia.

Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Tanko, B L; Essah, E A; Elijah, O; Zakka, W P and Klufallah, M (2023) Bibliometric analysis, scientometrics and metasynthesis of internet of things (IoT) in smart buildings. Built Environment Project and Asset Management, 13(5), pp. 646-665. ISSN 2044-124X

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.

Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.

Tatum, C B (1987) Improving constructibility during conceptual planning. Journal of Construction Engineering and Management, 113(2), pp. 191-207. ISSN 0733-9364

Tatum, C B (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), pp. 602-617. ISSN 0733-9364

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B (2018) Construction engineering research: Integration and innovation. Journal of Construction Engineering and Management, 144(3): 04018005, ISSN 0733-9364

Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks. PhD thesis, Stanford University, USA.

Taylor, J E (2007) Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks. Journal of Construction Engineering and Management, 133(12), pp. 993-1002. ISSN 0733-9364

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Teicholz, P and Fischer, M (1994) Strategy for computer integrated construction technology. Journal of Construction Engineering and Management, 120(1), pp. 117-131. ISSN 0733-9364

Terwel, K C (2014) Structural safety: Study into critical factors in the design and construction process. PhD thesis, Delft University of Technology, Netherlands.

Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.

Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: A case study. Building Research & Information, 29(5), pp. 394-408. ISSN 0961-3218

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Tong, K; Mills, G and Çidik, M S (2023) Value of modularisation in healthcare buildings: An exploration of the nucleus programme. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tran, D Q; Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(5), pp. 774-787. ISSN 0969-9988

Tran, D Q; Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(6), pp. 1319-1336. ISSN 0969-9988

Trigunarsyah, B (2004) Constructability practices among construction contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669. ISSN 0733-9364

Trigunarsyah, B (2004) A review of current practice in constructability improvement: Case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580. ISSN 01446193

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(2), pp. 207-215. ISSN 1466433X

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X

Tumbare, M J (2013) Sedimentation of small and medium sized dams: Discussion issues. Journal of Engineering, Design and Technology, 11(2), pp. 112-128. ISSN 1726-0531

Tutt D, H C (2013) Journeys through the cave: The use of 3D immersive environments for client engagement practices in hospital design. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.

Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193

Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 0969-9988

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.

Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Vakeva-Baird, S; Tahmasebi, F; Williams, J J and Mumovic, D (2025) Effective interdisciplinary stakeholder engagement in net zero building design. Buildings & Cities, 6(1), pp. 654-673. ISSN 2632-6655

Van Den Berg, M; Voordijk, H; Adriaanse, A and Hartmann, T (2017) Experiencing supply chain optimizations: A serious gaming approach. Journal of Construction Engineering and Management, 143(11): 04017082, ISSN 0733-9364

Van Den Bossche, N; Blommaert, A and Daniotti, B (2023) The impact of demographical, geographical and climatological factors on building defects in Belgium. International Journal of Building Pathology and Adaptation, 41(3), pp. 549-573. ISSN 23984708

Van der Zwart, J (2014) Building for a better hospital: Value-adding management and design of healthcare real estate. PhD thesis, Delft University of Technology, Netherlands.

VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vassigh, S; Davis, D; Behzadan, A H; Mostafavi, A; Rashid, K; Alhaffar, H; Elias, A and Gallardo, G (2020) Teaching building sciences in immersive environments: A prototype design, implementation, and assessment. International Journal of Construction Education and Research, 16(3), pp. 180-196. ISSN 1557-8771

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Venkataraman, V (2017) Investigating the impact of project management factors on green building project delivery using link analysis and system dynamics techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Vernikos, V K; Goodier, C I; Gibb, A G F; Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Walker, A and Kwong Wing, C (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(2), pp. 166-176. ISSN 0969-9988

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(2), pp. 158-184. ISSN 1471-4175

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Wang, C; Shen, W; Cui, B and Zeng, Y (2025) Numerical study on the thermal environment of the vertical greening system based on infrared thermal imaging. Architectural Engineering and Design Management, 21(2), pp. 315-337. ISSN 1745-2007

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Waters, B L; Dixit, M K and Pariafsai, F (2023) Architects' ranking of professional design services. Architectural Engineering and Design Management, 19(6), pp. 620-641. ISSN 1745-2007

Watson, K J and Whitley, T (2017) Applying social return on investment to the built environment. Building Research & Information, 45(8), pp. 875-891. ISSN 0961-3218

Webb, R M; Smallwood, J and Haupt, T C (2004) The potential of 4d cad as a tool for construction management. Journal of Construction Research, 5(1), pp. 43-60. ISSN 1609-9451

Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines. PhD thesis, Colorado State University, USA.

Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364

Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.

Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.

Whyte, A and Cammarano, C (2012) Value management in infrastructure projects in western Australia: Techniques and staging. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Wijekoon, K (2020) Optimising the adoption of building information modeliing (BIM) in facilities mnagement (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Wijekoon, K A D N C (2019) Optimising the adoption of building information modelling (BIM) in facilities management (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Wijekoon, K A D N C (2020) Optimising the adoption of building information modelling in facilities management: a model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings: A study of design and construction practices in Indonesia. International Journal of Construction Management, 10(1), pp. 75-86. ISSN 1562-3599

Windapo, A O and Goulding, J S (2015) Understanding the gap between green building practice and legislation requirements in South Africa. Smart and Sustainable Built Environment, 4(1), pp. 67-96. ISSN 2046-6099

Woju, U W and Balu, A S (2020) Time-dependent safety performance of reinforced concrete structures. Journal of Engineering, Design and Technology, 18(5), pp. 1103-1120. ISSN 1726-0531

Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xing, M; Cao, J and Cao, D (2023) Impacts of policy mix comprehensiveness on BIM implementation: Moderating effects of environmental state and response uncertainty. Journal of Construction Engineering and Management, 149(2): 04022171, ISSN 0733-9364

Yaghi, M A F (1980) Organizational decision making in a public organization: A case study of the new york state facilities design and construction group. DPA thesis, State University of New York at Albany, USA.

Yalciner, S (2018) Sustainable architecture and the influence of global assessment tools. PhD thesis, University of Manchester, UK.

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Yang, R J; Zou, P X W and Wang, J (2014) Stakeholder-associated risk networks in green buildings: China versus Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Yang, X; Zhong, H; Wang, Z; Du, P; Zhou, K; Zhou, H; Lai, X; Lau, Y L; Song, Y and Tang, L (2024) BEKG: A built environment knowledge graph. Building Research & Information, 52(1-2), pp. 19-37. ISSN 0961-3218

Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364

Yates, J K and Battersby, L C (2003) Master builder project delivery system and designer construction knowledge. Journal of Construction Engineering and Management, 129(6), pp. 635-644. ISSN 0733-9364

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yu, T; Liang, X and Wang, Y (2020) Factors affecting the utilization of big data in construction projects. Journal of Construction Engineering and Management, 146(5): 04020032, ISSN 0733-9364

Zahiroddiny, S (2016) Understanding the impact of building information modelling (BIM) on construction projects' communication patterns. PhD thesis, University of Northumbria at Newcastle, UK.

Zainab S, P W and Goodhew S, F A (2013) Stakeholders perspective on sustainable technology selection to achieve zero carbon retail buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Zeynalian, M; Trigunarsyah, B and Ronagh, H R (2013) Modification of advanced programmatic risk analysis and management model for the whole project life cycle's risks. Journal of Construction Engineering and Management, 139(1), pp. 51-59. ISSN 0733-9364

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, L; Hu, H; Fang, Y; Qiang, Z and Cai, Y (2023) Preliminary CSI specification localization methodology matrix in China. International Journal of Construction Management, 23(6), pp. 935-944. ISSN 1562-3599

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Zou R R, F R and Jewell C, T L C M (2013) An exploratory study of information maturity in construction and developing a decision-making model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

da Silva, M B C; Moschen, S D A; Cecatto, B and Larentis, F (2022) Perceived attributes and dimensions of accessibility in adapted bathrooms. Building Research & Information, 50(1-2), pp. 60-73. ISSN 0961-3218

de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007

van Manen, M; olde Scholtenhuis, L and Voordijk, H (2022) Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. Engineering, Construction and Architectural Management, 29(6), pp. 2535-2553. ISSN 0969-9988

This list was generated on Sun Aug 23 03:42:27 2026 UTC.