Items with Index Term: estimate
Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599
Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.
Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Abdelkhalek, S; Zayed, T and Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5): 04025034, ISSN 0733-9364
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.
Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.
AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364
Abouelkhier, N; Shawky, D and Marzouk, M (2022) Evaluating distance perception for architecture design alternatives in immersive virtual environment: A comparative study. Construction Innovation, 22(2), pp. 205-221. ISSN 1471-4175
Abourizk, S; Knowles, P and Hermann, U R (2001) Estimating labor production rates for industrial construction activities. Journal of Construction Engineering and Management, 127(6), pp. 502-511. ISSN 0733-9364
Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364
Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Adams, F K (2004) The management of risks in international infrastructural projects. PhD thesis, University of Edinburgh, UK.
Ade, R and Rehm, M (2020) Reaching for the stars: Green construction cost premiums for homestar certification. Construction Management and Economics, 38(6), pp. 570-580. ISSN 01446193
Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.
Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364
Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.
Aflatooni, Mehran (2015) Synthetic rating system for railway bridge management. PhD thesis, Queensland University of Technology, Australia.
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531
Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.
Ahiaga-Dagbui, D D; Love, P E D; Whyte, A and Boateng, P (2017) Costing and technological challenges of offshore oil and gas decommissioning in the UK North Sea. Journal of Construction Engineering and Management, 143(7): 05017008, ISSN 0733-9364
Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988
Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364
Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364
Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.
Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364
Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X
Aihie, V U; Oyetunji, A K; Omotayo, T and Ekundayo, D (2025) Does the analytical hierarchy process help appraisers make better decisions? A quasi-experimental approach for property investment comparables. International Journal of Building Pathology and Adaptation, 43(1), pp. 117-133. ISSN 2398-4708
Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.
Aka, A; Bello, A O; Bamgbade, A A and Bilau, A A (2024) Age-performance consideration in the recruitment of tradespeople in Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 386-404. ISSN 0969-9988
Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.
Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655
Akinbogun, O T (2023) An integrated capacity development for artisans in the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Akinradewo, O; Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: Examining the influencing factors. Built Environment Project and Asset Management, 10(5), pp. 657-671. ISSN 2044-124X
Akinradewo, O I; Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects' estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(3), pp. 407-421. ISSN 1366-4387
Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193
Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.
Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.
Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.
Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.
Al-Omari, J A (1992) Critique of aspects of development theory using construction industry as a capital-surplus developing economy as an exemplar. PhD thesis, University of Reading, UK.
Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531
Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 0969-9988
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.
Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193
Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364
Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.
Alchaer, E and Issa, C A (2020) Engineering productivity measurement: A novel approach. Journal of Construction Engineering and Management, 146(8): 0001875, ISSN 0733-9364
Alfred Olatunji, O (2016) Blending 'fair dinkum' into group assessment of construction students. International Journal of Construction Education and Research, 12(4), pp. 270-284. ISSN 1557-8771
Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708
Ali, H M and Ruddock, L (2000) The impact of portfolio strategy onthe 'style' performance of UK property companies. Journal of Financial Management of Property and Construction, 5(3), pp. 123-133. ISSN 1366-4387
Alkhorayef, A N M (2014) Improving decision making on large scale investment projects: A psychological perspective. PhD thesis, University of Leeds, UK.
Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.
Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alnaser, N W (2010) Utilisation of solar and wind energy in buildings in the Kingdom of Bahrain: a step towards sustainable building construction. PhD thesis, University of Reading, UK.
Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kw PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(1), pp. 162-174. ISSN 2046-6099
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599
Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364
Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029
Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X
Alqahtani, A and Whyte, A (2016) Evaluation of non-cost factors affecting the life cycle cost: An exploratory study. Journal of Engineering, Design and Technology, 14(4), pp. 818-834.
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364
Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599
Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.
Alzraiee, H (2022) Cost estimate system using structured query language in BIM. International Journal of Construction Management, 22(14), pp. 2731-2743. ISSN 1562-3599
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Amirkhanian, S N; Burati, J L and Mirchandani, H C (1994) Effect of testing variability on contractor payment for asphalt pavements. Journal of Construction Engineering and Management, 120(3), pp. 579-592. ISSN 0733-9364
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599
Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Anderson, B (2023) A residential emissions-based carbon levy: City and neighbourhood consequences. Buildings & Cities, 4(1), pp. 545-564. ISSN 2632-6655
Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655
Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599
Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364
Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364
Anwer, S; Li, H; Antwi-Afari, M F; Umer, W; Mehmood, I and Wong, A Y L (2022) Effects of load carrying techniques on gait parameters, dynamic balance, and physiological parameters during a manual material handling task. Engineering, Construction and Architectural Management, 29(9), pp. 3415-3438. ISSN 0969-9988
Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.
Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.
Arabiat, A; Edum-Fotwe, F T and McCaffer, R (2007) Does client behaviour actively induce risk in construction projects? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Aragon, V; Gauthier, S; Warren, P; James, P A B and Anderson, B (2019) Developing English domestic occupancy profiles. Building Research & Information, 47(4), pp. 375-393. ISSN 0961-3218
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X
Arif, F (2013) A decision support framework for infrastructure maintenance investment decision-making. PhD thesis, Florida International University, USA.
Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599
Arif, M; Syal, M and Hightower, R (2013) Investigating the green leadership in energy and environmental design (LEED) servicescape scale in Brazil. Construction Innovation, 13(3), pp. 242-265. ISSN 1471-4175
Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218
Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364
Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asante, J; Kissi, E; Gyadu-Asiedu, W; Adinkrah-Appiah, K; Atta Nyamekye, C and Badu, B (2025) Factors influencing contractors services demand in developing countries: The case of the Ghanaian construction firms. International Journal of Construction Management, 25(15), pp. 1769-1777. ISSN 1562-3599
Asghari, V and Hsu, S C (2022) Upscaling complex project-level infrastructure intervention planning to network assets. Journal of Construction Engineering and Management, 148(1): 04021188, ISSN 0733-9364
Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364
Asiedu, R O and Gyadu-Asiedu, W (2020) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology, 18(3), pp. 583-600. ISSN 1726-0531
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364
Atmaca, N (2017) Life-cycle assessment of post-disaster temporary housing. Building Research & Information, 45(5), pp. 524-538. ISSN 0961-3218
Atta, A; Ali, N; Taman, M and Etman, E (2018) Improvement the structural behavior of recycled RC elements using CdO nanoparticles. Construction Innovation, 18(2), pp. 134-151. ISSN 1471-4175
Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 0969-9988
Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988
Ayat, M; Rehman, H; Qureshi, S M and Kang, C W (2023) Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, 23(11), pp. 1856-1866. ISSN 1562-3599
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Ayyub, B M and Haidar, A (1985) Decisions in construction operations. Journal of Construction Engineering and Management, 111(4), pp. 343-357. ISSN 0733-9364
Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193
Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364
Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364
Baccarini, D and Love, P E D (2014) Statistical characteristics of cost contingency in water infrastructure projects. Journal of Construction Engineering and Management, 140(3): 4013063, ISSN 0733-9364
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007
Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988
Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193
Baker, H (2021) A multimethod approach to learning from text-based construction failure data. PhD thesis, University of Edinburgh, UK.
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Ball, M and Wood, A (1995) How many jobs does construction expenditure generate? Construction Management and Economics, 13(4), pp. 307-318. ISSN 01446193
Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364
Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364
Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364
Barati, Khalegh (2018) Modeling fuel use, emissions and mass of on-road construction equipment through monitoring field operations. PhD thesis, University of New South Wales, Australia.
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599
Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.
Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364
Beeston, D (1986) Combining risks in estimating. Construction Management and Economics, 4(1), pp. 75-79. ISSN 01446193
Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.
Benjaoran, V; Dawood, N and Scott, D (2004) Bespoke precast productivity estimation with neural network model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Berglund-Brown, J; Dobie, I; Hewitt, J; De Wolf, C and Ochsendorf, J (2025) Lifetimes of demolished buildings in US and European cities. Buildings & Cities, 6(1), pp. 1099-1116. ISSN 2632-6655
Bergsdal, H; Brattebø, H and Müller, D B (2014) Dynamic material flow analysis for PCBs in the Norwegian building stock. Building Research & Information, 42(3), pp. 359-370. ISSN 0961-3218
Best, R and Langston, C (2006) Evaluation of construction contractor performance: A critical analysis of some recent research. Construction Management and Economics, 24(4), pp. 439-445. ISSN 01446193
Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bidanset, P; McCord, M; Davis, P and Sunderman, M (2019) An exploratory approach for enhancing vertical and horizontal equity tests for ad valorem property tax valuations using geographically weighted regression. Journal of Financial Management of Property and Construction, 24(2), pp. 231-250. ISSN 1366-4387
Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218
Biltonen, E F (2001) Cost-benefit analysis of a flood protection project incorporating poverty alleviation concerns: Case study Vietnam. PhD thesis, Colorado State University, USA.
Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.
Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.
Blay Jnr, A V K; Kukah, A S K; Opoku, A and Asiedu, R (2023) Impact of competitive strategies on achieving the sustainable development goals: Context of Ghanaian construction firms. International Journal of Construction Management, 23(13), pp. 2209-2220. ISSN 1562-3599
Blayse, A M and Manley, K (2004) Key influences on construction innovation. Construction Innovation, 4(3), pp. 143-154. ISSN 1471-4175
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Bobick, T G (2004) Falls through roof and floor openings and surfaces, including skylights: 1992-2000. Journal of Construction Engineering and Management, 130(6), pp. 895-907. ISSN 0733-9364
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218
Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364
Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building construction output in the United States, 1972-82. Construction Management and Economics, 4(1), pp. 1-18. ISSN 01446193
Bradley, P E and Kohler, N (2007) Methodology for the survival analysis of urban building stocks. Building Research & Information, 35(5), pp. 529-542. ISSN 0961-3218
Brady, L and Hanmer-Dwight, R (2016) The management and control of energy at the design stage of buildings. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364
Brocklesby, M (1999) The environmental impact of frame materials: an assessment of the embodied impacts for building frames in the UK construction industry. PhD thesis, University of Sheffield, UK.
Bruce-Konuah, A; Jones, R V and Fuertes, A (2023) A method for estimating scheduled and manual override heating behaviour and settings from measurements in low energy UK homes. International Journal of Building Pathology and Adaptation, 41(1), pp. 25-44. ISSN 23984708
Brunso, T P and Siddiqi, K M (2003) Using benchmarks and metrics to evaluate project delivery of environmental restoration programs. Journal of Construction Engineering and Management, 129(2), pp. 119-130. ISSN 0733-9364
Büchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(6), pp. 506-519. ISSN 01446193
Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364
Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364
Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364
Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.
Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.
Cariño, J M N and Garciano, L E O (2020) Proposed evacuation safety index (ESI) for school buildings. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 309-328. ISSN 1759-5916
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364
Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364
Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364
Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.
Cavalcante, Gustavo Henrique Ferreira (2022) Seismic risk analysis of typical bridges located in the northeastern Brazil. PhD thesis, Universidade Estadual de Campinas, Brazil.
Cedstrand, E (2023) Evaluating occupational health interventions: Design, implementation, and effects. PhD thesis, Karolinska Institutet, Sweden.
Celik, T (2014) Developing a building construction associated social cost estimation system for Turkish construction industry. PhD thesis, University of Salford, UK.
Chai, C; De Brito, J; Gaspar, P L and Silva, A (2014) Predicting the service life of exterior wall painting: Techno-economic analysis of alternative maintenance strategies. Journal of Construction Engineering and Management, 140(3): 4013057, ISSN 0733-9364
Chambers, M L (2021) Fine particulate air pollution and accident risk: Three essays. PhD thesis, Vanderbilt University, USA.
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chan, T K and Gao, S (2019) Can we really measure construction productivity? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Chancellor, W and Abbott, M (2015) The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176-186. ISSN 01446193
Chancellor, W and Lu, W (2016) A regional and provincial productivity analysis of the Chinese construction industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11): 05016013, ISSN 0733-9364
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, L M (1986) Inferential statistics for craftsman questionnaire. Journal of Construction Engineering and Management, 112(4), pp. 492-499. ISSN 0733-9364
Chang, L M and Borcherding, J D (1985) Evaluation of craftsman questionnaire. Journal of Construction Engineering and Management, 111(4), pp. 426-437. ISSN 0733-9364
Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364
Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.
Chang Albitres, C M (2007) Development of a multi-objective strategic management approach to improve decisions for pavement management practices in local agencies. PhD thesis, Texas A&M University, USA.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Chao, L C and Kuo, C P (2018) Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117, ISSN 0733-9364
Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364
Chao, L C and Skibniewski, M J (1995) Neural network method of estimating construction technology acceptability. Journal of Construction Engineering and Management, 121(1), pp. 130-142. ISSN 0733-9364
Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.
Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364
Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong. Construction Management and Economics, 13(1), pp. 15-21. ISSN 01446193
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, S; Tian, Y; Jin, L and Xiang, L (2021) Estimating the frequency of exposure to uncertain hazards: Impact of wind conditions on concrete dam construction. Journal of Construction Engineering and Management, 147(2): 04020167, ISSN 0733-9364
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.
Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.
Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599
Cheng, G and Wilmot, C G (2009) Louisiana highway construction cost trend after hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(7), pp. 594-600. ISSN 0733-9364
Cheng, L and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(3), pp. 255-263. ISSN 01446193
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Chenger, D T (2012) Executive level capital project decision making: Rational or rationale? PhD thesis, University of Calgary, Canada.
Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.
Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.
Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364
Chong, D; Wang, Y; Zhao, K; Wang, D and Oeser, M (2018) Asphalt fume exposures by pavement construction workers: Current status and project cases. Journal of Construction Engineering and Management, 144(4): 05018002, ISSN 0733-9364
Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids. PhD thesis, Illinois Institute of Technology, USA.
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.
Choy, L H T; Ho, W K O and Mak, S W K (2012) Housing attributes and Hong Kong real estate prices: A quantile regression analysis. Construction Management and Economics, 30(5), pp. 359-366. ISSN 01446193
Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.
Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.
Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.
Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364
Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.
Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.
Cole, R; Simpson, C H; Ferguson, L; Symonds, P; Taylor, J; Heaviside, C; Murage, P; Macintyre, H L; Hajat, S; Mavrogianni, A and Davies, M (2024) A population-level framework to estimate unequal exposure to indoor heat and air pollution. Buildings & Cities, 5(1), pp. 562-580. ISSN 2632-6655
Collins, F (2013) 2nd generation concrete construction: Carbon footprint accounting. Engineering, Construction and Architectural Management, 20(4), pp. 330-344. ISSN 0969-9988
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Cooper, Arthur Ashley (1971) An economic study of housing production and associated works in Australia. PhD thesis, University of New South Wales, Australia.
Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.
Cothern, E J (2021) Exposure to respirable crystalline silica during five OSHA Table 1 tasks and the effectiveness of dust controls, the contribution of background silica dust to personal exposures, and the use of a photometric instrument to assess silica dust exposure in real time. PhD thesis, Colorado State University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Cowie, G F (1987) Enough scope yields better estimates. Journal of Construction Engineering and Management, 113(2), pp. 315-320. ISSN 0733-9364
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Crawley, J; Biddulph, P; Wingfield, J; Ashdown, M; Lowe, R and Elwell, C (2020) Inferring the as-built air permeability of new UK dwellings. International Journal of Building Pathology and Adaptation, 38(1), pp. 3-19. ISSN 23984708
Crawley, J; McKenna, E; Gori, V and Oreszczyn, T (2020) Creating domestic building thermal performance ratings using smart meter data. Buildings & Cities, 1(1), pp. 1-13. ISSN 2632-6655
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.
Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364
Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364
Crowley, L G (2000) Friedman and gates: another look. Journal of Construction Engineering and Management, 126(4), pp. 306-312. ISSN 0733-9364
Cruz Rios, F (2018) Beyond recycling: Design for disassembly, reuse, and circular economy in the built environment. PhD thesis, Arizona State University, USA.
Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364
Dabirian, S; Abbaspour, S; Khanzadi, M and Ahmadi, M (2022) Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 22(2), pp. 182-191. ISSN 1562-3599
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387
Dadzie, J; Runeson, G and Ding, G (2020) Assessing determinants of sustainable upgrade of existing buildings: The case of sustainable technologies for energy efficiency. Journal of Engineering, Design and Technology, 18(1), pp. 270-292. ISSN 1726-0531
Dadzie, John (2018) A model for predicting the energy performance of existing buildings upgraded with sustainable technologies. PhD thesis, University of Technology Sydney, Australia.
Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988
Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599
Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599
Das, P P; Khatri, V N; Doley, R; Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(2), pp. 385-403. ISSN 1726-0531
Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.
David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: A joint methodology approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dawood, N N (2001) Development of a forecasting methodology for cost indices: An application to the Greek construction industry. Journal of Construction Procurement, 7(1), pp. 42-50. ISSN 1358-9180
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988
Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364
De Marco, A; Narbaev, T; Ottaviani, F M and Vanhoucke, M (2024) Influence of cost contingency management on project estimates at completion. International Journal of Construction Management, 24(9), pp. 935-945. ISSN 1562-3599
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193
Debrah, C and Owusu-Manu, D G (2022) An apposite framework for green cities development in developing countries: The case of Ghana. Construction Innovation, 22(4), pp. 789-808. ISSN 1471-4175
Decarolis, F (2009) When the highest bidder loses the auction: Theory and evidence from public procurement. PhD thesis, University of Chicago, USA.
Deddis, W G; McCluskey, W J; Mamis, A and McBumey, R D (1997) The potential for market research, property market analysis, & property valuation using (GIS) geographic information system technology. Journal of Financial Management of Property and Construction, 2(3), pp. 45-62. ISSN 1366-4387
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Dell'Anna, F; Bottero, M; Becchio, C; Corgnati, S P and Mondini, G (2020) Designing a decision support system to evaluate the environmental and extra-economic performances of a nearly zero-energy building. Smart and Sustainable Built Environment, 9(4), pp. 413-442. ISSN 2046-6099
Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.
Densley Tingley, D (2013) Design for deconstruction: an appraisal. PhD thesis, University of Sheffield, UK.
Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364
Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988
Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.
Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.
Dorr, E E (1979) Economies of scale in high school construction and operation. PhD thesis, North Carolina State University, USA.
Drury, P; Watson, S and Lomas, K J (2021) Summertime overheating in UK homes: Is there a safe haven? Buildings & Cities, 2(1), pp. 970-990. ISSN 2632-6655
Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364
Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988
Du, J; Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in capital project planning: A human-subject experiment. Construction Management and Economics, 37(1), pp. 44-60. ISSN 01446193
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duncan, K; Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(3), pp. 320-334. ISSN 0969-9988
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364
Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.
Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364
Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.
Ebiloma, D. O.; Aigbavboa, C. O. and Anumba, C. (2026) Key drivers of digital twin maintenance management for healthcare facilities in Nigeria. Engineering, Construction and Architectural Management, 33(3), pp. 1871-1890. ISSN 0969-9988
Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.
El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599
Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364
Elmousalami, H H; Ali, A H; Kineber, A F and Elyamany, A (2024) A novel conceptual cost estimation decision-making model for field canal improvement projects. International Journal of Construction Management, 24(6), pp. 651-663. ISSN 1562-3599
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Eltinay, N and Egbu, C (2017) Disaster risk reduction conceptual framework: Open data for building resilience in critical infrastructure. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364
Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364
Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.
Ernzen, J J and Schexnayder, C (2000) One company's experience with design/build: Labor cost risk and profit potential. Journal of Construction Engineering and Management, 126(1), pp. 10-14. ISSN 0733-9364
Eromobor, S O; Das, D K and Emuze, F (2020) Influence of building and indoor environmental parameters on designing energy-efficient buildings. International Journal of Building Pathology and Adaptation, 39(3), pp. 507-524. ISSN 23984708
Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099
Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.
Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X
Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193
Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364
Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.
Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387
Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364
Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387
Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099
Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988
Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988
Feng, Y (2015) Mathematical models for determining the minimum level of voluntary safety investments for building projects. Journal of Construction Engineering and Management, 141(7): 4015015, ISSN 0733-9364
Fernandes, Luciana Oliveira (2015) Procedure for retrofit of the heat power performance of educational buildings by applying passive strategies conditioning. PhD thesis, Universidade Estadual de Campinas, Brazil.
Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218
Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ford, B; Wilson, R; Gillott, M; Ibraheem, O; Salmeron, J and Sanchez, F J (2012) Passive downdraught evaporative cooling: Performance in a prototype house. Building Research & Information, 40(3), pp. 290-304. ISSN 0961-3218
Fox, D S J (1994) Knowledge-based systems for the demolition industry. PhD thesis, University of Portsmouth, UK.
Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.
Frimpong, S; Sunindijo, R Y; Wang, C C; Boadu, E F; Dansoh, A and Fagbenro, R K (2025) A scoping review of research on mental health conditions among young construction workers. Construction Innovation, 25(1), pp. 5-34. ISSN 1471-4175
Fu, E; Newell, D; Becker, A; Schwegler, B and Fischer, M (2013) Is adaptation sustainable? A method to estimate climate-critical construction resource capacity. Construction Innovation, 13(2), pp. 202-216. ISSN 1471-4175
Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.
Gabrielli, M F (2009) Structural analysis of auction models. PhD thesis, Pennsylvania State University, USA.
Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364
Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings. PhD thesis, University of California, Berkeley, USA.
Galvin, R (2015) Integrating the rebound effect: Accurate predictors for upgrading domestic heating. Building Research & Information, 43(6), pp. 710-722. ISSN 0961-3218
Galvin, R (2023) How prebound effects compromise the market premium for energy efficiency in German house sales. Building Research & Information, 51(5), pp. 501-517. ISSN 0961-3218
Gamez, E A (2009) Risk assessment for international development projects: Owner's perspective. PhD thesis, Northeastern University, USA.
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916
Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2022) Trade decomposition of CO2 emissions of global construction industries. Engineering, Construction and Architectural Management, 29(1), pp. 502-522. ISSN 0969-9988
Garcia Punhagui, Katia Regina (2014) Potential reducing of CO2 emissions and embodied energy in housing construction in Brazil by increasing the use of wood. PhD thesis, Universidade de São Paulo, Brazil.
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599
Gardner, B J; Gransberg, D D and Jeong, H D (2016) Reducing data-collection efforts for conceptual cost estimating at a highway agency. Journal of Construction Engineering and Management, 142(11): 04016057, ISSN 0733-9364
Garg, S and Misra, S (2022) Understanding the components and magnitude of the cost of quality in building construction. Engineering, Construction and Architectural Management, 29(1), pp. 26-48. ISSN 0969-9988
Garg, S and Misra, S (2023) Framework for estimating quality-related incentive and disincentive in construction projects. Journal of Construction Engineering and Management, 149(5): 04023018, ISSN 0733-9364
Garvin, M J (2001) Strategic indicators for characterization of water system infrastructure and management. PhD thesis, Massachusetts Institute of Technology, USA.
Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: A case of Sri Lanka. Construction Management and Economics, 39(8), pp. 704-721. ISSN 01446193
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Ghanbarpour, S; Mazaheripour, H; Mirmoradi, S H and Barari, A (2010) The effect of type and volume fraction (vf) of steel fiber on the mechanical properties of self-compacting concrete. Journal of Engineering, Design and Technology, 8(3), pp. 247-256. ISSN 1726-0531
Ghannoum, M; Assaad, J; Daaboul, M and El-Mir, A (2025) Deterministic and stochastic finite element modeling of reinforced concrete beams without stirrups containing plastic wastes. International Journal of Building Pathology and Adaptation, 43(4), pp. 614-632. ISSN 2398-4708
Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.
Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099
Gkountis, I and Zayed, T (2015) Subway infrastructure condition assessment. Journal of Construction Engineering and Management, 141(12): 04015042, ISSN 0733-9364
Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Glew, D; Johnston, D; Miles-Shenton, D and Thomas, F (2020) Retrofitting suspended timber ground-floors; comparing aggregated and disaggregated evaluation methods. Building Research & Information, 48(5), pp. 572-586. ISSN 0961-3218
Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.
Godoy-Shimizu, D; Steadman, P and Evans, S (2021) Density and morphology: From the building scale to the city scale. Buildings & Cities, 2(1), pp. 92-113. ISSN 2632-6655
Goh, B H and Sun, Y (2016) The development of life-cycle costing for buildings. Building Research & Information, 44(3), pp. 319-333. ISSN 0961-3218
Goh, Y M (2005) A case-based reasoning approach to construction safety risk assessment. PhD thesis, National University of Singapore, Singapore.
Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.
Gong, X (2019) Vertical integration and reputation: the case of real estate companies. PhD thesis, University of Hong Kong, Hong Kong.
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
González-Prieto, D; Fernández-Nava, Y; Marañón, E and Prieto, M M (2021) Environmental life cycle assessment based on the retrofitting of a twentieth-century heritage building in Spain, with electricity decarbonization scenarios. Building Research & Information, 49(8), pp. 859-877. ISSN 0961-3218
Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364
Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364
Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193
Govan, P B (2014) Causal network methods for integrated project portfolio risk analysis. PhD thesis, Texas A&M University, USA.
Govertsen, K and Kane, M (2024) Measuring health inequities due to housing characteristics. Buildings & Cities, 5(1), pp. 451-469. ISSN 2632-6655
Goyal, P K; Datta, T K and Vijay, V K (2012) Vulnerability of rural houses to cyclonic wind. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 20-41. ISSN 1759-5916
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Grahn, Karin (2023) Occupational exposure to particles in relation to chronic obstructive pulmonary disease and cardiovascular disease. PhD thesis, Karolinska Institutet, Sweden.
Gransberg, D D; Lopez Del Puerto, C and Humphrey, D (2007) Relating cost growth from the initial estimate to design fee for transportation projects. Journal of Construction Engineering and Management, 133(6), pp. 404-408. ISSN 0733-9364
Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364
Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.
Grimes, G A (2004) Recovering capital expenditures: The railroad industry paradox. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Gruneberg, S (2008) Modelling the UK built infrastructure market using gross fixed capital formation. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X
Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655
Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771
Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364
Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Guzman de la Cruz, A L (1998) Cost-performance criteria for seismic retrofitting. PhD thesis, University of Puerto Rico, Mayaguez, Puerto Roco.
Gómez-Chaparro, M; García-Sanz-Calcedo, J and Aunión-Villa, J (2020) Maintenance in hospitals with less than 200 beds: Efficiency indicators. Building Research & Information, 48(5), pp. 526-537. ISSN 0961-3218
Habisreutinger, P and Gunderson, D E (2006) Real estate reuse opportunities within the regenesis project area: A case study. International Journal of Construction Education and Research, 2(1), pp. 53-63. ISSN 1557-8771
Haddad, S; Osmond, P and King, S (2019) Application of adaptive thermal comfort methods for Iranian schoolchildren. Building Research & Information, 47(2), pp. 173-189. ISSN 0961-3218
Haik, R; Peled, A and Meir, I A (2021) Thermal performance of alternative binders lime hemp concrete (lhc) building: Comparison with conventional building materials. Building Research & Information, 49(7), pp. 763-776. ISSN 0961-3218
Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364
Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.
Hancher, D E; De La Garza, J M and Eckert, G K (1997) Improving workers' compensation management in construction. Journal of Construction Engineering and Management, 123(3), pp. 285-291. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364
Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364
Hao, J X (2007) Infrastructure investment and economic development. PhD thesis, University of Maryland, College Park, USA.
Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York city during hurricane sandy. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 133-143. ISSN 1759-5916
Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.
Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988
Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.
He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364
He, C (2018) Public procurement: award mechanisms and implementation process. PhD thesis, Loughborough University, UK.
He, N (2016) Conceptual cost modeling of innovative industrial estates using sysml and case-based reasoning. PhD thesis, National University of Singapore, Singapore.
He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364
He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.
Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Hellas, M S; Chaib, R and Verzea, I (2020) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology, 18(1), pp. 40-54. ISSN 1726-0531
Hendrickson, C and Horvath, A (2000) Resource use and environmental emissions of U.S. Construction sectors. Journal of Construction Engineering and Management, 126(1), pp. 38-44. ISSN 0733-9364
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193
Hicks, J C (1992) Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118(3), pp. 545-560. ISSN 0733-9364
Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.
Hinze, J W (1976) The effect of middle management on safety in construction. PhD thesis, Stanford University, USA.
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ho, P H K (2013) Forecasting the manpower demand for quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 1-12. ISSN 2204-9029
Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.
Hogg, K (2003) The role of the quantity surveying profession in accommodating client risk. Journal of Financial Management of Property and Construction, 8(1), pp. 49-56. ISSN 1366-4387
Hollick, F; Humphrey, D; Oreszczyn, T; Elwell, C and Huebner, G (2024) Building energy use in COVID-19 lockdowns: Did much change? Buildings & Cities, 5(1), pp. 182-198. ISSN 2632-6655
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Hopkins, O S (2004) Planning rural water supply systems in developing countries: The case of Rwanda. PhD thesis, University of North Carolina at Chapel Hill, USA.
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364
Hu, K (2011) Three essays on modeling complex dynamic problems in health and safety. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model. PhD thesis, University of Bath, UK.
Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X
Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X
Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Hung, C Y and Cheng, E W L (2014) Estimating contractors' efficiency with panel data: Comparison of the data envelopment analysis, Cobb-Douglas and translog production function methods. Construction Innovation, 14(3), pp. 274-291. ISSN 1471-4175
Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.
Hutchings, Sally J (2023) An investigation of methods used to estimate the future burden of disease due to occupation. PhD thesis, University of Manchester, UK.
Huuhka, S; Moisio, M and Arnould, M (2024) Evaluating past and future building operational emissions: Improved method. Buildings & Cities, 5(1), pp. 150-161. ISSN 2632-6655
Hvid Horup, L; Ohms, P K; Hauschild, M; Gummidi, S R B; Secher, A Q; Thuesen, C and Ryberg, M (2024) Evaluating mitigation strategies for building stocks against absolute climate targets. Buildings & Cities, 5(1), pp. 117-132. ISSN 2632-6655
Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364
Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364
Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364
Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Ilozor, B D and Ilozor, D B (2005) Openplan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364
Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.
Ingle, A; Moezzi, M; Lutzenhiser, L and Diamond, R (2014) Better home energy audit modelling: Incorporating inhabitant behaviours. Building Research & Information, 42(4), pp. 409-421. ISSN 0961-3218
Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.
Invernizzi, D C (2019) Benchmarking nuclear decommissioning. PhD thesis, University of Leeds, UK.
Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364
Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364
Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193
Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.
Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.
Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.
Ive, G; Murray, A and Marsh, R (2015) Cost and value ratios of operating renewed English secondary schools. Building Research & Information, 43(4), pp. 465-485. ISSN 0961-3218
Jaafar, T (1992) A unified methodology for project planning risk. PhD thesis, Nottingham Trent University, UK.
Jaafari, A (1977) Development and use of composite fibrous materials in the UK construction industry. PhD thesis, University of Surrey, UK.
Jablonowski, C J (2015) Quantitative method to model the underreporting of safety incidents. Journal of Construction Engineering and Management, 141(5): 06014012, ISSN 0733-9364
Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jacob, J C; Pandit, D and Sen, J (2025) Developing a validated simulation model of micro-zonal air-conditioning to evaluate thermal comfort parameters. Architectural Engineering and Design Management, 21(2), pp. 289-314. ISSN 1745-2007
Jafari, A; Valentin, V and Berrens, R P (2017) Estimating the economic value of energy improvements in U.S. Residential housing. Journal of Construction Engineering and Management, 143(8): 04017048, ISSN 0733-9364
Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jain, S; Singhal, S and Jain, N K (2021) Construction and demolition waste (C&DW) in India: Generation rate and implications of C&DW recycling. International Journal of Construction Management, 21(3), pp. 261-270. ISSN 1562-3599
Jalaei, F; Zoghi, M and Khoshand, A (2021) Life cycle environmental impact assessment to manage and optimize construction waste using building information modeling (BIM). International Journal of Construction Management, 21(8), pp. 784-801. ISSN 1562-3599
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Jarder, S L N; Garciano, L E O and Maruyama, O (2021) Probable maximum loss of a pipe network due to earthquakes: A case study in iloilo city, Philippines. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 223-237. ISSN 1759-5916
Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531
Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Javid, M and Seneviratne, P N (2000) Investment risk analysis in airport parking facility development. Journal of Construction Engineering and Management, 126(4), pp. 298-305. ISSN 0733-9364
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jegede, O E and Taki, A (2022) Optimization of building envelopes using indigenous materials to achieve thermal comfort and affordable housing in Abuja, Nigeria. International Journal of Building Pathology and Adaptation, 40(2), pp. 219-247. ISSN 23984708
Jeljeli, M N (1994) A risk-based methodology for estimating contractors' liability in superfund cleanup construction. PhD thesis, University of Wisconsin - Madison, USA.
Jeljeli, M N and Russell, J S (1995) Coping with uncertainty in environmental construction: Decision-analysis approach. Journal of Construction Engineering and Management, 121(4), pp. 370-380. ISSN 0733-9364
Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364
Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Jiang, H; Jin, X H and Liu, C (2013) The effects of the late 2000s global financial crisis on Australia's construction demand. Construction Economics and Building, 13(3), pp. 65-79. ISSN 2204-9029
Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X
Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.
Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.
Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364
Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.
Jobling, P E and Smith, N J (2018) Experience of the role of contracts in megaproject execution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 18-24. ISSN 17514304
Johnstone, I M (2001) Periodic refurbishment and reductions in national costs to sustain dwelling services. Construction Management and Economics, 19(1), pp. 97-108. ISSN 01446193
Johnstone, I M (2004) Development of a model to estimate the benefit-cost ratio performance of housing. Construction Management and Economics, 22(6), pp. 607-617. ISSN 01446193
Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: Evidence from India. Journal of Financial Management of Property and Construction, 25(2), pp. 273-291. ISSN 1366-4387
Jones, C (2014) Assessing safety culture and safety performance in a high hazard industry. PhD thesis, University of Nottingham, UK.
Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988
Joseph Garcia, A and Mollaoglu, S (2020) Individuals' capacities to apply transferred knowledge in AEC project teams. Journal of Construction Engineering and Management, 146(4): 04020016, ISSN 0733-9364
Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.
Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599
Kahandawa, R; Domingo, N; Chawynski, G and Uma, S R (2021) Factors impacting post-earthquake damage repair cost estimations. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 29-49. ISSN 1759-5916
Kaiser, M J (2006) Offshore decommissioning cost estimation in the gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp. 249-258. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.
Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364
Kang, K; Xiao, J and Moon, S (2025) Evaluating safety risks in pedestrian facilities for different ride modes: Application of a deep learning-based 3D scanning system. Journal of Construction Engineering and Management, 151(11): 04025183, ISSN 0733-9364
Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364
Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364
Karamujic, H (2012) Modelling seasonality in Australian building approvals. Construction Economics and Building, 12(1), pp. 26-36. ISSN 2204-9029
Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.
Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.
Karshenas, S (1984) Predesign cost estimating method for multistory buildings. Journal of Construction Engineering and Management, 110(1), pp. 79-86. ISSN 0733-9364
Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099
Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364
Kasozi, P and Tutesigensi, A (2007) A framework for appraising construction projects using carbon footprint. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.
Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.
Kempton, J (2006) The potential for lean thinking in the refurbishment and repair of dwellings in the registered social landlord sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kern, A P and Zuliani da Silva, L G (2025) System of rehabilitation assessment and cost comparative (SARC): Case study in abandoned buildings rehabilitation in Brazil. Architectural Engineering and Design Management, 21(1), pp. 78-97. ISSN 1745-2007
Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants. PhD thesis, Pennsylvania State University, USA.
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.
Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.
Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599
Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.
Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2013) Estimation of greenhouse gas emissions from land-use changes due to road construction in the republic of Korea. Journal of Construction Engineering and Management, 139(3), pp. 339-346. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364
Kim, Jungsoo (2014) Impact of indoor environmental quality (IEQ) factors on occupant evaluation of workspaces. PhD thesis, University of Sydney, Australia.
Kim, K; Jeong, I and Cho, Y K (2023) Signal processing and alert logic evaluation for IoT-based work zone proximity safety system. Journal of Construction Engineering and Management, 149(2): 05022018, ISSN 0733-9364
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.
Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.
Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364
Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029
Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.
Kleerekoper, L; van den Dobbelsteen, A A J F; Hordijk, G J; van Dorst, M J and Martin, C L (2015) Climate adaptation strategies: Achieving insight in microclimate effects of redevelopment options. Smart and Sustainable Built Environment, 4(1), pp. 110-136. ISSN 2046-6099
Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.
Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X
Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364
Konior, J and Szóstak, M (2023) Course of planned, actual and earned cost curves of diverse construction investments. International Journal of Construction Management, 23(5), pp. 865-876. ISSN 1562-3599
Koo, H J; Kelly, D and Deman, D (2024) Risk assessment of the challenges in the adaptive reuse of historic buildings. Journal of Construction Engineering and Management, 150(9): 04024119, ISSN 0733-9364
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kuittinen, M (2016) Does the use of recycled concrete lower the carbon footprint in humanitarian construction? International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 472-488. ISSN 1759-5916
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumar, S; Yadav, N; Singh, M and Kachhawa, S (2019) Estimating India's commercial building stock to address the energy data challenge. Building Research & Information, 47(1), pp. 24-37. ISSN 0961-3218
Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.
Kumar Singla, H (2019) A comparative analysis of long-term performance of construction and non-construction IPOs in India: A panel data investigation. Engineering, Construction and Architectural Management, 26(10), pp. 2447-2473. ISSN 0969-9988
Kumari, P; Reddy, S R N and Yadav, R (2024) Indoor occupancy detection and counting system based on boosting algorithm using different sensor data. Building Research & Information, 52(1-2), pp. 87-106. ISSN 0961-3218
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X
Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387
Lam, K C; Cheung, S O; Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(1), pp. 81-93. ISSN 2204-9029
Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218
Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X
Lashgari, Martin (2014) Comparative study of base-isolated and fixed-base buildings using a damage/cost approach. PhD thesis, University of Nebraska - Lincoln, USA.
Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.
Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.
Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531
Lazarski, A (2014) The importance of contextual factors on the accuracy of estimates in project management: An emergence of a framework for more realistic estimation process. PhD thesis, University of Bradford, UK.
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364
Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364
Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364
Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988
Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.
Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364
Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988
Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193
Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X
Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218
Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531
Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364
Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364
Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364
Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.
Li, Y (2007) Integrated dynamic perspective on firm competencies and organizationalperformance: a study of China's largeconstruction SOEs. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Li, Y and Liu, C (2010) Malmquist indices of total factor productivity changes in the Australian construction industry. Construction Management and Economics, 28(9), pp. 933-945. ISSN 1466433X
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312
Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.
Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.
Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387
Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X
Lindelöf, D and Morel, N (2008) Bayesian estimation of visual discomfort. Building Research & Information, 36(1), pp. 83-96. ISSN 0961-3218
Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988
Liu, C; Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(2), pp. 33-42. ISSN 2204-9029
Liu, H (2013) Adaptive optimization methods in system-level bridge management. PhD thesis, University of California, Berkeley, USA.
Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364
Liu, J and London, K (2011) Analysing the relationship between new housing supply and residential construction costs with the regional heterogeneities. Construction Economics and Building, 11(3), pp. 58-67. ISSN 2204-9029
Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.
Liu, X X; Liu, H H; Yang, G L and Pan, J F (2023) Productivity assessment of the real estate industry in China: A dea-malmquist index. Engineering, Construction and Architectural Management, 30(3), pp. 1243-1270. ISSN 0969-9988
Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.
Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387
Lombard, P C (1991) The relationship between highway infrastructure and regional economic development. PhD thesis, Purdue University, USA.
Lopes, J P; Oliveira, R A and Abreu, M I (2019) Estimating the built environment stock in Cape Verde. Engineering, Construction and Architectural Management, 26(5), pp. 814-826. ISSN 0969-9988
Lopes, M A R; Antunes, C H; Reis, A and Martins, N (2017) Estimating energy savings from behaviours using building performance simulations. Building Research & Information, 45(3), pp. 303-319. ISSN 0961-3218
Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364
Lou, Y (2022) Interconnections among energy consumption, carbon emissions, and economic impacts for sustainable buildings. PhD thesis, University of Colorado at Boulder, USA.
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.
Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Lu, W; Webster, C; Peng, Y; Chen, X and Zhang, X (2017) Estimating and calibrating the amount of building-related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), pp. 13-24. ISSN 1562-3599
Luczywek, Beata (2024) Essays on policy evaluations: Insights from public and labor economics. PhD thesis, University of California, San Diego, USA.
Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Lusby, A K (2003) The effect of increased public investment in transportation infrastructure on oklahoma's economic development. PhD thesis, Oklahoma State University, USA.
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988
Mahamid, I (2011) Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), pp. 87-101. ISSN 2204-9029
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364
Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099
Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193
Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193
Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175
Maloney, W F (1990) Framework for analysis of performance. Journal of Construction Engineering and Management, 116(3), pp. 399-415. ISSN 0733-9364
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Mao, Z (2003) Forecasting total factor productivity growth in the construction industry using neural network modelling. PhD thesis, National University of Singapore, Singapore.
Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.
Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Marques, M; Monteiro, R and Delgado, R (2018) An improved model for seismic risk assessment in Portugal. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 70-83. ISSN 1759-5916
Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X
Marteinsson, B (2003) Durability and the factor method of ISO 15686-1. Building Research & Information, 31(6), pp. 416-426. ISSN 0961-3218
Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects. PhD thesis, Purdue University, USA.
Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(2), pp. 111-124. ISSN 1471-4175
Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599
Mater, Y; Kamel, M; Karam, A and Bakhoum, E (2023) Ann-python prediction model for the compressive strength of green concrete. Construction Innovation, 23(2), pp. 340-359. ISSN 1471-4175
Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364
Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.
Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.
Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
McCloughan, P (2004) Construction sector concentration: Evidence from Britain. Construction Management and Economics, 22(9), pp. 979-990. ISSN 01446193
McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387
McDermot, E; Agdas, D; Rodríguez Díaz, C R; Rose, T and Forcael, E (2022) Improving performance of infrastructure projects in developing countries: An ecuadorian case study. International Journal of Construction Management, 22(13), pp. 2469-2483. ISSN 1562-3599
McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218
McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771
McLean, J S (2017) Navigational complexity within building codes. PhD thesis, University of Vermont and State Agricultural College, USA.
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988
Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364
Mello Saraiva Caldeira, L M and Brito, A (2014) Use of soil-rock mixtures in dam construction. Journal of Construction Engineering and Management, 140(8): 04014030, ISSN 0733-9364
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599
Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364
Michieka, N M; Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S. Construction Management and Economics, 41(6), pp. 500-518. ISSN 01446193
Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364
Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.
Milošević, I; Kovačević, M and Petronijević, P (2021) Estimating residual value of heavy construction equipment using ensemble learning. Journal of Construction Engineering and Management, 147(7): 04021073, ISSN 0733-9364
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364
Mirzaei, J; Amiri Hanzaei, H; Khaleghi, H and Kashani, H (2024) Cost estimation models for seismic retrofit of masonry school buildings. International Journal of Construction Management, 24(8), pp. 843-853. ISSN 1562-3599
Misztal, G (2004) Refurbishment urgency indicators of residential buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364
Mohagheghi-Fard, M N (2019) An online collaboration framework for small and medium sized enterprises in the United Kingdom construction sector. PhD thesis, University of Salford, UK.
Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X
Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(2), pp. 229-244. ISSN 1471-4175
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mohseni, Mehdi (2012) Dynamic vulnerability assessment of highway and railway bridges. PhD thesis, University of Nebraska - Lincoln, USA.
Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193
Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364
Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708
Moncaster, A; Malmqvist, T; Forman, T; Pomponi, F and Anderson, J (2022) Embodied carbon of concrete in buildings, Part 2: Are the messages accurate? Buildings & Cities, 3(1), pp. 334-355. ISSN 2632-6655
Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.
Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.
Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.
Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364
Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364
Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework. PhD thesis, University of Calgary, Canada.
Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988
Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.
Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364
Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364
Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364
Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.
Mulekezi, L (1990) The design of project estimating systems. PhD thesis, University of Birmingham, UK.
Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364
Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193
Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model. PhD thesis, University of Johannesburg, South Africa.
Mustapha, Z (2017) An integrated health and safety compliance model for the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.
Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988
Nadhim, E A; Hon, C; Xia, B; Stewart, I and Fang, D (2018) Investigating the relationships between safety climate and safety performance indicators in retrofitting works. Construction Economics and Building, 18(2), pp. 110-129. ISSN 2204-9029
Najjar, M K; Figueiredo, K; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(4), pp. 541-555. ISSN 1562-3599
Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.
Narbaev, T and De Marco, A (2014) Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, 140(1): 04013038, ISSN 0733-9364
Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nelms, C E; Russell, A D and Lence, B J (2007) Assessing the performance of sustainable technologies: A framework and its application. Building Research & Information, 35(3), pp. 237-251. ISSN 0961-3218
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.
Nicholls, C and Murdoch, I J (2003) Construction industry capacity utilization and its implications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Nimcharoenwon, P and Miller, G (2001) Combating the 'sick building syndrome' by improving indoor air quality. Construction Economics and Building, 1(2), pp. 82-89. ISSN 2204-9029
Nipun, M W H; Ashik-Ur-Rahman, M; Rikta, S Y; Parven, A and Pal, I (2024) Rooftop rainwater harvesting for sustainable water usage in residential buildings for climate resilient city building: Case study of Rajshahi, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 80-100. ISSN 1759-5916
Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Nobe, M D (1996) Decision support for real estate development cost estimating. PhD thesis, Texas A&M University, USA.
Noshadravan, A; Miller, T R and Gregory, J G (2017) A lifecycle cost analysis of residential buildings including natural hazard risk. Journal of Construction Engineering and Management, 143(7): 04017017, ISSN 0733-9364
Notman, D; Norman, G; Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-95). Construction Management and Economics, 16(4), pp. 409-416. ISSN 01446193
Nwagwu, C C; Akin, S and Hertwich, E G (2024) Modelling Nigerian residential dwellings: bottom-up approach and scenario analysis. Buildings & Cities, 5(1), pp. 521-539. ISSN 2632-6655
Obaidat, Y T; Barham, W and Abu libdeh, R (2024) Development of interaction diagrams of reinforced concrete short columns strengthened by nsm-CFRP strips using finite element method. International Journal of Building Pathology and Adaptation, 42(6), pp. 1304-1327. ISSN 2398-4708
Oberlender, G D and Trost, S M (2001) Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management, 127(3), pp. 173-182. ISSN 0733-9364
Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.
Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ofori-Boadu, A N; Bryant, D; Bock-Hyeng, C; Assefa, Z; Aryeetey, F; Munkaila, S and Fini, E (2022) Physiochemical characterization of agricultural waste biochars for partial cement replacement. International Journal of Building Pathology and Adaptation, 40(4), pp. 569-586. ISSN 23984708
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364
Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387
Oktora, S I; Wulansari, I Y; Siagian, T H; Laksono, B C; Sugiandewi, N N R and Anindita, N (2024) Identifying the potential participation in natural disaster insurance: First attempt based on a national socio-economic survey in Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 177-192. ISSN 1759-5916
Oladunjoye, O A; Proverbs, D G; Collins, B and Xiao, H (2020) A cost-benefit analysis model for the retrofit of sustainable urban drainage systems towards improved flood risk mitigation. International Journal of Building Pathology and Adaptation, 38(3), pp. 423-439. ISSN 23984708
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(7), pp. 1240-1260. ISSN 0969-9988
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029
Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387
Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Oo, B L (2017) Release of construction clients' pre-tender cost estimates: An experimental study. Construction Economics and Building, 17(4), pp. 37-47. ISSN 2204-9029
Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X
Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364
Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531
Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387
Ostrovsky, Y (2003) Four studies of lifecycle patterns of housing arrangements in Canada. PhD thesis, York University, Canada.
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Owusu-Manu, D G; Amo-Asamoah, E; Ghansah, F A and Asumadu, G (2022) An analysis of the economic viability of waste-to-energy generation in the kumasi metropolis of Ghana. Journal of Financial Management of Property and Construction, 27(1), pp. 1-15. ISSN 1366-4387
Owusu-Manu, D G; Edwards, D J; Donkor-Hyiaman, K A; Asiedu, R O; Hosseini, M R and Obiri-Yeboah, E (2019) Housing attributes and relative house prices in Ghana. International Journal of Building Pathology and Adaptation, 37(5), pp. 733-746. ISSN 23984708
Owusu-Manu, D G; Kukah, A S; Edwards, D J; Pärn, E A; El-Gohary, H and Aigbavboa, C (2018) Causal relationships of moral hazard and adverse selection of Ghanaian public-private-partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16(3), pp. 439-460. ISSN 1726-0531
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Pagliara, F; El-Ansari, W and Henke, I (2025) A methodology to estimate the benefits and costs of stakeholder engagement in a transport decision-making process. Smart and Sustainable Built Environment, 14(2), pp. 326-341. ISSN 2046-6099
Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988
Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599
Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599
Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.
Park, H-S (2002) Development of a construction productivity metrics system (CPMS). PhD thesis, University of Texas at Austin, USA.
Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364
Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.
Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.
Patel, D A and Jha, K N (2016) An estimate of fatal accidents in Indian construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, Z; Deng, W and Hong, Y (2019) Materials consumption, indoor thermal comfort and associated energy flows of urban residential buildings: Case studies from the cold climate zone of China. International Journal of Building Pathology and Adaptation, 37(5), pp. 579-596. ISSN 23984708
Penteado Filho, P D A (1984) Productivity trends in the construction industry. PhD thesis, Cornell University, USA.
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599
Perera, S; Senaratne, S; Rodrigo, M N N and Brady, L (2021) Analysis of embodied carbon and cost profiles of school buildings in Australia. Built Environment Project and Asset Management, 11(4), pp. 660-672. ISSN 2044-124X
Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218
Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.
Pham, T Q D; Le-Hong, T and Tran, X V (2023) Efficient estimation and optimization of building costs using machine learning. International Journal of Construction Management, 23(5), pp. 909-921. ISSN 1562-3599
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.
Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.
Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.
Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364
Pittenger, D M (2012) Stochastic life cycle cost analysis for sustainable pavement preservation treatments. PhD thesis, University of Oklahoma, USA.
Ponnaluru, S S (2009) Empirical analysis of used construction equipment and auction house revenues. PhD thesis, Washington State University, USA.
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making. PhD thesis, Stanford University, USA.
Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599
Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.
Pérez-Bella, J M; Domínguez-Hernández, J; Rodríguez-Soria, B; Del Coz-Díaz, J J and Cano-Suñén, E (2013) A new method for determining the water tightness of building facades. Building Research & Information, 41(4), pp. 401-414. ISSN 0961-3218
Qabaja, M and Tenekeci, G (2023) Nexus between construction sector and economic indicators for Turkey and European Union evidenced by panel data analysis. Engineering, Construction and Architectural Management, 30(5), pp. 1978-2007. ISSN 0969-9988
Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.
Radu, A C (2015) Life-cycle estimates of structures subjected to seismic loads. PhD thesis, Cornell University, USA.
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Rahman, S (2010) Knowledge-based decision support system for multi criteria roofing material selection and cost modelling. PhD thesis, University of Ulster, UK.
Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.
Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.
Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Raja, P (2025) A building centric urban digital twin for resiliency planning. PhD thesis, Rutgers The State University of New Jersey, USA.
Rajabi Asadabadi, M and Zwikael, O (2024) Unrealistic project goals: Detection and modification. Journal of Construction Engineering and Management, 150(3): 04023166, ISSN 0733-9364
Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364
Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988
Ram, S-A (2024) Understanding sustainability education within undergraduate engineering at the university of Toronto. PhD thesis, University of Toronto, Canada.
Ramalingam Rethnam, O. and Thomas, A. (2026) A physics-informed deep learning-based urban building thermal comfort modeling and prediction framework for identifying thermally vulnerable building stock. Smart and Sustainable Built Environment, 15(2), pp. 622-648. ISSN 2046-6099
Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193
Ranasinghe, M (1999) Private sector participation in infrastructure projects: A methodology to analyse viability of BOT. Construction Management and Economics, 17(5), pp. 613-623. ISSN 01446193
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364
Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.
Rautela, P; Joshi, G C and Ghildiyal, S (2019) Economics of seismic safety for earthquake-prone Himalayan province of Uttarakhand in India. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 317-342. ISSN 1759-5916
Rehm, M and Ade, R (2013) Construction costs comparison between green and conventional office buildings. Building Research & Information, 41(2), pp. 198-208. ISSN 0961-3218
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364
Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.
Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.
Rijal, H B; Humphreys, M A and Nicol, J F (2017) Towards an adaptive model for thermal comfort in Japanese offices. Building Research & Information, 45(7), pp. 717-729. ISSN 0961-3218
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.
Roberts, B M; Allinson, D and Lomas, K J (2023) Evaluating methods for estimating whole house air infiltration rates in summer: Implications for overheating and indoor air quality. International Journal of Building Pathology and Adaptation, 41(1), pp. 45-72. ISSN 23984708
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988
Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X
Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175
Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),
Rossenbach, T D (2018) The development of a management accounting system for decentralised construction companies. PhD thesis, University of Gloucestershire, UK.
Rouhana, F and Jawad, D (2020) Transportation network resilience against failures: GIS-based assessment of network topology role. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 357-370. ISSN 1759-5916
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499
Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.
Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Sabellano, R E (2023) Development of a decision-making tool for bridge preservation and maintenance. DEng thesis, Morgan State University, USA.
Sackey, S and Kim, B S (2018) Environmental and economic performance of asphalt shingle and clay tile roofing sheets using life cycle assessment approach and TOPSIS. Journal of Construction Engineering and Management, 144(11): 04018104, ISSN 0733-9364
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218
Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099
Sajjad, S and Dar, K H (2025) Economic infrastructure and its impact on economic growth: A case study of 7 sister states. Journal of Financial Management of Property and Construction, 30(3), pp. 357-376. ISSN 1366-4387
Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387
Saka, N; Saka, A B; Akinradewo, O and Aigbavboa, C O (2024) Impact assessment of political administrations on the performance of the construction sector: A time series analysis. Journal of Engineering, Design and Technology, 22(1), pp. 1-21. ISSN 1726-0531
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleem, M; Al-Kutti, W A; Al-Akhras, N M and Haider, H (2016) Nondestructive testing procedure to evaluate the load-carrying capacity of concrete anchors. Journal of Construction Engineering and Management, 142(5): 04015104, ISSN 0733-9364
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Salvado, F; de Almeida, N M and Azevedo, Á V E (2019) Historical analysis of the economic life-cycle performance of public school buildings. Building Research & Information, 47(7), pp. 813-832. ISSN 0961-3218
Sam, A (2023) A framework for leadership development in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.
Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988
Sandanayake, M; Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(3), pp. 453-463. ISSN 1562-3599
Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364
Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.
Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.
Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531
Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193
Saranya P; Nagarajan, P and Shashikala, A P (2024) Fracture properties of ggbs-dolomite geopolymer concrete. Journal of Engineering, Design and Technology, 22(1), pp. 120-129. ISSN 1726-0531
Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599
Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.
Satirasetthavee, D and Herabat, P (2007) Integration of the component of financial statement in highway maintenance planning. Construction Management and Economics, 25(9), pp. 925-936. ISSN 1466433X
Savikko, H; Hokkanen, J; Metsäranta, H; Honkatukia, J; Haapanen, M; Tohmo, T and Pongrácz, E (2025) A methodological framework to assess the employment impacts of transport infrastructure construction. Construction Economics and Building, 25(2), pp. 143-167. ISSN 2204-9029
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Schiller, G (2007) Urban infrastructure: Challenges for resource efficiency in the building stock. Building Research & Information, 35(4), pp. 399-411. ISSN 0961-3218
Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.
Scognamiglio, A (2014) Essays in labor economics and political economy. PhD thesis, Massachusetts Institute of Technology, USA.
Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364
Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Settembre Blundo, D; García-Muiña, F E; Pini, M; Volpi, L; Siligardi, C and Ferrari, A M (2019) Sustainability as source of competitive advantages in mature sectors: The case of ceramic district of Sassuolo (Italy). Smart and Sustainable Built Environment, 8(1), pp. 53-79. ISSN 2046-6099
Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.
Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.
Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364
Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364
Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.
Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364
Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531
Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.
Sharrard, A L; Matthews, H S and Roth, M (2007) Environmental implications of construction site energy use and electricity generation. Journal of Construction Engineering and Management, 133(11), pp. 846-854. ISSN 0733-9364
Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599
Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988
Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Shi, X; Qiao, Y; Zhao, X; Liu, Y; Liu, C; Huang, R and Cui, Y (2025) Improving emergency evacuation capacity for subway stations based on agent-based modelling. Construction Innovation, 25(6), pp. 1865-1881. ISSN 1471-4175
Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.
Shoar, S; Nasirzadeh, F and Zarandi, H R (2019) Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. Construction Innovation, 19(1), pp. 48-70. ISSN 1471-4175
Shohet, I M and Laufer, A (1996) Exterior cladding methods: A technoeconomic analysis. Journal of Construction Engineering and Management, 122(3), pp. 242-247. ISSN 0733-9364
Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218
Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.
Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531
Silva, A; Dias, J L; Gaspar, P L and De Brito, J (2011) Service life prediction models for exterior stone cladding. Building Research & Information, 39(6), pp. 637-653. ISSN 0961-3218
Silwal, A.; Rouhanizadeh, B.; Safapour, E. and Ricks, M. (2026) Sustainable transportation infrastructure: Comparative analysis and a comprehensive decision-support tool. Built Environment Project and Asset Management, 16(3), pp. 616-636. ISSN 2044-124X
Simon, S and O’brien, W (2023) Pilot study to measure the energy and carbon impacts of teleworking. Buildings & Cities, 4(1), pp. 174-192. ISSN 2632-6655
Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Singh, G and Banjoko, O O (1990) The development of a rational bill of quantities. Construction Management and Economics, 8(1), pp. 31-47. ISSN 01446193
Singh, S (1990) Cost model for reinforced concrete beam and slab structures in buildings. Journal of Construction Engineering and Management, 116(1), pp. 54-67. ISSN 0733-9364
Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(2), pp. 205-215. ISSN 01446193
Singh, S; Sharma, S K and Akbar, M A (2023) Heat resistance and sorptivity of an air-entrained concrete containing mineral admixtures and CBA. Journal of Engineering, Design and Technology, 21(2), pp. 527-551. ISSN 1726-0531
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Singla, H K (2020) Does ownership structure and market sentiment affect the performance of IPOs in India in short run? A dynamic panel data analysis. Journal of Financial Management of Property and Construction, 26(1), pp. 1-22. ISSN 1366-4387
Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.
Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193
Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X
Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988
Skitmore, R M (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(1), pp. 83-89. ISSN 01446193
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364
Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Soutos, M and Lowe, D J (2011) Elemental cost estimating: Current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(2), pp. 147-162. ISSN 1366-4387
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Staneff, S T (1997) A decision support system for infrastructure management. PhD thesis, University of California, Berkeley, USA.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Stephen, M and Picken, D (2000) Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), pp. 130-136. ISSN 0733-9364
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364
Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Subin, Z M; Lombardi, J; Muralidharan, R; Korn, J; Malik, J; Pullen, T; Wei, M and Hong, T (2024) US urban land-use reform: A strategy for energy sufficiency. Buildings & Cities, 5(1), pp. 400-417. ISSN 2632-6655
Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.
Suhomlinova, O O (1996) Organizational transformation in the post-Soviet economy: The case of the Russian construction industry, 1985-1993. PhD thesis, Duke University, USA.
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sun, B; Wu, J; You, H and Du, J (2025) Estimating belief updates in AI-driven drone controls for urban search and rescue operations. Journal of Construction Engineering and Management, 151(9): 04025128, ISSN 0733-9364
Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X
Sun, J; Murphy, M R; Hazlett, D G; Shuai, C and Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6): 04025049, ISSN 0733-9364
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364
Suriyanon, N; Sutheerawatthana, P; Rinchumphu, D and Suksawat, R (2025) Carbon footprint assessment of a precast concrete yard: A case study from Thailand. Construction Economics and Building, 25(2), pp. 43-68. ISSN 2204-9029
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.
Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387
Sweis, R J (1999) A model to assess alternative policies to promote the construction industry in developing countries. PhD thesis, Northwestern University, USA.
Symonds, P; Taylor, J; Mavrogianni, A; Davies, M; Shrubsole, C; Hamilton, I and Chalabi, Z (2017) Overheating in English dwellings: Comparing modelled and monitored large-scale datasets. Building Research & Information, 45(1-2), pp. 195-208. ISSN 0961-3218
Synovec, T M (2020) A strategy to reduce total cost of ownership of the U.S. Air Force's airfield pavements. PhD thesis, Mississippi State University, USA.
Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364
Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.
Tah, J H M and Carr, V (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), pp. 491-500. ISSN 01446193
Tam, T H; Abdul Rahman, M Z; Harun, S; Shahid, S; Try, S; Jamal, M H; Ismail, Z; Razak, K A; Ghani, M K and Abdul Wahab, Y F (2025) Flood hazard assessment using design rainfall under climate change scenarios in the Kelantan River Basin, Malaysia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 1-19. ISSN 1759-5908
Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.
Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(2), pp. 154-158. ISSN 0969-9988
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tang, C M and Leung, A Y T (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.
Tanikawa, H and Hashimoto, S (2009) Urban stock over time: Spatial material stock analysis using 4d-GIS. Building Research & Information, 37(5-6), pp. 483-502. ISSN 0961-3218
Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.
Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988
Tavakoli, A (1986) Transient response analysis of a dual cycle system. Journal of Construction Engineering and Management, 112(3), pp. 403-410. ISSN 0733-9364
Tavares, V M M (2022) Life cycle assessment of prefabricated buildings towards a building stock approach. PhD thesis, Universidade de Coimbra, Portugal.
Taylor, J; Salmela, A; Täubel, M; Heimlander, A; Karvonen, A M; Pakkala, T; Lahdensivu, J and Pekkanen, J (2023) Risk factors for moisture damage presence and severity in Finnish homes. Buildings & Cities, 4(1), pp. 708-726. ISSN 2632-6655
Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X
Teixeira, Carla Fernanda Barbosa (2013) Analysis thermal performance of fiber cement tiles treated with white coatings and submitted to water spraying. PhD thesis, Universidade Estadual de Campinas, Brazil.
Teli, D; James, P A B and Jentsch, M F (2015) Investigating the principal adaptive comfort relationships for young children. Building Research & Information, 43(3), pp. 371-382. ISSN 0961-3218
Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304
Teo, S I E; Zhou, Y and Yeoh, J K W (2025) Indoor wifi path loss model to estimate indoor network coverage considering residential design. Smart and Sustainable Built Environment, 14(5), pp. 1407-1433. ISSN 2046-6099
Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Teo, P; Gajanayake, A; Jayasuriya, S; Izaddoost, A; Perera, T; Naderpajouh, N and Wong, P S P (2022) Application of a bottom-up approach to estimate economic impacts of building maintenance projects: Cladding rectification program in Australia. Engineering, Construction and Architectural Management, 29(1), pp. 333-353. ISSN 0969-9988
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Thomas, H R; Guevara, J M and Gustenhoven, C T (1984) Improving productivity estimates by work sampling. Journal of Construction Engineering and Management, 110(2), pp. 178-188. ISSN 0733-9364
Thomas, H R and Raynar, K A (1997) Scheduled overtime and labor productivity: Quantitative analysis. Journal of Construction Engineering and Management, 123(2), pp. 181-188. ISSN 0733-9364
Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218
Tixier, A J-P (2015) Leveraging unstructured construction injury reports to predict safety outcomes and model safety risk using natural language processing, machine learning, and probability theory. PhD thesis, University of Colorado at Boulder, USA.
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tokede, O; Boggavarapu, M K and Wamuziri, S (2023) Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment. Built Environment Project and Asset Management, 13(5), pp. 666-681. ISSN 2044-124X
Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988
Touran, A (1993) Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering and Management, 119(1), pp. 58-71. ISSN 0733-9364
Touran, A; Sheahan, T C and Ozcan, E (1997) Rational equipment selection method based on soil conditions. Journal of Construction Engineering and Management, 123(1), pp. 85-88. ISSN 0733-9364
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.
Troive, S (1998) Structural LCC design of concrete bridges. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.
Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364
Tse, R Y C; Ho, C W and Ganesan, S (1999) Matching housing supply and demand: An empirical study of Hong Kong's market. Construction Management and Economics, 17(5), pp. 625-633. ISSN 01446193
Tseng, A A; Tanaka, M; Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(2), pp. 97-110. ISSN 1471-4175
Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.
Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531
Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.
Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.
Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.
Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X
Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Victoria, M F and Perera, S (2018) Managing embodied carbon in buildings: A Pareto approach. Built Environment Project and Asset Management, 8(5), pp. 504-514. ISSN 2044-124X
Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X
Vieira, P M d S (2007) Environmental assessment of office buildings. PhD thesis, University of California, Berkeley, USA.
Viet-Ngu, H; Susilawati, C and Joko Purnomo, R (2024) Analysis of productivity performance of real estate and construction firms in Indonesia. Construction Management and Economics, 42(3), pp. 215-228. ISSN 01446193
Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988
Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364
Wahalathantri, B; Lokuge, W; Karunasena, W and Setunge, S (2018) Quantitative assessment of flood discharges and floodway failures through cross-cultivation of advancement in knowledge and traditional practices. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 435-456. ISSN 1759-5916
Waldman, B; Huang, M and Simonen, K (2020) Embodied carbon in construction materials: A framework for quantifying data quality in epds. Buildings & Cities, 1(1), pp. 625-636. ISSN 2632-6655
Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.
Walshaw, D (1991) Statistical analysis of wind speeds. PhD thesis, University of Sheffield, UK.
Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364
Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029
Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771
Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X
Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364
Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364
Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364
Wang, X; Li, J; Wang, R; Zhang, J and Ma, G (2025) Automated evaluation and optimization of subgrade construction based on intelligent compaction. Journal of Construction Engineering and Management, 151(9): 04025127, ISSN 0733-9364
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Wang, Y; Goodrum, P M; Haas, C; Glover, R and Vazari, S (2010) Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28(12), pp. 1269-1285. ISSN 1466433X
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193
Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.
Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599
Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.
Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771
Westberg, K; Norén, J and Kus, H (2001) On using available environmental data in service life estimations. Building Research & Information, 29(6), pp. 428-439. ISSN 0961-3218
Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.
Whalen, T M; Gopal, S and Abraham, D M (2004) Cost-benefit model for the construction of tornado shelters. Journal of Construction Engineering and Management, 130(6), pp. 772-779. ISSN 0733-9364
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364
Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364
Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wikstrom, M R (1993) Four papers on wage formation in a unionized economy. PhD thesis, Umea Universitet, Sweden.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.
Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193
Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wolters, R S and Burleson, R C (1996) Merit shop recruitment and selection practices in Alabama. Journal of Construction Engineering and Management, 122(2), pp. 152-157. ISSN 0733-9364
Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193
Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.
Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988
Wu, L; Mohamed, E; Jafari, P and Abourizk, S (2023) Machine learning-based Bayesian framework for interval estimate of unsafe-event prediction in construction. Journal of Construction Engineering and Management, 149(11): 04023118, ISSN 0733-9364
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.
Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988
Xiong, Bo (2016) Improving cost estimation performance: An investigation of prediction technique and person-environment interaction. PhD thesis, Queensland University of Technology, Australia.
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599
Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007
Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.
Yang, W and Lam, P T I (2026) A framework for foundational and transitional value assessment of non-market benefits of a smart government system. Building Research & Information, 54(2), pp. 237-256. ISSN 0961-3218
Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.
Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218
Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X
Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yoon, Y; Patel, S; Ji, R and Hastak, M (2017) Current state of reflective cracking in the United States. Journal of Construction Engineering and Management, 143(3): 04016099, ISSN 0733-9364
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.
Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193
Yuan, X X (2011) A correlated bidding model for markup size decisions. Construction Management and Economics, 29(11), pp. 1101-1119. ISSN 1466433X
Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988
Zafaranchi, M and Sözer, H (2024) Comparing energy profiles of different building types by determining their sensitivities. Architectural Engineering and Design Management, 20(6), pp. 1489-1510. ISSN 1745-2007
Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708
Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364
Zea Escamilla, E (2015) Development of simplified life cycle assessment methodology for construction materials and buildings outside of the European context through the use of geographic information systems. DSc thesis, ETH Zürich, Switzerland.
Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.
Zeng, C S (2025) Decision under intensity-based costs in large-scale systems. PhD thesis, Princeton University, USA.
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zhang, P (2018) Mapping buried utilities in difficult environments. PhD thesis, University of Nottingham, UK.
Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364
Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364
Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364
Zhi, M; Hua, G B; Wang, S Q and Ofori, G (2003) Total factor productivity growth accounting in the construction industry of Singapore. Construction Management and Economics, 21(7), pp. 707-718. ISSN 01446193
Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects. EngD thesis, George Washington University, USA.
Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X
Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.
Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.
Zhu, W; Li, J; Shen, K and Li, X (2025) Carbon dioxide emission reduction assessments of recycled aggregate concrete applications for infrastructure by incorporating vegetation carbon sink. Journal of Construction Engineering and Management, 151(9): 04025132, ISSN 0733-9364
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zhu, Y and Issa, R (2017) Computer simulation for construction education using the structure-behavior-function theory: A pilot study on learning estimating concepts. International Journal of Construction Education and Research, 13(2), pp. 142-60. ISSN 1557-8771
Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364
d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings. PhD thesis, University of California, Irvine, USA.
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
van Gelder, P H A J M (2000) Statistical methods for the risk -based design of civil structures. PhD thesis, Delft University of Technology, Netherlands.
van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193
van der Bent, H S (2022) Towards a future sustainable housing stock: Assessment of the energy performance of dwellings of non-profit housing associations. PhD thesis, Delft University of Technology, Netherlands.
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.