Items with Index Term: personnel
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abbasian-Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis. PhD thesis, North Carolina State University, USA.
Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364
Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364
Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(1), pp. 45-58. ISSN 1358-9180
Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193
Abed, A; Ali, H; Ibrahim, A and Wedyan, M (2023) Impact of setbacks on thermal comfort and visual privacy in detached houses in Jordan. Building Research & Information, 51(4), pp. 446-458. ISSN 0961-3218
Abeysekera, V and McLean, C (2001) Project success and relationships from a stakeholder perspective: A pilot study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Abisuga, O A; Ogungbemi, A O; Akinpelu, A A and Oshodi, O S (2017) Assessment of building maintenance projects success factors in Lagos, Nigeria. Journal of Construction Business and Management, 1(1), pp. 29-38. ISSN 2521-0165
Acar, E; Wall, J; McNamee, F; Carney, M and Öney-Yazici, E (2008) Innovative safety management training through e-learning. Architectural Engineering and Design Management, 4(3-4), pp. 239-250. ISSN 1745-2007
Ackerman Jr., P J (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Adah, C A; Daniel, E I and Tunji-Olayeni, P (2025) The experience of women in construction craftspeople apprenticeship programmes in Nigeria. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 83-93. ISSN 17514304
Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adeyemi, O and Oke, A (2022) Factors affecting mentoring of professionals in construction firms: Nigerian quantity surveyors' perspective. International Journal of Construction Management, 22(12), pp. 2300-2307. ISSN 1562-3599
Adzroe, E K (2015) A study of e-business technology transfer via foreign direct investment in the Ghanaian construction industry. PhD thesis, University of Salford, UK.
Afshari, A R (2017) Methods for selection of construction project manager: Case study. Journal of Construction Engineering and Management, 143(12): 06017003, ISSN 0733-9364
Aghimien, L M; Aigbavboa, C O; Anumba, C J and Thwala, W D (2023) A confirmatory factor analysis of the challenges of effective management of construction workforce in South Africa. Journal of Engineering, Design and Technology, 21(4), pp. 1134-1152. ISSN 1726-0531
Agumba, J N and Haupt, T C (2014) The implementation of health and safety practices: Do demographic attributes matter? Journal of Engineering, Design and Technology, 12(4), pp. 530-550.
Agunbiade, O (2019) Transcendental phenomenological study of what the pipeline engineering personnel perceive as intention-to-leave. DM thesis, University of Phoenix, USA.
Ahmad, R K and Gibb, A G F (2003) Measuring safety culture with SPMT: Field-data. Journal of Construction Research, 4(1), pp. 29-44. ISSN 1609-9451
Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364
Ahn, S; Lee, S and Steel, R P (2014) Construction workers' perceptions and attitudes toward social norms as predictors of their absence behavior. Journal of Construction Engineering and Management, 140(5): 04013069, ISSN 0733-9364
Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364
Aigbavboa, C; Addo, L Y; Ebekozien, A; Thwala, W D and Arthur-Aidoo, B M (2023) Developing a framework for effective institutional management of Ghana's urban water supply. International Journal of Building Pathology and Adaptation, 41(6), pp. 290-302. ISSN 23984708
Ajelabi, I K (2013) Product based project portfolio and information sharing. PhD thesis, University of Reading, UK.
Akanmu, A A (2012) Towards cyber-physical systems integration in construction. PhD thesis, Pennsylvania State University, USA.
Akcamete, A (2011) A formal approach for managing facility change information and capturing change history as part of building information models (BIMs). PhD thesis, Carnegie Mellon University, USA.
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Al Sultan, Sulaiman (2025) Exploring the US construction workforce: The future of the frontline supervisor role and digital marketing to increase undergraduate enrollment. PhD thesis, Arizona State University, USA.
Al-Bayati, A J; Abudayyeh, O; Fredericks, T and Butt, S E (2017) Managing cultural diversity at U.S. Construction sites: Hispanic workers' perspectives. Journal of Construction Engineering and Management, 143(9): 04017064, ISSN 0733-9364
Al-Bayati, A J; Abudayyeh, O; Fredericks, T and Butt, S E (2017) Reducing fatality rates of the Hispanic workforce in the U.S. Construction industry: Challenges and strategies. Journal of Construction Engineering and Management, 143(3): 04016105, ISSN 0733-9364
Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), pp. 3-23. ISSN 1466433X
Al-Saadi, R and Abdou, A (2016) Factors critical for the success of public‒private partnerships in UAE infrastructure projects: Experts' perception. International Journal of Construction Management, 16(3), pp. 234-248. ISSN 1562-3599
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Zarooni, S (1997) Developing the construction industry in the United Arab Emirates with special reference to Abu Dhabi. PhD thesis, University of London, University College London, UK.
Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Albert, A; Hallowell, M R; Kleiner, B; Chen, A and Golparvar-Fard, M (2014) Enhancing construction hazard recognition with high-fidelity augmented virtuality. Journal of Construction Engineering and Management, 140(7): 04014024, ISSN 0733-9364
Albert, A; Hallowell, M R and Kleiner, B M (2014) Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study. Journal of Construction Engineering and Management, 140(2): 04013042, ISSN 0733-9364
Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. II: Predictive modeling and empirical validation. Journal of Construction Engineering and Management, 143(7): 04017024, ISSN 0733-9364
Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.
Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499
Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499
Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.
Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(2), pp. 82-91. ISSN 0961-3218
Allison, L and Kaminsky, J (2017) Safety communication networks: Females in small work crews. Journal of Construction Engineering and Management, 143(8): 04017050, ISSN 0733-9364
Almutairi, M (2019) The influence of national culture on health and safety performance in Kuwait oil and gas sector construction projects. PhD thesis, University of Salford, UK.
Alrehaili, Omar (2016) Assessing safety culture among personnel in governmental construction sites at Saudi Arabia: A quantitative study approach. PhD thesis, University of Central Florida, USA.
Alsamadani, R; Hallowell, M R; Javernick-Will, A and Cabello, J (2013) Relationships among language proficiency, communication patterns, and safety performance in small work crews in the United States. Journal of Construction Engineering and Management, 139(9), pp. 1125-1134. ISSN 0733-9364
Aluko, O R; Godwin Iroroakpo, I and Mewomo, M C (2021) Relationship between perceived service quality and client satisfaction indicators of engineering consultancy services in building projects. Journal of Engineering, Design and Technology, 19(2), pp. 557-577. ISSN 1726-0531
Alwasel, A; Abdel-Rahman, E M; Haas, C T and Lee, S (2017) Experience, productivity, and musculoskeletal injury among masonry workers. Journal of Construction Engineering and Management, 143(6): 05017003, ISSN 0733-9364
Alzoubi, Y; Locatelli, G and Sainati, T (2024) Turning a blind eye: Ignoring modern slavery in the race to construction project completion. Journal of Construction Engineering and Management, 150(10): 04024136, ISSN 0733-9364
Amade, B; Moneke, U U and Okorie, C E (2024) Modelling the hindrances to building information modelling adoption on construction projects in Nigeria. Journal of Construction in Developing Countries, 29(1), pp. 23-46. ISSN 1823-6499
Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165
Amirkhanian, S N and Baker, N J (1992) Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. ISSN 0733-9364
Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
An, J; Wang, Z; Pan, S; Qin, H; Luo, Q and Yan, D (2024) An integrated resilience and assessment methodology framework for addressing uncertainty in highway operation and maintenance systems. Journal of Construction Engineering and Management, 150(12): 04024174, ISSN 0733-9364
Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Arai, K and Morimoto, E (2021) Productivity and innovation in the Japanese construction industry. Construction Innovation, 21(4), pp. 917-933. ISSN 1471-4175
Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364
Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988
Arditi, D and Balci, G (2009) Managerial competencies of female and male construction managers. Journal of Construction Engineering and Management, 135(11), pp. 1275-1278. ISSN 0733-9364
Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asiedu, R O; Manu, P; Mahamadu, A M; Booth, C A; Olomolaiye, P; Agyekum, K and Abadi, M (2023) Critical skills for infrastructure procurement: Insights from developing country contexts. Journal of Engineering, Design and Technology, 21(6), pp. 1948-1974. ISSN 1726-0531
Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.
Assaf, S; Srour, O and Hassanain, M A (2013) Causes of failure of small contractors in Saudi Arabia. International Journal of Construction Management, 13(4), pp. 1-10. ISSN 1562-3599
Austigard, M S and Mattsson, J (2020) Monitoring climate change related biodeterioration of protected historic buildings. International Journal of Building Pathology and Adaptation, 38(4), pp. 529-538. ISSN 23984708
Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.
Awolusi, I G and Marks, E D (2017) Safety activity analysis framework to evaluate safety performance in construction. Journal of Construction Engineering and Management, 143(3): 05016022, ISSN 0733-9364
Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771
Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988
Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988
Banahene, K O; Anvuur, A and Dainty, A (2014) Conceptualising organisational resilience: An investigation into project organising. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.
Banham, G P (2009) Improving knowledge retention and use in construction project team environments: a soft systems methodology approach. PhD thesis, University of Surrey, UK.
Baroudi, B and McAnulty, S (2013) Management of remote construction projects: The Australian experience. International Journal of Construction Management, 13(2), pp. 1-12. ISSN 1562-3599
Barry, S; Cronin, W; Spillane, J P and Bradley, J G (2021) Compliance with COVID-19 regulations in micro-enterprises and SMEs in the Irish construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bavi, R (2005) The development of a model design-build specification document for educational facilities construction projects. EdD thesis, Wilmington College (Delaware), USA.
Bayona Malo, A A (2025) Evidence-based strategies to define, differentiate, and prevent serious injury and fatality exposure in construction. PhD thesis, University of Colorado at Boulder, USA.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality. PhD thesis, University of Michigan, USA.
Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364
Berawi, M A; Miraj, P; Arifuddin, R; Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), pp. 87-107. ISSN 1823-6499
Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.
Bhandari, S and Hallowell, M R (2017) Emotional engagement in safety training: Impact of naturalistic injury simulations on the emotional state of construction workers. Journal of Construction Engineering and Management, 143(12): 4017090, ISSN 0733-9364
Bhattacharya, S; Momaya, K S and Iyer, K C (2021) Bridging the gaps for business growth among Indian construction companies. Built Environment Project and Asset Management, 11(2), pp. 231-250. ISSN 2044-124X
Bigelow, B F; Perrenoud, A J; Rahman, M and Saseendran, A (2021) An exploration of age on attraction and retention of managerial workforce in the electrical construction industry in the United States. International Journal of Construction Education and Research, 17(1), pp. 3-17. ISSN 1557-8771
Bismark, D; Melagoda, D G and Rowlinson, S (2024) Innovation ambidexterity in construction firms: External knowledge antecedents and performance consequences. Construction Management and Economics, 42(6), pp. 503-526. ISSN 01446193
Bloechle, Robert A (1969) Equal employment opportunity in the construction industry. PhD thesis, Creighton University, UK.
Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967. EdD thesis, Stanford University, USA.
Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364
Bowen, P.; Govender, R.; Edwards, P. and Cattell, K. (2015) Tested or not? A categorical examination of HIV/AIDS testing among workers in the South African construction industry. Journal of Construction Engineering and Management, 141(12): 04015040, ISSN 0733-9364
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Predictive modeling of workplace stress among construction professionals. Journal of Construction Engineering and Management, 140(3): 4013055, ISSN 0733-9364
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Workplace stress, stress effects, and coping mechanisms in the construction industry. Journal of Construction Engineering and Management, 140(3): 4013059, ISSN 0733-9364
Bowen, P; Govender, R and Edwards, P (2014) Structural equation modeling of occupational stress in the construction industry. Journal of Construction Engineering and Management, 140(9): 04014042, ISSN 0733-9364
Bowen, P; Govender, R; Edwards, P and Cattell, K (2015) Tested or not? a categorical examination of HIV/AIDS testing among workers in the South African construction industry. Journal of Construction Engineering and Management, 141(12): 04015040, ISSN 0733-9364
Bowen, P; Govender, R; Edwards, P; Cattell, K and Street, A (2015) Factors determining South African construction workers' prejudice towards and discrimination against HIV+ persons. Journal of Construction Engineering and Management, 141(7): 4015014, ISSN 0733-9364
Boyd, D and Gichuhi, F (2003) Studying site meetings in projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Brewer, G; Gajendran, T and Runeson, G (2013) ICT & innovation: A case of integration in a regional construction firm. Construction Economics and Building, 13(3), pp. 24-36. ISSN 2204-9029
Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364
Bruen, J; Spillane, J P and Brooks, T (2021) Community orientated post-disaster sustainable housing recovery, rebuilding and community renewal: Sri Lanka case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bu-Bushait, K A (1984) A descriptive examination of the relationships between the application of project management techniques and project characteristics. PhD thesis, Georgia State University, USA.
Bugg, R; Collins, W and Gilbert, C (2018) Applying radio frequency identification tags to improve personnel safety in dredging construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364
Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.
Butler, C J (2005) The relationship between emotional intelligence and transformational leadership behavior in construction industry leaders. PhD thesis, University of Colorado at Boulder, USA.
Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218
Cabahug, Ruel R (2003) A profile for classifying plant operator maintenance proficiency. PhD thesis, Loughborough University, UK.
Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364
Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364
Cameron, I; Hare, B and Duff, R (2013) An analysis of safety advisor roles and site safety performance. Engineering, Construction and Architectural Management, 20(5), pp. 505-521. ISSN 0969-9988
Carter, A (2022) Perceptions of construction trade careers amid a growing labor shortage: An exploratory study. PhD thesis, Wilmington University (Delaware), USA.
Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.
Chan, A P C; Javed, A A; Lyu, S; Hon, C K H and Wong, F K W (2016) Strategies for improving safety and health of ethnic minority construction workers. Journal of Construction Engineering and Management, 142(9): 05016007, ISSN 0733-9364
Chan, K (2023) Fast track: State capacity and railway bureaucracies in China and India. PhD thesis, Princeton University, USA.
Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Chapman, R J (1999) The likelihood and impact of changes of key project personnel on the design process. Construction Management and Economics, 17(1), pp. 99-106. ISSN 01446193
Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988
Chaudhari, R; Goodrum, P; Brady, N; Jones, M; Hallowell, M; Yeh, T and Bhandari, S (2025) Exploring the impact of augmented reality on work performance in a full-scale MEP assembly task: Study of industry and novice populations. Journal of Construction Engineering and Management, 151(12): 04025189, ISSN 0733-9364
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364
Chen, K; Loo, S C and Alias, A (2024) A bibliometric review of maturity model studies in the construction industry. Journal of Construction in Developing Countries, 29(2), pp. 129-145. ISSN 1823-6499
Chen, Q and Jin, R (2013) Multilevel safety culture and climate survey for assessing new safety program. Journal of Construction Engineering and Management, 139(7), pp. 805-817. ISSN 0733-9364
Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364
Chen, Y; McCabe, B and Hyatt, D (2017) Relationship between individual resilience, interpersonal conflicts at work, and safety outcomes of construction workers. Journal of Construction Engineering and Management, 143(8): 04017042, ISSN 0733-9364
Chen, Y-T (2008) Automated on-site productivity evaluation using RFID and GPS. PhD thesis, Purdue University, USA.
Cheng, E W L and Li, H (2006) Job performance evaluation for construction companies: An analytic network process approach. Journal of Construction Engineering and Management, 132(8), pp. 827-835. ISSN 0733-9364
Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364
Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.
Chew, M Y L; Conejos, S and Azril, F H B (2019) Design for maintainability of high-rise vertical green facades. Building Research & Information, 47(4), pp. 453-467. ISSN 0961-3218
Chih, Y Y; Kiazad, K; Cheng, D; Emamirad, E and Restubog, S L (2018) Interactive effects of supportive leadership and top management team's charismatic vision in predicting worker retention in the Philippines. Journal of Construction Engineering and Management, 144(10): 04018095, ISSN 0733-9364
Chih, Y Y; Kiazad, K; Cheng, D; Lajom, J A L and Restubog, S L D (2017) Feeling positive and productive: Role of supervisor-worker relationship in predicting construction workers' performance in the Philippines. Journal of Construction Engineering and Management, 143(8): 04017049, ISSN 0733-9364
Chih, Y Y; Kiazad, K; Li, M; Capezio, A; Zhou, L and Restubog, S L D (2017) Broken promises: Implications for the job insecurity and job performance of Chinese construction workers. Journal of Construction Engineering and Management, 143(4): 04016114, ISSN 0733-9364
Chih, Y Y; Kiazad, K; Zhou, L; Capezio, A; Li, M and Restubog, S L D (2016) Investigating employee turnover in the construction industry: A psychological contract perspective. Journal of Construction Engineering and Management, 142(6): 04016006, ISSN 0733-9364
Chileshe, N and Haupt, T C (2010) The effect of age on the job satisfaction of construction workers. Journal of Engineering, Design and Technology, 8(1), pp. 107-118. ISSN 1726-0531
Choe, Sooyoung (2015) 4-dimensional process-aware site-specific construction safety planning. PhD thesis, University of Texas at Austin, USA.
Choi, B; Ahn, S and Lee, S H (2017) Role of social norms and social identifications in safety behavior of construction workers. I: Theoretical model of safety behavior under social influence. Journal of Construction Engineering and Management, 143(5): 04016124, ISSN 0733-9364
Choi, B and Lee, S (2018) An empirically based agent-based model of the sociocognitive process of construction workers' safety behavior. Journal of Construction Engineering and Management, 144(2): 04017102, ISSN 0733-9364
Chou, J S; Irawan, N and Pham, A D (2013) Project management knowledge of construction professionals: Cross-country study of effects on project success. Journal of Construction Engineering and Management, 139(11): 4013015, ISSN 0733-9364
Chow, L J; Then, D and Skitmore, R M (2005) Characteristics of teamwork in Singapore construction projects. Journal of Construction Research, 6(1), pp. 15-46. ISSN 1609-9451
Chua, S J L; Zubbir, N B; Ali, A S and Au-Yong, C P (2018) Maintenance of high-rise residential buildings. International Journal of Building Pathology and Adaptation, 36(2), pp. 137-151. ISSN 23984708
Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.
Chung, W W S; Tariq, S; Mohandes, S R and Zayed, T (2023) IoT-based application for construction site safety monitoring. International Journal of Construction Management, 23(1), pp. 58-74. ISSN 1562-3599
Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193
Clegg, S and Kreiner, K (2014) Fixing concrete: Inquiries, responsibility, power and innovation. Construction Management and Economics, 32(3), pp. 262-278. ISSN 01446193
Comodromos, George (2016) How academics respond, adapt and cope with the transformational changes in the Australian higher education sector. PhD thesis, Victoria University, Australia.
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Cooke, T; Lingard, H and Blismas, N (2007) On-line oh&s risk assessment for construction designers: The 'toolshed' prototype. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364
Cox, R F; Issa, R R A and Koblegard, K (2005) Management's perception of key behavioral indicators for construction. Journal of Construction Engineering and Management, 131(3), pp. 368-376. ISSN 0733-9364
Cunningham, K R (2006) An investigation of vocational choice among community college construction education students in the state of Pennsylvania. PhD thesis, Pennsylvania State University, USA.
Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364
Dainty, A R J; Bagilhole, B M and Neale, R H (2000) The compatibility of construction companies' human resource development policies with employee career expectations. Engineering, Construction and Architectural Management, 7(2), pp. 169-178. ISSN 0969-9988
Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708
Debs, L and Shaurette, M (2021) An exploration of telephone and e-mail communications for design-related construction problems. International Journal of Construction Education and Research, 17(2), pp. 154-177. ISSN 1557-8771
Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364
Dioguardi, G (1983) Macrofirms: Construction firms for the computer age. Journal of Construction Engineering and Management, 109(1), pp. 13-24. ISSN 0733-9364
Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2023) Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), pp. 4933-4954. ISSN 0969-9988
Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193
Dong, M H (1981) Assessment of Occupational Safety and Health Act of 1970: A case analysis of retrospective work injury data. DPA thesis, University of Southern California, USA.
Druker, J; White, G; Hegewisch, A and Mayne, L (1996) Between hard and soft HRM: Human resource management in the construction industry. Construction Management and Economics, 14(5), pp. 405-416. ISSN 01446193
Duodo, B (2017) Intellectual capital and innovation in construction firms: the role of learning capability. PhD thesis, University of Hong Kong, Hong Kong.
Ebiloma, D. O.; Aigbavboa, C. O. and Anumba, C. (2026) Key drivers of digital twin maintenance management for healthcare facilities in Nigeria. Engineering, Construction and Architectural Management, 33(3), pp. 1871-1890. ISSN 0969-9988
Ebiloma, D O (2024) A digital twin maintenance management model for public hospital buildings in Nigeria. PhD thesis, University of Johannesburg, South Africa.
Edema, E U (2020) Risk mitigation strategies to prevent the failure of civil engineering projects in Nigeria. PhD thesis, Northcentral University, USA.
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531
Edstrom, C A (1972) Occupational training patterns and characteristics of selected personnel in the construction industry in Kinshasa. EdD thesis, University of Illinois at Urbana-Champaign, USA.
Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(2), pp. 145-156. ISSN 01446193
Edwards, D; Parn, E A; Sing, M C P and Thwala, W D (2019) Risk of excavators overturning: Determining horizontal centrifugal force when slewing freely suspended loads. Engineering, Construction and Architectural Management, 26(3), pp. 479-498. ISSN 0969-9988
Egbu, C O; Botterill, K and Bates, M (2001) The influence of knowledge management and intellectual capital on organizational innovations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.
Ekemode, B G; Adegoke, O J and Aderibigbe, A (2017) Factors influencing land title registration practice in Osun state, Nigeria. International Journal of Law in the Built Environment, 9(3), pp. 240-255. ISSN 1756-1450
El-Adaway, I H; Ali, G; Assaad, R; Elsayegh, A and Abotaleb, I S (2019) Analytic overview of citation metrics in the civil engineering domain with focus on construction engineering and management specialty area and its subdisciplines. Journal of Construction Engineering and Management, 145(10): 04019060, ISSN 0733-9364
El-adaway, I H; Ali, G G; Eissa, R; Abdul Nabi, M; Ahmed, M O; Elbashbishy, T and Khalef, R (2023) Construction Management and Economics 40th anniversary: Investigating knowledge structure and evolution of research trends. Construction Management and Economics, 41(4), pp. 338-360. ISSN 01446193
Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X
Elbashbishy, T S; Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: Mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(5), pp. 406-427. ISSN 01446193
Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Emmitt, S; Pasquire, C and Mertia, B (2012) Is good enough "making do"? An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(3), pp. 369-383. ISSN 1471-4175
Enshassi, A; Abdul-Aziz, A R and Abushaban, S (2012) Analysis of contractors performance in Gaza Strip construction projects. International Journal of Construction Management, 12(2), pp. 65-79. ISSN 1562-3599
Enshassi, A; El-Rayyes, Y and Alkilani, S (2015) Job stress, job burnout and safety performance in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 20(2), pp. 170-187. ISSN 1366-4387
Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.
Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. I: Analysis at the fundamental level. Journal of Construction Engineering and Management, 141(8): 04015021, ISSN 0733-9364
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364
Etmektzoglou, Apostolos (2013) The impact of the financial crisis on industrial relations in Greek industry. DBA thesis, Nottingham Trent University, UK.
Fang, D; Zhao, C and Zhang, M (2016) A cognitive model of construction workers' unsafe behaviors. Journal of Construction Engineering and Management, 142(9): 04016039, ISSN 0733-9364
Faulkenberry, L M (1993) Impact of emerging contract employment patterns on training, competitiveness, and company operation in the electrical construction industry. EdD thesis, Texas A&M University, USA.
Fenais, A (2020) Developing an augmented reality solution for mapping underground infrastructure. PhD thesis, Arizona State University, USA.
Feng, K; Wang, S; Lu, W; Liu, C and Wang, Y (2022) Planning construction projects in deep uncertainty: A data-driven uncertainty analysis approach. Journal of Construction Engineering and Management, 148(8): 04022060, ISSN 0733-9364
Feng, Y (2015) Mathematical models for determining the minimum level of voluntary safety investments for building projects. Journal of Construction Engineering and Management, 141(7): 4015015, ISSN 0733-9364
Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364
Fini, A A F; Akbarnezhad, A; Rashidi, T H and Waller, S T (2018) Dynamic programming approach toward optimization of workforce planning decisions. Journal of Construction Engineering and Management, 144(2): 04017113, ISSN 0733-9364
Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304
Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Fitch, T; Keki, I and Smyth, H (2010) Power and perceptions in business development: The case of a major contractor and design consultancies in civil engineering influencer and referral markets. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fletcher, S M; Gunning, J G and Coates, R (2014) Soft skills of senior contracts managers in Northern Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 35-45. ISSN 17514304
Flyen, C; Hauge, Å L; Almås, A J and Godbolt, Å L (2018) Municipal collaborative planning boosting climate resilience in the built environment. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 58-69. ISSN 1759-5916
Flynn, M A and Sampson, J M (2012) Trench safety-using a qualitative approach to understand barriers and develop strategies to improve trenching practices. International Journal of Construction Education and Research, 8(1), pp. 63-79. ISSN 1557-8771
Fuertes, A and Khatabakhshrad, M (2024) Health and safety risk management in a changing climate: Contrasting supervisors and workers perceptions and approaches to heat coping strategies on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364
Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364
Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364
Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(8), pp. 851-859. ISSN 01446193
Gao, L; Luo, X; Wang, Y; Zhang, N and Deng, X (2024) Retention in challenging international construction assignments: Role of expatriate resilience. Journal of Construction Engineering and Management, 150(2): 04023158, ISSN 0733-9364
Gao, R; Chan, A P C; Utama, W P and Zahoor, H (2017) Workers' perceptions of safety climate in international construction projects: Effects of nationality, religious belief, and employment mode. Journal of Construction Engineering and Management, 143(4): 04016117, ISSN 0733-9364
Gao, Y; González, V A and Yiu, T W (2020) Exploring the relationship between construction workers' personality traits and safety behavior. Journal of Construction Engineering and Management, 146(3): 04019111, ISSN 0733-9364
Gerassis, S; Martín, J E; García, J T; Saavedra, A and Taboada, J (2017) Bayesian decision tool for the analysis of occupational accidents in the construction of embankments. Journal of Construction Engineering and Management, 143(2): 04016093, ISSN 0733-9364
Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals. PhD thesis, University of Leeds, UK.
Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.
Gibb, A G F and Isack, F (2001) Client drivers for construction projects: Implications for standardization. Engineering, Construction and Architectural Management, 8(1), pp. 46-58. ISSN 0969-9988
Gill, A; Gray, J; Skitmore, M and Callaghan, S (2015) Comparison of the effects of litigation and adr in South-East Queensland. International Journal of Construction Management, 15(3), pp. 254-263. ISSN 1562-3599
Ginevan, S R (2022) The difference of how gender perceives project complexity: A cross sectional study. PhD thesis, Capella University, USA.
Giritli, H and Oraz, G T (2004) Leadership styles: Some evidence from the Turkish construction industry. Construction Management and Economics, 22(3), pp. 253-262. ISSN 01446193
Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175
Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364
Goh, Y M and Binte Sa'Adon, N F (2015) Cognitive factors influencing safety behavior at height: A multimethod exploratory study. Journal of Construction Engineering and Management, 141(6): 04015003, ISSN 0733-9364
Goh, Y M and Wang, Q (2015) Investigating the adequacy of horizontal lifeline system design through case studies from Singapore. Journal of Construction Engineering and Management, 141(7): 4015017, ISSN 0733-9364
Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364
Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.
Goodrum, P M (2004) Hispanic and non-Hispanic wage differentials: Implications for United States construction industry. Journal of Construction Engineering and Management, 130(4), pp. 552-559. ISSN 0733-9364
Goodrum, P M; Miller, J; Sweany, J and Alruwaythi, O (2016) Influence of the format of engineering information and spatial cognition on craft-worker performance. Journal of Construction Engineering and Management, 142(9): 04016043, ISSN 0733-9364
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029
Graham, B and Thomas, K (2005) An investigation into the development of knowledge management systems within the leading Irish construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.
Gunduz, M; Birgonul, M T and Ozdemir, M (2017) Fuzzy structural equation model to assess construction site safety performance. Journal of Construction Engineering and Management, 143(4): 04016112, ISSN 0733-9364
Gunhan, S and Arditi, D (2005) Factors affecting international construction. Journal of Construction Engineering and Management, 131(3), pp. 273-282. ISSN 0733-9364
Guo, B H W; Yiu, T W; González, V A and Goh, Y M (2017) Using a pressure-state-practice model to develop safety leading indicators for construction projects. Journal of Construction Engineering and Management, 143(2): 04016092, ISSN 0733-9364
Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364
Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364
Hallowell, M R; Hinze, J W; Baud, K C and Wehle, A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10): 04013010, ISSN 0733-9364
Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.
Hampton, P; Chinyio, E A and Riva, S (2019) Framing stress and associated behaviours at work: An ethnography study in the United Kingdom. Engineering, Construction and Architectural Management, 26(11), pp. 2566-2580. ISSN 0969-9988
Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364
Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364
Harris, R B (1992) A challenge for research. Journal of Construction Engineering and Management, 118(3), pp. 422-434. ISSN 0733-9364
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hasanzadeh, S; Esmaeili, B and Dodd, M D (2017) Impact of construction workers' hazard identification skills on their visual attention. Journal of Construction Engineering and Management, 143(10): 04017070, ISSN 0733-9364
Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.
Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364
Henderson, J R; Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(3), pp. 290-306. ISSN 0969-9988
Hinze, J; Hallowell, M and Baud, K (2013) Construction-safety best practices and relationships to safety performance. Journal of Construction Engineering and Management, 139(10): 04013006, ISSN 0733-9364
Hinze, J W (1976) The effect of middle management on safety in construction. PhD thesis, Stanford University, USA.
Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(3), pp. 295-310. ISSN 01446193
Hosseini, A.; Niknam, M.; Shafaat, A. and Fathi, A. (2026) A unified ontology framework for cross-domain integration of BIM, IoT, and maintenance services in smart facility management. Engineering, Construction and Architectural Management, 33(3), pp. 1784-1812. ISSN 0969-9988
Hu, Z.; Li, S.; He, C.; Shen, Y. and Xu, Z. (2026) Effect of management commitment on construction project safety resilience: Safety competence and working conditions as the mediators. Journal of Construction Engineering and Management, 152(8): 04026123, ISSN 0733-9364
Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(5), pp. 674-691. ISSN 0969-9988
Huang, K; Jia, G; Liu, D and Ma, Y (2018) The transformation mechanism of work-related stress into unsafe behaviour in construction industry: Based on DEA method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Huang, L and Cao, Y (2025) A study on factors influencing the spatial oppressiveness in small courtyard spaces within university residential areas. Architectural Engineering and Design Management, 21(4), pp. 589-602. ISSN 1745-2007
Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364
Hughes, D; Williams, T and Ren, Z (2012) Differing perspectives on collaboration in construction. Construction Innovation, 12(3), pp. 355-368. ISSN 1471-4175
Hwang, B G and Soh, C K (2013) Trade-level productivity measurement: Critical challenges and solutions. Journal of Construction Engineering and Management, 139(11): 4013013, ISSN 0733-9364
Hwang, B G and Yeo, Z B (2011) Perception on benefits of construction waste management in the Singapore construction industry. Engineering, Construction and Architectural Management, 18(4), pp. 394-406. ISSN 0969-9988
Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771
Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364
Ibrahim, M N; Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation, 19(4), pp. 550-569. ISSN 1471-4175
Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Ikediashi, D I; Ogunlana, S O and Odesola, I A (2015) Service quality and user satisfaction of outsourced facilities management services in Nigeria's public hospitals. Built Environment Project and Asset Management, 5(4), pp. 363-379. ISSN 2044-124X
Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364
Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218
Irizarry, J and Gheisari, M (2013) Situation awareness (SA), a qualitative user-centered information needs assessment approach. International Journal of Construction Management, 13(3), pp. 35-53. ISSN 1562-3599
Jablonowski, C J (2015) Quantitative method to model the underreporting of safety incidents. Journal of Construction Engineering and Management, 141(5): 06014012, ISSN 0733-9364
Jackson, P (1987) The anatomy of constructional failures. PhD thesis, Heriot-Watt University, UK.
Jacobs, A (2007) Will the new offence of corporate manslaughter motivate companies to prioritise safety over profit? PhD thesis, University of Birmingham, UK.
Jacobsen, E L; Solberg, A; Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(3), pp. 531-553. ISSN 1471-4175
Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.
Jeelani, I; Albert, A; Azevedo, R and Jaselskis, E J (2017) Development and testing of a personalized hazard-recognition training intervention. Journal of Construction Engineering and Management, 143(5): 04016120, ISSN 0733-9364
Jeelani, I; Albert, A and Gambatese, J A (2017) Why do construction hazards remain unrecognized at the work interface? Journal of Construction Engineering and Management, 143(5): 04016128, ISSN 0733-9364
Jeelani, I; Albert, A; Han, K and Azevedo, R (2018) Are visual search patterns predictive of hazard recognition performance? Empirical investigation using eye-tracking technology. Journal of Construction Engineering and Management, 145(1): 04018115, ISSN 0733-9364
Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.
Jia, Y A; Rowlinson, S; Xu, M and Li, B (2015) Institutional environment and institutional logics in construction safety management: The case of climatic heat stress on site. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Jiang, S; Wang, S; Sun, H; Liu, W; Xiao, B; Cha, H S and Zhang, J (2025) Enhancing quality management: Lightweight detection and risk warning of concrete cracks and rebar exposure using improved YOLOv8. Journal of Construction Engineering and Management, 151(8): 04025087, ISSN 0733-9364
Jiang, W; Ding, L and Zhou, C (2021) Cyber physical system for safety management in smart construction site. Engineering, Construction and Architectural Management, 28(3), pp. 788-808. ISSN 0969-9988
Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364
Johansen, A; Collins, D; Temeljotov-Salaj, A and Hagehaugen, G (2022) By the fjord: Successful public and private collaboration in a neighbourhood redevelopment project in Norway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 156-165. ISSN 17514304
Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364
Jones, I and Graham, M (2009) The integration of sprinkler systems into school fire safety packages within South and West Wales. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Jordanour, F; Kiomjian, D and Srour, I M (2016) Learning curves in construction: A critical review and new model. Journal of Construction Engineering and Management, 142(4): 06015004, ISSN 0733-9364
Joseph, A and Hamilton, D K (2008) The Pebble Projects: Coordinated evidence-based case studies. Building Research & Information, 36(2), pp. 129-145. ISSN 0961-3218
Ju, C; Ning, Y and Shen, Y (2025) How do different management control configurations influence construction safety professionals' work attitudes. Engineering, Construction and Architectural Management, 32(5), pp. 2870-2889. ISSN 0969-9988
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kaluarachchi, Y D and Jones, K (2007) Monitoring of a strategic partnering process: The Amphion experience. Construction Management and Economics, 25(10), pp. 1053-1061. ISSN 1466433X
Kamardeen, I and Sunindijo, R Y (2017) Personal characteristics moderate work stress in construction professionals. Journal of Construction Engineering and Management, 143(10): 04017072, ISSN 0733-9364
Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.
Kang, Y; Siddiqui, S; Suk, S J; Chi, S and Kim, C (2017) Trends of fall accidents in the U.S. Construction industry. Journal of Construction Engineering and Management, 143(8): 04017043, ISSN 0733-9364
Karakhan, A A and Gambatese, J A (2017) Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives. Journal of Construction Engineering and Management, 143(9): 04017069, ISSN 0733-9364
Karakhan, A A; Rajendran, S; Gambatese, J and Nnaji, C (2018) Measuring and evaluating safety maturity of construction contractors: Multicriteria decision-making approach. Journal of Construction Engineering and Management, 144(7): 04018054, ISSN 0733-9364
Karamitsos, I (2020) Examination of the relationship between organisational and facility management strategy and value added. PhD thesis, University of Salford, UK.
Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988
Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(3), pp. 464-472. ISSN 1562-3599
Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(6), pp. 634-644. ISSN 0969-9988
Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects. PhD thesis, Nottingham Trent University, UK.
Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304
Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, S Y; Lee, Y S; Nguyen, V T and Luu, V T (2016) Barriers to applying value management in the Vietnamese construction industry. Journal of Construction in Developing Countries, 21(2), pp. 55-80. ISSN 1823-6499
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364
Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988
Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364
Koehn, E and Jones, M W (1983) Benefits and costs of EEO rules in construction. Journal of Construction Engineering and Management, 109(4), pp. 435-446. ISSN 0733-9364
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Korpela, J; Miettinen, R; Salmikivi, T and Ihalainen, J (2015) The challenges and potentials of utilizing building information modelling in facility management: The case of the center for properties and facilities of the University of Helsinki. Construction Management and Economics, 33(1), pp. 3-17. ISSN 01446193
Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Kumar, S (2016) Assessment and selection of psychological attributes: Design team perspectives. Journal of Engineering, Design and Technology, 14(4), pp. 874-896.
Kumarasiri, B and Dissanayake, P (2021) Barriers to implementing waste-to-energy projects in Sri Lanka: A pestel analysis. Built Environment Project and Asset Management, 11(4), pp. 544-558. ISSN 2044-124X
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988
Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.
Kuo, Vincent (2019) Latent semantic analysis for knowledge management in construction. DSc(Tech) thesis, Aalto University, Finland.
Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193
Langdon, R R and Sawang, S (2018) Construction workers' well-being: What leads to depression, anxiety, and stress? Journal of Construction Engineering and Management, 144(2): 04017100, ISSN 0733-9364
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Le, T. T. D.; Do, S. T.; Tran, C. N. N. and Nguyen, V. T. (2026) Analysis of causal relationships and interactions between barriers to implementing BIM-nd in construction. International Journal of Construction Management, 26(8), pp. 1407-1427. ISSN 1562-3599
Le, Y; Shan, M; Chan, A P C and Hu, Y (2014) Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector. Journal of Construction Engineering and Management, 140(9): 05014007, ISSN 0733-9364
Lebea, M J; Agumba, J N and Adebowale, O J (2024) Critical success factors in the maintenance strategies of public healthcare facilities. International Journal of Building Pathology and Adaptation, 42(7), pp. 55-75. ISSN 23984708
Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364
Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Leung, M Y; Bowen, P; Liang, Q and Famakin, I (2015) Development of a job-stress model for construction professionals in south Africa and Hong Kong. Journal of Construction Engineering and Management, 141(2): 04014077, ISSN 0733-9364
Leung, M Y; Chan, Y S and Olomolaiye, P (2008) Impact of stress on the performance of construction project managers. Journal of Construction Engineering and Management, 134(8), pp. 644-652. ISSN 0733-9364
Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364
Leung, M Y; Liang, Q and Chan, I Y S (2017) Development of a stressors-stress-performance-outcome model for expatriate construction professionals. Journal of Construction Engineering and Management, 143(5): 04016121, ISSN 0733-9364
Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X
Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364
Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, J; Yang, M; Liu, C; Li, A and Guo, B (2023) Listen to the companies: Exploring BIM job competency requirements by text mining of recruitment information in China. Journal of Construction Engineering and Management, 149(9): 04023076, ISSN 0733-9364
Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988
Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364
Li, S; Wu, X; Wang, X and Hu, S (2020) Relationship between social capital, safety competency, and safety behaviors of construction workers. Journal of Construction Engineering and Management, 146(6): 04020059, ISSN 0733-9364
Li, X; Han, S; Gül, M; Al-Hussein, M and El-Rich, M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. Journal of Construction Engineering and Management, 144(1): 04017093, ISSN 0733-9364
Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364
Liao, C W (2015) Optimal inspection strategies for labor inspection in the construction industry. Journal of Construction Engineering and Management, 141(2): 04014073, ISSN 0733-9364
Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364
Lim, B T C (1987) Causal modelling construction project performance. PhD thesis, Heriot-Watt University, UK.
Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364
Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364
Ling, Y Y (2000) A theoretical framework for selection of consultants by design-build contractors. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Lingard, H (2004) Work and family sources of burnout in the Australian engineering profession: Comparison of respondents in dual- and single-earner couples, parents, and nonparents. Journal of Construction Engineering and Management, 130(2), pp. 290-298. ISSN 0733-9364
Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364
Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193
Lingard, H C; Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: A multi-level analysis. Construction Management and Economics, 28(8), pp. 813-825. ISSN 1466433X
Liu, J; Love, P E D; Sing, M C P; Carey, B and Matthews, J (2015) Modeling Australia's construction workforce demand: Empirical study with a global economic perspective. Journal of Construction Engineering and Management, 141(4): 05014019, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364
Liu, Y (2017) Human-tool-interaction-based action recognition framework for automatic construction operation monitoring. PhD thesis, Texas A&M University, USA.
Longzhen, Z and Feng, S (2023) Pedestrian evacuation method based on improved cellular automata in emergencies. Engineering, Construction and Architectural Management, 30(8), pp. 3645-3673. ISSN 0969-9988
Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.
Lopez Del Puerto, C; Clevenger, C M; Boremann, K and Gilkey, D P (2014) Exploratory study to identify perceptions of safety and risk among residential Latino construction workers as distinct from commercial and heavy civil construction workers. Journal of Construction Engineering and Management, 140(2): 04013048, ISSN 0733-9364
Loudoun, R and Markwell, K (2017) Energy drink consumption in the Australian construction industry: A risky new trend? Journal of Construction Engineering and Management, 143(8): 04017039, ISSN 0733-9364
Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364
Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364
Love, P E D; Veli, S; Davis, P; Teo, P and Morrison, J (2017) See the difference in a precast facility: Changing mindsets with an experiential safety program. Journal of Construction Engineering and Management, 143(2): 05016021, ISSN 0733-9364
Lucas, J D (2012) An integrated BIM framework to support facility management in healthcare environments. PhD thesis, Virginia Tech, USA.
Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas. PhD thesis, University of Wisconsin - Madison, USA.
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Luo, X; Li, H; Dai, F; Cao, D; Yang, X and Guo, H (2017) Hierarchical Bayesian model of worker response to proximity warnings of construction safety hazards: Toward constant review of safety risk control measures. Journal of Construction Engineering and Management, 143(6): 04017006, ISSN 0733-9364
Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364
Luo, Z; Guo, J; Han, J and Wang, Y (2024) Research on the construction safety risk assessment of prefabricated subway stations in China. Engineering, Construction and Architectural Management, 31(4), pp. 1751-1787. ISSN 0969-9988
Mahamadu, A-M; Manu, P; Booth, C; Olomolaiye, P; Coker, A; Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria's public sector. Journal of Engineering, Design and Technology, 16(1), pp. 2-24.
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Malone, E K and Issa, R R A (2014) Predictive models for work-life balance and organizational commitment of women in the U.S. Construction industry. Journal of Construction Engineering and Management, 140(3): 4013064, ISSN 0733-9364
Maloney, W F; Cameron, I and Hare, B (2007) Tradesmen involvement in health and safety. Journal of Construction Engineering and Management, 133(4), pp. 297-305. ISSN 0733-9364
Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364
Manu, P; Mahamadu, A M; Booth, C; Olomolaiye, P; Ibrahim, A D and Coker, A (2018) Assessment of procurement capacity challenges inhibiting public infrastructure procurement: A Nigerian inquiry. Built Environment Project and Asset Management, 8(4), pp. 386-402. ISSN 2044-124X
Manu, P; Mahamadu, A M; Booth, C; Olomolaiye, P O; Coker, A; Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(9), pp. 1962-1985. ISSN 0969-9988
Marefat, A; Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: Applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(9), pp. 1855-1877. ISSN 0969-9988
Marin Ramirez, L S (2014) Safety climate, safety hazards and organizational practices in the construction industry in Colombia. ScD thesis, University of Massachusetts Lowell, USA.
Marks, E D; Cheng, T and Teizer, J (2013) Laser scanning for safe equipment design that increases operator visibility by measuring blind spots. Journal of Construction Engineering and Management, 139(8), pp. 1006-1014. ISSN 0733-9364
Martin, G L (1988) Training programs for engineering consulting firms. Journal of Construction Engineering and Management, 114(1), pp. 121-132. ISSN 0733-9364
Martin, H and Lewis, T M (2014) Pinpointing safety leadership factors for safe construction sites in Trinidad and Tobago. Journal of Construction Engineering and Management, 140(2): 04013046, ISSN 0733-9364
Mathar, H; Assaf, S; Hassanain, M A; Abdallah, A and Sayed, A M Z (2020) Critical success factors for large building construction projects: Perception of consultants and contractors. Built Environment Project and Asset Management, 10(3), pp. 349-367. ISSN 2044-124X
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Matto, M C (2023) Identifying the latent shortcomings of force account projects in Tanzania: The case of construction projects in the education sector. Engineering, Construction and Architectural Management, 30(2), pp. 787-804. ISSN 0969-9988
McCabe, B Y; Alderman, E; Chen, Y; Hyatt, D E and Shahi, A (2017) Safety performance in the construction industry: Quasi-longitudinal study. Journal of Construction Engineering and Management, 143(4): 04016113, ISSN 0733-9364
McCord, P J and Gunderson, D E (2014) Factors that most affect relationships with general contractors on commercial construction projects: Pacific Northwest subcontractor perspectives. International Journal of Construction Education and Research, 10(2), pp. 126-139. ISSN 1557-8771
McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364
McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(1), pp. 35-48. ISSN 01446193
McLaren, Matthew (2018) An investigation of swift trust formation in disaster management teams. PhD thesis, University of New South Wales, Australia.
McNicholas, T M (1994) Potential barriers to the adoption of new technology in the United States construction industry. DBA thesis, Golden Gate University, USA.
Meiling, J; Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(2), pp. 141-158. ISSN 0969-9988
Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.
Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.
Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X
Missa, P and Ahmed, V (2010) Bme migrants' employment in construction: A multicultural perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175
Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.
Mohamed, M A; Hamzah, M J A; Pauzi, N N; Shahrudin, N S N and Sheffie, S I M (2023) The effect of COVID-19 on construction site personnel: Psychological and physiological perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X
Moore, J D and Plugge, P W (2008) Perceptions and expectations: Implications for construction management internships. International Journal of Construction Education and Research, 4(2), pp. 82-96. ISSN 1557-8771
Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364
Mujalli, R O; Marie, I and Al-Kasasbeh, M (2024) Consequences of COVID-19 on jordan's construction sector using data mining techniques. International Journal of Construction Management, 24(12), pp. 1339-1348. ISSN 1562-3599
Mwelu, N; Davis, P; Ke, Y and Watundu, S (2018) Compliance within a regulatory framework in implementing public road construction projects. Construction Economics and Building, 18(4), pp. 1-23. ISSN 2204-9029
Mäki T, K H (2013) Site managers' uses of building information modeling on construction sites. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Nagogo, U B (2022) A strategy for stakeholder engagement in public private partnership urban infrastructure provision in Nigeria. PhD thesis, University of Salford, UK.
Namian, M; Albert, A; Zuluaga, C M and Behm, M (2016) Role of safety training: Impact on hazard recognition and safety risk perception. Journal of Construction Engineering and Management, 142(12): 04016073, ISSN 0733-9364
Namian, M; Albert, A; Zuluaga, C M and Jaselskis, E J (2016) Improving hazard-recognition performance and safety training outcomes: Integrating strategies for training transfer. Journal of Construction Engineering and Management, 142(10): 04016048, ISSN 0733-9364
Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988
Nascimento, C R S M S; Almeida-Filho, A T and Perez Palha, R (2025) A TOPSIS-based framework for construction projects' portfolio selection in the public sector. Engineering, Construction and Architectural Management, 32(4), pp. 2553-2570. ISSN 0969-9988
Nazem, S M (1969) A study into the technical and managerial manpower in the construction industry. PhD thesis, University of Manchester, UK.
Ng, A W Y and Chan, A H S (2017) Mental models of construction workers for safety-sign representation. Journal of Construction Engineering and Management, 143(2): 04016091, ISSN 0733-9364
Ng, C W (2024) Enhancing the performance of the adoption of building information modelling (BIM) and common data environment (CDE) using risk management and performance contract techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Nguyen, H T and Hadikusumo, B (2017) Impacts of human resource development on engineering, procurement, and construction project success. Built Environment Project and Asset Management, 7(1), pp. 73-85. ISSN 2044-124X
Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364
Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364
Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599
Nguyen, T A; Le, N M U; Nguyen, S H and Ngo, N V (2024) Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam. Journal of Construction in Developing Countries, 29(2), pp. 157-180. ISSN 1823-6499
Nguyen, T T N; Do, S T; Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(2), pp. 891-918. ISSN 0969-9988
Nnaji, C; Gambatese, J; Karakhan, A and Osei-Kyei, R (2020) Development and application of safety technology adoption decision-making tool. Journal of Construction Engineering and Management, 146(4): 04020028, ISSN 0733-9364
Nwal, S S; Panuwatwanich, K and Naing, M (2024) Critical factors influencing the performance of public housing construction projects in Myanmar. Journal of Construction in Developing Countries, 29(1), pp. 163-190. ISSN 1823-6499
Nwaogu, J M and Chan, A P C (2021) Evaluation of multi-level intervention strategies for a psychologically healthy construction workplace in Nigeria. Journal of Engineering, Design and Technology, 19(2), pp. 509-536. ISSN 1726-0531
O'Brien, S (2022) Critical infrastructure organisation management: an analysis of the transition to the Industry 4.0 era. PhD thesis, University of Cambridge, UK.
O'Connor, J T; Larimore, M A and Tucker, R L (1986) Collecting constructability improvement ideas. Journal of Construction Engineering and Management, 112(4), pp. 463-475. ISSN 0733-9364
Obiozo, R N and Smallwood, J J (2015) Biophilic construction site model: Enhancing the motivational and humanistic value of the green construction site. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Fragmentation of capital development projects: A tool for job creation and skill development. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ogbu, C P and Imafidon, M O (2022) Influence of selection criteria on clients' satisfaction with construction consultancy services in Nigeria. Journal of Engineering, Design and Technology, 20(6), pp. 1519-1537. ISSN 1726-0531
Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(6), pp. 707-720. ISSN 0969-9988
Oke, A E; Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(6), pp. 722-737.
Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Oladimeji, O and Aina, O O (2018) Financial performance of locally owned construction firms in Southwestern Nigeria. Journal of Financial Management of Property and Construction, 23(1), pp. 112-128. ISSN 1366-4387
Olagunju, O A (2014) The development of a framework for sustainable housing delivery in Lagos, Nigeria. PhD thesis, University of Wolverhampton, UK.
Oleinik, P (2018) Method for creating a work management plan of a construction company. International Journal of Construction Management, 18(5), pp. 446-451. ISSN 1562-3599
Omidvar, G (2014) Core competencies for construction project managers in Malaysia. PhD thesis, University of Malaya, Malaysia.
Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029
Osuizugbo, I C; Oyeyipo, O O and Olojo, A D (2025) Drivers of corporate social responsibility initiatives among construction companies in Nigeria. International Journal of Building Pathology and Adaptation, 43(6), pp. 1595-1611. ISSN 2398-4708
Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Lawani, A O and Onokwai, A O (2025) Barriers to adoption of work–life balance practices amongst construction companies in Lagos, Nigeria: An exploratory factor analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1643-1669. ISSN 0969-9988
Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531
Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175
Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364
Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry. PhD thesis, University of Texas at Austin, USA.
Panthi, K; Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(2), pp. 79-94. ISSN 1557-8771
Pappas, M P (2004) An assessment of implementation requirements for the Tier II construction workforce strategy. PhD thesis, University of Texas at Austin, USA.
Park, J; Marks, E; Cho, Y K and Suryanto, W (2016) Performance test of wireless technologies for personnel and equipment proximity sensing in work zones. Journal of Construction Engineering and Management, 142(1): 04015049, ISSN 0733-9364
Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.
Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.
Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Patel, D A and Jha, K N (2015) Neural network model for the prediction of safe work behavior in construction projects. Journal of Construction Engineering and Management, 141(1): 04014066, ISSN 0733-9364
Patel, D A and Jha, K N (2017) Developing a process to evaluate construction project safety hazard index using the possibility approach in India. Journal of Construction Engineering and Management, 143(1): 04016081, ISSN 0733-9364
Patel, D A; Kikani, K D and Jha, K N (2016) Hazard assessment using consistent fuzzy preference relations approach. Journal of Construction Engineering and Management, 142(12): 04016067, ISSN 0733-9364
Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.
Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.
Pellicer, T M; Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 573-597. ISSN 0969-9988
Peng, J and Zhang, Q (2025) Construction group conflict under resource overlap: A game theory approach. Engineering, Construction and Architectural Management, 32(1), pp. 156-171. ISSN 0969-9988
Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364
Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988
Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pillai, S (2022) Regulation of artificial intelligence technologies in the Indian construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Pillajo, E; Mourgues, C and González, V A (2024) Formalizing the information requirements for decision-making of field managers during indoor construction activities. Engineering, Construction and Architectural Management, 31(10), pp. 4125-4145. ISSN 0969-9988
Pinfold, L (2018) Coupling innovative technology, space management and BIM processes with smart city management: Congested construction sites in urban centres in Cape Town South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Plebankiewicz, E and Kubek, D (2016) Multicriteria selection of the building material supplier using AHP and fuzzy AHP. Journal of Construction Engineering and Management, 142(1): 04015057, ISSN 0733-9364
Praticò, F G (2017) Metrics for management of asphalt plant sustainability. Journal of Construction Engineering and Management, 143(4): 04016116, ISSN 0733-9364
Pretorius, F I H and Taylor, R G (1986) Conflict and individual coping behaviour in informal matrix organizations within the construction industry. Construction Management and Economics, 4(2), pp. 87-104. ISSN 01446193
Price, A D F (2003) The strategy process within large construction orgnisations. Engineering, Construction and Architectural Management, 10(4), pp. 283-296. ISSN 0969-9988
Qi, L; Zhai, H and Shuang, Q (2026) Attention-driven multiobject tracking for proactive fall safety management in construction. Journal of Construction Engineering and Management, 152(5): 04026052, ISSN 0733-9364
Rad, A A; Asnaashari, E; Knight, A and Hurst, A (2010) ICT utilization in administrative tasks in Iranian construction organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.
Rahmani, F; Scott-Young, C; Tadayon, A and van der Walt, J D (2022) Team composition in relational contracting (RC) in large infrastructure projects: A belbin's team roles model approach. Engineering, Construction and Architectural Management, 29(5), pp. 2027-2046. ISSN 0969-9988
Raidén, A B (2004) The development of a strategic employee resourcing framework (SERF) for construction organisations. PhD thesis, Loughborough University, UK.
Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ramli, A H (2014) Relationships between safety climate factors and occupational safety and health level of awareness in Malaysian government agencies. PhD thesis, University of Malaya, Malaysia.
Ranasinghe, A (2012) Construction arbitration in Sri Lanka. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 91-94. ISSN 17514312
Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364
Raynar, K A (1994) Integrating computer vision with computer aided design to produce construction as-built drawings. PhD thesis, Pennsylvania State University, USA.
Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387
Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.
Riemer, J W (1975) On building buildings: The social organization of a transitional work setting. PhD thesis, University of New Hampshire, USA.
Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.
Rodríguez-Garzón, I; Martínez-Fiestas, M; Delgado-Padial, A and Lucas-Ruiz, V (2016) An exploratory analysis of perceived risk among construction workers in three Spanish-speaking countries. Journal of Construction Engineering and Management, 142(11): 04016066, ISSN 0733-9364
Rogers, J; Chong, H Y and Preece, C (2015) Adoption of building information modelling technology (BIM): Perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management, 22(4), pp. 424-445. ISSN 0969-9988
Rogers, J; Chong, H-Y and Preece, C (2015) Adoption of building information modelling technology: Perspectives from Malaysian engineering consulting services firms. Engineering, Construction and Architectural Management, 22(4), pp. 424-445. ISSN 0969-9988
Rogers, T R (1996) A conceptual communication-system model applied to construction. PhD thesis, University of Maryland, College Park, USA.
Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218
Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364
Rowlinson, S (2001) Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change. Construction Management and Economics, 19(7), pp. 669-673. ISSN 01446193
Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.
Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364
Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364
Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364
Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193
Rutherford, A W (1989) Organizational evolution I-595 Port Everglades expressway. Journal of Construction Engineering and Management, 115(3), pp. 357-369. ISSN 0733-9364
Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(1), pp. 55-66. ISSN 1466433X
Ryan, Peter William Joseph (2017) Unlocking the key to mega project delivery. PhD thesis, University of Melbourne, Australia.
Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304
Saka, A B and Chan, D W M (2020) Knowledge, skills and functionalities requirements for quantity surveyors in building information modelling (BIM) work environment: An international Delphi study. Architectural Engineering and Design Management, 16(3), pp. 227-246. ISSN 1745-2007
Salas, R and Hallowell, M (2016) Predictive validity of safety leading indicators: Empirical assessment in the oil and gas sector. Journal of Construction Engineering and Management, 142(10): 04016052, ISSN 0733-9364
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364
Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364
Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments. PhD thesis, University of Florida, USA.
Schropfer, T (2004) Relational geographies of building practice: An analytic framework. DDes thesis, Harvard University, USA.
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Seibert, J E and Evans, G W (1991) Time-constrained resource leveling. Journal of Construction Engineering and Management, 117(3), pp. 503-520. ISSN 0733-9364
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Sepasgozar, Samad (2015) Technology adoption in construction. PhD thesis, University of New South Wales, Australia.
Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.
Seward, M and Kestle, L (2014) Health and safety practices on Christchurch's post-earthquake rebuild projects: How relevant is Heinrich's safety pyramid? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Shan, Y; Imran, H; Lewis, P and Zhai, D (2017) Investigating the latent factors of quality of work-life affecting construction craft worker job satisfaction. Journal of Construction Engineering and Management, 143(5): 04016134, ISSN 0733-9364
Sharma, S K and Singh, A P (2023) Urban logistics stakeholder priority assessment to improve urban planning policy. International Journal of Construction Management, 23(16), pp. 2869-2878. ISSN 1562-3599
Shash, A A and Ahcom, J (2005) Organizational aspects of safety management subsystem. Journal of Construction Research, 6(2), pp. 237-252. ISSN 1609-9451
Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451
Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.
Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175
Shen, X and Marks, E (2016) Near-miss information visualization tool in BIM for construction safety. Journal of Construction Engineering and Management, 142(4): 04015100, ISSN 0733-9364
Shen, X; Marks, E; Pradhananga, N and Cheng, T (2016) Hazardous proximity zone design for heavy construction excavation equipment. Journal of Construction Engineering and Management, 142(6): 05016001, ISSN 0733-9364
Shen, Y; Koh, T Y; Rowlinson, S and Bridge, A J (2015) Empirical investigation of factors contributing to the psychological safety climate on construction sites. Journal of Construction Engineering and Management, 141(11): 04015038, ISSN 0733-9364
Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531
Simkoko, E E (1989) Analysis of factors impacting technology transfer in construction projects: Case studies from developing countries. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Simpeh, F and Adisa, S (2022) On-campus student accommodation safety measures: Provision versus risk analysis. International Journal of Building Pathology and Adaptation, 40(1), pp. 60-75. ISSN 23984708
Sing, C P; Love, P E D; Fung, I W H and Edwards, D J (2014) Personality and occupational accidents: Bar benders in Guangdong Province, Shenzhen, China. Journal of Construction Engineering and Management, 140(7): 05014005, ISSN 0733-9364
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Sivapragasam, C; Ajith, S and Arumugaprabu, V (2023) A conceptual framework for minimizing construction site accidents using task-personnel nexus matrix. International Journal of Construction Management, 23(9), pp. 1603-1610. ISSN 1562-3599
Skipper, C O (2004) An analysis of leadership behaviors in the construction industry: Identification of influences that develop top performing project managers and engineers. PhD thesis, Clemson University, USA.
Smithers, G L and Walker, D H T (2000) The effect of the workplace on motivation and demotivation of construction professionals. Construction Management and Economics, 18(7), pp. 833-841. ISSN 01446193
Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218
Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.
Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.
Sommerville, J (1993) Recruitment sources and employee turnover in sectors of the construction industry. PhD thesis, Heriot-Watt University, UK.
Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(2), pp. 147-154. ISSN 01446193
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.
Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364
Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029
Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.
Spillane, J P; Oyedele, L O; von Meding, J K and Konanahalli, A (2011) Confined site construction: A qualitative review of issues regarding health and safety on-site. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ssegawa, J K; Rwelamila, P D and Mogome, M G (2020) The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1), pp. 13-23. ISSN 2521-0165
Su, Y.; Gao, X. and Zheng, Z. (2026) Unsupervised deep learning and Bayesian network-based identification of key risk factors in construction quality defects. Journal of Construction Engineering and Management, 152(7): 04026083, ISSN 0733-9364
Sun, Y.; Lin, K.; Wang, J.; Zhu, F.; Wang, L. and Lu, L. (2026) Risk assessment of mountain tunnel entrance collapse based on pso-LSTM surface settlement prediction. Engineering, Construction and Architectural Management, 33(3), pp. 2586-2605. ISSN 0969-9988
Sunindijo, R Y and Kamardeen, I (2017) Work stress is a threat to gender diversity in the construction industry. Journal of Construction Engineering and Management, 143(10): 04017073, ISSN 0733-9364
Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sunindijo, R Y and Zou, P X W (2012) Political skill for developing construction safety climate. Journal of Construction Engineering and Management, 138(5), pp. 605-612. ISSN 0733-9364
Sunindijo, R Y and Zou, P X W (2013) Conceptualizing safety management in construction projects. Journal of Construction Engineering and Management, 139(9), pp. 1144-1153. ISSN 0733-9364
Sunindijo, R Y and Zou, P X W (2013) The roles of emotional intelligence, interpersonal skill, and transformational leadership on improving construction safety performance. Construction Economics and Building, 13(3), pp. 97-113. ISSN 2204-9029
Sunindijo, Riza (2012) Skills for developing safety climate in construction projects. PhD thesis, University of New South Wales, Australia.
Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.
Tam, C M; Fung, I W H; Yeung, T C L and Tung, K C F (2003) Relationship between construction safety signs and symbols recognition and characteristics of construction personnel. Construction Management and Economics, 21(7), pp. 745-753. ISSN 01446193
Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.
Tao, L; Wu, C; Chiang, Y H; Wong, F K W and Liang, S (2017) Generational perceptions of freedom-related work values: Hong Kong's implementation of a no-saturday-site-work policy in construction. Journal of Construction Engineering and Management, 143(7): 06017002, ISSN 0733-9364
Tatum, C B (1986) Potential mechanisms for construction innovation. Journal of Construction Engineering and Management, 112(2), pp. 178-191. ISSN 0733-9364
Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916
Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387
Tenah, K A (1986) Construction personnel role and information needs. Journal of Construction Engineering and Management, 112(1), pp. 33-48. ISSN 0733-9364
Teo, P and Love, P E D (2017) Re-examining the association between quality and safety performance in construction: From heterogeneous to homogeneous datasets. Journal of Construction Engineering and Management, 143(6): 04017011, ISSN 0733-9364
Tetteh, M O; Chan, A P C; Nani, G; Darko, A and Oppong, G D (2023) Impacts of management control mechanisms on the performance of international construction joint ventures: An empirical study. Engineering, Construction and Architectural Management, 30(6), pp. 2280-2303. ISSN 0969-9988
Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364
Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364
Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364
Thompson, D E (2014) A study of building information modeling usage through the perceived utilization of facilities management training, building information modeling technical specifications, and a quality building information model for facilities management at higher educational institutions in Texas. PhD thesis, Texas A&M University, USA.
Thorpe, D (2003) Online remote construction management trials in Queensland department of main roads: A participant's perspective. Construction Innovation, 3(2), pp. 65-79. ISSN 1471-4175
Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.
Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771
Tixier, A J P; Hallowell, M R; Albert, A; Van Boven, L and Kleiner, B M (2014) Psychological antecedents of risk-taking behavior in construction. Journal of Construction Engineering and Management, 140(11): 4014052, ISSN 0733-9364
Toh, Y Z; Goh, Y M and Guo, B H W (2017) Knowledge, attitude, and practice of design for safety: Multiple stakeholders in the Singapore construction industry. Journal of Construction Engineering and Management, 143(5): 04016131, ISSN 0733-9364
Toor, S U R and Ogunlana, S (2009) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(3), pp. 254-272. ISSN 0969-9988
Toor, S U R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(2), pp. 149-167. ISSN 1471-4175
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Townsend, R and Gershon, M (2020) Attaining successful construction project execution through personnel and communication. Journal of Construction Engineering and Management, 146(9): 04020101, ISSN 0733-9364
Townsend, R S (2019) Successful infrastructure construction project execution. DBA thesis, Temple University, USA.
Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988
Tran, V D (2017) Evaluating the economics of construction and demolition waste minimisation and zero waste in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364
Tsitsirigos, C; Begg, D and Fox, D (1999) Attitudes to management and their effect on progress. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364
Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988
Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Low-cost ergonomic intervention for mitigating physical and subjective discomfort during manual rebar tying. Journal of Construction Engineering and Management, 143(10): 04017075, ISSN 0733-9364
Unuafe, E (2017) Developing framework for improving the Nigerian public sector construction projects selection processes. PhD thesis, University of Bedfordshire, UK.
Uwakweh, B O (2005) Effect of foremen on construction apprentice. Journal of Construction Engineering and Management, 131(12), pp. 1320-1327. ISSN 0733-9364
Uwakweh, B O (2006) Motivational climate of construction apprentice. Journal of Construction Engineering and Management, 132(5), pp. 525-532. ISSN 0733-9364
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vaz-Serra, P and Mitcheltree, H (2021) Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia. International Journal of Construction Education and Research, 17(3), pp. 222-241. ISSN 1557-8771
Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.
Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364
Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.
Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.
Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364
Votano, S and Sunindijo, R Y (2014) Client safety roles in small and medium construction projects in Australia. Journal of Construction Engineering and Management, 140(9): 04014045, ISSN 0733-9364
Wagner, H; Kim, A J and Gordon, L (2013) Relationship between personal protective equipment, self-efficacy, and job satisfaction of women in the building trades. Journal of Construction Engineering and Management, 139(10): 04013005, ISSN 0733-9364
Walker, D H T and Wilson, A J (2004) The knowledge advantage (K-Adv) concept. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wall, D M (1993) Building maintenance in the context of developing countries. Construction Management and Economics, 11(3), pp. 186-193. ISSN 01446193
Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Wang, Y; Liu, C and Zhao, W (2026) Safety attitudes and safety management: Perspectives of managerial personnel and frontline workers in construction sites in China. Engineering, Construction and Architectural Management, 33(1), pp. 666-689. ISSN 0969-9988
Wang, C; Mohd-Rahim, F A; Chan, Y Y and Abdul-Rahman, H (2017) Fuzzy mapping on psychological disorders in construction management. Journal of Construction Engineering and Management, 143(2): 04016094, ISSN 0733-9364
Wang, D; Arditi, D and Damci, A (2017) Construction project managers' motivators and human values. Journal of Construction Engineering and Management, 143(4): 04016115, ISSN 0733-9364
Wang, D; Dai, F and Ning, X (2015) Risk assessment of work-related musculoskeletal disorders in construction: State-of-the-art review. Journal of Construction Engineering and Management, 141(6): 04015008, ISSN 0733-9364
Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988
Wang, P; Fenn, P and Wang, K (2024) A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria. Engineering, Construction and Architectural Management, 31(11), pp. 4625-4644. ISSN 0969-9988
Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364
Wang, R and Gong, D (2025) Abnormal behavior recognition algorithm in small sample scenarios for a utility tunnel project based on dcgan. Journal of Construction Engineering and Management, 151(6): 04025043, ISSN 0733-9364
Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.
Wang, Y; Deng, X and Mao, H (2023) The optimization of personnel localization management on international construction projects: Cases study from China enterprises. Engineering, Construction and Architectural Management, 30(8), pp. 3259-3291. ISSN 0969-9988
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364
Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599
Weidman, J; Dickerson, D E and Koebel, C T (2015) Intervention to improve purchasing decision-maker perceptions of ventilated tools. Journal of Construction Engineering and Management, 141(6): 04015007, ISSN 0733-9364
Weidman, J; Dickerson, D E and Koebel, C T (2016) Effective intervention strategy to improve worker readiness to adopt ventilated tools. Journal of Construction Engineering and Management, 142(8): 4016028, ISSN 0733-9364
Welch, G P (2015) Right-of-way: Equal employment opportunity on the trans Alaska oil pipeline, 1968-1977. PhD thesis, Duke University, USA.
Wentz, B (2015) Life stressors of mechanical contracting supervisory personnel. International Journal of Construction Education and Research, 11(4), pp. 268-279. ISSN 1557-8771
Wentz, B E (2013) Life stressors of mechanical contracting supervisory personnel. PhD thesis, Indiana State University, USA.
White, T G (1975) Ergonomic analysis of human factors affecting optimum performance of mobile crane drivers. PhD thesis, University of Surrey, UK.
Willcock, J and Evans, S (2003) Co-development: A case study linking work from the automotive sector with the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Willenbrock, J H; Thomas, H R and Francis, P J (1987) Factors affecting outage construction efficiency. Journal of Construction Engineering and Management, 113(1), pp. 99-116. ISSN 0733-9364
Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.
Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364
Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.
Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Wong, F K W (2000) Construction safety in Hong Kong: The development of models for the safety performance assessment of major contractors. PhD thesis, London South Bank University, UK.
Wong, L; Wang, Y; Law, T and Lo, C T (2016) Association of root causes in fatal fall-from-height construction accidents in Hong Kong. Journal of Construction Engineering and Management, 142(7): 4016018, ISSN 0733-9364
Wu, C; Song, X; Wang, T and Fang, D (2015) Core dimensions of the construction safety climate for a standardized safety-climate measurement. Journal of Construction Engineering and Management, 141(8): 04015018, ISSN 0733-9364
Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.
Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.
Xie, X; Lu, Q; Rodenas-Herraiz, D; Parlikad, A K and Schooling, J M (2020) Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management, 27(8), pp. 1835-1852. ISSN 0969-9988
Xie, X; Thorpe, A and Baldwin, A N (2000) A survey of communication issues in construction design. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Xu, S; Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(6), pp. 2224-2247. ISSN 0969-9988
Yan, D; Sunindijo, R; Wang, C and Yang, Z (2024) Comparing the career paths of male and female managers in the construction industry: Insights from LinkedIn data. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Yang, C P (2006) Factors affecting the performance of public projects in Taiwan. Journal of Construction Research, 7(1), pp. 207-225. ISSN 1609-9451
Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.
Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364
Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599
Yarbrough, K (2017) Exploring how managers integrate sustainability practices that exceed goals set by government agencies. DM thesis, Colorado Technical University, USA.
Yates, M E B (2017) An extended PMBOK project management model for companies delivering large multidiscipline mining projects. PhD thesis, University of Johannesburg, South Africa.
Yates-Suver, J K (1986) A cross-cultural evaluation of the behavior and training of American engineering and construction professionals who operate in the international marketplace. PhD thesis, Texas A&M University, USA.
Yean Yng Ling, F; Ming Hsia Ang, A and su yu Lim, S (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(6), pp. 501-518. ISSN 0969-9988
Yip, B and Rowlinson, S (2009) Job redesign as an intervention strategy of burnout: Organizational perspective. Journal of Construction Engineering and Management, 135(8), pp. 737-745. ISSN 0733-9364
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X
Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364
Young, D R (1968) The development of a construction industry interest inventory. PhD thesis, Ohio State University, USA.
Yu, H.; Peng, Z. and Wu, Z. (2026) Coupled analysis and simulation of safety risks in deep foundation pit construction for subway stations based on the N-K model and system dynamics. Journal of Construction Engineering and Management, 152(7): 04026088, ISSN 0733-9364
Yu, J; Wang, J; Shi, Q; Xu, J and Wang, J (2026) Exploring job competency related to intelligent construction in China using a text mining method. Engineering, Construction and Architectural Management, 33(1), pp. 318-335. ISSN 0969-9988
Yu, H; Peng, Z; He, Z and Huang, C (2024) Application maturity evaluation of building steel structure welding robotic technology based on multi-level gray theory. Engineering, Construction and Architectural Management, 31(11), pp. 4372-4397. ISSN 0969-9988
Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.
Yusuf, A O; Opawole, A; Musa, N A; Kadiri, D S and Ebunoluwa, E I (2024) Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1058-1083. ISSN 2398-4708
Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175
Zeb, J and Froese, T (2017) Transaction formalism protocol tool in infrastructure management. Construction Innovation, 17(2), pp. 180-203. ISSN 1471-4175
Zhang, C (2013) Automated progress control using laser scanning technology. PhD thesis, Illinois Institute of Technology, USA.
Zhang, J; Jiang, S and Qi, X (2025) Enhancing fire safety with improved risk index and BIM in building evacuation. Engineering, Construction and Architectural Management, 32(5), pp. 2793-2813. ISSN 0969-9988
Zhang, J; Zhou, Q and Zhang, S (2022) Case study of field application of prefabricated anchoring frame beam structure in slope supporting projects. Journal of Construction Engineering and Management, 148(9): 05022008, ISSN 0733-9364
Zhang, M; Cao, Z; Yang, Z and Zhao, X (2020) Utilizing computer vision and fuzzy inference to evaluate level of collision safety for workers and equipment in a dynamic environment. Journal of Construction Engineering and Management, 146(6): 04020051, ISSN 0733-9364
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhang, X; Li, Y and Wu, D (2020) Developing an underground utility occupation index for efficient urban utilities planning. Journal of Construction Engineering and Management, 146(5): 04020036, ISSN 0733-9364
Zhao, D (2015) Exploring construction safety and control measures through electrical fatalities. PhD thesis, Virginia Tech, USA.
Zhao, D; McCoy, A P; Kleiner, B M; Smith-Jackson, T L and Liu, G (2016) Sociotechnical systems of fatal electrical injuries in the construction industry. Journal of Construction Engineering and Management, 142(1): 04015056, ISSN 0733-9364
Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364
Zhou, H.; Xu, M. and Yang, Q. (2026) Quantitative safety risk coupling assessment method based on complex network theory: A case study in super-high-rise building construction. Journal of Construction Engineering and Management, 152(7): 04026095, ISSN 0733-9364
Zhou, H; Zhou, L; Gao, B; Huang, W; Huang, W; Zuo, J and Zhao, X (2025) Intelligent identification of risks in construction contract clauses based on semantic reasoning. Engineering, Construction and Architectural Management, 32(10), pp. 6593-6626. ISSN 0969-9988
Zhou, Q; Deng, X; Wang, G; Mahmoudi, A and Zhang, N (2025) Exploring the key drivers of inter-organizational knowledge transfer in projects: Evidence from international construction projects. Engineering, Construction and Architectural Management, 32(12), pp. 7994-8020. ISSN 0969-9988
Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988
Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), pp. 15-29. ISSN 1823-6499
Zou, P X W and Li, J (2010) Risk identification and assessment in subway projects: Case study of Nanjing Subway Line 2. Construction Management and Economics, 28(12), pp. 1219-1238. ISSN 1466433X
Zulkeflee, A A; Faisol, N; Ismail, F and Ismail, N A A (2022) Safety compliances enhancement: Foreign labours behaviour in the Malaysian construction site. Journal of Construction in Developing Countries, 27(1), pp. 153-171. ISSN 1823-6499
Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.
al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175
Up a level