Items with Subject: contractual arrangements

Number of items: 7260.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Ababio, B K and Lu, W (2023) Barriers and enablers of circular economy in construction: A multi-system perspective towards the development of a practical framework. Construction Management and Economics, 41(1), pp. 3-21. ISSN 01446193

Ababio, B K; Lu, W and Ghansah, F A (2023) Transitioning from green to circular procurement in developing countries: A conceptual framework for Ghana's construction sector. Building Research & Information, 51(7), pp. 798-815. ISSN 0961-3218

Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.

Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599

Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.

Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531

Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364

Abbasianjahromi, H and Aghakarimi, M (2023) Safety performance prediction and modification strategies for construction projects via machine learning techniques. Engineering, Construction and Architectural Management, 30(3), pp. 1146-1164. ISSN 0969-9988

Abbasnejad, B; Nasirian, A; Duan, S; Diro, A; Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(5): 04024032, ISSN 0733-9364

Abbasnejad, B; Nepal, M P; Ahankoob, A; Nasirian, A and Drogemuller, R (2020) Building information modelling (BIM) adoption and implementation enablers in AEC firms: A systematic literature review. Architectural Engineering and Design Management, 17(5-6), pp. 411-433. ISSN 1745-2007

Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364

Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007

Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.

Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X

Abdel Aziz, A M (2007) Successful delivery of public-private partnerships for infrastructure development. Journal of Construction Engineering and Management, 133(12), pp. 918-931. ISSN 0733-9364

Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364

Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007

Abdel-Razek, R H (1997) How construction managers would like their performance to be evaluated. Journal of Construction Engineering and Management, 123(3), pp. 208-213. ISSN 0733-9364

Abdel-Razek, R H (1998) Quality improvement in Egypt: Methodology and implementation. Journal of Construction Engineering and Management, 124(5), pp. 354-360. ISSN 0733-9364

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2008) Insights into the overlap between constructionskills' footprint and other sector skills councils. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdelwahab, M A and Nassar, A H (2024) Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry. International Journal of Construction Management, 24(13), pp. 1431-1443. ISSN 1562-3599

Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.

Abdirad, H (2017) Metric-based BIM implementation assessment: A review of research and practice. Architectural Engineering and Design Management, 13(1), pp. 52-78. ISSN 1745-2007

Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988

Abdirad, H; Dossick, C S; Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: Perception and response patterns. Building Research & Information, 49(2), pp. 161-178. ISSN 0961-3218

Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(6), pp. 457-474. ISSN 1745-2007

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175

Abduh, M (2000) Utility assessment of electronic networking technologies for design -build projects. PhD thesis, Purdue University, USA.

Abduh, M; Sukardi, S N; Wirahadikusumah, R D; Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), pp. 2171-2184. ISSN 1562-3599

Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099

Abdul Kareem, H I and Abu Bakar, A H (2013) Management procedures for realizing information technology benefits in Malaysia. International Journal of Construction Management, 13(3), pp. 1-13. ISSN 1562-3599

Abdul Karim, Mahmoud (2022) Postwar infrastructure reconstruction in Syria: How public-private partnership impacts economic growth. ArtD thesis, University of Florence, Italy.

Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.

Abdul Nasir, N A B; Hassan, A S; Khozaei, F and Abdul Nasir, M H B (2021) Investigation of spatial configuration management on social distancing of recreational clubhouse for COVID-19 in Penang, Malaysia. International Journal of Building Pathology and Adaptation, 39(5), pp. 782-810. ISSN 23984708

Abdul Nifa, F A (2013) Development of a framework for partnering through aligning organizational cultures in the Malaysian construction industry. PhD thesis, University of Salford, UK.

Abdul Rahman, N.; Belayutham, S. and Che Ibrahim, C. K. I. (2026) Socio-technical dynamics of barriers to sustainable railway projects in Malaysia. Built Environment Project and Asset Management, 16(3), pp. 637-654. ISSN 2044-124X

Abdul Razak, R.; Alias, A. R.; A.Rahman, R. and Lee, Y. S. (2026) Embedding circular economy in infrastructure through social strategies: PLS SEM approach. Journal of Engineering, Design and Technology, 24(5), pp. 1215-1234. ISSN 1726-0531

Abdul-Aziz, A R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(1), pp. 37-55. ISSN 1466433X

Abdul-Aziz, A R and Chwee Ngoh Tan, A M Y (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(1), pp. 31-37. ISSN 0969-9988

Abdul-Rahman, H (1996) Some observations on the management of quality among construction professionals in the UK. Construction Management and Economics, 14(6), pp. 485-495. ISSN 01446193

AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236

Abdullah, A M and Vickridge, I G (2000) The extent of multi-project management implementation in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Abdullah, A-N M (2019) Assessing economic, social, political and environmental issues related to mega-projects : A case study of Merowe Dam in Sudan. PhD thesis, University of Plymouth, UK.

Abdullah, M R and Egbu, C (2011) The application of analytical hierarchy process (AHP) as a decision tool in choosing the type of industrialised building system (IBS) for housing projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abdullah, W M W (2010) Critical factors in project success: A study of public sector construction projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.

Abdullahi, D; Renukappa, S; Suresh, S and Oloke, D (2022) Barriers for implementing solar energy initiatives in Nigeria: An empirical study. Smart and Sustainable Built Environment, 11(3), pp. 647-660. ISSN 2046-6099

Abela, A; McGrath, P; Hoxley, M and Goodhew, S (2013) A comparative analysis of implementation of the energy performance of buildings directive in the Mediterranean. International Journal of Law in the Built Environment, 5(3), pp. 222-240. ISSN 17561469

Abid, M S (1995) Reconstruction for low-income communities in earthquake zones: an investigation for the implementation of community-managed housing reconstruction programmes in low-income countries located in earthquakes zones. PhD thesis, Loughborough University, UK.

Abideen, D; Yunusa-Kaltungo, A; Manu, P and Cheung, C (2023) Expert verification of information requirements for integrating building information modelling with operation and maintenance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

AboMoslim, S and Russell, A (2014) Screening design and construction technologies of skyscrapers. Construction Innovation, 14(3), pp. 307-345. ISSN 1471-4175

Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia. PhD thesis, Brunel University, UK.

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.

Abraham, K A (2015) Influencing the design decision process: Information visualization in multi-criteria decision support systems for early-stage building design. PhD thesis, Stanford University, USA.

Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988

Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.

Abu Awwad, K (2020) The implementation of building information modelling Level 2 in the UK construction industry: the case of small and medium enterprises. PhD thesis, Coventry University, UK.

Abu Seif, Majed D (2023) Trees on buildings: Investigating opportunities and challenges for implementation. PhD thesis, Griffith University, Australia.

Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Abubakri, S; Mangat, P S; Grigoriadis, K and Starinieri, V (2025) Pore properties and moisture loss of repair mortars under low-impact microwave curing. International Journal of Building Pathology and Adaptation, 43(4), pp. 749-765. ISSN 2398-4708

Abuelma'atti, A (2012) A strategic approach to the implementation of information technologies in small and medium-sized architecture, engineering and construction enterprises. PhD thesis, University of Salford, UK.

Abuelmaatti, A and Ahmed, V (2010) The potential of collaborative environments implementation in small and medium enterprises for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.

Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Abuzeinab, A (2015) Implementing green business models in the UK construction industry: opportunities and challenges. PhD thesis, University of Salford, UK.

Acar, E and Yalçın, N (2019) Task-related pro-environmental behaviours of architectural designers: LEED-based evidence from Turkey. Architectural Engineering and Design Management, 15(2), pp. 121-140. ISSN 1745-2007

Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387

Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599

Adaku, E; Ankrah, N A and Ndekugri, I E (2022) Prevention through design: Conceptual models for the assessment of a principal designer's skills, knowledge and experience. Journal of Engineering, Design and Technology, 20(3), pp. 595-623. ISSN 1726-0531

Adam, V; Manu, P; Mahamadu, A M; Dziekonski, K; Kissi, E; Emuze, F and Lee, S (2022) Building information modelling (BIM) readiness of construction professionals: The context of the Seychelles construction industry. Journal of Engineering, Design and Technology, 20(3), pp. 823-840. ISSN 1726-0531

Adami, V S; Verschoore, J R and Antunes, J A V (2019) Effect of relational characteristics on management of wind farm interorganizational construction projects. Journal of Construction Engineering and Management, 145(3): 05018019, ISSN 0733-9364

Adams, J D and Brown, A W (2002) Project management in public sector construction projects: Assessing value for money. Journal of Construction Procurement, 8(2), pp. 84-100. ISSN 1358-9180

Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.

Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531

Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531

Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771

Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771

Addy, M; Adinyira, E and Ayarkwa, J (2018) Antecedents of building information modelling adoption among quantity surveyors in Ghana: An application of a technology acceptance model. Journal of Engineering, Design and Technology, 16(2), pp. 313-326. ISSN 1726-0531

Addy, M N; Addo, E T; Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: An application of utaut2. Construction Innovation, 23(5), pp. 1038-1053. ISSN 1471-4175

Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X

Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adebayo, S O (1991) A study of the maintenance management of public buildings in Nigeria. PhD thesis, University of Lagos, Nigeria.

Adebimpe, O A; Proverbs, D G and Oladokun, V O (2021) A fuzzy-analytic hierarchy process approach for measuring flood resilience at the individual property level. International Journal of Building Pathology and Adaptation, 39(2), pp. 197-217. ISSN 23984708

Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Adedokun, O; Aje, I; Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context? Journal of Financial Management of Property and Construction, 27(2), pp. 259-278. ISSN 1366-4387

Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599

Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531

Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.

Adekunle, S A; Aigbavboa, C O and Ejohwomu, O A (2022) Understanding the BIM actor role: A study of employer and employee preference and availability in the construction industry. Engineering, Construction and Architectural Management, 31(13), pp. 160-180. ISSN 0969-9988

Adel, R; Megahed, N; Hassan, A M and Shahda, M (2025) Evolution of the courtyard to the skycourt: A bibliometric analysis of research trends. International Journal of Building Pathology and Adaptation, 43(2), pp. 257-280. ISSN 2398-4708

Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes. PhD thesis, Northcentral University, USA.

Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.

Adetooto, J; Windapo, A and Pomponi, F (2024) The use of alternative building technologies as a sustainable affordable housing solution: Perspectives from South Africa. Journal of Engineering, Design and Technology, 22(5), pp. 1447-1463. ISSN 1726-0531

Adetooto, J; Windapo, A; Pomponi, F; Companie, F; Alade, K and Mtya, A (2024) Strategies to promote the acceptance of sandbag building technology for sustainable and affordable housing delivery: The South African case. Journal of Engineering, Design and Technology, 22(5), pp. 1505-1522. ISSN 1726-0531

Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.

Adeyemi, H O; Adejuyigbe, S B; Ismaila, S O and Adekoya, A F (2015) Low back pain assessment application for construction workers. Journal of Engineering, Design and Technology, 13(3), pp. 419-434.

Adeyeye, K (2024) From product to service–strategies for upscaling smart home performance monitoring. Building Research & Information, 52(1-2), pp. 107-128. ISSN 0961-3218

Adeyeye, K; Pasquire, C; Bouchlaghem, D and Chandler, J (2006) Exploring the efficacy of digital tools for the design and construction of hybrid buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adighibe, C; Skitmore, M and Wong, J (2010) The management of transport construction projects: A survey of public sector organisations in Queensland Australia. International Journal of Construction Management, 10(1), pp. 17-33. ISSN 1562-3599

Adighibe, Charles Nnason (2015) Public private partnership infrastructure delivery: Benefits and costs for society. PhD thesis, Queensland University of Technology, Australia.

Adjei, K O; Abudu, H D; Nana-Addy, E and Musonda, I (2025) The motivation for occupants’ adoption of hidden emergency exits in buildings. Engineering, Construction and Architectural Management, 32(13), pp. 133-147. ISSN 0969-9988

Adnan, N. A.; Ramali, F. N.; Yahya, N.; Amin, N. D. M.; Sabil, A.; Mohd Siraj, S. and Ismail, N. (2025) Preservation strategies for historic timber mosques: Structural integrity assessment on masjid jamek an nur, Batu Pahat, Johor. Journal of Construction in Developing Countries, 30(2), pp. 343-361. ISSN 1823-6499

Adogbo, K J (2013) Development of a framework for attracting and retaining women in construction practice. Unpublished PhD thesis, Ahmadu Bello University, Zaria, Nigeria.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Adshead, J (2009) An integrated approach to water protection and management: The European Union model. International Journal of Law in the Built Environment, 1(3), pp. 234-243. ISSN 1756-1450

Adu, E T and Opawole, A (2020) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), pp. 230-250. ISSN 1726-0531

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988

Adukpo, Emmanuel Selorm (2018) The development of governance capabilities for project owners and operators : a dynamic capabilities perspective. PhD thesis, University of Hong Kong, Hong Kong.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.

Aduwo, E B; Ibem, E O; Afolabi, A O; Oluwnmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A; Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), pp. 56-76. ISSN 2204-9029

Afful, A E; Ayarkwa, J; Acquah, G K K and Osei-Asibey, D (2023) Enablers of incorporating indoor environmental quality (IEQ) principles into buildings. Smart and Sustainable Built Environment, 12(1), pp. 38-59. ISSN 2046-6099

Afolabi, A; Ibem, E; Aduwo, E and Tunji-Olayeni, P (2022) Digitizing the grey areas in the Nigerian public procurement system using e-procurement technologies. International Journal of Construction Management, 22(12), pp. 2215-2224. ISSN 1562-3599

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Afxentiadis, D E (2010) Interpreting a major event organization's efforts to reliably manage information security risks: the case of the Athens 2004 Olympics. PhD thesis, London School of Economics and Political Science, UK.

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364

Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916

Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agbaxode, P D K; Saghatforoush, E; Dlamini, S and Korsah, J K (2024) Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality. Built Environment Project and Asset Management, 14(6), pp. 817-834. ISSN 2044-124X

Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.

Agdas, D and Ellis, R D (2010) The potential of xml technology as an answer to the data interchange problems of the construction industry. Construction Management and Economics, 28(7), pp. 737-746. ISSN 1466433X

Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises. PhD thesis, University of Johannesburg, South Africa.

Agumba, J N and Haupt, T C (2014) The implementation of health and safety practices: Do demographic attributes matter? Journal of Engineering, Design and Technology, 12(4), pp. 530-550.

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708

Agyekum, A K; Fugar, F D K; Agyekum, K; Akomea-Frimpong, I and Pittri, H (2023) Barriers to stakeholder engagement in sustainable procurement of public works. Engineering, Construction and Architectural Management, 30(9), pp. 3840-3857. ISSN 0969-9988

Agyekum, K; Adinyira, E and Ampratwum, G (2020) Factors driving the adoption of green certification of buildings in Ghana. Smart and Sustainable Built Environment, 9(4), pp. 595-613. ISSN 2046-6099

Agyekum, K; Ghansah, F A; Tetteh, P A and Amudjie, J (2021) The role of project managers (pms) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(1), pp. 245-262. ISSN 1726-0531

Agyekum, K; Pittri, H; Botchway, E A and Dompey, A M A (2024) Key attributes of designers' competencies for design-for-deconstruction implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 117-126. ISSN 17514304

Agyekum-Mensah, G; Knight, A and Pasquire, C (2012) Adaption of structured analysis design techniques methodology for construction project planning. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahadzi, M and Bowles, G (2001) Public-private partnerships in UK infrastructure development: The macroeconomic perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ahadzi, M and Bowles, G (2001) The private finance initiative: The procurement process in perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193

Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X

Ahankoob, A; Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(4), pp. 588-599. ISSN 1562-3599

Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahern, E (2022) A framework for improving the process of building certification to enhance energy efficiency: the case of Ireland. DProf thesis, Anglia Ruskin University, UK.

Ahiabu, M K; Emuze, F and Das, D (2023) Perception of the benefits of sustainable construction in Ghana. Built Environment Project and Asset Management, 13(2), pp. 306-323. ISSN 2044-124X

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D; Tokede, O; Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), pp. 3341-3361. ISSN 0969-9988

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmad, A H (2008) Private housing development: refining rational choice. PhD thesis, University College London, UK.

Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.

Ahmad, H; An, M and Gaterell, M (2008) Km model to embed knowledge management activities into work activities in construction organisations. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ahmad, H S; An, M and Gaterell, M (2007) Development of km model to simplify knowledge management implementation in construction projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ahmad, H S M (2011) Development of knowledge management model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, Hesham Saleh Mahmoud (2011) Development of km model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, I (1990) Decision-support system for modeling bid/no-bid decision problem. Journal of Construction Engineering and Management, 116(4), pp. 595-608. ISSN 0733-9364

Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193

Ahmad, I U and Sein, M K (1997) Construction project teams for TQM: A factor-element impact model. Construction Management and Economics, 15(5), pp. 457-467. ISSN 01446193

Ahmad, M A; Demian, P and Price, A D F (2012) Building information modelling implementation plans: A comparative analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahmad Shazali, A S and Tahar, K N (2020) Virtual 3D model of canseleri building via close-range photogrammetry implementation. International Journal of Building Pathology and Adaptation, 38(1), pp. 217-227. ISSN 23984708

Ahmad-Latiffi, A (2012) Performance measurement for construction businesses. PhD thesis, Loughborough University, UK.

Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, A L (2019) Development of conceptual constructs for organisational BIM adoption and their systematic application within the UK architecture sector. PhD thesis, University of Sheffield, UK.

Ahmed, A M; Sayed, W; Asran, A and Nosier, I (2023) Identifying barriers to the implementation and development of sustainable construction. International Journal of Construction Management, 23(8), pp. 1277-1288. ISSN 1562-3599

Ahmed, I and McEvoy, D (2014) Post-tsunami resettlement in Sri Lanka and India: Site planning, infrastructure and services. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 53-65. ISSN 1759-5916

Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364

Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364

Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.

Ahmed, Mohammed Ali (2020) An exploration of factors influencing quality management system implementation: The case of the Australian construction industry. PhD thesis, Queensland University of Technology, Australia.

Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.

Ahmed, S; Hossain, M M and Haq, I (2021) Implementation of lean construction in the construction industry in Bangladesh: Awareness, benefits and challenges. International Journal of Building Pathology and Adaptation, 39(2), pp. 368-406. ISSN 23984708

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed, S and Sobuz, M H R (2020) Challenges of implementing lean construction in the construction industry in Bangladesh. Smart and Sustainable Built Environment, 9(2), pp. 174-207. ISSN 2046-6099

Ahmed, V S (2000) The effectiveness of computer assisted learning in construction. PhD thesis, Loughborough University, UK.

Ahmed, Y A; Shehzad, H M F; Khurshid, M M; Abbas Hassan, O H; Abdalla, S A and Alrefai, N (2024) Examining the effect of interoperability factors on building information modelling (BIM) adoption in Malaysia. Construction Innovation, 24(2), pp. 606-642. ISSN 1471-4175

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Ahuja, R.; Sawhney, A.; Jain, M.; Arif, M. and Rakshit, S. (2020) Factors influencing BIM adoption in emerging markets: The case of India. International Journal of Construction Management, 20(1), pp. 65-76. ISSN 1562-3599

Ahuja, R; Sawhney, A and Arif, M (2018) Developing organizational capabilities to deliver lean and green project outcomes using BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1255-1276. ISSN 0969-9988

Ahuja, R; Sawhney, A; Jain, M; Arif, M and Rakshit, S (2020) Factors influencing BIM adoption in emerging markets: the case of India. International Journal of Construction Management, 20(1), pp. 65-76. ISSN 1562-3599

Ahuja, Vanita (2007) It enhanced communication protocols for building project management by small and medium enterprises in the Indian construction industry. PhD thesis, Queensland University of Technology, Australia.

Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988

Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Aichouni, M; Messaoudene, N A; Al-Ghonamy, A and Touahmia, M (2014) An empirical study of quality management systems in the Saudi construction industry. International Journal of Construction Management, 14(3), pp. 181-190. ISSN 1562-3599

Aitken, A and Paton, R A (2016) The 'transaction X-ray': Understanding construction Procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 115-123. ISSN 17514304

Aiyetan, Ayodeji; Das, Kumar Dillip and Ayodabo, Blessing (2026) Factors influencing procurement in construction: The role of clients and construction machinery in KwaZulu-Natal. Journal of Construction Business and Management, 8(S1), pp. 72-87. ISSN 2521-0165

Ajayi, O O (2016) Maintenance management of prison facilities in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Ajayi, O O; Koleoso, H; Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in Southwestern Nigeria. Journal of Construction Business and Management, 3(2), pp. 26-34. ISSN 2521-0165

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.

Ajayi, S O; Lister, N; Dauda, J A; Oyegoke, A and Alaka, H (2024) Influencing sub-contracted operatives' attitudes and behaviours towards improved health and safety culture in construction. Engineering, Construction and Architectural Management, 31(6), pp. 2286-2305. ISSN 0969-9988

Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531

Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387

Ajisomo, T. O.; Saka, A.; Dauda, J. and Osuolale, M. (2025) Investigating circular economy barriers for construction and demolition waste in the construction industry: A Delphi and interpretive structural modelling approach. Construction Innovation, 26(4), pp. 1278-1308. ISSN 1471-4175

Ajslev, J Z N and Møller, J L (2023) The art of role-switching: Positioning practices and the relational roles of OSH coordinators in the Danish construction industry. Construction Management and Economics, 41(9), pp. 703-723. ISSN 01446193

Ajslev, J Z N; Wåhlin-Jacobsen, C D; Brandt, M; Møller, J L and Andersen, L L (2020) Losing face from engagement: an overlooked risk in the implementation of participatory organisational health and safety initiatives in the construction industry. Construction Management and Economics, 38(9), pp. 824-839. ISSN 01446193

Aka, A; Iji, J; Isa, R B and Bamgbade, A A (2021) Assessing the relationships between underlying strategies for effective building information modeling (BIM) implementation in Nigeria construction industry. Architectural Engineering and Design Management, 17(5-6), pp. 434-446. ISSN 1745-2007

Aka, A; Isah, A D; Eze, C J and Timileyin, O (2020) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(3), pp. 658-679. ISSN 0969-9988

Akadiri, O P (2011) Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD thesis, University of Wolverhampton, UK.

Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.

Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akinbo, T F; Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(9), pp. 1018-1028. ISSN 1562-3599

Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364

Akindele, O E; Ajayi, S; Toriola-Coker, L; Oyegoke, A S; Alaka, H and Zulu, S L (2023) Sustainable construction practice in Nigeria: Barriers and strategies for improvement. Built Environment Project and Asset Management, 13(4), pp. 590-609. ISSN 2044-124X

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry. PhD thesis, University of Liverpool, UK.

Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599

Akinradewo, O; Aigbavboa, C; Oke, A; Edwards, D and Kasongo, N (2023) Key requirements for effective implementation of building information modelling for maintenance management. International Journal of Construction Management, 23(11), pp. 1902-1910. ISSN 1562-3599

Akinradewo, O I; Aigbavboa, C O; Edwards, D J and Oke, A E (2022) A principal component analysis of barriers to the implementation of blockchain technology in the South African built environment. Journal of Engineering, Design and Technology, 20(4), pp. 914-934. ISSN 1726-0531

Akintola, A; Root, D and Venkatachalam, S (2017) Key constraints to optimal and widespread implementation of BIM in the South African construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Akintola, A; Venkatachalam, S and Root, D (2020) Understanding BIM's impact on professional work practices using activity theory. Construction Management and Economics, 38(5), pp. 447-467. ISSN 01446193

Akintola, A A; Venkatachalam, S; Root, D and Oti, A H (2021) Distilling agency in BIM-induced change in work practices. Construction Innovation, 21(3), pp. 490-522. ISSN 1471-4175

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) Risk identification practices under PFI environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2003) Outsourcing the Risk Analysis Function in 'Private Finance Initiative' Projects. Journal of Construction Procurement, 9(1), ISSN 1358-9180

Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988

Akintoye, A and Fitzgerald, E (1995) Design and build: A survey of architects' views. Engineering, Construction and Architectural Management, 2(1), pp. 27-44. ISSN 0969-9988

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Akintoye, A; Taylor, C and Fitzgerald, E (1998) Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5(1), pp. 9-21. ISSN 0969-9988

Akmam Syed Zakaria, S and Amtered El-Abidi, K M (2021) Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry. Architectural Engineering and Design Management, 17(1-2), pp. 50-66. ISSN 1745-2007

Akomah, B B and Ramani, P V (2025) Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects. Construction Innovation, 25(4), pp. 1250-1286. ISSN 1471-4175

Akomea-Frimpong, I; Jin, X; Osei Kyei, R; Tetteh, P A; Tumpa, R J; Ofori, J N A and Pariafsai, F (2024) A review of circular economy models and success factors on public-private partnership infrastructure development. Built Environment Project and Asset Management, 14(1), pp. 109-126. ISSN 2044-124X

Akomea-Frimpong, I; Jin, X and Osei-Kyei, R (2021) Developing a financial risk maturity model for public-private partnership projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Akotia, J and Fortune, C (2012) Early stage evaluation of the socio-economic benefits of built environment housing regeneration projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.

Aksorn, T and Hadikusumo, B H W (2007) Gap analysis approach for construction safety program improvement. Journal of Construction in Developing Countries, 12(1), pp. 77-97. ISSN 1823-6499

Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708

Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499

Akunyumu, S; Fugar, F and Adinyira, E (2024) Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana. Journal of Engineering, Design and Technology, 22(6), pp. 1797-1824. ISSN 1726-0531

Al Ahbabi, M and Alshawi, M (2015) BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(4), pp. 402-408. ISSN 1471-4175

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.

Al Dairi, J S S (2017) The design and development of a knowledge-based lean six sigma maintenance system for sustainable buildings. PhD thesis, University of Bradford, UK.

Al Hashemi, A (2011) Examining the relationship between migration, labour and crime in UAE: the case of Dubai. PhD thesis, University of Portsmouth, UK.

Al Hashmi, E (2016) Fire engineering in sustainable buildings: an evaluation for the application of performance-based design in Abu Dhabi. PhD thesis, University of Central Lancashire, UK.

Al Hatmi, H (2012) Business relationships: A cross-culture management investigation in the UAE construction industry. PhD thesis, Liverpool John Moores University, UK.

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Hosni, I S; Amoudi, O and Callaghan, N (2020) An exploratory study on challenges of circular economy in the built environment in Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 104-113. ISSN 17514304

Al Nahyan, M T; Sohal, A S; Fildes, B N and Hawas, Y E (2012) Transportation infrastructure development in the UAE: Stakeholder perspectives on management practice. Construction Innovation, 12(4), pp. 492-514. ISSN 1471-4175

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al Neyadi, A (2019) Sustainable and digital strategies for enhancing United Arab Emirates construction industry competiveness. PhD thesis, University of Wolverhampton, UK.

Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.

Al Sanad, S A (2014) The promotion of sustainable construction practices in Kuwait. PhD thesis, University of Manchester, UK.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Al Shamsi, S K (2019) Managing construction projects in the United Arab Emirates to gain competitive advantage. PhD thesis, University of Wolverhampton, UK.

Al Solaiman, Sultan (2014) An empirical study of the factors impacting on the involvement of clients in Saudi Arabian construction projects. PhD thesis, Queensland University of Technology, Australia.

Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.

Al Yahya, M; Skitmore, M; Bridge, A; Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(2), pp. 183-205. ISSN 1471-4175

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Al-Ashaikh, M H (1996) Project management in the public sector of Saudi Arabia, problems and solutions. PhD thesis, University of Liverpool, UK.

Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Al-Biqami, N M (2001) Virtual procurement system for virtual enterprises. PhD thesis, University of Nottingham, UK.

Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(7), pp. 771-782. ISSN 1466433X

Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599

Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Ghassani, A M; Kamara, J M; Anumba, C J and Carrillo, P M (2006) Prototype system for knowledge problem definition. Journal of Construction Engineering and Management, 132(5), pp. 516-524. ISSN 0733-9364

Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary. PhD thesis, University of Liverpool, UK.

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Hammad, A M; Assaf, S and Al-Hazmi, T (1996) Assessment of the types of public building maintenance contracts in Saudi Arabia. Building Research & Information, 24(6), pp. 358-362. ISSN 0961-3218

Al-Harasis, D H; Jabi, W and Sharmin, T (2025) Developing a taxonomy for sensory-informed architectural design qualities in autism. Building Research & Information, 53(4), pp. 532-551. ISSN 0961-3218

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Kayed, A. A.; Rotimi, F. E.; Purushothaman, M. B.; Pawley, M. and Ghaffarian Hoseini, A. (2026) Modelling the enablers of effective digital technology implementation for competitiveness enhancement among subcontracting organisations in new zealand's residential construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 894-919. ISSN 1726-0531

Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.

Al-Khiami, M. I.; Lindhard, S. M. and Wandahl, S. (2026) Cross-cultural analysis of movement patterns and work-related musculoskeletal disorders in Danish and Kuwaiti construction: Implications for targeted exoskeleton design. International Journal of Construction Management, 26(8), pp. 1690-1706. ISSN 1562-3599

Al-Khiami, M. I. and Lindhard, Sø M. (2026) On-site evaluation of back-support exoskeleton effectiveness in construction: A multiple case study of physical performance, ergonomic comfort, and user acceptance among masonry workers. Journal of Construction Engineering and Management, 152(10): 04026167, ISSN 0733-9364

Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.

Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq. PhD thesis, University of Southampton, UK.

Al-Mhdawi, M K S; Brito, M; Onggo, B S; Qazi, A; O'Connor, A and Namian, M (2023) Construction risk management in Iraq during the COVID-19 pandemic: Challenges to implementation and efficacy of practices. Journal of Construction Engineering and Management, 149(9): 04023086, ISSN 0733-9364

Al-Mohammad, M S; Haron, A T; Aloko, M N and Rahman, R A (2023) Factors affecting BIM implementation in post-conflict low-income economies: The case of Afghanistan. Journal of Engineering, Design and Technology, 21(1), pp. 299-318. ISSN 1726-0531

Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175

Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Al-Musleh, A M (2011) Development of a framework for total quality management principles in the construction companies with special reference to the construction companies in the state of Qatar. PhD thesis, Queen Mary University of London, UK.

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Nakeeb, A A R (2000) An assessment of the effectiveness of quality assurance systems in the construction industry. PhD thesis, University of South Wales, UK.

Al-Omari, J A (1992) Critique of aspects of development theory using construction industry as a capital-surplus developing economy as an exemplar. PhD thesis, University of Reading, UK.

Al-Qayoudhi, S. A. S.; Kamal, E. M. and Said, I. (2026) Improving total quality management implementation at the University of Technology and Applied Sciences in the Sultanate of Oman. Journal of Construction in Developing Countries, 30(Supp.), pp. 15-37. ISSN 1823-6499

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.

Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia. PhD thesis, University of Washington, USA.

Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Al-Shabbani, Z (2019) Improving safety performance of highway maintenance crews through pre-task safety toolbox talks. PhD thesis, University of Kentucky, USA.

Al-Shammari, M A (2014) An appraisal of the protocol that was published by the construction industry council (CIC) to facilitate the use of building information modelling (BIM) on projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Al-Sharif, F and Kaka, A (2003) Potential of PFI/PPP as a financing source for public services projects in Saudi Arabia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Al-Sharif, F and Kaka, A (2004) PFI/PPP topic coverage in construction journals. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Al-Sinan, M A (2004) TQM and the construction industry: Saudi Arabia: a case study. PhD thesis, City, University of London, UK.

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.

Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.

Al-Yami, A and Sanni-Anibire, M O (2021) BIM in the Saudi Arabian construction industry: State of the art, benefit and barriers. International Journal of Building Pathology and Adaptation, 39(1), pp. 33-47. ISSN 23984708

Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.

Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management. PhD thesis, Iowa State University, USA.

AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599

AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364

AlMunifi, A A and Almutairi, S (2021) Lessons learned framework for efficient delivery of construction projects in Saudi Arabia. Construction Economics and Building, 21(4), pp. 115-141. ISSN 2204-9029

AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.

Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 0969-9988

Alade, W A (2020) Environmental and socio-economic impacts of Ojodu-Berger Road upgrade, Lagos, Nigeria. Journal of Construction Business and Management, 4(1), pp. 24-33. ISSN 2521-0165

Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.

Alameri, R and Esmaeili, B (2023) Progressive design-build delivery method: Assessment of project performance. International Journal of Construction Education and Research, 19(1), pp. 22-41. ISSN 1557-8771

Alamil, H M (2022) Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations. PhD thesis, University of Wolverhampton, UK.

Alamoudi, A K; Abidoye, R B and Lam, T Y M (2024) An evaluation of stakeholders' participation process in developing smart sustainable cities in Saudi Arabia. Smart and Sustainable Built Environment, 13(5), pp. 1074-1095. ISSN 2046-6099

Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.

Alansari, A M (2019) Risk assessment for marine construction projects. PhD thesis, Claremont Graduate University, USA.

Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.

Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, W (2013) Total quality management within the construction industry of Kuwait: the role of Total Quality Management and its usage. PhD thesis, Loughborough University, UK.

Alazzam, M. and Celoza, A. (2026) Current state of supplier qualification in capital projects: Factors, practices, and industry perspectives. Journal of Construction Engineering and Management, 152(8): 04026111, ISSN 0733-9364

Albalawi, R K (2023) Comprehensive analysis of the multiskilling strategy among craft professionals in the construction industry. PhD thesis, University of Colorado at Boulder, USA.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry. PhD thesis, Aston University, UK.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Albayoudh, K A F (2003) Assessment of total quality management in the Saudi construction industry organisations. PhD thesis, Loughborough University, UK.

Albert, A (2013) Strategies for construction hazard recognition. PhD thesis, University of Colorado at Boulder, USA.

Albert, A; Hallowell, M R; Lingard, H and Kleiner, B M (2015) Multiple baseline testing: Experimental method for drawing causal inferences in construction engineering and management research. Journal of Construction Engineering and Management, 141(7): 4015012, ISSN 0733-9364

Alcaraz Carrillo de Albornoz, V; Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(1), pp. 97-107. ISSN 1562-3599

Alchaer, E and Issa, C A (2020) Engineering productivity measurement: A novel approach. Journal of Construction Engineering and Management, 146(8): 0001875, ISSN 0733-9364

Aldhaheri, M; Bakchan, A and Sandhu, M A (2018) A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user's perspective. Engineering, Construction and Architectural Management, 25(9), pp. 1226-1252. ISSN 0969-9988

Aldhanhani, M A A (2018) Enablers and barriers to knowledge sharing in the UAE infrastructural projects. PhD thesis, British University in Dubai, UAE.

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Alternative project delivery method adoption in the AEC industry: An organizational change perspective. International Journal of Construction Education and Research, 19(2), pp. 150-165. ISSN 1557-8771

Aldossari, K M A (2020) Organizational change management for the adoption of alternative project delivery methods within the AEC industry. PhD thesis, Arizona State University, USA.

Aldridge, G; Pasquire, C; Gibb, A and Blismas, N G (2001) Methods for measuring the "unmeasurable": Evaluating the benefits of pre-assembly and standardization in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364

Alemayehu, S; Nejat, A; Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2635-2664. ISSN 0969-9988

Alencastro, J; Fuertes, A and de Wilde, P (2020) Quality management in UK social housing projects: Addressing thermal performance. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alencastro, J; Fuertes, A and de Wilde, P (2024) Investigating the influence of quality management on building thermal performance. Engineering, Construction and Architectural Management, 31(8), pp. 3356-3376. ISSN 0969-9988

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries. PhD thesis, Brunel University, UK.

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364

Alghadeer, Abdulaziz I (2013) Influence of socio-cultural and technological factors on the adoption of the project management office (pmo) in Saudi Arabia: An innovation diffusion perspective. PhD thesis, Griffith University, Saudi Arabia.

Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Alhammadi, Y (2017) Developing and evaluation the implementation of construction management research in the Saudi construction industry. PhD thesis, Arizona State University, USA.

Alharthi, A; Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364

Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.

Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364

Alhemoud, A M (1996) The development and testing of a comprehensive tool for assessing the effectiveness of occupational safety and health programs. PhD thesis, University of Cincinnati, USA.

Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and managing quality scheme for rmc industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(4), pp. 249-255. ISSN 0733-9364

Alhudaithy, I M (2006) Rights of tenderers and contractors under Saudi public procurement contract regulations: a comparative study with England and Wales. PhD thesis, Durham University, UK.

Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.

Alhusban, A A; Alhusban, S A and Alhusban, M A (2022) How the COVID 19 pandemic would change the future of architectural design. Journal of Engineering, Design and Technology, 20(1), pp. 339-357. ISSN 1726-0531

Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.

Alhusban, M; Elghaish, F; Hosseini, M R and Mayouf, M (2025) Revamping established project procurement approaches to support BIM implementation. Smart and Sustainable Built Environment, 14(3), pp. 672-695. ISSN 2046-6099

Alhusban, M; Nasereddin, M; Alghossoon, A and Hatamleh, M T (2025) A hybrid conceptual procurement framework for BIM uptake to enhance buildings' sustainability performance in the Jordanian public sector. International Journal of Building Pathology and Adaptation, 43(1), pp. 93-116. ISSN 2398-4708

Ali, A; Wang, H; Soomro, M A and Islam, T (2020) Shared leadership and team creativity: Construction industry perspective. Journal of Construction Engineering and Management, 146(10): 04020122, ISSN 0733-9364

Ali, A H and Kineber, A F (2025) Unveiling and modelling the impact of safety drivers on the overall success of construction projects in developing countries. International Journal of Construction Management, 25(11), pp. 1357-1379. ISSN 1562-3599

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Ali, A K (2019) A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education. Engineering, Construction and Architectural Management, 26(9), pp. 2040-2059. ISSN 0969-9988

Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Ali, Atif (2010) Investigating project management practices in public sector organisations of a less developed country. PhD thesis, RMIT University, Australia.

Ali, F; Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(2), pp. 178-189. ISSN 1726-0531

Ali, G M; Olearczyk, J; Bouferguene, A and Al-Hussein, M (2021) Implementation of combined loading to calculate ground bearing pressure under crawler crane tracks. Journal of Construction Engineering and Management, 147(7): 04021051, ISSN 0733-9364

Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.

Alim, S (1985) Fuzzy expert systems in civil engineering. PhD thesis, Imperial College London, UK.

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499

Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499

Aliu, J and Oke, A E (2023) Construction in the digital age: Exploring the benefits of digital technologies. Built Environment Project and Asset Management, 13(3), pp. 412-429. ISSN 2044-124X

Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599

Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.

Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.

Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.

Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.

Alkatheeri, A (2018) An investigative study on the relationship between organizational factors and knowledge management effectiveness in UAE public organizations: the case study of Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE. PhD thesis, University of Wolverhampton, UK.

Alkhaldi, M (2019) Impact of human errors on accidents in the oil and gas industry in Bahrain. PhD thesis, University of Salford, UK.

Alkhard, A (2016) Analysis of influencing factors on safety culture in the construction industry of Saudi Arabia. PhD thesis, University of Florida, USA.

Alkhard, A (2024) Leveraging digital asset management and meta-data integration for enhanced asset management. Construction Economics and Building, 24(3), pp. 76-94. ISSN 2204-9029

Alkharmany, A (2017) Project management: The effect of saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia. PhD thesis, University of Brighton, UK.

Alkhateeb, A M; Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(4), pp. 576-591. ISSN 1471-4175

Alkhraisha, A (2023) Approaches for enhancing the construction and demolition waste management strategy in Jordan. PhD thesis, Anglia Ruskin University, UK.

Alkilani, S Z; Jupp, J and Sawhney, A (2013) Issues of construction health and safety in developing countries: A case of Jordan. Construction Economics and Building, 13(3), pp. 141-156. ISSN 2204-9029

Alkinani, H (2014) Models of training needs assessment for the Iraqi construction industry. PhD thesis, University of Salford, UK.

Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175

Allam, A S; Bassioni, H; Ayoub, M and Kamel, W (2024) A framework for obtaining a BIM-compatible design solution based on quantitative decisions on building performance. International Journal of Construction Management, 24(11), pp. 1176-1190. ISSN 1562-3599

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Allport, R J (2015) Pre-implementation planning: The weak link in rail projects 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 205-212. ISSN 17514304

Allport, R J and Anderson, R J (2011) Managing strategic risk: the worldwide experience of metros. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 173-180. ISSN 17514304

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(1), pp. 57-64. ISSN 1562-3599

Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(4), pp. 416-426. ISSN 1562-3599

Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175

Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988

Almarri, K; Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), pp. 1696-1711. ISSN 0969-9988

Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X

Almarri, K and Boussabaine, H (2025) Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation, 25(2), pp. 224-247. ISSN 1471-4175

Almatari, H A Q; Chan, M and Masrom, M A N (2024) Factors inhibiting the adoption of industrial revolution 4.0 in malaysian construction industry. Smart and Sustainable Built Environment, 13(4), pp. 1041-1065. ISSN 2046-6099

Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988

Almazkoor, F B (2014) Two-stage methodology for managing and controlling material flow between multiple construction projects. PhD thesis, Clemson University, USA.

Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.

Almeida, Laura (2019) Energy-related occupant behaviour in green and non-rated buildings. PhD thesis, Western Sydney University, Australia.

Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.

Almén, L and Larsson, T J (2014) Health and safety coordinators in building projects. Built Environment Project and Asset Management, 4(3), pp. 251-263. ISSN 2044-124X

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alnoaimi, Ali D (2021) Development of sustainability assessment framework for sewerage infrastructure projects in the Kingdom of Bahrain. PhD thesis, Griffith University, Australia.

Alnsour, M A M (2020) Integrating sustainability assessment into public works development in Jordan. PhD thesis, University of Leeds, UK.

Alnuaimi, N T; Chatha, K A and Abdallah, S (2025) Role of big data analytics and information processing capabilities in enhancing transparency and accountability in e-procurement applications. Journal of Engineering, Design and Technology, 23(5), pp. 1729-1750. ISSN 1726-0531

Alofi, A (2017) Improving the Saudi Arabia procurement system: Perception and development of the construction industry. PhD thesis, Arizona State University, USA.

Aloini, D; Dulmin, R; Mininno, V and Ponticelli, S (2012) A conceptual model for construction supply chain management implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Along, N Z B; Ahmed, I and MacKee, J (2024) Flood knowledge management by multiple stakeholders: An example from Malaysia. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 141-157. ISSN 1759-5916

Alosaimi, H (2019) Embedding knowledge management strategies in the Kingdom of Saudi Arabia construction industry. PhD thesis, University of Wolverhampton, UK.

Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.

Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364

Alpmen, A S (2013) Development and implementation of a proactive safety performance evaluation system for general contractors. PhD thesis, Wayne State University, USA.

Alqahtani, A (2019) An appraisal of the role of project management offices (PMO) in promoting knowledge management (km) within KSA construction companies. PhD thesis, University of Salford, UK.

Alqahtani, A (2019) An appraisal of the role of project management offices in promoting knowledge management within KSA construction companies. PhD thesis, University of Salford, UK.

Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city. PhD thesis, Northumbria University, UK.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Alreshidi, E (2015) Towards facilitating team collaboration during construction project via the development of cloud-based BIM governance solution. PhD thesis, Cardiff University, UK.

Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.

Alsahli, A (2011) A framework for successful implementation of IT for the construction organizations in Saudi Arabia. PhD thesis, University of Salford, UK.

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Alsakini, W (2012) Two models for managing the virtualisation of construction management firms in the context of Finnish construction markets. PhD thesis, Aalto University, Finland.

Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599

Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599

Alsedairy, F S (2019) Dynamics of mega infrastructure decision-making in Saudi Arabia. PhD thesis, University of Edinburgh, UK.

Alsehaimi, A O and Sanni-Anibire, M O (2026) Industry 4.0 technologies: An examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry. Construction Innovation, 26(2), pp. 607-630. ISSN 1471-4175

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Alsemari, M A A A and Ramegowda, M (2025) BIM-based approach to manage basra oil company projects. Smart and Sustainable Built Environment, 14(6), pp. 1824-1845. ISSN 2046-6099

Alshahrani, A Y (2020) Interpretive investigation into the implementation of sustainable business models within Saudi housing construction industry. PhD thesis, University of Salford, UK.

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175

Alshawi, M and Underwood, J (1996) Improving the constructability of design solutions through an integrated system. Engineering, Construction and Architectural Management, 3(1-2), pp. 47-67. ISSN 0969-9988

Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshehri, A R (2016) Quality management system for building maintenance. PhD thesis, Heriot-Watt University, UK.

Alsheikh-Salem, Y M-B (2022) The development of a sustainability risk assessment model for construction projects: A case study on the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988

Alsulaiman, Y; Bowles, G and Ogunlana, S (2014) Evaluating risk management in independent water and power plant projects in Saudi Arabia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness. PhD thesis, Heriot-Watt University, UK.

Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Altayeb, S A (1990) Drug testing and its impact on the incident rate in the construction industry. PhD thesis, Clemson University, USA.

Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process. PhD thesis, University of Alberta, Canada.

Alvanchi, A; Baniassadi, F; Shahsavari, M and Kashani, H (2021) Improving materials logistics plan in road construction projects using discrete event simulation. Engineering, Construction and Architectural Management, 28(10), pp. 3144-3163. ISSN 0969-9988

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation, 19(1), pp. 110-124. ISSN 1471-4175

Alvand, A; Mirhosseini, S M; Ehsanifar, M; Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), pp. 392-404. ISSN 1562-3599

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.

Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988

Alyatama, M (2021) Application of agile project management in Kuwait oil and gas capital projects. PhD thesis, University of Northampton, UK.

Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law. PhD thesis, University of Hull, UK.

Alzahrani, H; Arif, M; Kaushik, A; Goulding, J and Heesom, D (2021) Artificial neural network analysis of teachers' performance against thermal comfort. International Journal of Building Pathology and Adaptation, 39(1), pp. 20-32. ISSN 23984708

Alzahrani, H; Arif, M; Kaushik, A K; Rana, M Q and Aburas, H M (2023) Evaluating the effects of indoor air quality on teacher performance using artificial neural network. Journal of Engineering, Design and Technology, 21(2), pp. 604-618. ISSN 1726-0531

Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.

Amade, B; Ogbonna, A C and Nkeleme, E I (2022) An investigation of the factors affecting successful enterprise resource planning (ERP) implementation in Nigeria. Journal of Construction in Developing Countries, 27(1), pp. 41-63. ISSN 1823-6499

Amadi, C; Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Amadi, C; Carrillo, P and Tuuli, M (2020) PPP projects: Improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(2), pp. 544-560. ISSN 0969-9988

Amakali, T R; Cook, G and Larsen, G D (2012) Striving for inclusive design in the built environment: Learning strategy adopted by policy implementers at local authorities in England. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Amarachukwu Nnadozie, N and Wilkinson, S (2021) Building code amendment and building resilience: Perspective of building code users in New Zealand. Built Environment Project and Asset Management, 11(4), pp. 643-659. ISSN 2044-124X

Amarasinghe, I A and Hadiwattege, C (2022) Enablers for facilitating life cycle assessment: Key stakeholder perspectives of Sri Lankan construction industry. Built Environment Project and Asset Management, 12(4), pp. 590-612. ISSN 2044-124X

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Amavasai, A (2023) Beyond the deterministic approach: On the feasibility of data assimilation methods in geotechnics. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ambekar, S; Roy, D; Hiray, A; Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: A case of construction, real estate, infrastructure and project (crip) sectors. Engineering, Construction and Architectural Management, 29(7), pp. 2878-2902. ISSN 0969-9988

Ambituuni, A. (2026) Infrastructure transparency initiative and anticorruption in public infrastructure projects: A principal-agent perspective to the antecedents that enable (or hinder) the effectiveness of transparency. Engineering, Construction and Architectural Management, 33(7), pp. 5934-5957. ISSN 0969-9988

Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Ameh, H and Lamond, J (2025) Public preference of flood-resilient housing technologies in Nigeria: A case study of Kogi State. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 87-103. ISSN 1759-5908

Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708

Ameyaw, C; Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(3), pp. 268-285. ISSN 1366-4387

Amin, K F and Abanda, F H (2019) Building information modelling plan of work for managing construction projects in Egypt. Journal of Construction in Developing Countries, 24(2), pp. 23-61. ISSN 1823-6499

Amini, M; Mahdavinejad, M and Bemanian, M (2019) Future of interactive architecture in developing countries: Challenges and opportunities in case of Tehran. Journal of Construction in Developing Countries, 24(1), pp. 163-184. ISSN 1823-6499

Aminian, E; Kirkham, R and Fenn, P (2011) Contracting strategies in construction industries. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Amiri, Mojtaba and Saghatforoush, Ehsan (2026) From exploration to prioritization: Advancing BIM-IOT integration for construction health and safety improvement. Journal of Construction Business and Management, 8(S1), pp. 125-139. ISSN 2521-0165

Amiri, O; Rahimi, M; Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 42(3), pp. 369-385. ISSN 23984708

Amiri Ara, R; Paardenkooper, K and van Duin, R (2022) A new blockchain system design to improve the supply chain of engineering, procurement and construction (EPC) companies: a case study in the oil and gas sector. Journal of Engineering, Design and Technology, 20(4), pp. 887-913. ISSN 1726-0531

Amiril, A (2014) The importance and implementation of sustainability factors in Malaysian railway projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Amirtash, P; Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for international engineering, procurement and construction projects. Built Environment Project and Asset Management, 11(2), pp. 330-349. ISSN 2044-124X

Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.

Amjad Mohammadi, A; Safaeipour, H; Chenaghlou, M R; Behnejad, A and Afghani Khoraskani, R (2024) Configuration processing and construction of large-span karbandi vaults: A case of the karbandi vaulting of haj-mohammad-qoli timche in tabriz historic bazaar. Engineering, Construction and Architectural Management, 31(1), pp. 432-468. ISSN 0969-9988

Ammar, Ashtarout (2023) Digital twins for ancillary transportation asset data management. PhD thesis, University of Kentucky, USA.

Ammar, M (2016) Aerial construction: Robotic fabrication of tensile structures with flying machines. DSc thesis, ETH Zürich, Switzerland.

Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Amoah, C (2017) Public procurement reforms in Ghana: impact on the growth of the local construction industry. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Amoah, C (2023) Quality management framework for government social housing construction in South Africa. International Journal of Building Pathology and Adaptation, 41(6), pp. 217-236. ISSN 23984708

Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599

Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Amos, D; Musa, Z N and Au-Yong, C P (2020) Performance measurement of facilities management services in Ghana's public hospitals. Building Research & Information, 48(2), pp. 218-238. ISSN 0961-3218

Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312

Ampratwum, G; Agyekum, K; Adinyira, E and Duah, D (2021) A framework for the implementation of green certification of buildings in Ghana. International Journal of Construction Management, 21(12), pp. 1263-1277. ISSN 1562-3599

Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029

Amudjie, J; Agyekum, K; Adinyira, E; Amos-Abanyie, S and Botchway, E A (2025) Implementing the principles of circular economy in the construction industry: Exploratory and confirmatory factor analyses of strategies. Construction Innovation, 25(3), pp. 761-786. ISSN 1471-4175

An, X; Ren, S; Wang, L and Huang, Y (2025) Evolutionary game analysis of collaborative application of BIM platform from the perspective of value co-creation. Engineering, Construction and Architectural Management, 32(7), pp. 4458-4474. ISSN 0969-9988

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Anastassakou, M (2008) Organisational benefits using explicit project management tools, techniques and knowledge. PhD thesis, University College London, UK.

Ancapi, F B (2023) Ex ante analysis of circular built environment policy coherence. Buildings & Cities, 4(1), pp. 575-593. ISSN 2632-6655

Ancell, D (2005) Reducing costs: A practical application of performance-based specification and transaction cost theories. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.

Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.

Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988

Andersen, C E; Kanafani, K; Zimmermann, R K; Rasmussen, F N and Birgisdóttir, H (2020) Comparison of GHG emissions from circular and conventional building components. Buildings & Cities, 1(1), pp. 379-392. ISSN 2632-6655

Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.

Andersen, L P; Karlsen, I L; Kines, P; Joensson, T and Nielsen, K J (2015) Social identity in the construction industry: Implications for safety perception and behaviour. Construction Management and Economics, 33(8), pp. 640-652. ISSN 01446193

Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007

Andersen, T O M and Gaarslev, A (1996) Perspectives on artificial intelligence in the construction industry. Engineering, Construction and Architectural Management, 3(1-2), pp. 3-14. ISSN 0969-9988

Anderson, A; Dossick, C S and Osburn, L (2020) Curriculum to prepare AEC students for BIM-enabled globally distributed projects. International Journal of Construction Education and Research, 16(4), pp. 270-289. ISSN 1557-8771

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.

Andersson, R; Buser, M and Bosch, P (2019) Improving renovation waste management in Sweden: The role of the demolition company. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Andon, Paul James (2009) (Per)forming a public private partnership: The agency of accounting and other practices. PhD thesis, University of New South Wales, Australia.

Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.

Andreas, B (2019) A framework for understanding the policy process for construction. PhD thesis, Loughborough University, UK.

Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312

Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218

Angelides, D and Xenidis, Y (2005) A methodology for the development of a european approach concerning performance and risks of built systems. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Angelidi, A (2007) Delays in construction projects in Greece: Causes, effects and project management tools. PhD thesis, University College London, UK.

Aniftos, S C (1996) International standards: United States construction industry competitiveness. PhD thesis, Polytechnic University, USA.

Anjomshoa, E (2025) The application of building information modeling (BIM) system in the smartification of green and sustainable buildings. Engineering, Construction and Architectural Management, 32(8), pp. 5194-5227. ISSN 0969-9988

Ankomah, E N; Ayarkwa, J and Agyekum, K (2020) Status of lean construction implementation among small and medium building contractors (SMBCs) in Ghana. Journal of Engineering, Design and Technology, 18(6), pp. 1691-1709. ISSN 1726-0531

Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(3), pp. 1-20. ISSN 2204-9029

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes. EngD thesis, Loughborough University, UK.

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.

Antoniadis, D N; Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2009) Complexity effect of project team member selection practices in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Anugwo, I C; Shakantu, W; Saidu, I and Adamu, A (2018) Potentiality of the South African construction smme contractors globalising within and beyond the SADC construction markets. Journal of Construction Business and Management, 2(1), pp. 41-49. ISSN 2521-0165

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Anumba, C J; Issa, R R A; Pan, J and Mutis, I (2008) Ontology-based information and knowledge management in construction. Construction Innovation, 8(3), pp. 218-239. ISSN 1471-4175

Anumba, C J; Pan, J; Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(1), pp. 78-94. ISSN 0969-9988

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry. PhD thesis, KTH Royal Institute of Technology, Sweden.

Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Anvuur, A M and Kumaraswamy, M M (2007) Conceptual model of partnering and alliancing. Journal of Construction Engineering and Management, 133(3), pp. 225-234. ISSN 0733-9364

Anvuur, A M; Kumaraswamy, M M and Mahesh, G (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(1), pp. 102-120. ISSN 0969-9988

Anzagira, L F; Duah, D; Badu, E; Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 22(3), pp. 1012-1029. ISSN 1726-0531

Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Aouad, G F; Ford, S R; Kirkham, J A; Child, T; Cooper, G S; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(3), pp. 271-278. ISSN 01446193

Aouad, G F; Hinks, J; Cooper, R; Sheath, D M; Kagioglou, M and Sexton, M (1998) An information technology (IT) map for a generic design and construction process protocol. Journal of Construction Procurement, 4(2), pp. 132-151. ISSN 1358-9180

Aouad, G F; Kirkham, J A; Cooper, G S; Ford, S; Sarshar, M; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1993) Information modelling in the construction industry: The information engineering approach. Construction Management and Economics, 11(5), pp. 384-397. ISSN 01446193

Apa, R and Sedita, S R (2017) How (do) internal capabilities and the geography of business networks shape the performance of contractors in public procurement tenders? Evidence from the construction industry. Construction Management and Economics, 35(7), pp. 404-419. ISSN 01446193

Apinayan, K.; Perera, B. A. K. S.; Weerasooriya, D. and Ranadewa, K. A. T. O. (2026) Adaptability of BIM technology for detailed cost estimation in Sri Lankan construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 633-665. ISSN 1726-0531

Apostolopoulos, C (2015) Risk assessment for change management within project management: a hierarchical model process approach. PhD thesis, City, University of London, UK.

Appell, H (2020) Workers of Europe unite!? Explaining the form of European labor organization: The construction industry. PhD thesis, Freie Universitaet Berlin, Germany.

Aquere, A L; Dinis-Carvalho, J and Lima, R M (2013) Project cell: Cellular organization of the building design process. Journal of Construction Engineering and Management, 139(5), pp. 538-546. ISSN 0733-9364

Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Arafat, G H (1991) Concept evaluation in structural design utilizing multiattribute utility theory and a knowledge-based approach. PhD thesis, Wayne State University, USA.

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007

Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arar, A J; Poirier, E and Staub-French, S (2025) A research and development framework for integrated project delivery. Construction Management and Economics, 43(2), pp. 85-112. ISSN 0144-6193

Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364

Araujo, L G; Piña, A B S; Aidar, L A G; Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil. Built Environment Project and Asset Management, 9(2), pp. 262-276. ISSN 2044-124X

Aravindraj, S and Vinodh, S (2014) Forty criteria based agility assessment using scoring approach in an Indian relays manufacturing organization. Journal of Engineering, Design and Technology, 12(4), pp. 507-518.

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988

Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175

Arbabi, H; Salehi-Taleshi, M J and Ghods, K (2020) The role of project management office in developing knowledge management infrastructure. Engineering, Construction and Architectural Management, 27(10), pp. 3261-3287. ISSN 0969-9988

Arditi, D (1983) Diffusion of network planning in construction. Journal of Construction Engineering and Management, 109(1), pp. 1-12. ISSN 0733-9364

Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364

Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193

Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364

Arico, Manuela (2025) Application of scan-to-BIM approaches to HBIM digitisations in architectural heritage environment for documentation, management and conservation purposes. PhD thesis, Università degli Studi di Palermo, Italy.

Arif, M; Bendi, D; Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: An exploratory study. Construction Innovation, 12(2), pp. 133-155. ISSN 1471-4175

Arif, M; Egbu, C; Haleem, A; Kulonda, D and Khalfan, M (2009) State of green construction in India: Drivers and challenges. Journal of Engineering, Design and Technology, 7(2), pp. 223-234. ISSN 1726-0531

Arif, M; Khalfan, M; Barnard, J H and Heller, N A (2012) Assessing knowledge retention in construction organisations: Cases from the UAE. Construction Economics and Building, 12(2), pp. 55-71. ISSN 2204-9029

Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312

Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312

Arjun, R A S and Vinodh, S (2016) A case study on application of oreste for agile concept selection. Journal of Engineering, Design and Technology, 14(4), pp. 781-801.

Arnold, J A (2000) Information interoperation for internet-based component engineering analysis. PhD thesis, Stanford University, USA.

Arnold, P and Javernick-Will, A (2013) Projectwide access: Key to effective implementation of construction project management software systems. Journal of Construction Engineering and Management, 139(5), pp. 510-518. ISSN 0733-9364

Arora, M; Prakash, A; Mittal, A and Singh, S (2024) Examining the slow acceptance of HR analytics in the Indian engineering and construction industry: A SEM-ann-based approach. Engineering, Construction and Architectural Management, 31(5), pp. 1973-1993. ISSN 0969-9988

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Ojo, L D and Adelusi, A O (2024) Driving factors for the adoption of digital twin technology implementation for construction project performance in Nigeria. Journal of Construction Engineering and Management, 150(1): 05023014, ISSN 0733-9364

Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.

Arriagada D, R E and Alarcón C, L F (2014) Knowledge management and maturation model in construction companies. Journal of Construction Engineering and Management, 140(4): B4013006, ISSN 0733-9364

Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arshad, M F; Thaheem, M J; Nasir, A R and Malik, M S A (2019) Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects. Journal of Construction Engineering and Management, 145(4): 04019010, ISSN 0733-9364

Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304

Asad, M M; Hassan, R B; Sherwani, F; Rind, I A and Maiji, Y (2020) Development of a novel safety and health educational management information system (HAZ-PRO) for oil and gas production operation: A proposed framework. Journal of Engineering, Design and Technology, 18(5), pp. 959-971. ISSN 1726-0531

Asadi, E (2020) Risk-informed multi-criteria decision framework for resilience and sustainability assessment of building structures. PhD thesis, Case Western Reserve University, USA.

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029

Asadian, E; Azeez, S; Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(5): 04024029, ISSN 0733-9364

Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies. PhD thesis, University of the West of England, Bristol, UK.

Asare, S O; Fobiri, G and Bondinuba, F K (2025) Enhancing fairness, transparency and accountability during tendering under Ghana's procurement system: A systematic review. Built Environment Project and Asset Management, 15(1), pp. 33-50. ISSN 2044-124X

Asefi, Maziar (2007) Transformable architectural structures: Background, development, evaluation and design. PhD thesis, University of Liverpool, UK.

Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.

Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Asiedu, R. O.; Amoakwa, A. B.; Ameyaw, C.; Owusu-Manu, D. G.; Daniels, P. A. and Gyimah, S. (2026) Environmental, social, and governance considerations in sustainable construction project delivery. Construction Economics and Building, 26(2), ISSN 2204-9029

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in Ghana's telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), pp. 265-293. ISSN 1823-6499

Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Asiedu, R O; Manu, P; Mahamadu, A M; Booth, C A; Olomolaiye, P; Agyekum, K and Abadi, M (2023) Critical skills for infrastructure procurement: Insights from developing country contexts. Journal of Engineering, Design and Technology, 21(6), pp. 1948-1974. ISSN 1726-0531

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.

Asigri, E O; Afram, S O and Ameyaw, C (2021) Fire safety design attributes of students' housing facilities in KNUST Ghana. African Journal of Built Environment Research, 5(1), pp. 41-58. ISSN 2414-0236

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Aslam, M; Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan's construction industry. Engineering, Construction and Architectural Management, 31(5), pp. 2077-2100. ISSN 0969-9988

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Aslani, F; Amini Hosseini, K and Fallahi, A (2020) A framework for earthquake resilience at neighborhood level. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 557-575. ISSN 1759-5916

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364

Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364

Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364

Assad, A; Moselhi, O and Zayed, T (2021) Resilience-driven sustainability-based rehabilitation planning for water distribution networks. Journal of Construction Engineering and Management, 147(8): 04021079, ISSN 0733-9364

Assaf, G and Assaad, R H (2024) Analyzing the critical success factors affecting project bundling performance of infrastructure projects. Journal of Construction Engineering and Management, 150(9): 04024106, ISSN 0733-9364

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364

Assaf, S A; Al-Hammad, A M and Ubaid, A (1996) Factors effecting construction contractors' performance. Building Research & Information, 24(3), pp. 157-163. ISSN 0961-3218

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Ateloye, A; Bowles, G and Oyegoke, A (2016) Private sector participation in Nigeria higher education infrastructure development. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.

Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708

Atkinson, R J; Tennakoon, M and Wedawatta, G (2023) Use of new models of construction procurement to enhance collaboration in construction projects: The UK construction industry perspective. Journal of Financial Management of Property and Construction, 28(1), pp. 45-63. ISSN 1366-4387

Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(4), pp. 335-351. ISSN 2044-124X

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Attallah, S O (2014) A life cycle analysis approach for the enhancement of sustainability decision-making in the construction industry using agent-based modeling. PhD thesis, Purdue University, USA.

Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988

Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Aurellado, E A (2010) ISO 9001.2000 as change strategy for a growing construction company. PhD thesis, Southeast Asia Interdisciplinary Development Institute, Philippines.

Austin, R B; Pishdad-Bozorgi, P and De La Garza, J M (2016) Identifying and prioritizing best practices to achieve flash track projects. Journal of Construction Engineering and Management, 142(2): 04015077, ISSN 0733-9364

Austin, S; Baldwin, A; Baizhan, L I and Waskett, P (2000) Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(2), pp. 173-182. ISSN 01446193

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Austin, S A; Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(3), pp. 249-258. ISSN 0969-9988

Awagah, Nicholas K (2024) An integrated framework for mentoring artisans in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Awale, R and Rowlinson, S (2014) A conceptual framework for achieving firm competitiveness in construction: A 'creating shared value' (CSV) concept. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Awale, R and Rowlinson, S (2015) An exploratory study of a CSV concept for achieving firm competitiveness in Hong Kong construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Awodele, O A; Aghimien, D O; Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement: A veritable surviving strategy for contractors in a challenging economy. Journal of Engineering, Design and Technology, 17(2), pp. 347-361. ISSN 1726-0531

Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.

Awuah, E (2020) A conceptual risk management framework for public private partnership in developing countries: A Ghanaian and South African perspective. PhD thesis, University of South Africa, South Africa.

Awuzie, B and McDermott, P (2016) A systems approach to assessing organisational viability in project-based organisations. Built Environment Project and Asset Management, 6(3), pp. 268-283. ISSN 2044-124X

Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304

Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry. PhD thesis, University of Salford, UK.

Awuzie, B O and McDermott, P (2015) A conceptual model for evaluating infrastructure-based temporary multi-organisations. Built Environment Project and Asset Management, 5(1), pp. 103-120. ISSN 2044-124X

Awuzie, B O and McDermott, P (2016) The role of contracting strategies in social value implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 106-114. ISSN 17514304

Awwad, K A; Shibani, A and Ghostin, M (2022) Exploring the critical success factors influencing BIM level 2 implementation in the UK construction industry: The case of SMEs. International Journal of Construction Management, 22(10), pp. 1894-1901. ISSN 1562-3599

Axon, S and Morrissey, J (2020) Just energy transitions? Social inequities, vulnerabilities and unintended consequences. Buildings & Cities, 1(1), pp. 393-411. ISSN 2632-6655

Ayala Collazo, I C (2023) An analysis of governing factors affecting diversity in local government capital improvement program implementation. DPA thesis, University of Baltimore, USA.

Ayat, M; Ullah, M; Pervez, Z; Lawrence, J; Kang, C W and Ullah, A (2025) Analyzing the differential impact of variables on the success of solicited and unsolicited private participation in infrastructure projects using machine learning techniques. Engineering, Construction and Architectural Management, 32(12), pp. 7909-7937. ISSN 0969-9988

Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.

Ayodele, T O and Kajimo-Shakantu, K (2022) Challenges and drivers to data sharing among stakeholders in the South African construction industry. Journal of Engineering, Design and Technology, 20(6), pp. 1698-1715. ISSN 1726-0531

Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387

Ayodele, T T (2022) Cost-effective retrofit packages for low-middle income residential buildings in Nigeria. PhD thesis, De Montfort University, UK.

Ayoub, H; Sweis, G; Abu-Khader, W and Sweis, R (2023) A framework to evaluate sustainable construction principles in government building projects: The case of Jordan. Engineering, Construction and Architectural Management, 30(9), pp. 4080-4098. ISSN 0969-9988

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Azam, M A M; Ross, A D; Fortune, C J and Jaggar, D (1998) An information strategy to support effective construction design decision making. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings. PhD thesis, University of Washington, USA.

Azcarate Aguerre, J F (2023) Facades-as-a-service: A cross-disciplinary model for the (re)development of circular building envelopes. PhD thesis, Delft University of Technology, Netherlands.

Azcarate-Aguerre, J F; Conci, M; Zils, M; Hopkinson, P and Klein, T (2022) Building energy retrofit-as-a-service: A total value of ownership assessment methodology to support whole life-cycle building circularity and decarbonisation. Construction Management and Economics, 40(9), pp. 676-689. ISSN 01446193

Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.

Azhar, S and Choudhry, R M (2016) Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), pp. 92-105. ISSN 2044-124X

Azhar, S; Khalfan, M and Maqsood, T (2012) Building information modeling (BIM): Now and beyond. Construction Economics and Building, 12(4), pp. 15-28. ISSN 2204-9029

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.

Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.

Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099

Aziz, Z (2005) Context-aware information delivery for mobile construction workers. PhD thesis, Loughborough University, UK.

Aziz, Z; Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(3), pp. 294-323. ISSN 1471-4175

Azman, M A (2016) Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(4), pp. 678-698.

Azmi, N A; Sweis, G; Sweis, R and Sammour, F (2023) Exploring blockchain-enabled smart contracts technology implementation within ready-mixed concrete plants industry in Saudi Arabia. International Journal of Construction Management, 23(14), pp. 2400-2408. ISSN 1562-3599

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Azzouz, A; Copping, A; Shepherd, P and Duncan, A (2016) Using the arup BIM maturity measure to demonstrate BIM implementation in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Azzouz, A; Hill, P and Papadonikolaki, E (2018) Digital innovation in Europe: Regional differences across one international firm. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Babalola, A and Harinarain, N (2024) Policy barriers to sustainable construction practice in the Nigerian construction industry: An exploratory factor analysis. Journal of Engineering, Design and Technology, 22(1), pp. 214-234. ISSN 1726-0531

Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531

Babalola, O O (2011) A model based framework for semantic interpretation of architectural construction drawings. PhD thesis, Georgia Institute of Technology, USA.

Babatunde, O K (2013) Cross cultural management of quality performance of Chinese construction firms in Nigeria. PhD thesis, National University of Singapore, Singapore.

Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.

Babatunde, S O; Adeniyi, O and Awodele, O A (2017) Investigation into the causes of delay in land acquisition for PPP projects in developing countries. Journal of Engineering, Design and Technology, 15(4), pp. 552-570.

Babatunde, S O and Ekundayo, D (2019) Barriers to the incorporation of BIM into quantity surveying undergraduate curriculum in the Nigerian universities. Journal of Engineering, Design and Technology, 17(3), pp. 629-648. ISSN 1726-0531

Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Babatunde, S O; Perera, S; Ekundayo, D and Adeleke, D S (2020) An investigation into BIM uptake among contracting firms: An empirical study in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 23-48. ISSN 1366-4387

Babatunde, S O; Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(1), pp. 81-110. ISSN 1471-4175

Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2015) Barriers to public private partnership projects in developing countries: A case of Nigeria. Engineering, Construction and Architectural Management, 22(6), pp. 669-691. ISSN 0969-9988

Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2016) Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environment Project and Asset Management, 6(1), pp. 74-91. ISSN 2044-124X

Babatunde, S O; Udeaja, C and Adekunle, A O (2021) Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. International Journal of Building Pathology and Adaptation, 39(1), pp. 48-71. ISSN 23984708

Babon-Ayeng, P; Kissi, E; Tannor, R A; Aigbavboa, C and Badu, E (2024) Critical success factors (CSFs) for the adoption of green construction concepts in road construction in Ghana. International Journal of Construction Management, 24(13), pp. 1465-1474. ISSN 1562-3599

Baborska-Narożny, M and Stevenson, F (2019) Service controls interfaces in housing: Usability and engagement tool development. Building Research & Information, 47(3), pp. 290-304. ISSN 0961-3218

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.

Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771

Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007

Badamasi, A A; Aryal, K R; Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(3), pp. 1307-1318. ISSN 0969-9988

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Badathuruge, Chamari Pamoshika Jayarathna (2023) Transforming logistics systems towards sustainability and circular economy. PhD thesis, Queensland University of Technology, Australia.

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.

Baden-Hellard, R (1996) The partnering philosophy: A procurement strategy for satisfaction through a teamwork solution to project quality. Journal of Construction Procurement, 2(1), pp. 41-55. ISSN 1358-9180

Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X

Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(1), pp. 21-37. ISSN 1358-9180

Badi, S (2017) Public sustainable-energy requirements and innovation in UK PFI school projects. Construction Management and Economics, 35(4), pp. 218-238. ISSN 01446193

Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Badu, E; Edwards, D J; Owusu-Manu, D and Brown, D M (2012) Barriers to the implementation of innovative financing (IF) of infrastructure. Journal of Financial Management of Property and Construction, 17(3), pp. 253-273. ISSN 1366-4387

Badu, E; Owusu-Manu, D G; Edwards, D J and Holt, G D (2013) Analysis of strategic issues underpinning the innovative financing of infrastructure within developing countries. Journal of Construction Engineering and Management, 139(6), pp. 726-737. ISSN 0733-9364

Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bagheri, M; Roth, L; Siebke, L; Rohde, C and Linke, H J (2024) Implementing housing policies for a sufficient lifestyle. Buildings & Cities, 5(1), pp. 300-315. ISSN 2632-6655

Baharuddin, H E A; Ibrahim, C K I C; Costello, S B and Wilkinson, S (2017) Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 151-160. ISSN 17514304

Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988

Bahrami, S (2021) Product information quality: A sustainability challenge in design and construction. PhD thesis, Lund University, Sweden.

Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: Lessons from the grenfell tower fire. Smart and Sustainable Built Environment, 12(3), pp. 488-506. ISSN 2046-6099

Bai, L; Shi, H; Kang, S and Zhang, B (2023) Project portfolio risk analysis with the consideration of project interdependencies. Engineering, Construction and Architectural Management, 30(2), pp. 647-670. ISSN 0969-9988

Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bailey, M; Booth, C A; Horry, R; Vidalakis, C; Mahamadu, A M and Awuah, K G B (2020) Opinions of small and medium UK construction companies on environmental management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 23-34. ISSN 17514304

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988

Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099

Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531

Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988

Bajpai, A and Misra, S C (2023) A framework for continuation of digitalization in construction: A PLS-SEM approach. Engineering, Construction and Architectural Management, 30(10), pp. 4715-4734. ISSN 0969-9988

Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(4), pp. 865-891. ISSN 1471-4175

Bajracharya, A (2009) Implementation of innovation on construction projects: A behavioral perspective. PhD thesis, National University of Singapore, Singapore.

Bakar, F A; Cheung, C M; Kaltungo, A Y; Mohandes, S R and Lou, E (2024) Key organisational attributes for developing a maturity model: Adopting immersive technologies in construction safety training. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364

Baker, H (2021) A multimethod approach to learning from text-based construction failure data. PhD thesis, University of Edinburgh, UK.

Baker, S; Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(2), pp. 205-213. ISSN 01446193

Baker, Scott William (1997) Risk management in major projects. PhD thesis, University of Edinburgh, UK.

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Bakogiannis, A (2005) Managing stakeholders: A case study in Athens, Greece. PhD thesis, University College London, UK.

Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988

Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364

Balasubramanian, S (2017) Green supply chain management: an investigation on the construction sector. PhD thesis, Middlesex University, UK.

Baldissera, P and Delprete, C (2020) From PBL to innovation: A decennial case-study from an HPV student team. Journal of Engineering, Design and Technology, 18(4), pp. 773-786. ISSN 1726-0531

Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.

Balgheeth, Y (2016) Enhancing existing health and safety processes in public sector construction projects within Saudi Arabia using building information modelling approaches. PhD thesis, University of Salford, UK.

Ball, D and Fortune, C (2000) Building project procurement processes and the development of environmentally friendly housing schemes. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballal, T M A and Sher, W D (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(4), pp. 263-271. ISSN 0969-9988

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193

Ballesteros-Pérez, P; Phua, F T T and Mora-Melià, D (2019) Human resource allocation to multiple projects based on members' expertise, group heterogeneity, and social cohesion. Journal of Construction Engineering and Management, 145(2): 04018134, ISSN 0733-9364

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Balogun, T B and Shahid, T (2022) Exploring the adoption of platform-based design for manufacture and assembly in the UK construction sector: A stakeholder perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Baloi, D (2003) Sustainable construction: Challenges and opportunities. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599

Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.

Bandara, C; Dissanayake, D M P P; Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(5), pp. 515-527. ISSN 2044-124X

Bangaru, S S; Wang, C; Zhou, X; Jeon, H W and Li, Y (2020) Gesture recognition-based smart training assistant system for construction worker earplug-wearing training. Journal of Construction Engineering and Management, 146(12): 04020144, ISSN 0733-9364

Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Banihashemi, S; Assadimoghadam, A; Hajirasouli, A; LeNguyen, K and Mohandes, S R (2025) Parametric design in construction: A new paradigm for quality management and defect reduction. International Journal of Construction Management, 25(13), pp. 1534-1551. ISSN 1562-3599

Banks, N A (2006) “The last bastion of discrimination”: The New York city building trades and the struggle over affirmative action, 1961–1976. PhD thesis, Columbia University, USA.

Bansal, V K (2012) Application areas of GIS in construction projects and future research directions. International Journal of Construction Management, 12(4), pp. 17-36. ISSN 1562-3599

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.

Banyte, J (2020) A framework development to facilitate the effective management of a sustainable commercial property market. PhD thesis, Liverpool John Moores University, UK.

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Bappa Salisu, J (2016) The impact of compensation on public sector construction workers in Jigawa State of Nigeria. PhD thesis, University of Wolverhampton, UK.

Barai, N and Faruk, M (2025) Analyzing physical environment of child friendly spaces in emergencies: In the context of rohingya crisis at cox's bazar, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 224-241. ISSN 1759-5908

Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(2), pp. 197-209. ISSN 0969-9988

Barkokebas, B; Khalife, S; Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(8), pp. 2155-2175. ISSN 0969-9988

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Baron, N and Cherenet, Z (2018) Perceptions and pathways of resilience in Addis Ababa. International Journal of Building Pathology and Adaptation, 36(4), pp. 337-352. ISSN 23984708

Barqawi, M; Chong, H Y and Lopez, R (2023) Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays. International Journal of Construction Management, 23(16), pp. 2788-2803. ISSN 1562-3599

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barraket, J and Loosemore, M (2018) Co-creating social value through cross-sector collaboration between social enterprises and the construction industry. Construction Management and Economics, 36(7), pp. 394-408. ISSN 01446193

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Barrett, M (2009) Forum policy challenges for building stocks. Building Research & Information, 37(2), pp. 201-205. ISSN 0961-3218

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Barros, Natalia Nakamura (2024) Integrative model of life cycle assessment with internet of things, BIM and machine learning. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barros D'Sa, A A J (2003) Changes in the liabilities and concerns of the construction professions at the turn of the 21st century. PhD thesis, University of Manchester, UK.

Barry, S; Cronin, W; Spillane, J P and Bradley, J G (2021) Compliance with COVID-19 regulations in micro-enterprises and SMEs in the Irish construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Barry, W; Leite, F and O'Brien, W J (2015) Late deliverable risk catalog: Evaluating the impacts and risks of late deliverables to construction sites. Journal of Construction Engineering and Management, 141(4): 04014087, ISSN 0733-9364

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099

Bartlett, H V (2006) Understanding the implementation of sustainability principles in UK educational building projects. PhD thesis, University of Cambridge, UK.

Bartley, E A (2013) Assessing the potential application of online social networks for the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Basaran, Y.; Aladag, H. and Isik, Z. (2026) Machine learning-based dynamic model for on-site subcontractor performance management. Engineering, Construction and Architectural Management, 33(7), pp. 5592-5624. ISSN 0969-9988

Bashir, A M (2013) A framework for utilising lean construction strategies to promote safety on construction sites. PhD thesis, University of Wolverhampton, UK.

Bashir, Muhammad Rizwan (2022) Big data management and analytics framework for IoT-enabled smart buildings. PhD thesis, University of Technology Sydney, Australia.

Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.

Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007

Bastem, S S and Cekmis, A (2022) Development of historic building information modelling: A systematic literature review. Building Research & Information, 50(5), pp. 527-558. ISSN 0961-3218

Bastos, J; Batterman, S A and Freire, F (2016) Significance of mobility in the life-cycle assessment of buildings. Building Research & Information, 44(4), pp. 376-393. ISSN 0961-3218

Basílio, M d S B (2011) Infrastructure public-private partnerships risk factors and agents' participation. PhD thesis, Universidade Tecnica de Lisboa, Portugal.

Batarseh, Sana (2025) An approach to adjusting design build for the modern construction industry. PhD thesis, Arizona State University, USA.

Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.

Bateman, G H (2009) The IChemE international forms of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 169-174. ISSN 17514304

Batista, L T; Franco, J R Q; Fakury, R H; Porto, M F; Alves, L V R and Kohlmann, G S (2024) BIM-IoT-FM integration: strategy for implementation of sustainable water management in buildings. Smart and Sustainable Built Environment, 13(5), pp. 1096-1116. ISSN 2046-6099

Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.

Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364

Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364

Baumgärtner, C E (2000) Collaboration between engineering consultants and their clients: characteristics of success. PhD thesis, University of Cambridge, UK.

Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms. PhD thesis, Heriot-Watt University, UK.

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.

Bayat, F.; Noorzai, E. and Golabchi, M. (2019) Identifying the most important public–private partnership risks in afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, F; Noorzai, E and Golabchi, M (2019) Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364

Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(2), pp. 41-56. ISSN 2204-9029

Bazzan, J; Echeveste, M; Formoso, C T and Kowalski, J D S (2024) A data-driven customer complaint management model for residential building companies. Architectural Engineering and Design Management, 20(6), pp. 1381-1402. ISSN 1745-2007

Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599

Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.

Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599

Beatham, S (2003) Development of an integrated business improvement system for construction. EngD thesis, Loughborough University, UK.

Becerik, B (2004) Suggestions for improving adoption of online collaboration and project management technology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.

Becerik-Gerber, B; Jazizadeh, F; Li, N and Calis, G (2012) Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management, 138(3), pp. 431-442. ISSN 0733-9364

Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.

Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.

Beemsterboer, S and Koch, C (2017) A human touch: Examining the roles of middle managers for innovation in contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Beg, Z A (2015) Complexity, contract design and incentive design in the construction management industry. DBA thesis, Harvard University, USA.

Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.

Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364

Behnisch, M and Ultsch, A (2009) Urban data-mining: Spatiotemporal exploration of multidimensional data. Building Research & Information, 37(5-6), pp. 520-532. ISSN 0961-3218

Beitelmal, W; Molenaar, K R; Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(6), pp. 1184-1202. ISSN 0969-9988

Beitelmal, W H (2016) Towards an infrastructure asset management organizational model for developing countries. PhD thesis, University of Colorado at Boulder, USA.

Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007

Belayutham, S and Ibrahim, C K I C (2019) Barriers and strategies for better safety practices: The case of construction SMEs in Malaysia. Construction Economics and Building, 19(1), pp. 20-39. ISSN 2204-9029

Belayutham, S; Ibrahim, K I and Hussain, A (2019) Shaping the future of prevention through design (PTD) practice in the Malaysian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Belayutham, S; Zabidin, N S and Ibrahim, C K I C (2018) Dynamic representation of barriers for adopting building information modelling in Malaysian tertiary education. Construction Economics and Building, 18(4), pp. 24-44. ISSN 2204-9029

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.

Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.

Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364

Bell, L C and McCullouch, B G (1983) Microcomputer spreadsheet applications. Journal of Construction Engineering and Management, 109(2), pp. 214-223. ISSN 0733-9364

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market. PhD thesis, University of Strathclyde, UK.

Bello, A. O. (2026) Towards achieving circular economy in the Nigerian construction industry: Policymakers perspectives and conceptual framework development. Smart and Sustainable Built Environment, 15(3), pp. 1391-1411. ISSN 2046-6099

Bello, A O; Isa, R B; Oke, A E; Arogundade, S and Lewis, J M O (2026) Circular economy implementation in the construction industry: An examination of the barriers in a developing country. International Journal of Building Pathology and Adaptation, 44(1), pp. 143-162. ISSN 2398-4708

Bello, A O; Okanlawon, T T; Gbenga, P O; Abdulraheem, A A and Olagoke, O T (2026) Critical success factors (csfs) for the implementation of distributed ledger technology (dlt) in the Nigerian construction industry. Construction Innovation, 26(2), pp. 531-550. ISSN 1471-4175

Bello, A O; Abdulraheem, A A; Agboola, S A and Afolabi, O P (2025) Factors influencing the adoption of distributed ledger technology in developing countries: An examination of Nigerian construction industry. International Journal of Construction Education and Research, 21(3), pp. 290-320. ISSN 1557-8771

Bello, A O; Eje, D O; Idris, A; Semiu, M A and Khan, A A (2024) Drivers for the implementation of modular construction systems in the AEC industry of developing countries. Journal of Engineering, Design and Technology, 22(6), pp. 2043-2062. ISSN 1726-0531

Bello, A O; Isa, R B; Afolabi, O P; Arogundade, S and Khan, A A (2025) Drivers for the implementation of circular economy in the Nigerian aeco industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(3), pp. 953-972. ISSN 1726-0531

Bello, A O; Khan, A A; Idris, A and Awwal, H M (2024) Barriers to modular construction systems implementation in developing countries' architecture, engineering and construction industry. Engineering, Construction and Architectural Management, 31(8), pp. 3148-3164. ISSN 0969-9988

Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Ben-Alon, L (2020) Natural buildings: Integrating earthen building materials and methods into mainstream construction. PhD thesis, Carnegie Mellon University, USA.

Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.

Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175

Bengtsson, S H (2017) Innovation in the construction industry: Factors, actors and the client's role. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Bengtsson, S H and Rosander, L (2018) Public clients' possibilities to initiate sustainable change: Exploring two Swedish clients' procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Benmansour, C and Hogg, K (2002) An investigation into the barriers to innovation and their relevance within the construction sector. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Benn, M and Stoy, C (2024) Challenges impairing the data quality of information deliverables in BIM during the planning phase of office buildings in Germany. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.

Bennett, J (1983) Project management in construction. Construction Management and Economics, 1(3), pp. 183-197. ISSN 01446193

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Benster, N A (1970) A study and assessment of water penetration and rapid deterioration in existing dwellings-developed as a guide to future building design, production and maintenance management. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Bentivegna, V; Curwell, S; Deakin, M; Lombardi, P; Mitchell, G and Nijkamp, P (2002) A vision and methodology for integrated sustainable urban development: Bequest. Building Research & Information, 30(2), pp. 83-94. ISSN 0961-3218

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988

Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Berg, J B; Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change: a case study of the Danish model of strategic partnerships. Construction Innovation, 23(3), pp. 665-682. ISSN 1471-4175

Berker, T and Woods, R (2025) Resistance against zero-emission neighbourhood infrastructuring: Key lessons from Norway. Buildings & Cities, 6(1), pp. 345-358. ISSN 2632-6655

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Bertolin, C and Berto, F (2024) Sustainable management of heritage buildings in long-term perspective (symbol): Current knowledge and further research needs. International Journal of Building Pathology and Adaptation, 42(1), pp. 1-17. ISSN 23984708

Bertz, M D (1998) Situated learning methodologies and assessment in civil engineering structures education. PhD thesis, Georgia Institute of Technology, USA.

Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450

Besaiso, H; Fenn, P; Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry. Engineering, Construction and Architectural Management, 25(2), pp. 241-256. ISSN 0969-9988

Betts, M (1991) Achieving and measuring flexibility in project information retrieval. Construction Management and Economics, 9(3), pp. 231-245. ISSN 01446193

Betts, M; Cher, L; Mathur, K and Ofori, G (1991) Strategies for the construction sector in the information technology era. Construction Management and Economics, 9(6), pp. 509-528. ISSN 01446193

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(3), pp. 295-311. ISSN 0969-9988

Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.

Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), pp. 2818-2829. ISSN 1562-3599

Bhandari, S; Hallowell, M R; Alruqi, W and Salas, R (2021) Modeling the relationship between personal risk tolerance, work-related risk tolerance, and risk-taking behavior of construction workers. Journal of Construction Engineering and Management, 147(4), ISSN 0733-9364

Bhanu, A C (2024) Integrating artificial intelligence and augmented reality for enhanced task performance in the construction industry. PhD thesis, Clemson University, USA.

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhatt, N and Sarkar, D (2020) Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. International Journal of Construction Management, 20(6), pp. 653-665. ISSN 1562-3599

Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(5), pp. 1397-1422. ISSN 0969-9988

Bhavsar, V; Thomas Alex, S; Vaishnav, P K; Jose, A; Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), pp. 2905-2913. ISSN 1562-3599

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bhutto, K H (2004) The application of integrated management systems by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Bhutto, Khalid Hussain (2004) The application of integrated management systems (IMS) by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Biagi, Silvia (2025) BIM for public administration: Critical investigation of the European situation and implementation perspectives for the Italian case. PhD thesis, Università degli Studi di Pisa, Italy.

Bibby, L (2003) Improving design management techniques in construction. EngD thesis, Loughborough University, UK.

Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988

Bidhendi, A.; Poshdar, M.; Babaeian Jelodar, M.; Rahimian, F. and González, V. A. (2026) Human-centric integrated change management framework for digital transformation in construction. Engineering, Construction and Architectural Management, 33(3), pp. 2048-2070. ISSN 0969-9988

Biggins, D (2018) An exploratory investigation into how project management methods are chosen and implemented by organisations in the UK. PhD thesis, University of Manchester, UK.

Bijivemula, S K R; Sai, S J and Chepuri, A (2024) A structural equation model of stakeholder roles in the implementation of green construction strategies in the Indian construction industry. International Journal of Construction Management, 24(5), pp. 486-494. ISSN 1562-3599

Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771

Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: Literature review on BIM and IPD framework. Construction Innovation, 21(4), pp. 723-742. ISSN 1471-4175

Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193

Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.

Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364

Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364

Bingol, B N and Polat, G (2015) Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Bird, B (1987) Costs-in-use: Principles in the context of building procurement. Construction Management and Economics, 5(4), ISSN 01446193

Bird, R and Wearne, S (2017) Contract structure for nuclear power projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 131-137. ISSN 17514304

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Birgonul, M T and Ozdogan, I (1998) A proposed framework for governmental organizations in the implementation of build-operate-transfer (BOT) model. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Birkes, A Y (1999) Multimedia data definition and requirements for construction applications. PhD thesis, Georgia Institute of Technology, USA.

Birnie, J (1998) Risk allocation to the construction firm within a private finance initiative (PFI) project. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Birnie, J (1999) Private Finance Initiative (PFI): UK construction industry response. Journal of Construction Procurement, 5(1), pp. 5-14. ISSN 1358-9180

Biscaya, S V N (2012) Coordination and management of information for construction design projects: a framework for Portugal. PhD thesis, University of Salford, UK.

Biswas, A (2019) Exploring Indian post-disaster temporary housing strategy through a comparative review. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 14-35. ISSN 1759-5916

Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Björk, B (2002) A formalised model of the information and materials handling activities in the construction process. Construction Innovation, 2(3), pp. 133-149. ISSN 1471-4175

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.

Blay, K B; Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-level 2 projects: Benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(5), pp. 581-596. ISSN 2044-124X

Blay-Armah A, R A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Blayse, A M and Manley, K (2004) Key influences on construction innovation. Construction Innovation, 4(3), pp. 143-154. ISSN 1471-4175

Blaza, S (1995) Implementing an integrated management information system in a medium sized construction firm. PhD thesis, Sheffield Hallam University, UK.

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175

Blismas, N G and Dainty, A R J (2003) Computer-aided qualitative data analysis: Panacea or paradox? Building Research & Information, 31(6), pp. 455-463. ISSN 0961-3218

Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.

Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364

Boadu, E F; Sunindijo, R Y; Wang, C C and Frimpong, S (2023) Factors constraining the promotion of health and safety in public works procurement in developing countries. International Journal of Construction Management, 23(9), pp. 1611-1621. ISSN 1562-3599

Boadu, E F; Sunindijo, R Y; Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(3), pp. 43-64. ISSN 2204-9029

Boadu, Elijah Frimpong (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana. PhD thesis, University of New South Wales, Australia.

Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531

Boamah, F A; Zhang, J; Shehzad, M U; Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(2), pp. 404-421. ISSN 1726-0531

Boateng, R. K.; Booth, C. A.; Horry, R. E.; Wiejak-Roy, G. A.; Agyekum, K.; Al-Tarazi, D.; Joseph, R.; Manu, P. and Prabhakaran, A. (2025) Implementing environmental management systems (ISO 14001) in the construction sector of Ghana. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 244-254. ISSN 1751-4304

Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.

Boeing Singh, L and Kalidindi, S N (2009) Criteria influencing debt financing of Indian PPP road projects: A case study. Journal of Financial Management of Property and Construction, 14(1), pp. 34-60. ISSN 1366-4387

Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Boes, H and Dorée, A (2011) The development of public procurement at local level in the Netherlands: A longitudinal study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Boes, H; Dorée, A and Veen, B v d (2002) First evaluation of new scheme for design-construct procurement in the Netherlands. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Boes, H and Holmen, E (2003) Changing supplier-customer interfaces in design-construct contracts? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Boes H, D A (2013) Public procurement at local level in the Netherlands: Towards a better client-contractor cooperation in a competitive environment. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bohn, J S and Teizer, J (2010) Benefits and barriers of construction project monitoring using high-resolution automated cameras. Journal of Construction Engineering and Management, 136(6), pp. 632-640. ISSN 0733-9364

Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967. EdD thesis, Stanford University, USA.

Boissonneault, A and Peters, T (2023) Concepts of performance in post-occupancy evaluation post-probe: A literature review. Building Research & Information, 51(4), pp. 369-391. ISSN 0961-3218

Bolchover, J and Mundle, K (2026) Post-disaster reconstruction: Infill housing prototypes for kathmandu. Buildings & Cities, 7(1), pp. 273-292. ISSN 2632-6655

Boles, W W; Maxwell, D A; Scott, W D; Heermann, P D; Yarborough, T and Underwood, J (1995) Construction automation and robotics–pathway to implementation. Journal of Construction Engineering and Management, 121(1), pp. 143-152. ISSN 0733-9364

Bologna, R and Del Nord, R (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(2), pp. 109-118. ISSN 0961-3218

Bon, R and Hutchinson, K (2000) Sustainable construction: Some economic challenges. Building Research & Information, 28(5-6), pp. 310-314. ISSN 0961-3218

Bonanomi, Marcella Maria Melania Teodora (2018) Digital transformation of multidisciplinary design firms: A systematic analysis-based approach to change management. PhD thesis, Politecnico di Milano, Italy.

Bond, S (2015) Residents' perceptions of risk towards residential property in Canterbury NZ subsequent to the earthquakes. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 234-267. ISSN 1759-5916

Bong, S; Rameezdeen, R; Zuo, J; Li, R Y M and Ye, G (2015) The designer's role in workplace health and safety in the construction industry: Post-harmonized regulations in South Australia. International Journal of Construction Management, 15(4), pp. 276-287. ISSN 1562-3599

Bonham, M B (2013) Leading by example: New professionalism and the government client. Building Research & Information, 41(1), pp. 77-94. ISSN 0961-3218

Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364

Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.

Borba, Maria Lucia Guilherme (2014) Technical-scientific and sociopolitical aspects of urban water management: Stormwater drainage in the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218

Borer, J (2020) Object oriented design of safety critical programmable equipment systems. Journal of Engineering, Design and Technology, 18(5), pp. 1081-1089. ISSN 1726-0531

Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies. PhD thesis, KTH Royal Institute of Technology, Sweden.

Borg, L and Lind, H (2014) Framework for structuring procurement contracts. Construction Economics and Building, 14(4), pp. 71-84. ISSN 2204-9029

Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.

Borthwick, F (2002) The impact of the European Construction Products Directive on UK construction product manufacturers. PhD thesis, De Montfort University, UK.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Boser, R A and El-Gafy, M (2011) Accelerating waste minimization in residential construction: A source separation case study. International Journal of Construction Education and Research, 7(1), pp. 58-70. ISSN 1557-8771

Bosfield, R; Gibson, G E and Din, Z U (2026) Open repository development framework for knowledge sharing: Best practices in the architecture, engineering, and construction industry. International Journal of Construction Management, 26(1), pp. 12-28. ISSN 1562-3599

Bosfield, R (2014) Feasibility of an open source repository for increasing the usage of best practices in the architecture-engineering-construction industry. PhD thesis, Arizona State University, USA.

Bosher, L; Dainty, A; Carrillo, P; Glass, J and Price, A (2007) Integrating disaster risk management into construction: A UK perspective. Building Research & Information, 35(2), pp. 163-177. ISSN 0961-3218

Bosserman, B E and Ford, M E (1984) Development of computerized specifications. Journal of Construction Engineering and Management, 110(3), pp. 375-384. ISSN 0733-9364

Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304

Botha, P S; van der Walt, J D; Scheepbouwer, E and Barutha, P J (2024) A tool for reporting the optimal timing of preconstruction services in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 240-252. ISSN 17514304

Botti, A and Ramos, M (2017) Adapting the design of a new care home development for a changing climate. International Journal of Building Pathology and Adaptation, 35(4), pp. 417-433.

Bou Hatoum, Makram Bou (2023) Value propositions, adoption factors, and implementation considerations: Building a path towards construction innovation. PhD thesis, University of Kentucky, USA.

Bouachera, T; Kishk, M and Power, L (2007) Towards a generic framework for whole life costing in the oil industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007

Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.

Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X

Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Bowen, P A; Cattel, K S; Hall, K A; Edwards, P J and Pearl, R G (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(2), pp. 48-56. ISSN 2204-9029

Bowen, P A; Edwards, P J and Cattell, K (2012) Corruption in the South African construction industry: A thematic analysis of verbatim comments from survey participants. Construction Management and Economics, 30(10), pp. 885-901. ISSN 1466433X

Bowen, P A; Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91-104. ISSN 0969-9988

Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Bowes, D C (2020) An aspirations-led capabilities approach to women's career pathways in quantity surveying. PhD thesis, University of Westminster, UK.

Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988

Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.

Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Boyd, D (2021) A critical inquiry into the hyperreality of digitalization in construction. Construction Management and Economics, 39(7), pp. 549-564. ISSN 01446193

Boyd, D and Gichuhi, F (2003) Studying site meetings in projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Boyd, N J P (2016) From bicycles to buildings: a SCOT analysis of project level adoption of BIPV. PhD thesis, University of Reading, UK.

Boyd, P and Harding, D (2025) Generative AI: reconfiguring supervision and doctoral research. Buildings & Cities, 6(1), pp. 294-309. ISSN 2632-6655

Boyd, P; Larsen, G D and Schweber, L (2014) Perspectives on the specification of building integrated photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193

Boyes, G (2021) Towards BIM/GIS interoperability: a theoretical framework and practical generation of spaces to support infrastructure Asset Management. PhD thesis, University College London, UK.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988

Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175

Brady, T; Davies, A and Gann, D (2005) Can integrated solutions business models work in construction? Building Research & Information, 33(6), pp. 571-579. ISSN 0961-3218

Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193

Brahmi, B F; Sassi Boudemagh, S; Kitouni, I and Kamari, A (2022) IPD and BIM-focussed methodology in renovation of heritage buildings. Construction Management and Economics, 40(3), pp. 186-206. ISSN 01446193

Branch, H K (2018) Strategies construction project managers use to create environmental sustainability in construction projects. PhD thesis, Walden University, USA.

Branco Pedro, J; Meijer, F and Visscher, H (2009) The Portuguese building regulation system: A critical review. International Journal of Law in the Built Environment, 1(2), pp. 156-171. ISSN 1756-1450

Brand, M C and Davenport, P (2011) Proposal for a "dual scheme" model of statutory adjudication for the Australian building and construction industry. International Journal of Law in the Built Environment, 3(3), pp. 252-268. ISSN 1756-1450

Brandalise, F M P; Formoso, C T and Viana, D D (2022) Development of a typology for understanding visual management concepts and their relationships. Journal of Construction Engineering and Management, 148(7): 04022041, ISSN 0733-9364

Brandon, P (2012) Sustainable development: Ignorance is fatal: what don't we know? Smart and Sustainable Built Environment, 1(1), pp. 14-28. ISSN 2046-6099

Brandon, P S and Loforte Ribeiro, F (1997) The assessment of applications for the house renovation grant system (hrgs): A multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(1), pp. 41-57. ISSN 0969-9988

Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(1), pp. 57-69. ISSN 01446193

Brandão, R; Hosseini, M R; Macêdo, A N; Melo, A C and Martek, I (2022) Public administration strategies that stimulate reverse logistics within the construction industry: A conceptual typology. Engineering, Construction and Architectural Management, 29(8), pp. 2924-2949. ISSN 0969-9988

Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.

Brawn, D (2012) Extensions of time and liquidated damages in construction contracts in England and Wales. International Journal of Law in the Built Environment, 4(1), pp. 75-90. ISSN 1756-1450

Bremer, W and Kok, K (2000) The Dutch construction industry: A combination of competition and corporatism. Building Research & Information, 28(2), pp. 98-108. ISSN 0961-3218

Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.

Brennan M, C A (2013) Development of a measure to assess attitudes towards sustainable development in the built environment: A pilot. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bresnen, M; Lennie, S J and Marshall, N (2025) Partnering in construction re-visited: Gauging progress in industry practice and prospects for advances in academic research. Construction Management and Economics, 43(1), pp. 59-77. ISSN 0144-6193

Bresnen, M and Marshall, N (1998) Partnering strategies and organizational cultures in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bresnen, M and Marshall, N (2000) Partnering in construction: A critical review of issues, problems and dilemmas. Construction Management and Economics, 18(2), pp. 229-237. ISSN 01446193

Bresnen, M and Marshall, N (2000) Building partnerships: Case studies of client-contractor collaboration in the UK construction industry. Construction Management and Economics, 18(7), pp. 819-832. ISSN 01446193

Bresnen, M and Marshall, N (2000) Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), pp. 587-598. ISSN 01446193

Bresnen, M and Marshall, N (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(5-6), pp. 335-345. ISSN 0969-9988

Bresnen, M and Swan, J (2002) Understanding the implementation of new management initiatives in the construction firm. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Bresnen, M J (1991) Construction contracting in theory and practice: A case study. Construction Management and Economics, 9(3), pp. 247-262. ISSN 01446193

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175

Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X

Bridge, C and Carnemolla, P (2014) An enabling BIM block library: An online repository to facilitate social inclusion in Australia. Construction Innovation, 14(4), pp. 477-492. ISSN 1471-4175

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Bright, S (2010) Carbon reduction and commercial leases in the UK. International Journal of Law in the Built Environment, 2(3), pp. 218-231. ISSN 1756-1450

Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies. PhD thesis, Purdue University, USA.

Brito, D M D; Ferreira, E D A M and Costa, D B (2021) Framework for building information modeling adoption based on critical success factors from Brazilian public organizations. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364

Brncich, A; Shane, J S; Strong, K C and Passe, U (2011) Using integrated student teams to advance education in sustainable design and construction. International Journal of Construction Education and Research, 7(1), pp. 22-40. ISSN 1557-8771

Brocklehurst, F; Morgan, E; Greer, K; Wade, J and Killip, G (2021) Domestic retrofit supply chain initiatives and business innovations: An international review. Buildings & Cities, 2(1), pp. 533-549. ISSN 2632-6655

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Broft, Rafaella; Badi, Sulafa M and Pryke, Stephen David (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187-204. ISSN 2044-124X

Brogan, Elizabeth A (2022) Drainage design engineering risk on design-build transportation projects. PhD thesis, University of Colorado at Denver, USA.

Brooks, T (2020) Implementation and effectiveness of the ISO 9001 quality management system in the construction sector in the UK and Ireland. PhD thesis, Queen's University Belfast, UK.

Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193

Brooks, T and Spillane, J (2017) Lies, damned lies and quality management systems: A pilot case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Brooks, T; Spillane, J; Tansey, P and Hendron, C (2016) The impact of the recent economic recession on the operation of the NEC contract in Northern Ireland. Construction Management and Economics, 34(6), pp. 393-417. ISSN 01446193

Brooks, T and Spillane, J P (2015) The impact of the recent economic recession on the NEC contract in Northern Ireland: A preliminary study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(4), pp. 271-285. ISSN 0969-9988

Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.

Brown, V (2004) Making home: A study of recent self-build projects in the UK. PhD thesis, De Montfort University, UK.

Bruce, R D; Gebken, R J and Strong, S D (2010) Evaluating self-perceived benefits of credentials in the building design and construction community: Cpc, LEED-ap, and dbia. International Journal of Construction Education and Research, 6(3), pp. 165-178. ISSN 1557-8771

Brumme, J (2013) The role of organisational behaviour in establishing a corporate academy in the construction industry. PhD thesis, University of Pretoria, South Africa.

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029

Bu, Guoping (2013) Development of an integrated deterioration method for long-term bridge performance prediction. PhD thesis, Griffith University, Australia.

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Budayan, C; Koc, K; Erk, E Y and Tokdemir, O B (2025) Uncovering value creation factors for healthcare public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(8), pp. 5456-5483. ISSN 0969-9988

Bueno, C; Pereira, L M and Fabricio, M M (2018) Life cycle assessment and environmental-based choices at the early design stages: An application using building information modelling. Architectural Engineering and Design Management, 14(5), pp. 332-346. ISSN 1745-2007

Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599

Buhl, H; Andersen, M and Harty, J (2020) Construction industry 4.0: Entangling colliding practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Buhl, H; Andersen, M and Klitgaard, A (2019) Boundary objects: Supporting better collaborative practice and research. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Bukari, C; Kheni, N A; Boateng, I; Owusu-Ansah, C M and Simpson, K B (2026) Integrating knowledge management with total quality management to enhance construction project delivery in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029

Bullen, P A and Davis, P R (2003) Explorations in sustainable construction and procurement in western Australia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bunemer, Ricardo (2020) Construction 4.0 proposal for digital technological innovations for the civil construction sector: Case study of a smart house. PhD thesis, Universidade Estadual de Campinas, Brazil.

Buniya, M K; Wuni, I Y; Yousif, O S and Al-Mhdawi, M K S (2026) Quantifying the impact index of key barriers to safety program initiatives in the Iraqi construction industry. Construction Innovation, 26(1), pp. 286-309. ISSN 1471-4175

Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364

Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364

Burati, J L; Matthews, M F and Kalidindi, S N (1992) Quality management organizations and techniques. Journal of Construction Engineering and Management, 118(1), pp. 112-128. ISSN 0733-9364

Burcar, I and Radujkovic, M (2005) Risk registers in construction in Croatia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Burke, C K A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.

Burke, R D; Parrish, K and El Asmar, M (2018) Environmental product declarations: Use in the architectural and engineering design process to support sustainable construction. Journal of Construction Engineering and Management, 144(5): 04018026, ISSN 0733-9364

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burney, D and Claflin, A (2016) Practical considerations for implementing research on the indoor built environment. Building Research & Information, 44(3), pp. 342-344. ISSN 0961-3218

Burnside-Lawry, J and Carvalho, L (2016) A stakeholder approach to building community resilience: Awareness to implementation. International Journal of Disaster Resilience in the Built Environment, 7(1), pp. 4-25. ISSN 1759-5916

Burr, K L and Jones, C B (2010) The role of the architect: Changes of the past, practices of the present, and indications of the future. International Journal of Construction Education and Research, 6(2), pp. 122-138. ISSN 1557-8771

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.

Buser, M and Andersson, R (2023) Including circular value propositions in business portfolio: Examples from Swedish AEC companies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Buser, M and Carlsson, V (2015) Renewing renovation: Looking at renovation of owners occupied houses with socio-materiality lenses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Buser, M; Gottlieb, S C; de Gier, A and Andersson, R (2021) From concept to practice: Implementation of circular building as a process of translation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X

Bygballe, L E; Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), pp. 1322-1338. ISSN 0969-9988

Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Byrne, J; Clarke, L and Van Der Meer, M (2005) Gender and ethnic minority exclusion from skilled occupations in construction: A Western European comparison. Construction Management and Economics, 23(10), pp. 1025-1034. ISSN 01446193

Bélafi, Z D (2018) Analysis and modelling of occupant behaviour to support building design and performance optimisation. PhD thesis, Budapest University of Technology and Economics, Hungary.

Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X

Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement. PhD thesis, University of Gloucestershire, UK.

Cadman, D M (2009) Developing sustainability in the design and construction process. PhD thesis, Lancaster University, UK.

Caetano, I.; Pinto, D.; Amândio, M.; Silva, J.; Sanhudo, L.; Azenha, M.; El Sibaii, M.; Granja, J.; Patrício, H.; Ganhão, F. and Poças Martins, J. (2026) Algorithmic workflow for digitising inspection data in railway tunnel maintenance. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Cai, W.; Hua, D.; Li, S.; Xue, S. and Xu, Z. (2026) 3D reconstruction of building interiors based on scan-to-BIM and generative design for as-built building. Engineering, Construction and Architectural Management, 33(3), pp. 1959-1979. ISSN 0969-9988

Cai, H; Rahman, A; Su, X and Zhang, H (2014) A GIS-microscopic simulation approach for optimizing road barrier placement and configuration in university campus emergency evacuation. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 362-379. ISSN 1759-5916

Cai, J; Li, Z; Dou, Y; Li, T and Yuan, M (2023) Understanding adoption of high off-site construction level technologies in construction based on the TAM and ttf. Engineering, Construction and Architectural Management, 30(10), pp. 4978-5006. ISSN 0969-9988

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364

Caixeta, M C B F and Fabricio, M M (2013) A conceptual model for the design process of interventions in healthcare buildings: A method to improve design. Architectural Engineering and Design Management, 9(2), pp. 95-109. ISSN 1745-2007

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364

Calderon, C and Keirstead, J (2012) Modelling frameworks for delivering low-carbon cities: Advocating a normalized practice. Building Research & Information, 40(4), pp. 504-517. ISSN 0961-3218

Calhoun, M E (2015) Synergistic effects among leading indicators of construction safety management. PhD thesis, University of Alaska Fairbanks, USA.

Callaghan, N; Avery, T and Mulville, M (2017) Smart motorway' innovation for achieving greater safety and hard shoulder management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Callaghan, Stephen (2023) Model and strategies for early contractor involvement in large linear engineering construction projects. PhD thesis, Queensland University of Technology, Australia.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Cambra-Rufino, L.; Solís-García, G.; Carrasco Pérez, A.; López Maestro, M.; De la Cruz Bértolo, J.; Moral Pumarega, M. T.; Pallás Alonso, C. R. and Piris Borregas, S. (2026) The physical environment of neonatal intensive care units: A descriptive survey in Spain. Architectural Engineering and Design Management, 22(2), pp. 325-339. ISSN 1745-2007

Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(9), pp. 899-909. ISSN 1466433X

Campagnac, E (2000) The contracting system in the French construction industry: Actors and institutions. Building Research & Information, 28(2), pp. 131-140. ISSN 0961-3218

Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.

Camrass, K (2022) Urban regenerative thinking and practice: A systematic literature review. Building Research & Information, 50(3), pp. 339-350. ISSN 0961-3218

Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Cao, D; Shao, S; Huang, B and Wang, G (2022) Multidimensional behavioral responses to the implementation of BIM in construction projects: An empirical study in China. Engineering, Construction and Architectural Management, 29(2), pp. 819-841. ISSN 0969-9988

Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(4), pp. 268-284. ISSN 1557-8771

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.

Capitanio, M (2018) More green space in Japanese shopping streets: Assessing the manifold potential of green roofs in Shimokitazawa, Tokyo. Smart and Sustainable Built Environment, 7(2), pp. 212-222. ISSN 2046-6099

Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988

Capra, M (2010) Collaborative mixed reality environments: an application for civil engineering. PhD thesis, University of Nottingham, UK.

Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Carbonara, N; Costantino, N and Pellegrino, R (2015) A model for designing the tendering process in public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 146-156. ISSN 17514304

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(2), pp. 140-156. ISSN 01446193

Carbonari, G (2018) Sustainable facilities management with the support of building information modelling. PhD thesis, University of Greenwich, UK.

Cardoso, Aline Michelle (2022) Stakeholder management in building information modeling projects in the construction industry: Proposal of a framework for stakeholder identification and classification. PhD thesis, Universidade Nove de Julho, Brazil.

Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.

Cariaga, I; El-Diraby, T and Osman, H (2007) Integrating value analysis and quality function deployment for evaluating design alternatives. Journal of Construction Engineering and Management, 133(10), pp. 761-770. ISSN 0733-9364

Carlsson, V (2017) SME contractors on the stage for energy renovations? A dramaturgical perspective on SME contractors’ roles and interactions with house owners. PhD thesis, Chalmers University of Technology, Sweden.

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387

Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364

Carmichael, S (2002) The development of implementation processes for partnering in construction. PhD thesis, University of Salford, UK.

Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.

Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Carpenter, N and Bausman, D C (2016) Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10): 05016009, ISSN 0733-9364

Carpenter, W J (2004) Design and construction in architectural education: 1963-2003. PhD thesis, Birmingham City University, UK.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carrillo, P (2004) Managing knowledge: Lessons from the oil and gas sector. Construction Management and Economics, 22(6), pp. 631-642. ISSN 01446193

Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X

Carrière, S; Weigend Rodríguez, R; Pey, P; Pomponi, F and Ramakrishna, S (2020) Circular cities: The case of Singapore. Built Environment Project and Asset Management, 10(4), pp. 491-507. ISSN 2044-124X

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Carter, D J (2004) Developments in tubular daylight guidance systems. Building Research & Information, 32(3), pp. 220-234. ISSN 0961-3218

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. PhD thesis, Heriot-Watt University, UK.

Carter, K and Fortune, C (2003) Procuring sustainable projects: A grounded approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Cartigny, T and Lord, W (2019) Evaluating social value in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 8-16. ISSN 17514304

Cartwright, N (2016) Scientific models versus social reality. Building Research & Information, 44(3), pp. 334-337. ISSN 0961-3218

Carvalho, P F M (2023) Tectonics and material transformations: Exploring concrete in architecture through digital fabrication processes. PhD thesis, Universidade do Porto, Portugal.

Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364

Cass, N (2018) Energy-related standards and UK speculative office development. Building Research & Information, 46(6), pp. 615-635. ISSN 0961-3218

Cassandro, J; Mirarchi, C; Gholamzadehmir, M and Pavan, A (2025) Advancements and prospects in building information modeling (BIM) for construction: A review. Engineering, Construction and Architectural Management, 32(9), pp. 6006-6026. ISSN 0969-9988

Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175

Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.

Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364

Castaño-Rosa, R and Nerweyi, D (2025) Bringing post-occupancy evaluation up front to enhance energy efficiency in residential buildings. Building Research & Information, 53(8), pp. 1075-1091. ISSN 0961-3218

Castelblanco, G; Fenoaltea, E M; De Marco, A; Demagistris, P; Petruzzi, S and Zeppegno, D (2024) Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects. Journal of Construction Engineering and Management, 150(2): 04023161, ISSN 0733-9364

Castelblanco, G; Guevara, J; Mangano, G and Rafele, C (2024) Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. Construction Management and Economics, 42(9), pp. 802-821. ISSN 01446193

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364

Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Castle, C M (1999) Construction project networks: A study of internet-based interorganizational information systems in the building industry. DDes thesis, Harvard University, USA.

Castán Broto, V; Olazabal, M and Ziervogel, G (2024) Disrupting the imaginaries of urban action to deliver just adaptation. Buildings & Cities, 5(1), pp. 199-214. ISSN 2632-6655

Cecilia, M M (2016) Requirements for the effective statutory adjudication practice in the South African construction industry. PhD thesis, University of Pretoria, South Africa.

Cedstrand, E (2023) Evaluating occupational health interventions: Design, implementation, and effects. PhD thesis, Karolinska Institutet, Sweden.

Celis-D'Amico, F; Echeverria-Valiente, E; Garcia-Alvarado, R; Escorcia-Oyola, O and da Casa-Martín, F (2025) CASA+: Highly energy-efficient housing system for the central-south of Chile. Construction Innovation, 25(2), pp. 306-327. ISSN 1471-4175

Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364

Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.

Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.

Cerić, A and Ivić, I (2025) Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. Engineering, Construction and Architectural Management, 32(1), pp. 1-15. ISSN 0969-9988

Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193

Chakraborty, B and Das, S (2014) MGNEGRA and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), pp. 33-50. ISSN 1823-6499

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement? International Journal of Law in the Built Environment, 8(2), pp. 161-175. ISSN 1756-1450

Challender, J (2017) Trust in collaborative construction procurement strategies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 115-124. ISSN 17514304

Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304

Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Challender, J; Farrell, P and Sherratt, F (2016) Collaborative trust in UK further education (FE) procurement strategies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304

Challender J, F P S F (2013) Collaborative procurement: An exploration of practice and trust in times of austerity. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chamikara, K L; Perera, B A K S; Raigama Acharige, D P and Ekanayake, B (2026) Adaptability of BIM technology to mitigate the cost overruns in design and build projects. Construction Innovation, 26(2), pp. 464-490. ISSN 1471-4175

Chammout, B; El-Adaway, I H; Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9): 04024109, ISSN 0733-9364

Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029

Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180

Chan, A P C; Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), pp. 523-533. ISSN 01446193

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2010) Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management, 136(5), pp. 484-494. ISSN 0733-9364

Chan, A P C; Yung, E H K; Lam, P T I; Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), pp. 699-718. ISSN 01446193

Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, D M; Chan, A P C; Lam, P T I; Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(3), pp. 139-150. ISSN 1366-4387

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364

Chan, D W M; Hung, H T W; Chan, A P C and Lo, T K K (2014) Overview of the development and implementation of the mandatory building inspection scheme (MBIS) in Hong Kong. Built Environment Project and Asset Management, 4(1), pp. 71-89. ISSN 2044-124X

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Chan, D W M; Olawumi, T O and Ho, A M L (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(9), pp. 1838-1854. ISSN 0969-9988

Chan, D W M; Olawumi, T O; Saka, A B and Ekundayo, D (2024) Comparative analysis of the barriers to smart sustainable practices adoption in the construction industry between Hong Kong and Nigeria. International Journal of Construction Management, 24(14), pp. 1499-1509. ISSN 1562-3599

Chan, E H W and Au, M C Y (2009) Factors influencing building contractors' pricing for time-related risks in tenders. Journal of Construction Engineering and Management, 135(3), pp. 135-145. ISSN 0733-9364

Chan, E H W; Suen, H C H and Chan, S L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(2), pp. 253-271. ISSN 1609-9451

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, Man-Yin Ede (2018) Enablers for knowledge management implementation by large construction organisations in Hong Kong. PhD thesis, Griffith University, Australia.

Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364

Chan, T K and Hiap, P T (2012) A balanced scorecard approach to measuring industry performance. Journal of Construction in Developing Countries, 17(S1), pp. 23-41. ISSN 1823-6499

Chan, T K and Sundaraj, G (2009) Performance measures for the Malaysian construction industry development board. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chang, C Y (2013) A critical review of the application of tce in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(2), pp. 99-103. ISSN 1466433X

Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364

Chang, C Y and Chen, S (2016) Transitional public-private partnership model in China: Contracting with little recourse to contracts. Journal of Construction Engineering and Management, 142(10): 05016011, ISSN 0733-9364

Chang, C Y and Chou, H Y (2014) Transaction-cost approach to the comparative analysis of user-pay and government-pay public-private partnership systems. Journal of Construction Engineering and Management, 140(9): 04014039, ISSN 0733-9364

Chang, C Y; Chou, H Y and Wang, M T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(6), pp. 647-656. ISSN 1466433X

Chang, C Y and Ive, G (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20(3), pp. 275-284. ISSN 01446193

Chang, C Y and Ive, G (2007) Reversal of bargaining power in construction projects: Meaning, existence and implications. Construction Management and Economics, 25(8), pp. 845-855. ISSN 1466433X

Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364

Chang, C Y; Pan, W and Howard, R (2017) Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis. Journal of Construction Engineering and Management, 143(8): 04017044, ISSN 0733-9364

Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Chang, K (2004) Multiattribute weighting models for best-value selection in public sector design-build projects. PhD thesis, University of Colorado at Boulder, USA.

Chang, L M and Chen, P H (2001) BOT financial model: Taiwan high speed rail case. Journal of Construction Engineering and Management, 127(3), pp. 214-222. ISSN 0733-9364

Chang, L M; Georgy, M E and AbdelRazig, Y A (2000) Warranting quality of steel bridge coating. Journal of Construction Engineering and Management, 126(5), pp. 374-380. ISSN 0733-9364

Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index. PhD thesis, University of Texas at Austin, USA.

Chang, W and Xue, C Q L (2021) Government and its aid buildings: The governmental influence on the design and management of China-aided stadium projects after 2000. Architectural Engineering and Design Management, 17(1-2), pp. 36-49. ISSN 1745-2007

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics, 29(1), pp. 37-48. ISSN 1466433X

Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.

Chang Recavarren, L G (2023) Establishing the effect of building design on construction work. PhD thesis, Arizona State University, USA.

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X

Charalambous, N; Panayi, C; Mady, C; Augustinčić, T and Berc, D (2025) Youth engagement in urban living labs: Tools, methods and pedagogies. Buildings & Cities, 6(1), pp. 1061-1080. ISSN 2632-6655

Charbel, G; Assaad, R H; Tejada, T R and Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4): 04025022, ISSN 0733-9364

Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.

Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988

Charles, Robert Douglas (2025) An investigation into the performance and implementation of the early contractor involvement procurement model within the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Charles, S; Vidyaratne, H and Melagoda, D G (2020) Prospects and restraints of green roofs for high-rise buildings in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 246-260. ISSN 2044-124X

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4), pp. 800-817. ISSN 1471-4175

Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Charousaei, M; Faizi, M and Khakzand, M (2025) The impact of the visual layout of university open space on students' behavior and satisfaction level: The case of Iran University of Science and Technology. Smart and Sustainable Built Environment, 14(4), pp. 992-1016. ISSN 2046-6099

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.

Chavan, A. P.; Ghosh, S. and McCuen, T. (2026) Use of virtual reality in construction education: USA educators' perspectives. International Journal of Building Pathology and Adaptation, 44(4), pp. 849-866. ISSN 2398-4708

Chawathe, T; Devkar, G and Yesudasan, L (2024) Investigating the application of lean tools in the design of healthcare facilities. Architectural Engineering and Design Management, 20(4), pp. 868-890. ISSN 1745-2007

Che Ibrahim, C K I and Aaltonen, K (2025) The evolution of project alliancing in construction: Insights from a two-decade bibliometric review. Construction Management and Economics, 43(12), pp. 1022-1044. ISSN 0144-6193

Che Ibrahim, C K I and Belayutham, S (2020) A knowledge, attitude and practices (KAP) study on prevention through design: A dynamic insight into civil and structural engineers in Malaysia. Architectural Engineering and Design Management, 16(2), pp. 131-149. ISSN 1745-2007

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2013) Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), pp. 1128-1143. ISSN 1466433X

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2015) A fuzzy approach to developing scales for performance levels of alliance team integration assessment. Journal of Construction Engineering and Management, 141(5): 04014094, ISSN 0733-9364

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2017) Validation of a team integration assessment tool in road infrastructure alliance projects. International Journal of Construction Management, 17(2), pp. 151-164. ISSN 1562-3599

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2018) Making sense of team integration practice through the "lived experience" of alliance project teams. Engineering, Construction and Architectural Management, 25(5), pp. 598-622. ISSN 0969-9988

Che Ibrahim, C K I; Mohamad Sabri, N A; Belayutham, S and Mahamadu, A (2019) Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry. Built Environment Project and Asset Management, 9(1), pp. 15-28. ISSN 2044-124X

Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. PhD thesis, University of Salford, UK.

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Chellappa, V and Luximon, Y (2026) Computer-aided technologies for posture-based ergonomic risk assessment in construction: A systematic review. International Journal of Construction Management, 26(2), pp. 316-331. ISSN 1562-3599

Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, C (2008) Risks in PPP: Process and institutional analyses. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988

Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193

Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007

Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988

Chen, G; Chen, J; Tang, Y; Li, Q and Luo, X (2022) Identifying effective collaborative behaviors in building information modeling-enabled construction projects. Journal of Construction Engineering and Management, 148(6): 04022026, ISSN 0733-9364

Chen, G; Zhang, G; Xie, Y M and Jin, X H (2012) Overview of alliancing research and practice in the construction industry. Architectural Engineering and Design Management, 8(2), pp. 103-119. ISSN 1745-2007

Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364

Chen, H; Lei, Y; Wu, X and Liu, Y (2025) Evaluation of fuzzy uncertainty risk identification for waste-to-energy public-private partnership projects on the basis of the cloud model and fuzzy cognitive map. Journal of Construction Engineering and Management, 151(12): 04025191, ISSN 0733-9364

Chen, J J and Chambers, D (1999) Sustainability and the impact of Chinese policy initiatives upon construction. Construction Management and Economics, 17(5), pp. 679-687. ISSN 01446193

Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.

Chen, K (2018) The quest for the holy grail : bridging BIM and building for information management in construction. PhD thesis, University of Hong Kong, Hong Kong.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation. Engineering, Construction and Architectural Management, 26(7), pp. 1518-1532. ISSN 0969-9988

Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.

Chen, L; Lu, Q and Zhao, X (2022) A semi-automatic image-based object recognition system for constructing as-is IFC BIM objects based on fuzzy-maut. International Journal of Construction Management, 22(1), pp. 51-65. ISSN 1562-3599

Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364

Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175

Chen, L and Whyte, J (2022) Understanding design change propagation in complex engineering systems using a digital twin and design structure matrix. Engineering, Construction and Architectural Management, 29(8), pp. 2950-2975. ISSN 0969-9988

Chen, L; Yuan, B and Wang, X (2024) Simulation analysis of the constraints on the green retrofit of existing buildings and strategies for its promotion: a hybrid method based on ISM and SD. Building Research & Information, 52(5), pp. 515-532. ISSN 0961-3218

Chen, Le (2007) Linking knowledge management to organisational business performance in construction. PhD thesis, Griffith University, Australia.

Chen, N (2017) An investigation of the influence of project complexity on communications in engineering construction projects. PhD thesis, University of Hong Kong, Hong Kong.

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, P H and Chang, L M (2002) Feasibility analysis of Taiwan high speed rail project. Journal of Construction Procurement, 8(1), pp. 64-78. ISSN 1358-9180

Chen, Q (2007) An object model framework for interface management in building information models. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364

Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364

Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China. PhD thesis, Northumbria University, UK.

Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2023) Developing a readiness model and a self-assessment tool for adopting digital technologies in construction organizations. Building Research & Information, 51(3), pp. 241-256. ISSN 0961-3218

Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599

Chen, X; Chang-Richards, A Y; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technology-enabled AEC project management: practical use cases, deployment patterns and emerging trends. Engineering, Construction and Architectural Management, 32(6), pp. 4125-4154. ISSN 0969-9988

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.

Chen, Y; Cai, X; Li, J; Lin, P; Song, H; Liu, G; Cao, D and Ma, X (2023) The values and barriers of BIM implementation combination evaluation based on stakeholder theory: A study in China. Engineering, Construction and Architectural Management, 30(7), pp. 2814-2836. ISSN 0969-9988

Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364

Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364

Chen, Y; Ruikar, K and Carrillo, P M (2008) Electronic procurement benchmarking exercise in the AEC industry sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chen, Y; Wang, W; Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: The anatomy of FIDIC model contracts. Construction Management and Economics, 36(8), pp. 472-485. ISSN 01446193

Chen, Y J (2012) Strategic implications of e-business in the construction industry. PhD thesis, Loughborough University, UK.

Chen, Y Q; Lu, H; Lu, W and Zhang, N (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(6), pp. 598-614. ISSN 0969-9988

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304

Chen, Z; Chen, K and Cheng, J C P (2023) ISM-based analysis of VR-AEC adoption barriers and their inner mechanisms. Engineering, Construction and Architectural Management, 30(9), pp. 4271-4293. ISSN 0969-9988

Chen, Z; Li, H; Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(1), pp. 55-73. ISSN 01446193

Chen, Z; Zhao, Y; Zhou, X; Hao, S and Li, J (2023) Identifying the risk factors and their interactions of human–robot collaboration implementation during engineering project construction: Evidence from China. Engineering, Construction and Architectural Management, 30(7), pp. 3073-3094. ISSN 0969-9988

Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175

Chenchu, M. K.; Ruikar, K. and Jha, K. N. (2026) Strategic social network analysis for overcoming knowledge management challenges in construction: An in-depth review. Engineering, Construction and Architectural Management, 33(7), pp. 5495-5521. ISSN 0969-9988

Cheng, M; Chong, H Y; Liu, G and Li, Q (2025) Strategies of perceived justice for added value in public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(12), pp. 8548-8570. ISSN 0969-9988

Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988

Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(4), pp. 292-303. ISSN 0969-9988

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Cheng, J C P; Chen, K and Chen, W (2020) State-of-the-art review on mixed reality applications in the AECO industry. Journal of Construction Engineering and Management, 146(2): 03119009, ISSN 0733-9364

Cheng, L Y; Wen, D C and Jiang, H C (2014) The performance excellence model in construction enterprises: An application study with modelling and analysis. Construction Management and Economics, 32(11), pp. 1078-1092. ISSN 01446193

Cheng, M Y and Tsai, M H (2003) Reengineering of construction management process. Journal of Construction Engineering and Management, 129(1), pp. 105-114. ISSN 0733-9364

Cheng, T; Soo, G; Kumaraswamy, M and Jin, W (2010) Security of payment for Hong Kong construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 17-28. ISSN 17514312

Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Chesworth, B; London, K and Gajendran, T (2011) Understanding lean implementation: Perspectives and approaches of an American construction organisation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387

Cheung, E; Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(3), pp. 292-308. ISSN 0969-9988

Cheung, E; Loosemore, M and Chandra, D C (2014) Assessing risk dynamics in public private partnership projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Cheung, Esther (2009) Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. PhD thesis, Queensland University of Technology, Australia.

Cheung, F Y K; Rowlinson, S; Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(2),

Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Cheung, S O and Pang, K H Y (2013) Anatomy of construction disputes. Journal of Construction Engineering and Management, 139(1), pp. 15-23. ISSN 0733-9364

Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193

Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Cheung, S-O; Lam, K-C; Wong, S-S and Wong, S-H (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(2), pp. 65-72. ISSN 2204-9029

Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.

Chew, M Y L (2021) Façade inspection for falling objects from tall buildings in Singapore. International Journal of Building Pathology and Adaptation, 41(6), pp. 162-183. ISSN 23984708

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.

Chiang, Lee-Yun (2023) Affordable housing as an infrastructure asset: A public-private partnerships approach. PhD thesis, Griffith University, Australia.

Chiang, R (2002) Agency and incentive contract in private investment of transport project: An exploration of fundamental relationships. PhD thesis, Massachusetts Institute of Technology, USA.

Chiang, Y H and Cheng, E W L (2009) Perception of financial institutions toward financing PFI projects in Hong Kong. Journal of Construction Engineering and Management, 135(9), pp. 833-840. ISSN 0733-9364

Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Employing the net present value-consistent IRR methods for PFI contracts. Journal of Construction Engineering and Management, 136(7), pp. 811-814. ISSN 0733-9364

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X

Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Chigara, B and Moyo, T (2023) The impact of COVID-19 on the construction sector in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 91-111. ISSN 1823-6499

Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.

Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.

Chileshe, N (2004) The application of TQM within small and medium sized construction related organisations. PhD thesis, Sheffield Hallam University, UK.

Chileshe, N (2006) Investigating practitioner's understanding of TQM in small and medium construction companies. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chileshe, N (2007) Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), pp. 49-67. ISSN 1726-0531

Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(2), pp. 276-298. ISSN 1726-0531

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531

Chileshe, N and John Kikwasi, G (2014) Risk assessment and management practices (ramp) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, 14(4), pp. 239-254. ISSN 1562-3599

Chileshe, N and Kavishe, N (2020) Capacity building for Tanzanian public-private partnerships (PPPs) projects: Challenges and advocated solutions. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: The case of Tanzania. Built Environment Project and Asset Management, 11(1), pp. 71-87. ISSN 2044-124X

Chileshe, N and Kavishe, N (2022) Human capacity building strategies for improving PPP implementation in Tanzanian construction projects. Built Environment Project and Asset Management, 12(6), pp. 906-923. ISSN 2044-124X

Chileshe, N; Kavishe, N and Edwards, D J (2023) Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: The case of Tanzania. International Journal of Construction Management, 23(3), pp. 495-504. ISSN 1562-3599

Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(3), pp. 291-319. ISSN 0969-9988

Chileshe, N; Njau, C W; Kibichii, B K; Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), pp. 1606-1617. ISSN 1562-3599

Chileshe, N; Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(2), pp. 134-157. ISSN 0969-9988

Chileshe, N; Rameezdeen, R; Lehmann, S and Hosseini, M r (2014) Reverse logistics (RL) implementation among contractors in Australia: Practices and barriers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499

Chileshe N, K G J (2013) Perception of barriers to implementing risk assessment and management practices by construction professionals in Tanzania. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success factors for iso9000 implementation. Journal of Construction Engineering and Management, 129(6), pp. 599-609. ISSN 0733-9364

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(2), pp. 114-131. ISSN 0969-9988

Chinda, Thanwadee (2008) A system dynamics approach to construction safety culture. PhD thesis, Griffith University, Australia.

Chinyio, E; Gameson, R and Suresh, S (2011) The management of construction stakeholders by higher education institutions (HEIs) in the United Kingdom (UK): A pilot study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193

Chiozzi, Maria Alma (2020) A collaborative contracting framework supported by BIM and lean. PhD thesis, Queensland University of Technology, Australia.

Chiponde, D B; Gledson, B and Greenwood, D (2020) An integrated approach to learning from project-related failures. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Chmutina, K; Lizarralde, G; von Meding, J K and Bosher, L (2023) Standardised indicators for "resilient cities": The folly of devising a technical solution to a political problem. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 514-535. ISSN 1759-5916

Cho, C-S; Mazze, C E; Dika, S L and Gehrig, G B (2015) Enhancing construction education: Implementing habitat for humanity projects as service-learning for construction materials. International Journal of Construction Education and Research, 11(1), pp. 4-20. ISSN 1557-8771

Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.

Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Chohan, A H; Che-Ani, A I; Bhai Khan, S; Awad, J; Jawaid, A and Mohd Tawil, N (2015) A model of housing quality determinants for affordable housing. Journal of Construction in Developing Countries, 20(1), pp. 117-136. ISSN 1823-6499

Choi, H H and Mahadevan, S (2008) Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management, 134(11), pp. 894-903. ISSN 0733-9364

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599

Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599

Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.

Choi, Y; Kim, D C; Kim, S S; Nam, M S and Kim, T H (2013) Implementation of noise-free and vibration-free PHC screw piles on the basis of full-scale tests. Journal of Construction Engineering and Management, 139(8), pp. 960-967. ISSN 0733-9364

Chong, H Y and Cheng, M (2023) Smart contract implementation in building information modeling-enabled projects: Approach to contract administration. Journal of Construction Engineering and Management, 149(5): 05023004, ISSN 0733-9364

Chong, H Y; Fan, S L; Sutrisna, M; Hsieh, S H and Tsai, C M (2017) Preliminary contractual framework for BIM-enabled projects. Journal of Construction Engineering and Management, 143(7): 04017025, ISSN 0733-9364

Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Chou, C C; Caldas, C H; O'Connor, J T; Sroka, A W and Goldman, G K (2009) Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts. Journal of Construction Engineering and Management, 135(9), pp. 812-818. ISSN 0733-9364

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Choudhry, R M; Gabriel, H F; Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), pp. 1-18. ISSN 1823-6499

Choudhry, R M; Hinze, J W; Arshad, M and Gabriel, H F (2012) Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 138(12), pp. 1353-1359. ISSN 0733-9364

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.

Chowdhury, S; Ren, Z; Rouhana, F; Wang, J and Zhu, J (2024) Exploring sustainability in resource management: Implementation of a water-energy-human nexus framework at a university campus. Journal of Construction Engineering and Management, 150(10): 04024140, ISSN 0733-9364

Chowdhury, S; Zhu, J; Rasoulkhani, K; Mostafavi, A; Jaselskis, E; Stoa, R; Li, Q; Banerjee, S; Alsharef, A and Brannen, L (2020) Guidelines for robust adaptation to environmental regulations in infrastructure projects. Journal of Construction Engineering and Management, 146(10): 04020121, ISSN 0733-9364

Christermaller, F; Ibrahim, C K I C; Manu, P; Belayutham, S; Mahamadu, A-M and Yunusa-Kaltungo, A (2022) Implementation of design for safety (dfs) in construction in developing countries: A study of designers in Malaysia. Construction Economics and Building, 22(2), pp. 1-26. ISSN 2204-9029

Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364

Christina, D; Loosemore, M and Newton, S (2016) The dimensionality of public trust in public private partnership projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.

Christudason, A and Kenna, P (2010) Can housing rights be applied to modern housing systems? International Journal of Law in the Built Environment, 2(2), pp. 103-117. ISSN 1756-1450

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Chritamara, S and Ogunlana, S O (2001) Problems experienced on design and build projects in Thailand. Journal of Construction Procurement, 7(1), pp. 73-93. ISSN 1358-9180

Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175

Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988

Chua, D K H and Li, D (2000) Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5), pp. 349-357. ISSN 0733-9364

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Chun, M I; Harty, C and Schweber, L (2015) Comparative study of user-centred design approaches. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, B (2007) An analysis of success and failure factors for ERP systems in engineering and construction firms. PhD thesis, University of Maryland, College Park, USA.

Chung, B; Skibniewski, M J and Kwak, Y H (2009) Developing ERP systems success model for the construction industry. Journal of Construction Engineering and Management, 135(3), pp. 207-216. ISSN 0733-9364

Chung, H C P and Adeyeye, K (2018) Structural flood damage and the efficacy of property-level flood protection. International Journal of Building Pathology and Adaptation, 36(5), pp. 471-499. ISSN 23984708

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218

Cidik M S, B D T N (2013) Understanding the polarized perspectives in BIM enabled projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.

Clark, G G (1993) Rule-based integrated building management systems. PhD thesis, Brunel University, UK.

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Clarke, N P; Spillane, J P and Bradley, J G (2024) Barriers to adopting strategic planning as a management tool in small construction firms. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Clarkson, Luke (2021) Comprehensive monitoring strategy for tailings dams. PhD thesis, University of Queensland, Australia.

Cloete, Brent; Agumba, Justus; Adebowale, Oluseyi Julius and Meyer, Chris (2026) From readiness to implementation: A framework for BIM adoption in facilities management organisations. Journal of Construction Business and Management, 8(2), pp. 43-53. ISSN 2521-0165

Coates, S P (2013) BIM implementation strategy framework for small architectural practices. PhD thesis, University of Salford, UK.

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.

Cohen, L (1972) A study of the effect of legal requirements on the design and construction of public school buildings in Pennsylvania. EdD thesis, Temple University, USA.

Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.

Collinge, W (2020) Stakeholder engagement in construction: Exploring corporate social responsibility, ethical behaviors, and practices. Journal of Construction Engineering and Management, 146(3): 04020003, ISSN 0733-9364

Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.

Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X

Collins, H J (2007) Identity and interpretation of the built environment: a case study of interpretation of symbolic artefacts in the organisational built environment and it's effect on the identity forming process. PhD thesis, University of Strathclyde, UK.

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Conejos, S; Chew, M Y L; Tay, K; Tay, S and Safiena, S (2023) Green maintainability assessment of building-integrated photovoltaic (BIPV) applications: Lessons learnt. International Journal of Building Pathology and Adaptation, 41(2), pp. 320-346. ISSN 23984708

Connaughton, J N (1993) Making and implementing industrial building investment decisions. PhD thesis, University of Greenwich, UK.

Connaughton, J N and Collinge, W H (2021) Trialling a new approach to interdisciplinary collaboration in UK construction: A projects-as-practice analysis. Construction Management and Economics, 39(7), pp. 595-616. ISSN 01446193

Connaughton J, W S (2013) Improving collaboration in construction: An opportunity for action research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Conradie, D C U (2001) The use of software systems to implement case-based reasoning enabled intelligent components for architectural briefing and design. SkoglDr thesis, University of Pretoria, South Africa.

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029

Consoli, G G S (2004) Conducting an ethno-methodological study for the comparison of private and public prison delivery processes in Australia. Journal of Construction Procurement, 10(1),

Consoli, G G S (2006) Correctional management attitudes to private prison design and construction briefs in Australia. Journal of Construction Research, 7(1), pp. 99-109. ISSN 1609-9451

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.

Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.

Cooney, J P; Oloke, D and Gyoh, L (2023) A novel heritage BIM (HBIM) framework development for heritage buildings refurbishment based on an investigative study of microorganisms. Journal of Engineering, Design and Technology, 21(4), pp. 1046-1082. ISSN 1726-0531

Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Corley, J; Rowe, A; Tranfield, D; Smart, P; Levene, R; Rogerson, J and Deasley, P (2001) Customer-centred construction: Bringing a service approach through cultural change and team-working. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.

Correia, J M; Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia: A proposed research agenda. Journal of Engineering, Design and Technology, 18(6), pp. 1449-1468. ISSN 1726-0531

Correia, J M F; De Oliveira Neto, G C; Leite, R R and Da Silva, D (2021) Plan to overcome barriers to reverse logistics in construction and demolition waste: Survey of the construction industry. Journal of Construction Engineering and Management, 147(2): 04020172, ISSN 0733-9364

Costa, Rafael de Oliveira (2021) Applicability of international environmental law in the construction of corporate social responsibility. PhD thesis, Universidade de São Paulo, Brazil.

Costantino, N and Pellegrino, R (2015) Public-private partnership implementation: Cross-case analysis. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 164-176. ISSN 17514304

Coulter III, C (1968) A systems analysis of the corps of engineers approach to design and construction. PhD thesis, Texas A&M University, USA.

Courtney, R and Winch, G M (2003) Re-engineering construction: The role of research and implementation. Building Research & Information, 31(2), pp. 172-178. ISSN 0961-3218

Couto, A and Couto, J (2007) Why deconstruction is not adequately considered in Portuguese building refurbishment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Cox, A and Townsend, M (1997) Latham as half-way house: A relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(2), pp. 143-158. ISSN 0969-9988

Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Cozens, P; Waters, J and Neale, R (2002) A virtual reality approach to personal safety and the design of built environment facilities. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary. EngD thesis, University of Warwick, UK.

Craig, R (1999) How innovative is the common law of tendering? Journal of Construction Procurement, 5(1), pp. 15-26. ISSN 1358-9180

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.

Cromie, S I (1992) Forecasting the demand for aggregates in England and Wales, the role of forecasts of demand in the aggregate planning system. PhD thesis, University of Dundee, UK.

Crossley, B J (2015) Inter-organisational relationship trust repair: A ranked Delphi study with UK professionals. International Journal of Law in the Built Environment, 7(3), pp. 195-213. ISSN 1756-1450

Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Crowley, A J (1998) The development & implementation of a product model for constructional steelwork. PhD thesis, University of Leeds, UK.

Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Cui, L (2025) Incentive contract design and selection for inhibiting unethical collusion in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 870-892. ISSN 0969-9988

Curran, M; Spillane, J and Clarke-Hagan, D (2018) External stakeholders in urban construction development projects: Who are they and how are they engaged? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.

Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193

Cutrim, Sérgio Sampaio (2017) Port planning and governance in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

D'Incognito, M; Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(2), pp. 202-216. ISSN 2044-124X

Dabarera, G K M; Perera, B A K S and Rodrigo, M N N (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(2), pp. 199-213. ISSN 2044-124X

Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599

Dabok, M M (2022) A training and skills development conceptual framework for construction technicians in Nigeria. PhD thesis, University of Central Lancashire, UK.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(6), pp. 1269-1280. ISSN 0969-9988

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: Perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(4), pp. 78-90. ISSN 2204-9029

Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 71-85. ISSN 1823-6499

Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387

Dadashnejad, A A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: A case study. Journal of Engineering, Design and Technology, 16(3), pp. 478-500. ISSN 1726-0531

Daddow, T and Skitmore, M (2004) Value management in practice: An interview survey. Construction Economics and Building, 4(2), pp. 11-18. ISSN 2204-9029

Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X

Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(1), pp. 296-320. ISSN 0969-9988

Dahalan, N H; Rahman, R A; Ahmad, S W and Che Ibrahim, C K I (2025) Public monitoring of environmental management plan implementation in road construction projects: Key performance indicators. Journal of Engineering, Design and Technology, 23(3), pp. 766-791. ISSN 1726-0531

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Performance indicators for public evaluation of environmental management plan implementation in highway construction projects. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 425-449. ISSN 1759-5916

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dainty, A R J; Bagilhole, B M and Neale, R H (1997) Analytical strategies for dealing with qualitative data in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193

Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dakhil, A (2013) The contribution of the construction industry to economic development in Libya. PhD thesis, Liverpool John Moores University, UK.

Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.

Dalgliesh, C D; Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(1), pp. 23-39. ISSN 0969-9988

Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.

Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.

Dams, B; Maskell, D; Shea, A; Allen, S; Cascione, V and Walker, P (2023) Upscaling bio-based construction: Challenges and opportunities. Building Research & Information, 51(7), pp. 764-782. ISSN 0961-3218

Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.

Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.

Daniel, C and Neufville, E K (2025) An autogluon-enabled robust machine learning model for concrete tensile and compressive strength forecast. International Journal of Construction Management, 25(13), pp. 1636-1647. ISSN 1562-3599

Daniel, E I; Nwankwo, N; Adah, C; Oshodi, O; Emuze, F; Chinyio, E and Umeokafor, N (2026) An exploratory study into UK construction industry response to digitalised health and safety management. Journal of Engineering, Design and Technology, 24(1), pp. 45-63. ISSN 1726-0531

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.

Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193

Danso, A. K.; Edwards, D. J.; Adjei, E. K.; Adjei-Kumi, T.; Owusu-Manu, D. G.; Fianoo, S. I. and Thwala, W. D. (2026) Analysis of the underlying factors affecting BIM-LCA integration in the Ghanaian construction industry: A factor analysis approach. Construction Innovation, 26(3), pp. 871-891. ISSN 1471-4175

Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam. PhD thesis, National University of Singapore, Singapore.

Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Darabseh, M Q M A (2024) Construction assets management using BIM and blockchain: Managing design assets intellectual property. PhD thesis, Universidade do Porto, Portugal.

Darby, S (2010) Smart metering: What potential for householder engagement? Building Research & Information, 38(5), pp. 442-457. ISSN 0961-3218

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

Darwai, V R; Mandavgane, S A and Lohia, P (2022) Systems based approach to a small scale dairy farm (goshala): A case study. Built Environment Project and Asset Management, 12(3), pp. 503-518. ISSN 2044-124X

Das, D K (2024) Conceptualising environmental justice in the construction of road transport infrastructure in the global South: An Indian context. International Journal of Construction Management, 24(4), pp. 400-410. ISSN 1562-3599

Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708

Das, M; Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(5), pp. 551-572. ISSN 0969-9988

Dasandara, M; Ingirige, B; Kulatunga, U and Fernando, T (2023) Climate financing barriers and strategies: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 28(2), pp. 242-259. ISSN 1366-4387

Dat Tien, D; GhaffarianHoseini, A; Naismith, N; Ghaffarianhoseini, A; Zhang, T and Tookey, J (2021) Examining critical perspectives on building information modelling (BIM) adoption in New Zealand. Smart and Sustainable Built Environment, 10(4), pp. 594-615. ISSN 2046-6099

Dauber, V F (2001) Classical lean constructs and their transferability to the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

Dauda, J A; Ajayi, S; Omotayo, T; Oladiran, O O and Ilori, O M (2024) Implementation of lean for small- and medium-sized construction organisational improvement. Smart and Sustainable Built Environment, 13(3), pp. 496-511. ISSN 2046-6099

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387

Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. PhD thesis, University of Central Lancashire, UK.

Davenport, D M and Smith, R (1995) International procurement systems: Assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(1), pp. 38-49. ISSN 1358-9180

Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218

Davidson, R (2021) Innovation within private finance initiative projects: the influence of governance throughout the first stage of post-contract implementation. PhD thesis, University of Brighton, UK.

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Davies, K; McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(1), pp. 78-93. ISSN 0969-9988

Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects. EngD thesis, Loughborough University, UK.

Davies, P J; Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: A contractor's perspective. Building Research & Information, 41(4), pp. 450-468. ISSN 0961-3218

Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193

Davies, R and Harty, C (2013) Measurement and exploration of individual beliefs about the consequences of building information modelling use. Construction Management and Economics, 31(11), pp. 1110-1127. ISSN 1466433X

Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Davila Delgado, J M and Oyedele, L O (2020) BIM data model requirements for asset monitoring and the circular economy. Journal of Engineering, Design and Technology, 18(5), pp. 1269-1285. ISSN 1726-0531

Davis, K (2016) Reconciling views of project success: a multiple stakeholder model. PhD thesis, Kingston University, UK.

Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364

Davis, K A (2004) Information technology change in the architecture, engineering, and construction industry: An investigation of individuals' resistance. PhD thesis, Virginia Tech, USA.

Davis, K A and Songer, A D (2009) Resistance to IT change in the AEC industry: Are the stereotypes true? Journal of Construction Engineering and Management, 135(12), pp. 1324-1333. ISSN 0733-9364

Davis, P and Love, P (2011) Alliance contracting: Adding value through relationship development. Engineering, Construction and Architectural Management, 18(5), pp. 444-461. ISSN 0969-9988

Davis, P R (2003) The application of relationship marketing in the construction industry: Work in progress report. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Davis, P R (2004) Relationship marketing techniques in construction projects: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Davis, P R (2007) Maintaining relationship based procurement. Construction Economics and Building, 7(2), pp. 37-44. ISSN 2204-9029

Davis, P R and Walker, D H T (2004) Relationship based procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Davis, P R and Walker, D H T (2009) Building capability in construction projects: A relationship-based approach. Engineering, Construction and Architectural Management, 16(5), pp. 475-489. ISSN 0969-9988

Davis, S; Davis, T; Howell, D and Leitzke, D (2020) Building engineers and construction managers: The impact of international service projects on the development of undergraduate students. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.

Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387

Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dawson, P J (1997) A hierarchical approach to the management of construction project risk. PhD thesis, University of Nottingham, UK.

Day, A (1996) The maquette, the model and the computer: Organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 15-28. ISSN 0969-9988

Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.

De Biasio, A and Murray, A (2017) The social network of the UK PPP secondary equity market: Returns and competition in an emerging market. Construction Management and Economics, 35(8-9), pp. 468-481. ISSN 0144-6193

De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007

De Castro E Silva Neto, D; Cruz, C O; Rodrigues, F and Silva, P (2016) Bibliometric analysis of PPP and PFI literature: Overview of 25 years of research. Journal of Construction Engineering and Management, 142(10): 06016002, ISSN 0733-9364

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach. PhD thesis, Aston University, UK.

De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364

De La Cruz, M P; Del Caño, A and De La Cruz, E (2006) Downside risks in construction projects developed by the civil service: The case of Spain. Journal of Construction Engineering and Management, 132(8), pp. 844-852. ISSN 0733-9364

De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364

De Luca, A; Chen, L and Gharehbaghi, K (2021) Sustainable utilization of recycled aggregates: Robust construction and demolition waste reduction strategies. International Journal of Building Pathology and Adaptation, 39(4), pp. 666-682. ISSN 23984708

De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364

De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364

De Marco, A; Mangano, G and Narbaev, T (2017) The influence of risk on the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 7(1), pp. 45-58. ISSN 2044-124X

De Silva, D G (2002) Asymmetries in procurement auctions. PhD thesis, University of Oklahoma, USA.

De Silva, S H; Ranadewa, K A T O and Rathnasinghe, A P (2025) Barriers and strategies for implementing lean six sigma in small- and medium sized enterprises (SMEs) in construction industry: A fuzzy TOPSIS analysis. Construction Innovation, 25(2), pp. 510-551. ISSN 1471-4175

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

DeJesus, I (2024) Strategies for implementing organizational change in the construction industry. DBA thesis, Walden University, USA.

Debela, G Y (2021) Assessment of government policies and regulations in the process of adopting Public-Private Partnership for infrastructure development in Ethiopia. PhD thesis, University of Birmingham, UK.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599

Dehdasht, G; Ferwati, M S; Mohandes, S R; El-Sabek, L and Edwards, D J (2023) Towards expediting the implementation of sustainable and successful lean paradigm for construction projects: A hybrid of dematel and SNA approach. Engineering, Construction and Architectural Management, 30(9), pp. 4294-4318. ISSN 0969-9988

Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.

Del Solar, P; Del Río, M; Villoria, P and Nadal, A (2016) Analysis of recurrent defects in the execution of ceramic-coatings cladding in building construction. Journal of Construction Engineering and Management, 142(4): 04015093, ISSN 0733-9364

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Delgado, J M P Q; Ramos, N M M; Barreira, E and Simões, M L (2014) Probabilistic risk assessment methodology of exterior surfaces defacement caused by algae growth. Journal of Construction Engineering and Management, 140(12): 05014012, ISSN 0733-9364

Delgado, L; Shealy, T; Garvin, M and Pearce, A (2018) Framing energy efficiency with payback period: Empirical study to increase energy consideration during facility procurement processes. Journal of Construction Engineering and Management, 144(5): 04018027, ISSN 0733-9364

Delgado, O A H (1998) Decision making for the selection of investment projects. PhD thesis, University of Nottingham, UK.

Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988

Delhi, V S K; Mahalingam, A and Palukuri, S (2012) Governance issues in BOT based PPP infrastructure projects in India. Built Environment Project and Asset Management, 2(2), pp. 234-249. ISSN 2044-124X

Deloly, C; Gall, A R; Moore, G; Bretelle, L; Milner, J; Mohajeri, N; Osrin, D; Salvia, G; Symonds, P; Tsoulou, I; Zimmermann, N; Wilkinson, P and Davies, M (2021) Relationship-building around a policy decision-support tool for urban health. Buildings & Cities, 2(1), pp. 717-733. ISSN 2632-6655

Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Demirel, H C; Leendertse, W and Hertogh, M (2015) Pre-contract assumptions in practice: A qualitative study on the flexibility to changes in dbfm contracts: Blankenburgverbinding project case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193

Demirkesen, S; Sadikoglu, E and Jayamanne, E (2021) Assessing psychological safety in lean construction projects in the United States. Construction Economics and Building, 21(3), pp. 159-175. ISSN 2204-9029

Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3), pp. 1470-1503. ISSN 0969-9988

Den Otter, A and Emmitt, S (2007) Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), pp. 408-419. ISSN 0969-9988

Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.

Deng, F; Smyth, H and Anvuur, A (2012) A critical review of pms in construction: Towards a research agenda. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Deng, J; Zhao, Y; Li, X; Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(9): 04023070, ISSN 0733-9364

Deng, X (2008) Research on agent construction management mode and principal-agent relationship. PhD thesis, Wuhan University, China.

Deng, Y and Poon, S W (2014) Mega-event flagships in transformation: Learning from Expo 2010 Shanghai China. Journal of Engineering, Design and Technology, 12(4), pp. 440-460.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Denny-Smith, G (2021) How compliance imperatives stifle the impact of social procurement. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Denny-Smith, G; Williams, M; Loosemore, M; Riza Yosia, S and Piggott, L (2024) What social value do indigenous contractors create? Construction Management and Economics, 42(1), pp. 16-34. ISSN 01446193

Denny-Smith, George (2022) The social value of indigenous procurement policies in the Australian construction industry. PhD thesis, University of New South Wales, Australia.

Derakhshanfar, Hossein (2021) A delay risk management framework for construction projects: Learning from past experiences. PhD thesis, University of South Australia, Australia.

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364

Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531

Devapriya, K A K and Ganesan, S (2002) Technology transfer through subcontracting in developing countries. Building Research & Information, 30(3), pp. 171-182. ISSN 0961-3218

Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Devkar, G A and Kalidindi, S N (2013) Modeling and assessment of competencies in urban local bodies for implementing PPP projects. Built Environment Project and Asset Management, 3(1), pp. 42-57. ISSN 2044-124X

Dewan, S and Singh, L (2020) Use of blockchain in designing smart city. Smart and Sustainable Built Environment, 9(4), pp. 695-709. ISSN 2046-6099

Dewberry, C; Hayes, A and Sarhan, S (2018) Behavioural assessments in construction procurement: A bandwagon of institutional waste? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X

Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.

Dey, A; Islam, S T; Paul, B; Bandyopadhyay, S; Sengupta, P; Sanyal, N; Mondal, K P; Jubaer, A and Mitra, R (2022) Waterlogging mitigation and safe water supply: Lessons learnt from low-lying areas of basirhat municipality, India. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 386-403. ISSN 1759-5916

Dhanshyam, M and Srivastava, S K (2023) Decision framework for efficient risk mitigation in BOT highway infrastructure service projects. Journal of Construction Engineering and Management, 149(9): 04023081, ISSN 0733-9364

Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364

Dharmapuri Tirumala, R; Dangol, N; Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: A study of schools in Melbourne. Construction Management and Economics, 39(11), pp. 894-911. ISSN 01446193

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Diaz Schery, C. A.; Caiado, R. G. G.; Ivson, P.; Santos, R. S. and Thadeu Corseuil, E. (2026) An integrative framework for BIM, digital twin and generative AI convergence in construction: A multi-dimensional analysis of synergies and enabling factors. Smart and Sustainable Built Environment, pp. 1-39. ISSN 2046-6099

Diaz Schery, C A; Caiado, R G G; Aguilar Vargas, S and Rodriguez Vignon, Y (2025) Paths to BIM-based digital transformation: A bibliometric and systematic review of critical factors. Engineering, Construction and Architectural Management, 32(7), pp. 4357-4383. ISSN 0969-9988

Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.

Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.

Dickinson, H and Swaffield, L (2004) Implementing a segregation-based waste management system on site: Does it reduce site waste disposal costs? Journal of Financial Management of Property and Construction, 9(2), pp. 75-90. ISSN 1366-4387

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects. PhD thesis, Heriot-Watt University, UK.

Diekmann, J; Ashley, D; Bauman, R; Carroll, J and Finlayson, F (2000) Viability of privatised transportation projects: An evaluation tool for design/build teams. Journal of Construction Procurement, 6(1), pp. 33-43. ISSN 1358-9180

Diekmann, J E (2007) Past perfect: Historical antecedents of modern construction practices. Journal of Construction Engineering and Management, 133(9), pp. 652-660. ISSN 0733-9364

Dike, I (2017) A critical exploration of the impact of building information modelling on the culture and performance of UK construction supply chains. PhD thesis, Coventry University, UK.

Dike, I U and Kapogiannis, G (2014) A conceptual model for improving construction supply chain performance. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.

Ding, G K C (2007) The evaluation of environmentally sustainable residential development using a building sustainability index. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ding, G K C (2007) Life cycle energy assessment of Australian secondary schools. Building Research & Information, 35(5), pp. 487-500. ISSN 0961-3218

Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Ding, S; Hu, H; Chai, Z and Wang, W (2024) Secure and formalized blockchain-IPFS information sharing in precast construction from the whole supply chain perspective. Journal of Construction Engineering and Management, 150(1): 04023150, ISSN 0733-9364

Ding, Z and Ng, F (2010) Personal construct-based factors affecting interpersonal trust in a project design team. Journal of Construction Engineering and Management, 136(2), pp. 227-234. ISSN 0733-9364

Ding, Z; Ng, F and Wang, J (2014) Testing trust scale measurement invariance in project teams. Journal of Engineering, Design and Technology, 12(2), pp. 209-222. ISSN 1726-0531

Ding, Z; Zuo, J; Wu, J and Wang, J Y (2015) Key factors for the BIM adoption by architects: A China study. Engineering, Construction and Architectural Management, 22(6), pp. 732-748. ISSN 0969-9988

Dioguardi, G (1983) Macrofirms: Construction firms for the computer age. Journal of Construction Engineering and Management, 109(1), pp. 13-24. ISSN 0733-9364

Dion, H; Evans, M and Farrell, P (2023) Hospitals management transformative initiatives; towards energy efficiency and environmental sustainability in healthcare facilities. Journal of Engineering, Design and Technology, 21(2), pp. 552-584. ISSN 1726-0531

Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.

Disney, O; Roupé, M and Johansson, M (2023) Driving circularity with total BIM: An integrated approach to data-driven design. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Disney, O; Roupé, M; Johansson, M and Domenico Leto, A (2024) Embracing BIM in its totality: A total BIM case study. Smart and Sustainable Built Environment, 13(3), pp. 512-531. ISSN 2046-6099

Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology, 17(3), pp. 554-571. ISSN 1726-0531

Dixit, A; Chauhan, R and Shaw, R (2025) Application of smart systems and emerging technologies for disaster risk reduction and management in Nepal. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 328-343. ISSN 1759-5908

Dixit, S; Stefańska, A and Singh, P (2023) Manufacturing technology in terms of digital fabrication of contemporary biomimetic structures. International Journal of Construction Management, 23(11), pp. 1828-1836. ISSN 1562-3599

Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Dizdaroglu, D; Yigitcanlar, T and Dawes, L (2012) A micro-level indexing model for assessing urban ecosystem sustainability. Smart and Sustainable Built Environment, 1(3), pp. 291-315. ISSN 2046-6099

Djalante, R and Thomalla, F (2012) Disaster risk reduction and climate change adaptation in Indonesia: Institutional challenges and opportunities for integration. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 166-180. ISSN 1759-5916

Djebbar, K E B and Mokhtari, A (2025) Evaluation of the level of awareness of the inhabitants on the importance of the energy retrofitting of buildings: Case study of Tlemcen (Algeria). International Journal of Building Pathology and Adaptation, 43(2), pp. 209-256. ISSN 2398-4708

Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.

Do, S T; Nguyen, V T and Likhitruangsilp, V (2023) Rsiam risk profile for managing risk factors of international construction joint ventures. International Journal of Construction Management, 23(7), pp. 1148-1162. ISSN 1562-3599

Doan, D. T.; Albsoul, H.; Shobha, A. R.; GhaffarianHoseini, A. and Ghaffarianhoseini, A. (2026) An integrated challenge-strategy framework for construction waste management in New Zealand: Behavioural and organisational challenges and strategies. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.

Dobrovnik, M.; Herold, D. M. and Kummer, S. (2026) Perception differences in dynamic capabilities for digital supply chain transformation across managerial hierarchies: A DEMATEL-based analysis in the construction industry. Construction Innovation, 26(9), pp. 204-232. ISSN 1471-4175

Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.

Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193

Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.

Dolla, T; Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(1), pp. 38-51. ISSN 2044-124X

Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029

Dolla, T and Laishram, B (2020) Factors affecting public-private partnership preference in Indian municipal waste sector. International Journal of Construction Management, 20(6), pp. 567-584. ISSN 1562-3599

Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(5), pp. 449-460. ISSN 2044-124X

Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Doloi, H (2014) Rationalizing the implementation of web-based project management systems in construction projects using PLS-SEM. Journal of Construction Engineering and Management, 140(7): 04014026, ISSN 0733-9364

Domdouzis, K; Anumba, C and Thorpe, A (2004) Wireless sensor networking in the construction industry: Prospects and problems. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Domínguez-Herrera, M M; González-Morales, O and González-Díaz, E (2023) Social responsibility of construction company as strategy for sustainability in island territories. Construction Economics and Building, 23(1-2), pp. 30-55. ISSN 2204-9029

Donato, Matteo (2016) The influence of resource dependency on collaboration in the construction supply chain. PhD thesis, Victoria University, Australia.

Dong, Z.; Lu, W.; Wu, L.; Jiang, C. and Fu, Y. (2026) Efficiency-enhanced machine learning on blockchain (MLOB) framework for real-time construction activities recognition. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.

Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.

Donkers, A; Yang, D; Guendouz, S and Wang, B (2024) Making sense of smart features in the smart office: A stated choice experiment of office user preferences. Building Research & Information, 52(4), pp. 388-401. ISSN 0961-3218

Donkoh, D and Aboagye-Nimo, E (2017) Stakeholders' role in improving Ghana's construction safety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 68-76. ISSN 17514304

Donohoe, S (2010) Attitudes to sustainable construction and contracts: International perspectives and approaches. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X

Donohoe, S and Coggins, J K (2016) Framework agreements in a post-recession economy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499

Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.

Dorée, A; Holmen, E and Caerteling, J (2003) Co-operation and competition in the construction industry of the Netherlands. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Dorée, A G (1996) Tendering practice of Dutch municipalities. PhD thesis, University of Twente, Netherlands.

Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(3), pp. 78-88. ISSN 1358-9180

Dorée, A G (2004) Collusion in the Dutch construction industry: An industrial organization perspective. Building Research & Information, 32(2), pp. 146-156. ISSN 0961-3218

Dossick, C; Osburn, L and Neff, G (2025) Innovation through practice: The messy work of making technology useful for architecture, engineering and construction teams. Engineering, Construction and Architectural Management, 32(7), pp. 4887-4899. ISSN 0969-9988

Dossick, C S and Sakagami, M (2008) Implementing web-based project management systems in the United States and Japan. Journal of Construction Engineering and Management, 134(3), pp. 189-196. ISSN 0733-9364

Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165

Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029

Dou, Y; Yan, X; Dong, B; Zhong, L and Lin, H (2026) Predicting the interorganizational diffusion of prefabricated construction technology: Agent-based modeling and simulation. Journal of Construction Engineering and Management, 152(3): 04025266, ISSN 0733-9364

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Doume Ekale, M; Pavard, A; Benabderrahmane, K A and Andrew Poirier, E (2026) BIM adoption and implementation in the civil and transportation infrastructure sector: Analysis of governmental roadmaps and action plans. International Journal of Construction Management, 26(6), pp. 925-943. ISSN 1562-3599

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(1), pp. 11-29. ISSN 1358-9180

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995. PhD thesis, Nottingham Trent University, UK.

Dowsett, R. M. and Harty, C. F. (2019) Assessing the implementation of BIM–an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 0144-6193

Dowsett, R (2016) Assessing the success of BIM implementation. DEng thesis, University of Reading, UK.

Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Dowsett, R and Harty, C (2016) Making the link between bim's benefits and implementation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655

Dowsett, R M and Harty, C F (2014) The wider implementation issues of BIM within a multifaceted property and real estate consultancy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dowsett, R M and Harty, C F (2019) Assessing the implementation of BIM: an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 01446193

Dowsett R M, H C F (2013) Evaluating the benefits of BIM for sustainable design: A review. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499

Dreicer, G K (1993) The long span. Intercultural exchange in building technology: Development and industrialization of the framed beam in Western Europe and the United States, 1820-1870. PhD thesis, Cornell University, USA.

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Drews, F (2018) Designing meta-organisations: an empirical study of boundary setting in large infrastructure projects. PhD thesis, University of Manchester, UK.

Dsouza, M; Phadtare, A; Vyas, S S; Shinde, Y and Jadhav, A (2024) Toward resilient development in rural area: some strategic recommendations based on contextual findings in Bhokardan Taluka, Jalna. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 699-727. ISSN 1759-5916

Du, H; Han, Q and De Vries, B (2025) The effects of social influence on low-cost and high-cost household energy-efficient product adoption: A case study in wuhan. Smart and Sustainable Built Environment, 14(6), pp. 1908-1926. ISSN 2046-6099

Du, H; Han, Q; Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: Agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(4), pp. 1697-1725. ISSN 0969-9988

Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Du, J; Jing, H; Castro-Lacouture, D and Sugumaran, V (2020) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 270-295. ISSN 0969-9988

Du, Q (2009) Integrated decision-making in the cladding supply chain. PhD thesis, University of Bath, UK.

Du, Q; Zhang, Y; Zeng, L; Ma, Y and Li, S (2025) Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain. Engineering, Construction and Architectural Management, 32(7), pp. 4918-4945. ISSN 0969-9988

Du, Y; Yuan, J; Wang, S; Liu, Y and Zeng, N (2025) Leveraging blockchain to anchor information for supervision in PPP projects: A conceptual framework. Engineering, Construction and Architectural Management, 32(4), pp. 2745-2770. ISSN 0969-9988

Du Plessis, C (2005) Action for sustainability: Preparing an African plan for sustainable building and construction. Building Research & Information, 33(5), pp. 405-415. ISSN 0961-3218

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Duan, P; Zhou, J and Goh, Y M (2023) Safety risk diagnosis based on motion trajectory for construction workers: An integrated approach. Journal of Construction Engineering and Management, 149(11): 04023116, ISSN 0733-9364

Duan, Y; Ye, M; Zhang, Q and Lu, S (2025) Informal institutional pressures and ESG implementation by international contractors: The moderating effects of joint ventures. Journal of Construction Engineering and Management, 151(10): 04025139, ISSN 0733-9364

Duarte, Carolina Mendonça de Moraes (2022) Innovation management in construction and development companies. PhD thesis, Universidade Estadual de Campinas, Brazil.

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Duckles, B M (2009) The green building industry in California: From ideals to buildings. PhD thesis, University of Arizona, USA.

Duerr, D (1990) Lift of Shippingport reactor pressure vessel. Journal of Construction Engineering and Management, 116(1), pp. 188-197. ISSN 0733-9364

Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988

Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(3), pp. 163-178. ISSN 1366-4387

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Duffy, K; Graham, B and Thomas, K (2007) Assessing the potential for construction collaboration technologies (cct) in small to medium enterprises in the Irish construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Duke, A K (2001) A telepresence environment for concurrent life-cycle design and construction. PhD thesis, Loughborough University, UK.

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Dulaimi, M F and Kumaraswamy, M M (2000) Procuring for innovation: The integrating role of innovation in construction procurement. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dulaimi, M F; Ling, F Y Y; Ofori, G and De Silva, N (2002) Enhancing integration and innovation in construction. Building Research & Information, 30(4), pp. 237-247. ISSN 0961-3218

Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218

Duncan, R; Neale, R H and Bagilhole, B M (1999) Equal opportunities and the reconciliation of work and family within the construction process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Duncan, R I and Mortimer, J (2007) Race equality and procurement: An investigation into the impact of race equality policy on the procurement of black and minority ethnic (BME) contractors and consultants in the welsh social housing sector. Construction Management and Economics, 25(12), pp. 1283-1293. ISSN 1466433X

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007

Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Duodo, B (2017) Intellectual capital and innovation in construction firms: the role of learning capability. PhD thesis, University of Hong Kong, Hong Kong.

Durdyev, S; Hosseini, M R; Martek, I; Ismail, S and Arashpour, M (2020) Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), pp. 186-204. ISSN 0969-9988

Durdyev, S; Koc, K; Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(6), pp. 2481-2502. ISSN 0969-9988

Duren, J V; Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(1), pp. 107-128. ISSN 1471-4175

Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.

Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364

Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364

Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364

Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.

Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.

Dzokoto, F K; Edum-Fotwe, F and Demian, P (2014) Conceptualising actors' information behaviour: An investigation into project information dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Eadie, R; Browne, M; Odeyinka, H; McKeown, C and McNiff, S (2015) A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(1), pp. 4-21. ISSN 2044-124X

Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X

Easson, Michael Bernard (2016) The application of a theory of real options (tro) to the decision-making of mega urban transport projects (mutps). PhD thesis, University of Melbourne, Australia.

Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175

Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175

Ebekozien, A (2022) Construction companies' compliance to personal protective equipment on junior staff in Nigeria: Issues and solutions. International Journal of Building Pathology and Adaptation, 40(4), pp. 481-498. ISSN 23984708

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Low-cost housing demand-supply gap: Government housing planners perspective on possible solutions. International Journal of Construction Management, 22(9), pp. 1736-1745. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Ahmed, M A H; Akinradewo, O and Omoh-Paul, I (2024) Managing construction project risks in turbulent times: a stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(7), pp. 35-54. ISSN 23984708

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B; Ayo-Odifiri, S O and Amadi, G C (2024) Disasters recovery and rehabilitation in informal settlements: The role of fourth industrial revolution technologies. International Journal of Construction Management, 24(11), pp. 1155-1165. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B and Rohayati, M I (2024) Investigating safety violations on Nigerian construction sites. International Journal of Construction Management, 24(13), pp. 1454-1464. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Thwala, W D; Samsurijan, M S; Ahmed, M A H; Aliu, J and Adekunle, S A (2024) Appraising the application of cryptocurrency technologies in the Nigerian built environment: stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(7), pp. 93-112. ISSN 23984708

Ebekozien, A; Aigbavboa, C O; Adekunle, S A; Aliu, J and Thwala, W D (2024) Training needs of built environment professionals: The role of fourth industrial revolution. Engineering, Construction and Architectural Management, 31(11), pp. 4353-4371. ISSN 0969-9988

Ebekozien, A; Aigbavboa, C O; Aigbedion, M; Ogbaini, I F and Aginah, I L (2023) Integrated project delivery in the Nigerian construction sector: An unexplored approach from the stakeholders' perspective. Engineering, Construction and Architectural Management, 30(4), pp. 1519-1535. ISSN 0969-9988

Ebekozien, A; Aigbavboa, C O; Thwala, W D D; Aigbedion, M I and Ogbaini, I F (2023) An appraisal of generic skills for Nigerian built environment professionals in workplace: The unexplored approach. Journal of Engineering, Design and Technology, 21(6), pp. 1841-1856. ISSN 1726-0531

Ebekozien, A and Samsurijan, M S (2024) Incentivisation of digital technology takers in the construction industry. Engineering, Construction and Architectural Management, 31(4), pp. 1373-1390. ISSN 0969-9988

Eberhardt, L C M; Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(2), pp. 93-113. ISSN 1745-2007

Ebiloma, D. O.; Aigbavboa, C. O. and Anumba, C. (2026) Key drivers of digital twin maintenance management for healthcare facilities in Nigeria. Engineering, Construction and Architectural Management, 33(3), pp. 1871-1890. ISSN 0969-9988

Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771

Ebrahimigharehbaghi, S (2022) Understanding the decision-making process in homeowner energy retrofits: From behavioural and transaction cost perspectives. PhD thesis, Delft University of Technology, Netherlands.

Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Eccles, S D (2000) Quantitative evaluation of contract strategies for construction. PhD thesis, University of Sheffield, UK.

Edema, E U (2020) Risk mitigation strategies to prevent the failure of civil engineering projects in Nigeria. PhD thesis, Northcentral University, USA.

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531

Edirisinghe, R and Lingard, H (2016) Exploring the potential for the use of video to communicate safety information to construction workers: Case studies of organizational use. Construction Management and Economics, 34(6), pp. 366-376. ISSN 0144-6193

Edirisinghe, R; London, K A; Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet? Engineering, Construction and Architectural Management, 24(6), pp. 1119-1154. ISSN 0969-9988

Edkins, A J and Smyth, H J (2006) The imperative of trust in PPPs: Evaluations from the provision of 'full service' contracts. Journal of Construction Procurement, 12(1),

Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364

Edwards, D J; Martek, I; Ejohwomu, O; Aigbavboa, C and Hosseini, M R (2021) Hand-arm vibration management: An operational health and safety strategy framework. International Journal of Building Pathology and Adaptation, 39(5), pp. 811-830. ISSN 23984708

Edwards, P J and Bowen, P A (1999) Risk and risk management in construction projects: concepts, terms and risk categories re-defined. Journal of Construction Procurement, 5(1), pp. 47-57. ISSN 1358-9180

Egbelakin, T K and Wilkinson, S (2010) Sociological and behavioural impediments to earthquake hazard mitigation. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 310-321. ISSN 1759-5916

Egbelakin, T K; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research & Information, 39(3), pp. 286-300. ISSN 0961-3218

Egbu, C O; Botterill, K and Bates, M (2001) The influence of knowledge management and intellectual capital on organizational innovations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Ehrlich, M; Woodward, D and Tiong, R (2012) A state-of-practice survey on managing fx exposure in project companies, construction companies and SMEs. Journal of Financial Management of Property and Construction, 17(1), pp. 29-48. ISSN 1366-4387

Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes. PhD thesis, University of Edinburgh, UK.

Eiris Pereira, R and Gheisari, M (2019) Site visit application in construction education: A descriptive study of faculty members. International Journal of Construction Education and Research, 15(2), pp. 83-99. ISSN 1557-8771

Eisazadeh, N; De Troyer, F and Allacker, K (2025) Environmental performance of patient rooms using an integrated approach considering operational energy, daylight and comfort analysis. Smart and Sustainable Built Environment, 14(4), pp. 1117-1142. ISSN 2046-6099

Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364

Eissa, R and El-Adaway, I H (2024) Accelerating the circular economy transition: A construction value chain-structured portfolio of strategies and implementation insights. Journal of Construction Engineering and Management, 150(8): 04024077, ISSN 0733-9364

Eissa, R; Nabi, M A and El-Adaway, I H (2024) Risk–reward share allocation under different integrated project delivery relational structures: A monte-carlo simulation and cooperative game theoretic solutions approach. Journal of Construction Engineering and Management, 150(4): 04024013, ISSN 0733-9364

Ejidike, C C; Mewomo, M C; Olawumi, T O; Wang, S and Buniya, M K (2025) Barriers to the adoption of smart building technology in developing countries: An empirical survey. Journal of Construction Engineering and Management, 151(6): 04025067, ISSN 0733-9364

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2007) The UK construction industry: A review of black country skills demand. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ekanayake, E M A C; Shen, G; Kumaraswamy, M; Owusu, E K and Xue, J (2022) Capabilities to withstand vulnerabilities and boost resilience in industrialized construction supply chains: A Hong Kong study. Engineering, Construction and Architectural Management, 29(10), pp. 3809-3829. ISSN 0969-9988

Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Eken, G (2022) Using natural language processing for automated construction contract review during risk assessment at the bidding stage. PhD thesis, Middle East Technical University, Turkey.

Eker, S; Zimmermann, N; Carnohan, S and Davies, M (2018) Participatory system dynamics modelling for housing, energy and wellbeing interactions. Building Research & Information, 46(7), pp. 738-754. ISSN 0961-3218

Eksteen, B and Krause, S (2002) Constructing new automotive production facilities in a mature brownfield site. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.

Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708

Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.

El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364

El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364

El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El Ghandour, W (2007) Integrated information-based construction simulation system. PhD thesis, University of Alberta, Canada.

El Ghandour, Wael (2007) Integrated information-based construction simulation system (iicss). PhD thesis, University of Alberta, Canada.

El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.

El Nemr, W (2017) The enforceability of time bar clauses in construction contracts: a comparative analysis between the Egyptian civil code and the English and Welsh common law jurisdictions. PhD thesis, University of Salford, UK.

El Reifi, M H (2016) A novel lean briefing process for effective design management. PhD thesis, Loughborough University, UK.

El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), pp. 75-96. ISSN 1823-6499

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.

El-Batal, R S (1995) Reasoning by abstraction for public works contracts using a blackboard architecture. PhD thesis, Polytechnic University, USA.

El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment. PhD thesis, Stanford University, USA.

El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364

El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

El-Itr, Z and Kangari, R (1994) Minority contractors: Framework for new policy development. Journal of Construction Engineering and Management, 120(3), pp. 632-648. ISSN 0733-9364

El-Itr, Z M (1992) Equal business opportunity programs in the construction industry: A framework for development and implementation. PhD thesis, Georgia Institute of Technology, USA.

El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988

El-Mahdy, D and Ali, M (2024) Assessing the solar radiation performance of self-shaded 3D-printed clay-based façades. Architectural Engineering and Design Management, 20(2), pp. 249-268. ISSN 1745-2007

El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771

El-Medany, W M (2014) A cost-effective programmable soc for network security using xilinx spartan 3an fpga. Journal of Engineering, Design and Technology, 12(2), pp. 280-291. ISSN 1726-0531

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X

El-Sayegh, S M; Manjikian, S; Ibrahim, A; Abouelyousr, A and Jabbour, R (2021) Risk identification and assessment in sustainable construction projects in the UAE. International Journal of Construction Management, 21(4), pp. 327-336. ISSN 1562-3599

El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007

Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364

Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387

Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364

Elbashbishy, T S; Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: Mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(5), pp. 406-427. ISSN 01446193

Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387

Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Eldin, N N (1989) Measurement of work progress: Quantitative technique. Journal of Construction Engineering and Management, 115(3), pp. 462-474. ISSN 0733-9364

Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products. PhD thesis, University of California, Berkeley, USA.

Elfving, J A (2022) A decade of lessons learned: Deployment of lean at a large general contractor. Construction Management and Economics, 40(7-8), pp. 548-561. ISSN 01446193

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988

Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599

Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988

Elghaish, F; Matarneh, S T; Talebi, S; Abu-Samra, S; Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: A critical gap analysis. Construction Innovation, 22(3), pp. 554-579. ISSN 1471-4175

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175

Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Elias, R; Issa, R R A and Wu, W (2023) Progress on building information modeling education and talent acquisition. International Journal of Construction Education and Research, 19(4), pp. 363-382. ISSN 1557-8771

Eliwa, H K; Jelodar, M B; Poshdar, M and Zavvari, A (2024) Organizational infrastructure and information and communication technology infrastructure alignment in construction organizations. Journal of Construction Engineering and Management, 150(7): 04024057, ISSN 0733-9364

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elkbuli, M; Azmy, N and Lee, C K (2025) Enhancing project manager communication soft skills and risk management practices in Libyan oil and gas construction projects: The role of experience. Journal of Engineering, Design and Technology, 23(3), pp. 1017-1038. ISSN 1726-0531

Ellis, R C T (2001) Lessons in project management. PhD thesis, Loughborough University, UK.

Elmualim, A and Gilder, J (2014) BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3-4), pp. 183-199. ISSN 1745-2007

Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.

Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.

Elsayegh, A and El-Adaway, I H (2021) Holistic study and analysis of factors affecting collaborative planning in construction. Journal of Construction Engineering and Management, 147(4): 04021023, ISSN 0733-9364

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.

Eltinay, N and Egbu, C (2017) Disaster risk reduction conceptual framework: Open data for building resilience in critical infrastructure. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.

Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364

Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.

Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), pp. 138-148. ISSN 1745-2007

Emmitt, S; Pasquire, C and Mertia, B (2012) Is good enough "making do"? An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(3), pp. 369-383. ISSN 1471-4175

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Emuze, F; Norgbey, W S and Smallwood, J (2015) Provincial roads capex programme in South Africa: Planning and management inadequacies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Emuze, F and Smallwood, J J (2014) Collaborative working in South African construction: Contractors' perspectives. Journal of Engineering, Design and Technology, 12(3), pp. 294-306.

Emuze F, S J (2013) Construction motor vehicle accidents in South Africa: Causes and impact. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Emuze F, S J (2013) How can supply chain management proliferate in South African construction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.

Endut, I R (2008) Framework for minimising time overruns of Malaysian construction projects. PhD thesis, Glasgow Caledonian University, UK.

Enegbuma, W I; Aliagha, G U; Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), pp. 113-129. ISSN 1823-6499

Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007

Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ensar, A and Selin, G (2021) Individual and organisational level drivers and barriers to building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 89-109. ISSN 1823-6499

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(4), pp. 222-227. ISSN 0961-3218

Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Erdogan, B (2008) Organisational change management for the implementation of collaboration environments. PhD thesis, Loughborough University, UK.

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.

Erfani, A; Cui, Q and Cavanaugh, I (2021) An empirical analysis of risk similarity among major transportation projects using natural language processing. Journal of Construction Engineering and Management, 147(12): 04021175, ISSN 0733-9364

Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Eriksson, P E (2008) Procurement effects on coopetition in client-contractor relationships. Journal of Construction Engineering and Management, 134(2), pp. 103-111. ISSN 0733-9364

Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(2), pp. 211-230. ISSN 1366-4387

Eriksson, P E (2025) How clients choose procurement strategies and organizational control systems in the Swedish housing sector. Journal of Financial Management of Property and Construction, 30(1), pp. 22-41. ISSN 1366-4387

Eriksson, P E; Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), pp. 598-611. ISSN 0969-9988

Eriksson, P E; Nilsson, T and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(6), pp. 527-539. ISSN 0969-9988

Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X

Eriksson, P E and Szentes, H (2017) Managing the tensions between exploration and exploitation in large construction projects. Construction Innovation, 17(4), pp. 492-510. ISSN 1471-4175

Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Eriqat, M O; Sweis, R J and Sweis, G J (2025) The challenges of adopting emerging technologies in the AEC industry a literature review and bibliometric analysis. Construction Innovation, 25(6), pp. 1680-1706. ISSN 1471-4175

Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029

Ershadi, Mahmoud (2021) Analysing and modelling the critical success factors of project management offices in the construction industry. PhD thesis, University of Newcastle, Australia.

Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Esmaeili, B and Hallowell, M R (2012) Diffusion of safety innovations in the construction industry. Journal of Construction Engineering and Management, 138(8), pp. 955-963. ISSN 0733-9364

Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.

Espada, R J; Apan, A and McDougall, K (2015) Vulnerability assessment and interdependency analysis of critical infrastructures for climate adaptation and flood mitigation. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 313-346. ISSN 1759-5916

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Essah, E A; Sanders, C H; Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: Effects of roof underlay. Building Research & Information, 37(2), pp. 117-128. ISSN 0961-3218

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531

Evans, S; Godoy-Shimizu, D; Steadman, P; Amrith, S; Humphrey, D and Ruyssevelt, P (2023) Getting to net zero: Islington's social housing stock. Buildings & Cities, 4(1), pp. 524-544. ISSN 2632-6655

Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312

Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193

Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X

Ey, W; Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), pp. 148-155. ISSN 1562-3599

Eyiah, A K (2001) An integrated approach to financing small contractors in developing countries: A conceptual model. Construction Management and Economics, 19(5), pp. 511-518. ISSN 01446193

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Eyiah-Botwe, E; Aigbavboa, C O and Thwala, W D (2020) Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(1), pp. 50-63. ISSN 2044-124X

Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Ezulike, E I; Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(3), pp. 179-193. ISSN 0969-9988

Faccio, M; Gamberi, M; Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(3), pp. 342-359. ISSN 1726-0531

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2010) Development of an ICT-based logistics framework for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.

Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.

Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.

Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.

Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029

Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study. PhD thesis, Heriot-Watt University, UK.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Faisal, Fahim (2016) The role of government and development partner certification in public-private partnership infrastructure project financing. PhD thesis, Queensland University of Technology, Australia.

Faisol, N (2010) An investigation of relational contracting norms in construction projects in Malaysia. PhD thesis, Loughborough University, UK.

Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden. PhD thesis, KTH Royal Institute of Technology, Sweden.

Famakin, I O; Aigbavboa, C and Molusiwa, R (2023) Exploring challenges to implementing health and safety regulations in a developing economy. International Journal of Construction Management, 23(1), pp. 89-97. ISSN 1562-3599

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, C; Li, X and Li, H (2024) Optimizing the regulation of commercial real estate presale deposits: The role of third-party regulation and the design of government incentives. Journal of Construction Engineering and Management, 150(10): 04024143, ISSN 0733-9364

Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007

Fang, F and Aboushhiwa, R A (2012) Strategies to address skills shortages in South African civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 103-109. ISSN 17514312

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Fang, Z (2002) Behavioral analysis of project team performance in China. PhD thesis, University of Hong Kong, Hong Kong.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988

Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364

Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.

Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.

Faqih, F; Zayed, T and Alfalah, G (2022) Technology-based multi-tiered building diagnosis framework. International Journal of Building Pathology and Adaptation, 40(1), pp. 101-133. ISSN 23984708

Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.

Farag, F; McDermott, P and Huelin, C A (2016) The development of an activity zone conceptual framework to improve social value implementation in construction projects using human activity systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175

Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175

Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.

Farghaly, K; Collinge, W; Mosleh, M H; Manu, P and Cheung, C M (2022) Digital information technologies for prevention through design (ptd): A literature review and directions for future research. Construction Innovation, 22(4), pp. 1036-1058. ISSN 1471-4175

Farias, F (2013) Contemporary strategies for sustainable design. PhD thesis, Texas A&M University, USA.

Farias, Izaura Pereira (2014) Proposal of a construction waste management model for the eastern zone of the city of Teresina, Piauí. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364

Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364

Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531

Farouk Kineber, A; Othman, I B; Oke, A E and Chileshe, N (2022) Modelling the relationship between value management's activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, 20(2), pp. 414-435. ISSN 1726-0531

Farran, H H (1993) A study of the implementation and impact of turn-key management contracts in hospitals in the kingdom of Saudi Arabia. PhD thesis, Swansea University, UK.

Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988

Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599

Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.

Farrow, B and Burt, R (2020) Service learning: Aligning university mission with design and construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Farrow, C B and Reyes, M D (2022) Land-grant university strategic plans: Are university-level service-learning goals aligned with construction programs’ goals? International Journal of Construction Education and Research, 18(4), pp. 333-351. ISSN 1557-8771

Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988

Fasna, M F F and Gunatilake, S (2020) Roles and functions of stakeholders in implementing energy retrofits in the hotel sector. International Journal of Building Pathology and Adaptation, 38(5), pp. 737-751. ISSN 23984708

Fasna, M F F and Gunatilake, S (2020) Overcoming barriers for building energy efficiency retrofits: Insights from hotel retrofits in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 277-295. ISSN 2044-124X

Fateh, M A M and Mohammad, M F (2017) Industrialized building system provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), pp. 67-80. ISSN 1823-6499

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Fatokun, A; Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Faulkenberry, L M (1993) Impact of emerging contract employment patterns on training, competitiveness, and company operation in the electrical construction industry. EdD thesis, Texas A&M University, USA.

Faulkner, A C and Day, A K (1986) Images of status and performance in building team occupations. Construction Management and Economics, 4(3), pp. 245-260. ISSN 01446193

Fauzi, F Z and Kusumasari, B (2020) Public-private partnership in Western and non-Western countries: A search for relevance. Journal of Financial Management of Property and Construction, 26(1), pp. 87-102. ISSN 1366-4387

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.

Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Feige, A; Wallbaum, H and Krank, S (2011) Harnessing stakeholdermotivation: Towards a Swiss sustainable building sector. Building Research & Information, 39(5), pp. 504-517. ISSN 0961-3218

Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364

Feng, Z; Chao, Q; Tan, C and Yang, Y (2023) Using bargaining model with loss aversion and a risk of breakdown to determine compensation for buyback of early terminating BOT highway projects. Journal of Construction Engineering and Management, 149(5): 04023024, ISSN 0733-9364

Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.

Fernandes, C. N.; Ramalho, P. C. and Lima-Silva, F. (2026) Climate-related risks: Implications for municipal governments in Brazil. Buildings & Cities, 7(1), pp. 559-575. ISSN 2632-6655

Fernandes, A G G (2014) Improving and embedding project management practice in organisations. PhD thesis, University of Southampton, UK.

Fernandes, D A; Costa, A A and Lahdenperä, P (2018) Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(6), pp. 482-496. ISSN 1562-3599

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Fernando, N; Jayathilake, P; De Silva, M; Gunathilake, W; Devapura, N and Wise, B (2024) Built environment stakeholders and climate change adaptation: the case of Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 636-648. ISSN 1759-5916

Fernando, P G; Kulatunga, U; Thayaparan, M and Hadiwattege, C (2025) Reforming legal and regulatory structure of public–private partnerships in Sri Lanka. Built Environment Project and Asset Management, 15(2), pp. 211-227. ISSN 2044-124X

Fernie, S; Weller, S; Green, S D; Newcombe, R and Williams, M (2001) Learning across business sectors: Context, embeddedness and conceptual chasms. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ferreira, F; Briga, P; Ramos Teixeira, S and Almeida, F (2025) A platform sandbox for the assessment of municipal sustainable development goals. Journal of Engineering, Design and Technology, 23(2), pp. 599-617. ISSN 1726-0531

Ferreira, M; Almeida, M; Rodrigues, A and Silva, S M (2016) Comparing cost-optimal and net-zero energy targets in building retrofit. Building Research & Information, 44(2), pp. 188-201. ISSN 0961-3218

Ferreira, Thiago Lopes (2014) Vernacular architecture and contemporary production processes: Formation, experimentation and construction in a Brazilian rural settlement. PhD thesis, Universidade de São Paulo, Brazil.

Fetterhoff III, O G (2004) Comparative evaluation of strategic construction-market forecasting methodologies. PhD thesis, University of Florida, USA.

Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218

Few, J and Elwell, C A (2023) Applying the CO2 concentration decay tracer gas method in long-term monitoring campaigns in occupied homes: Identifying appropriate unoccupied periods and decay periods. International Journal of Building Pathology and Adaptation, 41(1), pp. 96-108. ISSN 23984708

Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Field, C and Davenport, D (1999) PFI policy since 1996 and the implications for small and medium sized enterprises in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture. PhD thesis, University of Newcastle upon Tyne, UK.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Finch, E F (1989) A requisite decision model for the selection of mechanical and electrical services in buildings. PhD thesis, University of Reading, UK.

Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364

Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029

Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304

Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304

Fiorani, Viviane Miranda Araujo (2016) Building sites environmental compensations in urban areas: Focusing the anthropic environment. PhD thesis, Universidade de São Paulo, Brazil.

Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fischer, M A and Adams, H (2011) Engineering-based decisions in construction. Journal of Construction Engineering and Management, 137(10), pp. 751-754. ISSN 0733-9364

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.

Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.

Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(6), pp. 2602-2620. ISSN 0969-9988

Fjeldstad, O H; Ali, M and Katera, L (2019) Policy implementation under stress: Central-local government relations in property tax administration in Tanzania. Journal of Financial Management of Property and Construction, 24(2), pp. 129-147. ISSN 1366-4387

Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.

Flood, I and Issa, R R A (2010) Empirical modeling methodologies for construction. Journal of Construction Engineering and Management, 136(1), pp. 36-48. ISSN 0733-9364

Flores Lara, J C; El Fadel, M and Khalfan, M M A (2025) Integrating industry 4.0 and circular economy in the UAE construction sector: A policy-aligned framework. Built Environment Project and Asset Management, 15(3), pp. 535-556. ISSN 2044-124X

Florez, L; Castro, D and Irizarry, J (2013) Measuring sustainability perceptions of construction materials. Construction Innovation, 13(2), pp. 217-234. ISSN 1471-4175

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Flyen, C; Hauge, Å L; Almås, A J and Godbolt, Å L (2018) Municipal collaborative planning boosting climate resilience in the built environment. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 58-69. ISSN 1759-5916

Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.

Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Fogarty, H (2009) Contractor perspective of the new Irish public works contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 29-34. ISSN 17514312

Fogleman, V (2014) The contaminated land regime: Time for a regime that is fit for purpose (Part 1). International Journal of Law in the Built Environment, 6(1-2), pp. 43-68. ISSN 1756-1450

Fogleman, V (2014) The contaminated land regime: Time for a regime that is fit for purpose (Part 2). International Journal of Law in the Built Environment, 6(1-2), pp. 129-151. ISSN 1756-1450

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364

Fore, S and Mudavanhu, T (2011) Application of RCM for a chipping and sawing mill. Journal of Engineering, Design and Technology, 9(2), pp. 204-226. ISSN 1726-0531

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Forman, T and Tweed, C (2014) Solid wall insulation retrofit in UK dwellings: Critical factors affecting management and quality. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Foroughi Sabzevar, M (2022) An AR-QR code approach to improve access of crews to design and construction information on construction sites. PhD thesis, Drexel University, USA.

Foroughi Sabzevar, M; Gheisari, M and Lo, J (2025) Analyzing the pros and cons of paper-based 2D drawings in construction: a survey of U.S. construction professionals. International Journal of Construction Management, 25(4), pp. 428-438. ISSN 1562-3599

Forsythe, P (2008) Modelling customer perceived service quality in housing construction. Engineering, Construction and Architectural Management, 15(5), pp. 485-496. ISSN 0969-9988

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Fortune, C and Hinks, J (1998) Strategic building project price forecasting models in use: Paradigm shift postponed. Journal of Financial Management of Property and Construction, 3(1), pp. 5-26. ISSN 1366-4387

Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Foster, M E (1997) Energy conservation in the United Kingdom housing sector: An exploration of technical and social issues. PhD thesis, Open University, UK.

Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.

Fouchal, F; Ellis, K; Hassan, T and Firth, S (2013) ICT-enabled energy efficiency: a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(2), pp. 158-178. ISSN 2046-6099

Foulds, C; Powell, J and Seyfan, G (2013) Investigating the performance of everyday domestic practices using building monitoring. Building Research & Information, 41(6), pp. 622-636. ISSN 0961-3218

Fox, S J (2001) Application of design for manufacture principles to building design and construction. PhD thesis, Sheffield Hallam University, UK.

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Francis, Annes Elsa (2025) Transforming stadiums into environmentally sustainable community infrastructure: A holistic perspective. PhD thesis, Griffith University, Australia.

Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304

Francis, T R; Wilkinson, S; Mannakkara, S and Chang-Richards, A (2018) Post-disaster reconstruction in Christchurch: A "build back better" perspective. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 239-248. ISSN 1759-5916

Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029

Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.

Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Franz, B and Roberts, B A M (2022) Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry. Journal of Construction Engineering and Management, 148(3): 05022001, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

Franze, Anthony (2024) Augmented fabrication: An Australian industry 4.0 augmented reality (ar) framework. PhD thesis, Queensland University of Technology, Australia.

Frederiksen, N and Gottlieb, S C (2020) From partnership to firm: Hybridity as source of routine change. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Fredriksson, A; Sezer, A A and Sundquist, V (2024) Construction logistics status and actors’ opinions: An industry wide survey in Sweden. Construction Innovation, 24(7), pp. 319-340. ISSN 1471-4175

Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Freer, D R (2000) Vital considerations for the design and construction of new student housing communities. EdD thesis, University of California, Los Angeles, USA.

Freire, J and Alarcón, L F (2002) Achieving lean design process: Improvement methodology. Journal of Construction Engineering and Management, 128(3), pp. 248-256. ISSN 0733-9364

Friend, R M; Thinphanga, P; Macclune, K; Henceroth, J; van Gai Tran, P and Nghiem, T P (2015) Urban transformations and changing patterns of local risk: Lessons from the Mekong region. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 30-43. ISSN 1759-5916

Frommweiler, C and Poirier, E (2025) Facilitating the building commissioning process using building information modeling: An action-research project. Engineering, Construction and Architectural Management, 32(1), pp. 601-620. ISSN 0969-9988

Frutos, J D and Borenstein, D (2003) Object-oriented model for customer-building company interaction in mass customization environment. Journal of Construction Engineering and Management, 129(3), pp. 302-313. ISSN 0733-9364

Frödell, M (2014) Organisation of purchasing and buyer-supplier relationships in large construction companies. PhD thesis, Chalmers University of Technology, Sweden.

Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364

Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.

Fu, Y; Chen, Y; Zhang, S and Wang, W (2015) Promoting cooperation in construction projects: An integrated approach of contractual incentive and trust. Construction Management and Economics, 33(8), pp. 653-670. ISSN 01446193

Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029

Fuertes, A and Khatabakhshrad, M (2024) Health and safety risk management in a changing climate: Contrasting supervisors and workers perceptions and approaches to heat coping strategies on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029

Fullen, M D (2009) The development, diffusion and evaluation of a fall hazard safety training program for residential construction workers utilizing instructor led and new media delivery. EdD thesis, West Virginia University, USA.

Fuller, P A (2011) Improving lessons learnt outcomes in multi-phase project environments. PhD thesis, Loughborough University, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and MacDonald, R (2009) Event-based measurement of learning in projects: A methodology. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and Slater, I (2007) Learning organisations: Can they be shown to exist through the realisation of quantifiable benefits? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.

Futcher, K (2001) Managing portfolios of projects. PhD thesis, Loughborough University, UK.

Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.

Gaafar, H K and Perry, J G (1999) Strategies for insuring subcontracted works. Construction Management and Economics, 17(3), pp. 383-391. ISSN 01446193

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gabe, J (2016) Successful greenhouse gas mitigation in existing Australian office buildings. Building Research & Information, 44(2), pp. 160-174. ISSN 0961-3218

Gade, A N; Larsen, T S and Selman, A D (2021) Leaving no one behind: A glimpse into the state of adoption of the Sustainable Development Goals in the Danish construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Gade, A N and Opoku, A (2020) Challenges for implementing the Sustainable Development Goals in the Danish construction industry: Building owners' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gade, R (2022) Achieving sustainable construction through construction & demolition waste minimisation in residential building projects. PhD thesis, Auckland University of Technology, New Zealand.

Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988

Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364

Gaitskell, R (1999) The IMechE/IEE model forms of contract: an investigation into the history and development of the forms, with particular reference to the allocation of contractual risk, including a survey of the industry's perception (BL). PhD thesis, King's College London, UK.

Gajendran, T and Brewer, G (2007) Integration of information and communication technology: Influence of the cultural environment. Engineering, Construction and Architectural Management, 14(6), pp. 532-549. ISSN 0969-9988

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(2), pp. 179-197. ISSN 1471-4175

Galaitsi, S E; Rand, K; Yeates, E; Talbot, C; O'Donnell, A; Pinigina, E and Linkov, I (2023) Stakeholder collaboration in the forecast-informed reservoir operations (firo) pilot project at lake mendocino, California. Built Environment Project and Asset Management, 13(6), pp. 880-895. ISSN 2044-124X

Galbraith, P J (1995) The development of a classification system for construction industry clients. PhD thesis, University of Reading, UK.

Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry. PhD thesis, University of Bath, UK.

Gale, K (2013) An evaluation of performance improvement within public sector construction framework agreements. PhD thesis, Anglia Ruskin University, UK.

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364

Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364

Gamage, I S W; Osmani, M and Glass, J (2009) An investigation into the impact of procurement systems on waste generation: The contractors' perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.

Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364

Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(5), pp. 507-517. ISSN 1466433X

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(6), pp. 553-567. ISSN 1466433X

Gambatese, J A and James, D E (2001) Dust suppression using truck-mounted water spray system. Journal of Construction Engineering and Management, 127(1), pp. 53-59. ISSN 0733-9364

Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364

Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364

Gambo, N; Inuwa, I I; Usman, N; Said, I and Shuaibu, U S (2021) Factors affecting budget implementation for successful delivery of primary health care building facilities within Nigerian health sector. International Journal of Construction Management, 21(5), pp. 476-489. ISSN 1562-3599

Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gamil, Y and Abdul Rahman, I (2019) Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry. Journal of Engineering, Design and Technology, 17(5), pp. 1077-1084. ISSN 1726-0531

Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531

Ganah, A A M (2003) The use of computer visualisation in communicating constructability information in UK. Journal of Engineering, Design and Technology, 1(2), pp. 151-167. ISSN 1726-0531

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X

Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gann, D M; Salter, A J and Whyte, J K (2003) Design quality indicator as a tool for thinking. Building Research & Information, 31(5), pp. 318-333. ISSN 0961-3218

Gao, C. M.; Wong, K. Y. and Mohd Maulana, M. I. I. (2026) Remanufacturing in the construction industry: Key factors, job competencies, and implementation framework. International Journal of Building Pathology and Adaptation, 44(5), pp. 1329-1360. ISSN 2398-4708

Gao, S.; Low, S. P. and Tok, S. K. W. (2026) Applications of lean principles in the operations of architectural and engineering design firms: An exploratory study in Singapore. Engineering, Construction and Architectural Management, 33(4), pp. 2649-2668. ISSN 0969-9988

Gao, H; Zhong, B; Luo, H and Chen, W (2022) Computational geometric approach for BIM semantic enrichment to support automated underground garage compliance checking. Journal of Construction Engineering and Management, 148(1): 05021013, ISSN 0733-9364

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Chan, T K and Hendy, P (2025) Adoption of the digitalised last planner system in infrastructure projects: An Australian case study. Construction Innovation, 25(3), pp. 994-1013. ISSN 1471-4175

Gao, S and Low, S P (2015) Implementing Toyota way principles for construction projects in China: A case study. International Journal of Construction Management, 15(3), pp. 179-195. ISSN 1562-3599

Gao, S and Low, S P (2015) Toyota way style human resource management in large Chinese construction firms: A qualitative study. International Journal of Construction Management, 15(1), pp. 17-32. ISSN 1562-3599

Gao, S; Song, X and Ding, R (2020) Promoting information transfer in collaborative projects through network structure adjustment. Journal of Construction Engineering and Management, 146(2): 04019108, ISSN 0733-9364

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.

Garba, A and Kishk, M (2014) Renewable energy technology means of providing sustainable electricity in Nigerian rural areas: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Garcia, R (2018) California energy policy alternatives for commercial buildings to create energy resiliency, reduce carbon emissions, and lessen dependency on electrical utilities for the future California economy. EdD thesis, Brandman University, USA.

Garcia Punhagui, Katia Regina (2014) Potential reducing of CO2 emissions and embodied energy in housing construction in Brazil by increasing the use of wood. PhD thesis, Universidade de São Paulo, Brazil.

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Garciacortes, A (2017) Knowledge transfer and application in integrated project delivery teams. PhD thesis, Michigan State University, USA.

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599

Garg, R; Chhikara, R; Singh, R; Agrawal, G; Talwar, V and Mehra, V (2021) A qualitative study to understand the factors affecting the adoption of glass fiber-reinforced gypsum (gfrg) as a sustainable building technology: Insights from Indian construction industry. Construction Innovation, 21(2), pp. 321-344. ISSN 1471-4175

Garip, S B; Güzelci, O Z; Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(1), pp. 49-66. ISSN 1471-4175

Garmston, H; Pan, W and de Wilde, P (2012) Decision-making in façade selection for multi-storey buildings. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.

Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Garvin, M J (2010) Enabling development of the transportation public-private partnership market in the United States. Journal of Construction Engineering and Management, 136(4), pp. 402-411. ISSN 0733-9364

Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599

Gasue, R; Aklashie, S; Dompey, A M A; Agyekum, K and Opoku, D (2026) Implementing materials passports in the construction industry: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 15-35. ISSN 2398-4708

Gbadegesin, J T and Aluko, B T (2014) Public private partnerships/private finance initiatives for financing infrastructure in public tertiary institutions in Nigeria. Built Environment Project and Asset Management, 4(2), pp. 199-215. ISSN 2044-124X

Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 0969-9988

Gehrig, G B (1985) Organizational practices and theories: Alignment of construction executive's beliefs with company policies. PhD thesis, Colorado State University, USA.

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Genc, O (2021) Symbioconstruction: A bibliography-driven dynamic construction industry symbiosis database. Journal of Construction Engineering and Management, 147(8): 04021077, ISSN 0733-9364

Genfi, N and Tokbolat, S (2023) The integration of green building technologies into the construction sector of developing countries: The case of Ghana. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Geng, S.; Chau, H. W.; Jamei, E. and Vrcelj, Z. (2026) Enablers and challenges of smart heritage implementation: The case of chinatown Melbourne. Smart and Sustainable Built Environment, 15(5), pp. 1695-1721. ISSN 2046-6099

Geoghegan, H J; Jensen, F W; Kershaw, T and Codinhoto, R (2022) Innovation realisation for digitalising Dutch small architecture practices: state of the art review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 176-191. ISSN 17514304

George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects. PhD thesis, Purdue University, USA.

Gerber, J K and Yacoubian G.S, Jr (2001) Evaluation of drug testing in the workplace: Study of the construction industry. Journal of Construction Engineering and Management, 127(6), pp. 438-444. ISSN 0733-9364

Gerding, D; Wamelink, H and Leclercq, E (2020) Implementation of circularity in the building process: A case study research into organizing the actor network and decision-making process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gerges, M (2020) Building information modelling for fire evacuation in high-rise residential buildings. PhD thesis, Loughborough University, UK.

Geroy, L S A and Pesigan, A M (2011) Disaster risk reduction for health facilities in the Western Pacific region. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 268-277. ISSN 1759-5916

Gerrish, T; Ruikar, K; Cook, M; Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(2), pp. 190-208. ISSN 0969-9988

Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 0969-9988

Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175

Geus, Lucio Marcos de (2016) A support model for defining the location of voluntary delivery points for small construction and demolition waste generators. PhD thesis, Pontifícia Universidade Católica do Paraná, Brazil.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.

Ghadiminia, N (2021) Integration of cybersecurity in BIM-enabled facilities management organisations. PhD thesis, Birmingham City University, UK.

GhaffarianHoseini, A; Tien, D D; Naismith, N; Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (Green Star). Engineering, Construction and Architectural Management, 24(4), pp. 696-714. ISSN 0969-9988

Ghafoor, S.; Kocaturk, T.; Hosseini, M. R.; Weiss, M. and Barnett, M. (2026) Navigating complexity: Systems thinking insights on deploying the pss for circular economy housing. Architectural Engineering and Design Management, 22(1), pp. 1-18. ISSN 1745-2007

Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.

Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan. PhD thesis, University of Newcastle upon Tyne, UK.

Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364

Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Ghansah, F A; De-Graft, O-M and Ayarkwa, J (2021) Project management processes in the adoption of smart building technologies: A systematic review of constraints. Smart and Sustainable Built Environment, 10(2), pp. 208-226. ISSN 2046-6099

Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: A scientometric and content analysis. Smart and Sustainable Built Environment, 13(1), pp. 63-84. ISSN 2046-6099

Ghansah, F A; Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(5), pp. 2128-2150. ISSN 0969-9988

Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2021) Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (sbts) in the developing countries. Construction Innovation, 21(4), pp. 685-707. ISSN 1471-4175

Ghansah, F A; Owusu-Manu, D G; Edwards, D J; Thwala, W D; Yamoah Agyemang, D and Ababio, B K (2024) A framework for smart building technologies implementation in the Ghanaian construction industry: A PLS-SEM approach. Building Research & Information, 52(1-2), pp. 148-163. ISSN 0961-3218

Ghansah, F A (2025) Digital twins for smart building at the facility management stage: A systematic review of enablers, applications and challenges. Smart and Sustainable Built Environment, 14(4), pp. 1194-1229. ISSN 2046-6099

Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531

Gharaibeh, L; Eriksson, K M; Lantz, B; Matarneh, S and Elghaish, F (2024) Toward digital construction supply chain-based industry 4.0 solutions: Scientometric-thematic analysis. Smart and Sustainable Built Environment, 13(1), pp. 42-62. ISSN 2046-6099

Gharehbaghi, K; Georgy, M; Robson, K M; Wilkinson, S and Farnes, K (2022) Versatility in sustainable building design (sbd) practices: An empirical study. International Journal of Building Pathology and Adaptation, 40(5), pp. 728-752. ISSN 23984708

Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.

Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals. PhD thesis, University of Leeds, UK.

Ghazali, F E M; Rashid, S A and Sadullah, A F M (2018) Disparity between the procurement process best practices for PPP projects in the UK and Malaysia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 264-270. ISSN 17514304

Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Ghodki, M K; Swarup, A and Pal, Y (2020) A new IR and sprinkler based embedded controller directed robotic arm for automatic cleaning of solar panel. Journal of Engineering, Design and Technology, 18(4), pp. 905-921. ISSN 1726-0531

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.

Gholami, M; Mofidi Shemirani, M and Fayaz, R (2018) A modelling methodology for a solar energy-efficient neighbourhood. Smart and Sustainable Built Environment, 7(1), pp. 117-132. ISSN 2046-6099

Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.

Gholami Rostam, Mehdi (2024) Energy efficiency assessment in building designs integrating climate resilience and long-term environmental sustainability. PhD thesis, University of New South Wales, Australia.

Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, A; Abawajy, J and Chowdhury, M (2024) Redefining the construction managerial landscape to facilitate Industry 4.0 implementation: Scientometric mapping of research frontiers. Construction Innovation, 24(3), pp. 657-683. ISSN 1471-4175

Ghosh, A; Edwards, D J; Hosseini, M R; Al-Ameri, R; Abawajy, J and Thwala, W D (2021) Real-time structural health monitoring for concrete beams: A cost-effective 'industry 4.0' solution using piezo sensors. International Journal of Building Pathology and Adaptation, 39(2), pp. 283-311. ISSN 23984708

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Ghosh, S and Lee, S K (2023) Using social network analysis to explore communication among members of an integrated project delivery team. International Journal of Construction Education and Research, 19(2), pp. 132-149. ISSN 1557-8771

Ghostin, M (2020) Exploring an implementation framework for building information modelling to support sustainable development in the Lebanese construction industry: a qualitative approach. PhD thesis, Coventry University, UK.

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Gibson, G E and Bell, L C (1990) Electronic data interchange in construction. Journal of Construction Engineering and Management, 116(4), pp. 727-737. ISSN 0733-9364

Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218

Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information. PhD thesis, University of Salford, UK.

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180

Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gidigah, B K; Agyekum, K and Baiden, B K (2022) Defining social value in the public procurement process for works. Engineering, Construction and Architectural Management, 29(6), pp. 2245-2267. ISSN 0969-9988

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655

Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.

Gillott, C; Davison, B and Densley Tingley, D (2022) Drivers, barriers and enablers: Construction sector views on vertical extensions. Building Research & Information, 50(8), pp. 909-923. ISSN 0961-3218

Gilly, B A; Touran, A and Asai, T (1987) Quality control circles in construction. Journal of Construction Engineering and Management, 113(3), pp. 427-439. ISSN 0733-9364

Gines, J A (2024) Mass timber utilization in architecture: Carbon sequestration, building materials and construction practices. PhD thesis, Mississippi State University, USA.

Gingue, N B (2022) The effects of the implementation of the use of data analytics on performance in the field of facilities management: A systematic review. DBA thesis, University of Maryland University College, USA.

Giri, O P; Sainju, P R and Htet, A (2025) Evaluating occupational health and safety practices in an airport construction project in Nepal. Built Environment Project and Asset Management, 15(1), pp. 149-164. ISSN 2044-124X

Giti, D M; K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction, 25(2), pp. 293-312. ISSN 1366-4387

Gkeredakis, E (2009) Explaining the distinctiveness of coordination through an in-depth study of a major construction project. PhD thesis, University of Liverpool, UK.

Gladovic, C (2026) Hard hats, soft skills: A responsive scaffold model for construction management education. Construction Economics and Building, 26(1), ISSN 2204-9029

Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.

Glavinich, T E (1990) Development of a model microcomputer-based project management system. DrEng thesis, University of Kansas, USA.

Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175

Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Godoy-Shimizu, D; Hong, S M; Korolija, I; Schwartz, Y; Mavrogianni, A and Mumovic, D (2022) Pathways to improving the school stock of England towards net zero. Buildings & Cities, 3(1), pp. 939-963. ISSN 2632-6655

Goel, A (2025) Construction management students' perception of BIM adoption and its implications in a non-mandated country. International Journal of Construction Management, 25(3), pp. 278-288. ISSN 1562-3599

Gogo, S E (2021) The role of leadership in the transformation of health and safety culture in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.

Goh, C S and Abdul-Rahman, H (2013) The identification and management of major risks in the Malaysian construction industry. Journal of Construction in Developing Countries, 18(1), pp. 19-32. ISSN 1823-6499

Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364

Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.

Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.

Gomda, Hardi Idris (2024) Leadership and implementation of sustainable construction in Ghana. DELead thesis, University of Charleston - Beckley, USA.

Gomes, V and Da Silva, M G (2005) Exploring sustainable construction: Implications from Latin America. Building Research & Information, 33(5), pp. 428-440. ISSN 0961-3218

Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499

Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.

Goncalves, Andriani Tavares Tenorio (2019) Integrated solid waste management index for decision support in municipalities. PhD thesis, Universidade Federal de Itajubá, Brazil.

Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.

Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.

González, J F and Gongal, A (2021) Unidirectional pedestrian circulation: Physical distancing in informal settlements. Buildings & Cities, 2(1), pp. 655-665. ISSN 2632-6655

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Goodfellow-Smith, M (2019) How can finance and insurance institutions help deliver sustainable city infrastructure? PhD thesis, University of Birmingham, UK.

Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364

Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.

Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364

Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218

Gorse, C; Dickinson, I; Platten, A; Walker, C and Hobday, J (2009) Disseminating sustainable practice: An evaluation of the impact of virtual site. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gorse, C; Sutton, R; Johnston, D and Miles-Shenton, D (2011) Heat loss through the building fabric: Low carbon construction practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gosling, J; Hewlett, B and Naim, M (2011) A framework for categorising engineer-to-order construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gosling, J; Naim, M; Sassi, P; Iosif, L and Lark, R (2008) Flexible buildings for an adaptable and sustainable future. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gosling, J; Towill, D and Naim, M (2012) Learning how to eat an elephant: Implementing supply chain management principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gotangco, C K; Jardeleza, J M; Lopez, C; Labaria, E C; Wickert, J and Shadiya, F (2020) Factors influencing disaster risk and resilience education in Asian HEIs. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 400-412. ISSN 1759-5916

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193

Goulden, S; Erell, E; Garb, Y and Pearlmutter, D (2017) Green building standards as socio-technical actors in municipal environmental policy. Building Research & Information, 45(4), pp. 414-425. ISSN 0961-3218

Goulding, J S (2000) GAPP-IT: A generic it training model for construction. PhD thesis, University of Salford, UK.

Goulding, J S and Alshawi, M (2004) A process-driven IT training model for construction: Core development issues. Construction Innovation, 4(4), pp. 243-254. ISSN 1471-4175

Gounden, S (1996) Reconstruction and development in South Africa: The construction industry and related procurement reform. Journal of Construction Procurement, 2(1), pp. 3-10. ISSN 1358-9180

Govan, P and Damnjanovic, I (2016) The resource-based view on project risk management. Journal of Construction Engineering and Management, 142(9): 04016034, ISSN 0733-9364

Govender, N.; Laryea, S. and Watermeyer, R. (2026) Through the client's lens: Factors impacting project document quality in the South African construction industry. Engineering, Construction and Architectural Management, 33(15), pp. 345-361. ISSN 0969-9988

Govender, N; Laryea, S and Watermeyer, R (2022) A framework for assessing quality of tender documents. Built Environment Project and Asset Management, 12(4), pp. 573-589. ISSN 2044-124X

Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364

Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988

Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029

Gowthami, N R; Sridhar, C N V and Venkata Ramana, N (2022) An empirical implementation model of total quality management in construction: Southern India. International Journal of Construction Management, 22(15), pp. 3023-3033. ISSN 1562-3599

Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.

Graham, B; Gahan, D and Thomas, K (2007) The application of knowledge management practices in the procurement and construction of cleanroom projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Graham, B; Gahan, D and Thomas, K (2008) An action research approach to sharing specialist construction knowledge. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Graham, P (2000) Building education for the next industrial revolution: Teaching and learning environmental literacy for the building professions. Construction Management and Economics, 18(8), pp. 917-925. ISSN 01446193

Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218

Granheimer, K; Gustavsson, T K and Eriksson, P E (2021) Public procurement of engineering services: Governance and control mechanisms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.

Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193

Green, S D; Fernie, S and Weller, S (2005) Making sense of supply chain management: A comparative study of aerospace and construction. Construction Management and Economics, 23(6), pp. 579-593. ISSN 01446193

Green, S D and May, S C (2003) Re-engineering construction: Going against the grain. Building Research & Information, 31(2), pp. 97-106. ISSN 0961-3218

Greenhalgh, S (2016) The effects of 3D printing in design thinking and design education. Journal of Engineering, Design and Technology, 14(4), pp. 752-769.

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Greenwood, D; Horne, M; Thompson, E M; Allwood, C M; Wernemyr, C and Westerdahl, B (2008) Strategic perspectives on the use of virtual reality within the building industries of four countries. Architectural Engineering and Design Management, 4(2), pp. 85-98. ISSN 1745-2007

Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.

Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364

Griffith, A (2011) Fulfilling contractors' corporate social responsibilities using standards-based management systems. International Journal of Construction Management, 11(2), pp. 37-47. ISSN 1562-3599

Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312

Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(4), pp. 341-348. ISSN 01446193

Griffith, A and Headley, J D (1998) Management of small building works. Construction Management and Economics, 16(6), pp. 703-709. ISSN 01446193

Griffith, A; King, A and Knight, A (2003) Examining the dynamics of novation from the principal contractor's and architect's perspectives. Construction Economics and Building, 3(1), pp. 13-18. ISSN 2204-9029

Griffith, A and Phillips, N (2001) The influence of the construction (design and management) regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(5), pp. 533-540. ISSN 01446193

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Grilo, L; Melhado, S; Silva, S A R; Edwards, P and Hardcastle, C (2007) International building design management and project performance: Case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(1), pp. 5-16. ISSN 1745-2007

Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), pp. 215-231. ISSN 0969-9988

Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218

Grist, E (2014) The implementation of innovative and sustainable construction materials. EngD thesis, University of Bath, UK.

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Grosse, E (2018) A gestalt perspective on co-creation: Action research in architectural practice. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Grosskopf, K R (2004) Teaching methods improvement using industry focus groups: A case study in construction financing. International Journal of Construction Education and Research, 1(1), pp. 13-25. ISSN 1557-8771

Grove, E (2019) Becoming collaborative: enhancing the understanding of intra-organisational relational dynamics. EngD thesis, Loughborough University, UK.

Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387

Gruneberg, S L; Hughes, W P and Ancell, D J (2007) Risk under performance-based contracting in the UK construction sector. Construction Management and Economics, 25(7), pp. 691-699. ISSN 1466433X

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.

Gu, J and Wu, Z (2026) Promoting project digital responsibility for sustainable digital construction: A perspective on the coupling of influencing factors. Journal of Construction Engineering and Management, 152(5): 04026050, ISSN 0733-9364

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Gu, J and Guo, F (2024) Promoting digital sustainability through project digital responsibility implementation: An empirical analysis. Journal of Construction Engineering and Management, 150(3): 04023172, ISSN 0733-9364

Guadalupe, H (2020) Safety design management processes to mitigate design errors. PhD thesis, Walden University, USA.

Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.

Guerin, C and Spillane, J P (2021) The role of the construction project manager in developing a culture of suicide prevention. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 6-13. ISSN 17514304

Guerrero, J R and Lindblad, H (2018) Client strategies for stimulating innovation in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gugssa, M; Li, L; Pu, L; Gurbuz, A; Luo, Y and Wang, J (2025) Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods. Engineering, Construction and Architectural Management, 32(7), pp. 4700-4717. ISSN 0969-9988

Guilbert, A (2024) Energy sufficiency and recognition justice: A study of household consumption. Buildings & Cities, 5(1), pp. 489-505. ISSN 2632-6655

Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.

Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988

Gumz, J and Fettermann, D C (2022) What improves smart meters' implementation? A statistical meta-analysis on smart meters' acceptance. Smart and Sustainable Built Environment, 11(4), pp. 1116-1136. ISSN 2046-6099

Gunasekara, D M H; Indikatiya, I H P R; Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(2), pp. 406-424. ISSN 1471-4175

Gunasekara, H G and Sridarran, P (2021) Barriers in blockchain technology adoption for facilities management procurement process in Sri Lanka. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.

Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655

Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988

Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Gunnigan, L (2007) Increasing effectiveness of public private partnerships in the Irish construction industry. PhD thesis, University of Salford, UK.

Gunning, J G (1997) The costs and benefits of achieving business excellence in construction organisations. Journal of Financial Management of Property and Construction, 2(1), pp. 45-58. ISSN 1366-4387

Gunning, J G (2003) The enhancement of quality in construction project management. PhD thesis, Ulster University, UK.

Gunning, J G and McAleenan, C (2010) Safe-T-Cert: An Irish solution to the universal problem of assuring construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Guo, F; Jahren, C T; Hao, J and Zhang, C (2020) Implementation of CIM-related technologies within transportation projects. International Journal of Construction Management, 20(5), pp. 510-519. ISSN 1562-3599

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988

Guo, K; Minchin, E and Ferragut, T (2005) The shift to warranties and performance specifications: What of method specifications? Construction Management and Economics, 23(9), pp. 953-963. ISSN 01446193

Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9): 04025118, ISSN 0733-9364

Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 0969-9988

Guo, S; Wang, J and Xiong, H (2023) The influence of effort level on profit distribution strategies in ipd projects. Engineering, Construction and Architectural Management, 30(9), pp. 4099-4119. ISSN 0969-9988

Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction, 25(3), pp. 347-369. ISSN 1366-4387

Gupta, R; Barnfield, L and Hipwood, T (2014) Impacts of community-led energy retrofitting of owner-occupied dwellings. Building Research & Information, 42(4), pp. 446-461. ISSN 0961-3218

Gupta, R and Gregg, M (2012) Appraisal of UK funding frameworks for energy research in housing. Building Research & Information, 40(4), pp. 446-460. ISSN 0961-3218

Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218

Gupta, T; Kothari, C and Misra, S (2025) Integrating 'difficulty in management' as a decision-making criterion in the risk assessment of PPP infrastructure projects. Construction Management and Economics, 43(7), pp. 502-517. ISSN 0144-6193

Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218

Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988

Guribie, F L; Akubah, J T; Tengan, C and Blay Jnr, A V K (2022) Demand for green building in Ghana: A conceptual modeling and empirical study of the impediments. Construction Innovation, 22(2), pp. 342-360. ISSN 1471-4175

Guribie, F L; Kheni, N A and Sule, M (2022) Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management, 12(4), pp. 667-683. ISSN 2044-124X

Gurmu, A; Kamardeen, I and Mahmood, M N (2023) Blended pedagogical model for effective teaching of building measurement and estimating. International Journal of Construction Management, 23(7), pp. 1138-1147. ISSN 1562-3599

Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364

Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599

Gurmu, A T (2021) Hybrid model for assessing the influence of safety management practices on labor productivity in multistory building projects. Journal of Construction Engineering and Management, 147(11): 04021139, ISSN 0733-9364

Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Guthrie, J L (2000) Group-level reengineering process. EngD thesis, University of Kansas, USA.

Gutierres, Henrique Elias Pessoa (2019) Methodological proposal for the evaluation of geomorphological impacts based on the environmental impact studies of the Serro Azul and Igarapeba dams in the state of Pernambuco. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects. PhD thesis, University of Washington, USA.

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X

Gwimile, T A (2026) Holistic maintenance management for higher learning institution buildings in Tanzania. International Journal of Building Pathology and Adaptation, 44(1), pp. 223-240. ISSN 2398-4708

Gyampoh-Vidogah, R; Moreton, R and Proverbs, D (2003) Implementing information management in construction: Establishing problems, concepts and practice. Construction Innovation, 3(3), pp. 157-173. ISSN 1471-4175

Gyi, D E; Gibb, A G F and Haslam, R A (1999) The quality of accident and health data in the construction industry: Interviews with senior managers. Construction Management and Economics, 17(2), pp. 197-204. ISSN 01446193

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Göswein, V; Arehart, J; Phan-Huy, C; Pomponi, F and Habert, G (2022) Barriers and opportunities of fast-growing biobased material use in buildings. Buildings & Cities, 3(1), pp. 745-755. ISSN 2632-6655

Günay, G (2025) Development of standards for modular construction: Learning from the freight container. PhD thesis, Middle East Technical University, Turkey.

Haass, Omid (2018) Resilience and emergence in contemporary project evaluation: An epic battle between professional and political logics. PhD thesis, Griffith University, Brazil.

Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.

Habibi, S (2022) Role of BIM and energy simulation tools in designing zero-net energy homes. Construction Innovation, 22(1), pp. 101-119. ISSN 1471-4175

Habtu, T. M.; A. Elsaigh, W. and Musonda, I. (2026) Toward a strategic framework for AI-BIM adoption in Ethiopian road infrastructure management. Engineering, Construction and Architectural Management, 33(15), pp. 564-589. ISSN 0969-9988

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.

Haddad, A N; Silva, A B; Hammad, A W A; Najjar, M K; Vazquez, E G and Tam, V W Y (2023) An integrated approach of building information modelling and life cycle assessment (BIM-LCA) for gas and solar water heating systems. International Journal of Construction Management, 23(14), pp. 2452-2468. ISSN 1562-3599

Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.

Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.

Hadidi, L and Abzakh, A (2022) Toward an understanding of BPR perception in the construction industry: The employee attitude toward job enlargement and enrichment in Saudi Arabia. Engineering, Construction and Architectural Management, 29(1), pp. 204-221. ISSN 0969-9988

Hadidi, L; Assaf, S; Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(2), pp. 176-190.

Hadikusumo, B H W (2001) Virtually real construction site processes: hazard identification and accident precaution planning using design-for-safety-process (DFSP) tool. PhD thesis, University of Hong Kong, Hong Kong.

Hadipriono, F C (1982) Institutional and procedural methods for preventing failures of long span structures. DEngr thesis, University of California, Berkeley, USA.

Hadjistephanou, P (2007) The Olympic Games: a demonstration of the positive and negative side of project management. PhD thesis, Keele University, UK.

Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.

Hadzaman, N A H; Takim, R and Nawawi, A H (2015) BIM roadmap strategic implementation plan: Lesson learnt from Australia, Singapore and Hong Kong. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor. PhD thesis, University of Leeds, UK.

Haggag, A G; Zaki, S H and Selim, A M (2023) Emergency camps design using analytical hierarchy process to promote the response plan for the natural disasters. Architectural Engineering and Design Management, 19(3), pp. 305-322. ISSN 1745-2007

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Haji Md Yusof, I (2019) Development of lean design process for building construction projects. PhD thesis, University of Birmingham, UK.

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Hajizadeh, S. and Seyis, S. (2026) Multi-climate zone approach to sustainable retrofitting for optimizing energy efficiency and CO2 reduction in Australian detached houses. International Journal of Building Pathology and Adaptation, 44(4), pp. 885-909. ISSN 2398-4708

Hajj, C E; Jawad, D and Montes, G M (2021) Analysis of a construction innovative solution from the perspective of an information system theory. Journal of Construction Engineering and Management, 147(9): 03121003, ISSN 0733-9364

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. PhD thesis, University of Strathclyde, UK.

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.

Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.

Halder, A and Batra, S (2024) Navigating the ethical discourse in construction: A state-of-the-art review of relevant literature. Journal of Construction Engineering and Management, 150(3): 03124001, ISSN 0733-9364

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Hall, A T; Durdyev, S; Koc, K; Ekmekcioglu, O and Tupenaite, L (2023) Multi-criteria analysis of barriers to building information modeling (BIM) adoption for SMEs in new zealand construction industry. Engineering, Construction and Architectural Management, 30(9), pp. 3798-3816. ISSN 0969-9988

Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations. PhD thesis, Stanford University, USA.

Hall, M and Tomkins, C (2001) A cost of quality analysis of building project: Towards a complete methodology for design and build. Construction Management and Economics, 19(7), pp. 727-740. ISSN 01446193

Hallal, I and Sahnoune, T (2023) Urban mix in housing neighbourhoods: Challenges, evaluation method and diagnosis of ayouf in jijel, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 229-248. ISSN 1759-5916

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Halliday, J (1995) Use of the New Engineering Contract in Hong Kong. Engineering, Construction and Architectural Management, 2(4), pp. 307-315. ISSN 0969-9988

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Hallowell, M R and Calhoun, M E (2011) Interrelationships among highly effective construction injury prevention strategies. Journal of Construction Engineering and Management, 137(11), pp. 985-993. ISSN 0733-9364

Hallowell, M R and Gambatese, J A (2010) Population and initial validation of a formal model for construction safety risk management. Journal of Construction Engineering and Management, 136(9), pp. 981-990. ISSN 0733-9364

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193

Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.

Hamida, M B (2025) Circular and adaptable building transformation: Reconceptualization, practice exploration, framework co‑development and implementation. PhD thesis, Delft University of Technology, Netherlands.

Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531

Hamida, M B and Hassanain, M A (2022) Investigation of AEC/FM practices in adaptive reuse projects. International Journal of Building Pathology and Adaptation, 40(4), pp. 636-660. ISSN 23984708

Hamidpour, E (2025) Title: Risk factors hindering the application of value engineering in Iranian construction projects. International Journal of Construction Management, 25(16), pp. 1998-2006. ISSN 1562-3599

Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218

Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects. PhD thesis, University of Texas at Austin, USA.

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hammond, S; Bowen, P and Cattell, K (2016) The roadside work-seeker phenomenon in the South African informal construction sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Hampshire, P (2015) The development of an approach and decision support tool to inform sustainable roof selection. EngD thesis, University of Bath, UK.

Hampson, K and Kwok, T (1997) Strategic alliances in building construction: a tender evaluation tool for the public sector. Journal of Construction Procurement, 3(1), pp. 28-41. ISSN 1358-9180

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hampton, D; Jin, J S and Clark, E A (1990) Foundation construction within wastewater-treatment plant. Journal of Construction Engineering and Management, 116(4), pp. 564-573. ISSN 0733-9364

Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387

Hamta, N; Ehsanifar, M and Sarikhani, J (2021) Presenting a goal programming model in the time-cost-quality trade-off. International Journal of Construction Management, 21(1), pp. 1-11. ISSN 1562-3599

Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988

Hamzeh, F; Rached, F; Hraoui, Y; Karam, A J; Malaeb, Z; El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: A middle East perspective. Built Environment Project and Asset Management, 9(3), pp. 334-347. ISSN 2044-124X

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, B and Leite, F (2021) Measuring the impact of immersive virtual reality on construction design review applications: Head-mounted display versus desktop monitor. Journal of Construction Engineering and Management, 147(6): 04021042, ISSN 0733-9364

Han, C-H (1990) Artificial intelligence methodology for simulation modeling. PhD thesis, Georgia Institute of Technology, USA.

Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.

Han, J; Rapoport, A and Fong, P S W (2020) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(1), pp. 49-65. ISSN 0969-9988

Han, S; Bouferguene, A; Al-Hussein, M and Hermann, U R (2017) 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. Journal of Construction Engineering and Management, 143(9): 04017060, ISSN 0733-9364

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Han, S-H (2004) A working prototype of distributed collaborative architectural design system. PhD thesis, University of Michigan, USA.

Hanafi, M H; Farrell, P; Yusoff, M N; Abdullah, S and Abdul Razak, A (2018) Installation systems of on-site prefabricated concrete components: A qualitative approach. International Journal of Construction Management, 18(5), pp. 343-350. ISSN 1562-3599

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.

Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations. PhD thesis, Heriot-Watt University, UK.

Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364

Hanna, A S (2016) Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9): 04016040, ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Hanna, A S; Yeutter, M and Aoun, D G (2014) State of practice of building information modeling in the electrical construction industry. Journal of Construction Engineering and Management, 140(12): 05014011, ISSN 0733-9364

Hansen, K L; Gann, D M and Gro K, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(2), pp. 115-126. ISSN 0969-9988

Haque, S M M (2004) Success factors in collaborative relationships (alliancing and partnering) in the UK upstream oil and gas industry, and perception of trust. PhD thesis, Robert Gordon University, UK.

Harada, S (2015) Bidding for private finance initiative projects: An analysis. Journal of Financial Management of Property and Construction, 20(2), pp. 188-202. ISSN 1366-4387

Haran, M; McCord, M; Hutchison, N; McGreal, S; Adair, A; Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: An international perspective. Journal of Financial Management of Property and Construction, 18(2), pp. 184-203. ISSN 1366-4387

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harding, D and Boyd, P (2024) Generative AI and phd supervision: A covert third wheel or a seat at the table? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Hari, S; Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(6), pp. 533-567. ISSN 0969-9988

Harinarain, Nishani and Babalola, Ayotunde (2026) Constraining sustainability: A critical examination of construction policy and practice in Nigeria. Journal of Construction Business and Management, 8(S1), pp. 111-124. ISSN 2521-0165

Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387

Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.

Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.

Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.

Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364

Harper, R S and Koehn, E (1998) Managing industrial construction safety in southeast Texas. Journal of Construction Engineering and Management, 124(6), pp. 452-457. ISSN 0733-9364

Harrington, S and Mulville, M (2021) A risk framework for the delivery of long-term performance through the large-scale energy focused retrofit of housing. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Harris, James Egerson (2025) Relationship between time assessment, cost projection, and project performance in the U.S. Government. DBA thesis, Walden University, USA.

Harris, M A (2007) Developing a scorecard to evaluate the use of personal fall arrest systems. PhD thesis, University of Florida, USA.

Harris, P T and Holt, G D (1999) The management of sustainable social housing refurbishment strategies in the West Midlands region of the UK. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218

Harris Sr., C E (2023) Public private partnerships in infrastructure: A study on performance and equity improvement. DBA thesis, National University, USA.

Harrop, J N (2018) Sustainability, awareness and the built environment. PhD thesis, Cranfield University, UK.

Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.

Hartmann, T (2011) Goal and process alignment during the implementation of decision support systems by project teams. Journal of Construction Engineering and Management, 137(12), pp. 1134-1141. ISSN 0733-9364

Hartmann, T and Levitt, R E (2010) Understanding and managing three-dimensional/four-dimensional model implementations at the project team level. Journal of Construction Engineering and Management, 136(7), pp. 757-767. ISSN 0733-9364

Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X

Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218

Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X

Harty, J (2012) The impact of digitalisation on the management role of architectural technology. PhD thesis, Robert Gordon University, UK.

Haruna, A.; Likhitruangsilp, V.; Pinich, S. and Ioannou, P. G. (2025) Critical success factors for circular economy implementation toward sustainable construction: An iterative stationary approach. Architectural Engineering and Design Management, 21(6), pp. 1416-1434. ISSN 1745-2007

Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.

Hasan, A and Jha, K N (2016) Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India. Journal of Construction Engineering and Management, 142(2): 04015064, ISSN 0733-9364

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hasan, L N; Lizarralde, G and Lachapelle, E (2025) The legitimation of private net zero emission building standards in the context of global decarbonization goals. Construction Management and Economics, 43(5), pp. 360-380. ISSN 0144-6193

Hasan, M and Fadli, F (2025) Street re-design for the adoption of autonomous vehicles: Case of the city of doha, qatar. Smart and Sustainable Built Environment, 14(3), pp. 776-793. ISSN 2046-6099

Hasan, M R; Sagar, M S I and Ray, B C (2023) Barriers to improving construction and demolition waste management in Bangladesh. International Journal of Construction Management, 23(14), pp. 2333-2347. ISSN 1562-3599

Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. PhD thesis, University of Birmingham, UK.

Hasanzadeh, S; De La Garza, J M and Geller, E S (2020) Latent effect of safety interventions. Journal of Construction Engineering and Management, 146(5): 04020033, ISSN 0733-9364

Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771

Hashem M. Mehany, M S and Guggemos, A (2015) Risk management for asphalt road construction and maintenance under performance-based contracts. International Journal of Construction Education and Research, 11(4), pp. 292-315. ISSN 1557-8771

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassan, N M and Alashwal, A (2025) Developing a model for the implementation of designing out waste in construction. Architectural Engineering and Design Management, 21(1), pp. 154-170. ISSN 1745-2007

Hassan, O A B (2016) An integrated approach to assessing the sustainability of buildings. Journal of Engineering, Design and Technology, 14(4), pp. 835-850.

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

Hassan Ali, A; Farouk Kineber, A; Elshaboury, N; Arashpour, M and Osama Daoud, A (2025) Analysing multifaceted barriers to modular construction in sustainable building projects: a comprehensive evaluation using multi-criteria decision making. International Journal of Construction Management, 25(1), pp. 1-17. ISSN 1562-3599

Hassanain, M A; Al-Marzooq, A; Alshibani, A and Zami, M S (2026) Factors influencing IoT adoption for sustainable facilities management in Saudi Arabia: A stakeholder assessment. Smart and Sustainable Built Environment, 15(1), pp. 319-342. ISSN 2046-6099

Hassanain, M A (2002) Integrated systems for maintenance management. PhD thesis, University of British Columbia, Canada.

Hassanain, M A; Alamoudi, A; Al-Hammad, A M and Abdallah, A (2020) Barriers to the implementation of poe practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(2), pp. 150-165. ISSN 1745-2007

Hassanain, M A; Bin-Mohanna, A; Al-Hammad, A-M and Sanni-Anibire, M O (2017) Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(2), pp. 130-142. ISSN 2044-124X

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics. PhD thesis, Missouri University of Science and Technology, USA.

Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387

Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988

Hasso, M H (1996) Strategic systems model for the management of United States international engineering and construction growth. PhD thesis, Worcester Polytechnic Institute, USA.

Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hastak, M; Vanegas, J A and Puyana-Camargo, M (1993) Time-based competition: Competitive advantage tool for A/E/C firms. Journal of Construction Engineering and Management, 119(4), pp. 785-800. ISSN 0733-9364

Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175

Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.

Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364

Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.

Haupt, T C (2001) The performance approach to construction worker safety and health. PhD thesis, University of Florida, USA.

Haupt, T C (2003) A study of management attitudes to a performance approach to construction worker safety. Journal of Construction Research, 4(1), pp. 87-100. ISSN 1609-9451

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(3), pp. 203-214. ISSN 0969-9988

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.

Hayne, G; Kumar, B and Hare, B (2017) Design hazard identification and the link to site experience. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 85-94. ISSN 17514304

Haynes, W A (2002) An exploration of the nexus of the public and private sectors in the project management organizations for two boston megaprojects: The central artery/tunnel project and the Boston Harbor cleanup. PhD thesis, Northeastern University, USA.

He, C (2018) Public procurement: award mechanisms and implementation process. PhD thesis, Loughborough University, UK.

He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.

He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193

He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364

He, Y; Shi, L and Li, Z (2021) The combined effect of marginal social and private benefit on the socially optimal equity structure of PPP projects. Construction Management and Economics, 39(10), pp. 807-823. ISSN 01446193

Hearne, R (2013) Realising the "right to the city": Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(2), pp. 172-187. ISSN 17561469

Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.

Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364

Hedborg, S and Rosander, L (2024) Self-organizing in urban development: Developers coordinating between construction projects. Construction Management and Economics, 42(2), pp. 114-128. ISSN 01446193

Hedborg Bengtsson, S; Karrbom Gustavsson, T and Eriksson, P E (2018) Users’ influence on inter-organizational innovation: mapping the receptive context. Construction Innovation, 18(4), pp. 488-504. ISSN 1471-4175

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193

Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364

Hegazy, T; Zaneldin, E and Grierson, D (2001) Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127(4), pp. 322-329. ISSN 0733-9364

Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387

Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service. PhD thesis, University of Edinburgh, UK.

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(3), pp. 309-327. ISSN 0969-9988

Henderson, J R; Ruikar, K D and Dainty, A R J (2013) The need to improve double-loop learning and design-construction feedback loops: A survey of industry practice. Engineering, Construction and Architectural Management, 20(3), pp. 290-306. ISSN 0969-9988

Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction. PhD thesis, University of Michigan, USA.

Henry, E and Brothers, H S (2001) Cost analysis between SABER and design bid build contracting methods. Journal of Construction Engineering and Management, 127(5), pp. 359-366. ISSN 0733-9364

Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X

Hepworth, A (2021) Decision-making in immature projects organisational environment: A mental model approach that influences conscientious critical thinking. PhD thesis, University of Liverpool, UK.

Herazo, Benjamin (2017) The influence of sustainability in project management practices in the building sector. PhD thesis, Université de Montréal, Canada.

Herbert, Y; Dale, A and Stashok, C (2022) Canadian cities: Climate change action and plans. Buildings & Cities, 3(1), pp. 854-873. ISSN 2632-6655

Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364

Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364

Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities. PhD thesis, Coventry University, UK.

Hernandez Delgado, O A (1998) Decision-making for the selection of investment projects. PhD thesis, University of Nottingham, UK.

Hernandez Mendez, A (2018) Improving project performance through implementation of agile methodologies in the renewable energy construction industry. DEngr thesis, George Washington University, USA.

Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2021) Analyzing the association between lean design management practices and BIM uses in the design of construction projects. Journal of Construction Engineering and Management, 147(4): 04021010, ISSN 0733-9364

Herrera Valencia, R F (2020) Impact of BIM/lean on the interaction of construction project design teams. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Hessami, A R; Faghihi, V; Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(8), pp. 726-738. ISSN 01446193

Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects. PhD thesis, University College London, UK.

Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.

Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X

Hewlett, B; Sherratt, F and Edmondson, V (2022) Managing designing for safety: A framework for whole-Team decision making and risk control. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 15-26. ISSN 17514304

Heylighen, A; Martin, W M and Cavallin, H (2007) Building stories revisited: Unlocking the knowledge capital of architectural practice. Architectural Engineering and Design Management, 3(1), pp. 65-74. ISSN 1745-2007

Hezel, Claudia Regina (2014) Impact assessment of the requirements of the contractor in integrated management systems for industrial assembly companies in the oil industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Hidayat, B (2013) The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. PhD thesis, University of Salford, UK.

Hidayat, B and Egbu, C (2010) A literature review of the role of project management in post-disaster reconstruction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hide, G (2010) Producing a programme under the NEC form of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 59-64. ISSN 17514312

Hide, S (2003) Exploring accident causation in the construction industry. PhD thesis, Loughborough University, UK.

Hietajärvi, A-M and Aaltonen, K (2018) The formation of a collaborative project identity in an infrastructure alliance project. Construction Management and Economics, 36(1), pp. 1-21. ISSN 0144-6193

Hietajärvi, A-M; Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(3), pp. 340-362. ISSN 1471-4175

Higham, A and Fortune, C J (2012) Investment appraisal tools and sustainability evaluation in social housing. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Higuera-Trujillo, J L; Llinares Millán, C; Montañana i Aviñó, A and Rojas, J C (2020) Multisensory stress reduction: A neuro-architecture study of paediatric waiting rooms. Building Research & Information, 48(3), pp. 269-285. ISSN 0961-3218

Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hilali, A; Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(8), pp. 1574-1592. ISSN 0969-9988

Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hill, Natoya (2025) A systematic literature review: Exploring the integration of artificial intelligence in construction management. DSc thesis, Middle Georgia State University, USA.

Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.

Hindle, R D and Muller, M H (1997) The role of education as an agent of change: a two-fold effect. Journal of Construction Procurement, 3(1), pp. 56-69. ISSN 1358-9180

Hindle, R D and Rwelamila, P (1998) Resistance to change: Architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(2), pp. 150-158. ISSN 0969-9988

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387

Hlatshwayo, T N s (2024) Enabling legislative coherence in the Eswatini construction industry. PhD thesis, Nelson Mandela University, South Africa.

Ho, M F; Drew, D; McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: A case study in Hong Kong. Construction Management and Economics, 22(6), pp. 595-606. ISSN 01446193

Ho, S P (2006) Model for financial renegotiation in public-private partnership projects and its policy implications: Game theoretic view. Journal of Construction Engineering and Management, 132(7), pp. 678-688. ISSN 0733-9364

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180

Hochachka, G; Logan, K G; Raymond, J and Mérida, W (2022) Climate action in urban mobility: Personal and political transformations. Buildings & Cities, 3(1), pp. 1019-1041. ISSN 2632-6655

Hochscheid, E; Falardeau, M; Lapalme, J; Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(9): 05023010, ISSN 0733-9364

Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.

Hodkinson, S and Essen, C (2015) Grounding accumulation by dispossession in everyday life: The unjust geographies of urban regeneration under the private finance initiative. International Journal of Law in the Built Environment, 7(1), pp. 72-91. ISSN 1756-1450

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(6), pp. 696-708. ISSN 0969-9988

Hoezen, M and Doree, A (2008) First Dutch competitive dialogue projects: A procurement route caught between competition and collaboration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Hoezen, M; Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(1), pp. 6-24. ISSN 2044-124X

Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X

Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.

Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(1), pp. 46-66. ISSN 1471-4175

Holt, G D and Goulding, J S (2017) PROD2UCT: An outcome-oriented dissertation study model for construction engineering students. Journal of Engineering, Design and Technology, 15(1), pp. 104-117.

Holt, G D; Proverbs, D G and Whitehouse, L (2001) A survey of public sector procurement in England. Journal of Construction Procurement, 7(1), pp. 3-10. ISSN 1358-9180

Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(1), pp. 57-74. ISSN 01446193

Holt, L (1989) Project management excellence: The Shell Stanney case. Construction Management and Economics, 7(3), pp. 217-234. ISSN 01446193

Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach. PhD thesis, University of Washington, USA.

Honda, Wilson Saburo (2016) Sustainability certificate of corporate offices buildings in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Hong, Y; Hammad, A; Zhong, X; Wang, B and Akbarnezhad, A (2020) Comparative modeling approach to capture the differences in BIM adoption decision-making process in Australia and China. Journal of Construction Engineering and Management, 146(2): 04019099, ISSN 0733-9364

Hong, Y; Hammad, A W A and Akbarnezhad, A (2019) Impact of organization size and project type on BIM adoption in the Chinese construction market. Construction Management and Economics, 37(11), pp. 675-691. ISSN 01446193

Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988

Hong, Ying Civil (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations. PhD thesis, University of New South Wales, Australia.

Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing. PhD thesis, Northumbria University, UK.

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193

Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916

Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.

Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599

Hosseini, M R; Chileshe, N; Jepson, J and Arashpour, M (2016) Critical success factors for implementing risk management systems in developing countries. Construction Economics and Building, 16(1), pp. 18-32. ISSN 2204-9029

Hosseinian, S M; Andalib, M and Carmichael, D G (2022) Appropriate types of payments in construction contracts based on agency theory parameters. Journal of Construction Engineering and Management, 148(1): 04021187, ISSN 0733-9364

Hosseinian, S M and Carmichael, D G (2013) Optimal incentive contract with risk-neutral contractor. Journal of Construction Engineering and Management, 139(8), pp. 899-909. ISSN 0733-9364

Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988

Hosseinian, S M and Tavakoli, M (2023) Markets, hierarchies, or hybrids as alternative governance structures in construction contracts: Transaction cost economics analysis. Journal of Construction Engineering and Management, 149(1): 04022149, ISSN 0733-9364

Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Howarth, T; Stoneman, G and Hill, C (2000) A review of the construction (design and management) regulations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Howell, G A (2011) New operating system for project management: Consequences and opportunities. Journal of Construction Engineering and Management, 137, pp. 882-886. ISSN 0733-9364

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Hsiao, C-C (2000) Constructing a sustainable impact assessment methodology: an evaluation of Taiwanese EIA of high-rise building. PhD thesis, University of Edinburgh, UK.

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection. PhD thesis, University of Maryland, College Park, USA.

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364

Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(5), pp. 674-691. ISSN 0969-9988

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.

Hu, M and Milner, D (2021) Factors influencing existing medium-sized commercial building energy retrofits to achieve the net zero energy goal in the United States. Building Research & Information, 49(5), pp. 525-542. ISSN 0961-3218

Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599

Hu, X; Chong, H Y; Wang, X and London, K (2019) Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8): 03119003, ISSN 0733-9364

Hu, Z; Li, Q; Liu, T; Wang, L and Cheng, Z (2021) Government equity investment, effective communication and public private partnership (PPP) performance: Evidence from China. Engineering, Construction and Architectural Management, 28(9), pp. 2811-2827. ISSN 0969-9988

Hua, Y (2017) Cultural dynamics of information communication technology (ICT) adoption in construction. PhD thesis, University of Hong Kong, Hong Kong.

Hua, Y; Kang, F; Zhang, S and Li, J (2023) Impacts of task interdependence and equivocality on ICT adoption in the construction industry: A task-technology fit view. Architectural Engineering and Design Management, 19(1), pp. 92-109. ISSN 1745-2007

Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(6), pp. 423-438. ISSN 1745-2007

Hua, Y; Zhang, Y and Ma, P (2024) The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management, 20(3), pp. 636-655. ISSN 1745-2007

Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988

Huang, C (2005) The development of an integrated paradigm and a decision support framework for IT innovation adoption. Unpublished PhD thesis, University of Reading, UK.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, J (2012) The effects of the development of Private Finance Initiatives in the UK and their relevance in the implementation of Build-Operate-Transfer projects in Chinese road and water sectors. PhD thesis, De Montfort University, UK.

Huang, J; Abadi, M and Yeow, J (2023) Policies for the transition to circular construction: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Huang, K; Jia, G; Liu, D and Ma, Y (2018) The transformation mechanism of work-related stress into unsafe behaviour in construction industry: Based on DEA method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.

Huang, N; Du, Q; Bai, L and Chen, Q (2025) Optimizing collaborative decision-making of multi-agent resources for large-scale projects: From a matching perspective. Engineering, Construction and Architectural Management, 32(1), pp. 16-37. ISSN 0969-9988

Huang, N; Du, Q; Zou, P X W and Huang, Y (2023) Analysis of key factors influencing green highway project development focusing on network interaction and project success: Evidence from China. Engineering, Construction and Architectural Management, 30(8), pp. 3203-3223. ISSN 0969-9988

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, Y; Trinh, M T and Le, T (2021) Critical factors affecting intention of use of augmented hearing protection technology in construction. Journal of Construction Engineering and Management, 147(8): 0002116, ISSN 0733-9364

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Huang, Y L and Pi, C C (2009) Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach. Construction Management and Economics, 27(7), pp. 653-666. ISSN 1466433X

Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364

Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development. PhD thesis, University of California, Berkeley, USA.

Hughes, C and Crosby, N (2012) The challenge of self-regulation in commercial property leasing: A study of lease codes in the UK. International Journal of Law in the Built Environment, 4(1), pp. 23-44. ISSN 1756-1450

Hughes, D; Williams, T and Ren, Z (2012) Differing perspectives on collaboration in construction. Construction Innovation, 12(3), pp. 355-368. ISSN 1471-4175

Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.

Hughes, W P (1989) Organizational analysis of building projects. PhD thesis, Liverpool Polytechnic, UK.

Hughes, W P (1997) Construction management contracts: Law and practice. Engineering, Construction and Architectural Management, 4(1), pp. 59-79. ISSN 0969-9988

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hughes, W P and Shinoda, H (1999) Achieving satisfactory contractual terms for the engineer's role. In: Hughes, W P (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Hugo, J and Farhadian, M (2026) Living labs and building testing labs: Enabling climate change adaptation. Buildings & Cities, 7(1), pp. 126-142. ISSN 2632-6655

Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387

Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364

Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.

Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.

Hunhevicz, J J (2022) Exploring the potential of blockchain and cryptoeconomics for the construction industry. DSc thesis, ETH Zürich, Switzerland.

Huni, Tendai (2025) Social power configurations influencing relationship strength and supplier performance in the construction industry. PhD thesis, Vaal University of Technology, South Africa.

Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Huo, X; Yu, A T W; Zezhou, W and Jayantha, W M (2020) Site planning and design of green residential building projects: Case studies in China. Engineering, Construction and Architectural Management, 27(2), pp. 525-543. ISSN 0969-9988

Hurst, A G (2009) CPD and work-based learning for construction managers: Is it accessible? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Husain, T (2023) Foreign investment and infrastructure financing: railways during the first age of globalisation. PhD thesis, University College London, UK.

Hussain, A.; Che Ibrahim, C. K. I.; Belayutham, S.; Manu, P. and Cheung, C. (2026) Exploring regulatory capabilities for design for safety in construction: The case of Malaysia. Built Environment Project and Asset Management, 16(2), pp. 221-241. ISSN 2044-124X

Hussein, M K; Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), pp. 153-173. ISSN 1823-6499

Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.

Hussien, A (2017) ARGILE: a conceptual framework combining augmented reality with agile philosophy for the UK construction industry. PhD thesis, Liverpool John Moores University, UK.

Huynh, N. M.; Bui, P. T.; Le-Hoai, L. and Tang, M. N. (2026) Prioritizing actions to mitigate causes of material waste in construction using quality function deployment. Construction Economics and Building, 26(2), ISSN 2204-9029

Hwang, J.; Bagh, S. and Han, K. (2026) Toward automated SLAM-to-BIM for digital twin applications: BIM-assisted 360-degree camera-based visual SLAM using reference point-based bundle adjustment. Journal of Construction Engineering and Management, 152(10): 04026161, ISSN 0733-9364

Hwang, B G and Ho, J W (2012) Front-end planning implementation in Singapore: Status, importance, and impact. Journal of Construction Engineering and Management, 138(4), pp. 567-573. ISSN 0733-9364

Hwang, B G; Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(2), pp. 143-159. ISSN 0969-9988

Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364

Hwang, S (2022) Sharing tacit knowledge in small-medium regional construction companies in the U.S.: The current status and the impact of organizational ecology. International Journal of Construction Management, 22(9), pp. 1746-1755. ISSN 1562-3599

Hwang, S (2022) Framework for implementing integrated service-learning. International Journal of Construction Management, 22(7), pp. 1260-1273. ISSN 1562-3599

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364

Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X

Höök, M and Stehn, L (2014) Exploring the management of multiple business models in one company. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.

Ibbotson, K and Farrell, P (2019) The challenges of prioritising low carbon in public sector flood and coastal erosion risk management (FCERM) construction. International Journal of Building Pathology and Adaptation, 37(5), pp. 615-628. ISSN 23984708

Ibbs, C W (1986) Future directions for computerized construction research. Journal of Construction Engineering and Management, 112(3), pp. 326-345. ISSN 0733-9364

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364

Ibem, E O; Aduwo, E B; Afolabi, A O; Oluwunmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) procurement adoption and users’ experience in the Nigerian construction sector. International Journal of Construction Education and Research, 17(3), pp. 258-276. ISSN 1557-8771

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Ibrahim, K; Okanlawon, T T; Oyewobi, L O; Badamasi, A; Dodo, M and Jimoh, R A (2026) Construction 4.0: Enhancing sustainable construction practices by evaluating digital twin barriers in the Nigerian AEC industry. Engineering, Construction and Architectural Management, 33(1), pp. 258-283. ISSN 0969-9988

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),

Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the local improvement finance trust (lift) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(5), pp. 504-518. ISSN 0969-9988

Ibrahim, C K I C; Manu, P; Belayutham, S; Cheung, C; Mohamad, M Z; Yunusa-Kaltungo, A; Ismail, S and Hussain, A (2023) Factors influencing dfs adoption: The case of Malaysian construction organisations. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029

Ibrahim, K I; Costello, S B and Wilkinson, S (2015) Validation of a model for assessing alliance team integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Ibrahim, M (2016) Analyzing decision making in alternative contracting for highway pavement rehabilitation projects. PhD thesis, Florida International University, USA.

Ibrahim, M N; Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation, 19(4), pp. 550-569. ISSN 1471-4175

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.

Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007

Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531

Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499

Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499

Iftikhar, Rehab (2017) Crisis management in project based organizations and mega projects: An integrated approach. PhD thesis, Luiss Guido Carli, Italy.

Ignacio, J T S; Gotangco Gonzales, C K and Lee-Chua, Q (2024) A systems thinking approach to e-learning on climate change: Capacity-building for junior high school teachers in the Philippines. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 409-424. ISSN 1759-5916

Ihm, S Y; Lee, H J; Lee, E J and Park, Y H (2021) A policy knowledge- and reasoning-based method for data-analytic city policymaking. Building Research & Information, 49(1), pp. 38-54. ISSN 0961-3218

Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.

Ikediashi, D; Udo, G and Ofoegbu, M (2020) Post-occupancy evaluation of University of Uyo buildings. Journal of Engineering, Design and Technology, 18(6), pp. 1711-1730. ISSN 1726-0531

Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(5), pp. 1591-1615. ISSN 1726-0531

Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708

Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387

Iles, D and Ryall, P (2016) How can the United Kingdom construction industry implement sustainable procurement strategies? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Ilhan, B and Yobas, B (2019) Measuring construction for social, economic and environmental assessment. Engineering, Construction and Architectural Management, 26(5), pp. 746-765. ISSN 0969-9988

Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes. PhD thesis, Concordia University, Canada.

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Ilter, D and Dikbas, A (2008) The use of key attrıbutes ın alternatıve dıspute resolutıon (ADR) process desıgn. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599

Imoudu, E W; Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(4), pp. 408-432. ISSN 1471-4175

Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364

Imriyas, K; Pheng, L S and Teo, E A L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(6), pp. 563-584. ISSN 1466433X

Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193

Inan Gunaydin, T (2022) Wind flow on and around u-shaped buildings. Journal of Engineering, Design and Technology, 20(3), pp. 841-859. ISSN 1726-0531

Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364

Indikatiya, I H P R; Liyanage, M L D C J and Jayawardene, S M (2025) Managing intragroup conflicts between direct stakeholder's teams during construction stage: Case studies in Sri Lanka. Journal of Financial Management of Property and Construction, 30(3), pp. 500-517. ISSN 1366-4387

Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.

Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.

Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), pp. 55-73. ISSN 2414-0236

Invernizzi, D C; Locatelli, G and Brookes, N J (2020) Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance. Construction Management and Economics, 38(10), pp. 947-963. ISSN 01446193

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.

Inyim, P (2015) Time, cost, and environmental impact analysis for sustainable design at multiple building levels. PhD thesis, Florida International University, USA.

Ioannou, P G (1987) Geologic prediction model for tunneling. Journal of Construction Engineering and Management, 113(4), pp. 569-590. ISSN 0733-9364

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364

Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364

Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364

Iqbal, M.; Lin, Z.; Ahmed, R. I.; Ahmad, N. and Hussain, K. (2026) Exploring the paths to big data analytics implementation success in construction projects: An integrated approach. Engineering, Construction and Architectural Management, 33(7), pp. 5418-5444. ISSN 0969-9988

Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Isa, S S M and Abidin, N Z (2021) Eco-innovation adoption in Malaysian contractor firms: Understanding the components and drivers. Construction Economics and Building, 21(3), pp. 221-242. ISSN 2204-9029

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Isah, A D; Muhammad, I B and Katun, I (2018) Optimizing architects’ building materials’ specification strategy through knowledge management principles. Construction Innovation, 18(4), pp. 394-411. ISSN 1471-4175

Ishak, S S M and Newton, S (2016) An innovation resistance factor model. Construction Economics and Building, 16(3), pp. 87-103. ISSN 2204-9029

Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599

Ishtiaque, T A; Wondimu, P A; Memic, N; Andersen, B S; Lædre, O and Klakegg, O J (2025) Ranking the benefits of early contractor involvement: a client's perspective. International Journal of Construction Management, 25(6), pp. 728-739. ISSN 1562-3599

Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X

Isiadinso, C; Anumba, C J; El-Rimawi, J and Bhamra, T (2006) Design for deconstruction lessons from the manufacturing industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Isikdag, U (2006) Towards the implementation of building information models in geospatial context. PhD thesis, University of Salford, UK.

Isikdag, U; Underwood, J; Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: A fire response management case. Architectural Engineering and Design Management, 3(2), pp. 124-142. ISSN 1745-2007

Iskandar, K A S (2018) A new comprehensive mathematical assessment methodology for team collaboration and integration and project performance in healthcare construction. PhD thesis, University of Wisconsin - Madison, USA.

Iskandarani, H; Proverbs, D G and Xiao, H (2023) Towards improving the design and planning of post-conflict housing reconstruction projects: A conceptual framework. Built Environment Project and Asset Management, 13(2), pp. 253-269. ISSN 2044-124X

Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.

Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499

Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Ismail, S and Azzahra, H F (2014) Rationales for public private partnership (PPP) implementation in Malaysia. Journal of Financial Management of Property and Construction, 19(3), pp. 188-201. ISSN 1366-4387

Ismail, S; Che Ibrahim, C K I; Belayutham, S and Mohammad, M Z (2022) Analysis of attributes critical to the designer's prevention through design competence in construction: The case of Malaysia. Architectural Engineering and Design Management, 18(3), pp. 325-343. ISSN 1745-2007

Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X

Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X

Ismail, S; Musawa, M S and Ahmad, H (2019) Transparency of public private partnership (PPP): The extent of mandatory information disclosure. Built Environment Project and Asset Management, 9(5), pp. 655-668. ISSN 2044-124X

Ismail, Sushilawati (2018) Developing a framework for sustainable industrialised building systems for infrastructure projects in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708

Ismail, Z A (2021) Implementation of BIM technology for knowledge transfer in IBS building maintenance projects. International Journal of Building Pathology and Adaptation, 39(1), pp. 115-134. ISSN 23984708

Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.

Issa, D; Emsley, M and Krikham, R (2012) Reviewing risk allocation for infrastructure pfi: Between theory and practice. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Issa, M H (2011) The Canadian green building initiative: Post occupancy evaluation of Canadian green schools. PhD thesis, University of New Brunswick, Canada.

Issa, R R A and Haddad, J (2008) Perceptions of the impacts of organizational culture and information technology on knowledge sharing in construction. Construction Innovation, 8(3), pp. 182-201. ISSN 1471-4175

Isuri Anuradha, A; Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), pp. 304-329. ISSN 2044-124X

Itoya, E (2012) Carbon emissions evaluation for highway management and maintenance. EngD thesis, Loughborough University, UK.

Ive, G and Chang, C Y (2007) The principle of inconsistent trinity in the selection of procurement systems. Construction Management and Economics, 25(7), pp. 677-690. ISSN 1466433X

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(1), pp. 50-65. ISSN 2204-9029

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jabour Al Hazmi, H S (2011) National culture and knowledge sharing practices: Empirical study in the context of the procurement of educational building projects in Saudi Arabia. PhD thesis, Griffith University, Australia.

Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771

Jackson, J I (2009) Collaboration in planning sustainable developments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 69-74. ISSN 17514312

Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Jacob, D; Kochendörfer, B; Von Drygalski, M and Hilbig, C (2014) Ten years of PPP in Germany: Experiences and perspectives. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 180-188. ISSN 17514304

Jacobs, A (2007) Will the new offence of corporate manslaughter motivate companies to prioritise safety over profit? PhD thesis, University of Birmingham, UK.

Jacobs, C and Jacobs, K (2003) An integrated approach to curriculum at foundation level. Journal of Engineering, Design and Technology, 1(1), pp. 89-101. ISSN 1726-0531

Jacobs, C and Miller, S (2003) An integrated approach to project work: An exploration of assessment practices from lecturer perspectives. Journal of Engineering, Design and Technology, 1(1), pp. 75-87. ISSN 1726-0531

Jacobs, Y L (2024) Barriers to the implementation of lean construction in South Africa. PhD thesis, University of Pretoria, South Africa.

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X

Jacobsson, M and Roth, P (2014) Towards a shift in mindset: Partnering projects as engagement platforms. Construction Management and Economics, 32(5), pp. 419-432. ISSN 01446193

Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007

Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988

Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175

Jadallah, H (2021) Educational theory-embedded training for construction industry professionals. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364

Jadidoleslami, S; Saghatforoush, E; Heravi, A and Preece, C (2022) A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7), pp. 1225-1239. ISSN 1562-3599

Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.

Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.

Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jain, P; Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(3), pp. 926-968. ISSN 1726-0531

Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges-a comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599

Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges: A comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599

Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2019) Developing a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 357-381. ISSN 1745-2007

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Jaly Zada, A J (2016) Versioning of IFC-based information models for collaborative design. PhD thesis, University of Nottingham, UK.

Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Jamir Singh, P S; Oke, A E; Aliu, J; Isaiah Kayode, T; Azura Ramli, R; Haizzan Yahaya, M and Idris, A (2026) A study on substance abuse awareness and usage trends within the construction sector. Construction Innovation, 26(3), pp. 674-692. ISSN 1471-4175

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.

Jang, W S and Skibniewski, M J (2009) Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management, 135(5), pp. 378-386. ISSN 0733-9364

Jang, Y; Kim, K; Leite, F; Ayer, S and Cho, Y K (2021) Identifying the perception differences of emerging construction-related technologies between industry and academia to enable high levels of collaboration. Journal of Construction Engineering and Management, 147(10): 06021004, ISSN 0733-9364

Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.

Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(1), pp. 89-109. ISSN 1471-4175

Jansen, B (2024) The circular kitchen: Perspectives for design and implementation. PhD thesis, Delft University of Technology, Netherlands.

Jansson, G; Johnsson, H and Engström, D (2014) Platform use in systems building. Construction Management and Economics, 32(1-2), pp. 70-82. ISSN 01446193

Jansson, G; Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(2), pp. 236-255. ISSN 1471-4175

Jaradat, S and Beunders, N (2023) Participatory design in refugee camps: Ethnographic case studies from Greece. Engineering, Construction and Architectural Management, 30(3), pp. 1080-1097. ISSN 0969-9988

Jaradat, S and Sexton, M (2016) BIM articulation in different-sized architectural firms. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jaramillo, L V (2019) Implementations of resilience engineering for natural system disturbances: A panarchical perspective. PhD thesis, University of New Mexico, USA.

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364

Jarkas, A M (2016) Effect of buildability on labor productivity: A practical quantification approach. Journal of Construction Engineering and Management, 142(2): 06015002, ISSN 0733-9364

Jarrah, R T (2007) Planning for, facilitating, and evaluating design effectiveness. PhD thesis, University of Texas at Austin, USA.

Jaselskis, E; Ruwanpura, J; Becker, T; Silva, L; Jewell, P and Floyd, E (2011) Innovation in construction engineering education using two applications of internet-based information technology to provide real-time project observations. Journal of Construction Engineering and Management, 137, pp. 829-835. ISSN 0733-9364

Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364

Jaselskis, E J and El-Misalami, T (2003) Implementing radio frequency identification in the construction process. Journal of Construction Engineering and Management, 129(6), pp. 680-688. ISSN 0733-9364

Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364

Jasiński, A (2021) Impact of BIM implementation on architectural practice. Architectural Engineering and Design Management, 17(5-6), pp. 447-457. ISSN 1745-2007

Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jayanetti, J. K. D. D. T.; Fernando, M. H.; Ranadewa, K. A. T. O. and Perera, B. A. K. S. (2026) Fusion of machine learning to enhance the adaptability of lean construction maturity models (lcmms). Journal of Engineering, Design and Technology, 24(5), pp. 1298-1321. ISSN 1726-0531

Jayaram, S and Gonzalez, E (2011) Design and construction of a low-cost economical thermal vacuum chamber for spacecraft environmental testing. Journal of Engineering, Design and Technology, 9(1), pp. 47-62. ISSN 1726-0531

Jayasena, N S; Chan, D W M; Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), pp. 1932-1944. ISSN 1562-3599

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Jayasuriya, S; Zhang, G and Yang, R J (2020) Exploring the impact of stakeholder management strategies on managing issues in PPP projects. International Journal of Construction Management, 20(6), pp. 666-678. ISSN 1562-3599

Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.

Jeeninga, H and Kets, A (2004) Evolution of energy policy in the Netherlands: Past, present and future. Building Research & Information, 32(1), pp. 38-41. ISSN 0961-3218

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029

Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988

Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.

Jeffries, M; Gameson, R; Chen, S E and Elliott, T (2001) The justification and implementation of project alliances: Reflections from the Wandoo B development. Journal of Construction Procurement, 7(2), pp. 31-41. ISSN 1358-9180

Jeljeli, M N; Russell, J S; Guy Meyer, H W and Vonderohe, A P (1993) Potential applications of geographic information systems to construction industry. Journal of Construction Engineering and Management, 119(1), pp. 72-86. ISSN 0733-9364

Jelodar, M B; Wilkinson, S; Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: An integrated decision support system for building information modelling. Built Environment Project and Asset Management, 12(1), pp. 111-127. ISSN 2044-124X

Jelodar, M B; Yiu, T W and Wilkinson, S (2016) Relationship-quality judgment model for construction project procurement: A conjoint measurement. Journal of Construction Engineering and Management, 142(7): 4016012, ISSN 0733-9364

Jemal, K. M.; Aibinu, A. and Oraee, M. (2026) Technological enablers of lighting-as-a-service business model for circular lighting: A qualitative study. Smart and Sustainable Built Environment, pp. 1-23. ISSN 2046-6099

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jennings, Iain C (1997) Systemic integration in construction project organisations. PhD thesis, University of Melbourne, Australia.

Jennings, M J and Betts, M (1996) Competitive strategy for quantity surveying practices: The importance of information technology. Engineering, Construction and Architectural Management, 3(3), pp. 163-186. ISSN 0969-9988

Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007

Jensen, P A and Jóhannesson, E I (2013) Building information modelling in Denmark and Iceland. Engineering, Construction and Architectural Management, 20(1), pp. 99-110. ISSN 0969-9988

Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.

Jervis, E K (2015) Lowering CO2 emissions: a framework for overcoming institutional pressures and diffusing low carbon strategy throughout the construction supply chain. PhD thesis, University of Liverpool, UK.

Jesumoroti, C; Olanrewaju, A and Khor, S C (2024) Defects in Malaysian hospital buildings. International Journal of Building Pathology and Adaptation, 42(5), pp. 835-856. ISSN 2398-4708

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X

Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364

Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.

Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193

Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jia, M and Zhao, L (2025) Evolutionary analysis of information-based construction management promotion using a government-enterprise evolutionary game model. Engineering, Construction and Architectural Management, 32(1), pp. 349-373. ISSN 0969-9988

Jiang, S; Zhang, J; Shi, J and Wu, Y (2026) Adaptive information retrieval for enhanced building safety management leveraging BIM. Engineering, Construction and Architectural Management, 33(1), pp. 336-360. ISSN 0969-9988

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988

Jiang, W; Zhao, X and Zuo, J (2021) Confucian principles and performance: A contractors' leadership model. International Journal of Construction Management, 21(8), pp. 834-844. ISSN 1562-3599

Jiang, X; Zhou, H; Li, M; Lu, K; Lyu, S; Omrani, S and Skitmore, M (2024) Sustainable construction projects management in the AEC industry: Analysis and visualization. International Journal of Construction Management, 24(4), pp. 384-399. ISSN 1562-3599

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 189-216. ISSN 1823-6499

Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.

Jin, R; Hancock, C M; Tang, L and Wanatowski, D (2017) BIM investment, returns, and risks in China's AEC industries. Journal of Construction Engineering and Management, 143(12): 04017089, ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, X; Shen, G; Luo, L and Zhou, X (2025) Influence of policies on stakeholders to drive the success of modular integrated construction in Hong Kong. Engineering, Construction and Architectural Management, 32(5), pp. 2814-2843. ISSN 0969-9988

Jin, X H; Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(3), pp. 297-316. ISSN 1471-4175

Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364

Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988

Jingmond, M and Ågren, R (2015) Unravelling causes of defects in construction. Construction Innovation, 15(2), pp. 198-218. ISSN 1471-4175

Jintamanaskoon, S and Chan, P W (2014) Boundary making in public-private-partnerships (PPP): A historical account of the British railway industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana. PhD thesis, University of Bath, UK.

Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.

Johansen, A; Collins, D; Temeljotov-Salaj, A and Hagehaugen, G (2022) By the fjord: Successful public and private collaboration in a neighbourhood redevelopment project in Norway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 156-165. ISSN 17514304

Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Johar, N (2017) Community participation: A cementing process, theorizing various dimensions and approaches. Journal of Construction in Developing Countries, 22(S1), pp. 47-61. ISSN 1823-6499

Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(2), pp. 321-340. ISSN 0969-9988

John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364

John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988

Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Johnson, R D (2016) Integrated project delivery in architecture, engineering, and construction: An interpretative phenomenological analysis of practice. DM thesis, Colorado Technical University, USA.

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Johnson, T R; Feng, P; Sitzabee, W and Jernigan, M (2013) Federal acquisition regulation applied to alliancing contract practices. Journal of Construction Engineering and Management, 139(5), pp. 480-487. ISSN 0733-9364

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218

Johnston, D and Miles-Shenton, D (2009) Airtightness of UK dwellings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Johnston, D W; Ahluwalia, N T and Gwyn, M B (2007) Improving the professional engineering licensure process for construction engineers. Journal of Construction Engineering and Management, 133(9), pp. 669-677. ISSN 0733-9364

Johnston, J O D (1975) Development of a computerised library system in the construction industry. PhD thesis, Aston University, UK.

Johnston, M; Guaralda, M and Sawang, S (2014) Sustainable innovation for Queensland's housing design: A case study. Construction Economics and Building, 14(4), pp. 11-31. ISSN 2204-9029

Jones, A M (1990) Design and construction for traditional house building. PhD thesis, Aston University, UK.

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Jones, I and Graham, M (2009) The integration of sprinkler systems into school fire safety packages within South and West Wales. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jones, K (2019) A framework for assessing interventions to promote the implementation of material innovations on construction projects. PhD thesis, University College London, UK.

Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916

Jones, L (2023) The golden thread of information and fire safety in construction: Making our buildings safer through the development of a robust design specification strategy and BIM framework integration. PhD thesis, University of Derby, UK.

Jones, P (2018) A 'smart' bottom-up whole-systems approach to a zero-carbon built environment. Building Research & Information, 46(5), pp. 566-577. ISSN 0961-3218

Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Jooste, S F (2010) Exploring the networks of organizations that enable and govern infrastructure public-private partnerships: An organizational field-level perspective. PhD thesis, Stanford University, USA.

Jordan, E; Gross, M E; Javernick-Will, A N and Garvin, M J (2011) Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159-1173. ISSN 1466433X

Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.

Joseph, S; Ralwala, A; Wachira-Towey, I and Mutisya, E (2023) Sustainable construction transition (SCT) policy regime in Kenya. Journal of Construction Business and Management, 6(1), pp. 1-16. ISSN 2521-0165

Joseph Garcia, A and Mollaoglu, S (2020) Individuals' capacities to apply transferred knowledge in AEC project teams. Journal of Construction Engineering and Management, 146(4): 04020016, ISSN 0733-9364

Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (aac) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), pp. 1-10. ISSN 2521-0165

Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655

Jowett, B; Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: A requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(1), pp. 134-163. ISSN 1471-4175

Jowett, B R (2023) A framework for the implementation of mobile BIM technology at project and organisational level supporting lean construction approaches. PhD thesis, University of Northumbria at Newcastle, UK.

Joy Vasantha Rani, S P and Aruna Prabha, K (2010) Stochastic logic computation based rbfnn with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(2), pp. 206-220. ISSN 1726-0531

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.

Juan, Y K; Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(1), pp. 229-245. ISSN 0969-9988

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Jung, C; Ismail, M A; Arar, M and AlQassimi, N (2026) Mitigating indoor air pollution in uae's high-rise apartment buildings: A study on eco-friendly materials and adsorbents. Smart and Sustainable Built Environment, 15(1), pp. 40-61. ISSN 2046-6099

Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364

Jung, Y; Oh, H and Jeong, M M (2019) An approach to automated detection of structural failure using chronological image analysis in temporary structures. International Journal of Construction Management, 19(2), pp. 178-185. ISSN 1562-3599

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.

Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client. PhD thesis, Luleå University of Technology, Sweden.

Jørgensen, B and Emmitt, S (2008) Lost in transition: The transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), pp. 383-398. ISSN 0969-9988

Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

K'Akumu, O A; Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in Nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), pp. 15-32. ISSN 1823-6499

Kabiri, S (2014) Role conflict and role ambiguity in construction projects. PhD thesis, University of Reading, UK.

Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.

Kadir Pakir, A H (2003) Integration: A study in the context of low cost housing projects in Malaysia with special reference to the state of penang. PhD thesis, University College London, UK.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.

Kaggiah, G M B (2022) Strategies for improving the sustainability of SMEs in the construction industry in Malawi. PhD thesis, University of Bolton, UK.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Kagioglou, M; Cooper, R; Aouad, G and Sexton, M (2000) Rethinking construction: The generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(2), pp. 141-153. ISSN 0969-9988

Kahvandi, Z; Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), pp. 63-89. ISSN 1823-6499

Kahvandi, Z; Saghatforoush, E; Ravasan, A Z and Viana, M L (2020) A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2), pp. 219-236. ISSN 1823-6499

Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mudaaki, S P (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 22-42. ISSN 17514304

Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175

Kalantari, S; Shepley, M M; Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: Facility managers' perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(6), pp. 457-478. ISSN 1745-2007

Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.

Kale, S (2009) Fuzzy intellectual capital index for construction firms. Journal of Construction Engineering and Management, 135(6), pp. 508-517. ISSN 0733-9364

Kale, S and Karaman, E A (2011) Evaluating the knowledge management practices of construction firms by using importance-comparative performance analysis maps. Journal of Construction Engineering and Management, 137(12), pp. 1142-1152. ISSN 0733-9364

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia–assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia: Assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988

Kallow, M A; Bodla, A A; Ejaz, A and Ishaq, M R (2023) How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), pp. 2779-2787. ISSN 1562-3599

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.

Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499

Kamal, E M; Lou, E C W; Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(3), pp. 313-324. ISSN 1745-2007

Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Kamara, J M; Augenbroe, G; Anumba, C J and Carrillo, P M (2002) Knowledge management in the architecture, engineering and construction industry. Construction Innovation, 2(1), pp. 53-67. ISSN 1471-4175

Kamardeen, I (2007) A fuzzy knowledge-based system for premium-rating of workers' compensation insurance for construction projects. PhD thesis, National University of Singapore, Singapore.

Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988

Kamardeen, I (2013) Motivation-driven learning and teaching model for construction education. Construction Economics and Building, 13(1), pp. 36-49. ISSN 2204-9029

Kamari, A; Kotula, B M and Schultz, C P L (2022) A BIM-based LCA tool for sustainable building design during the early design stage. Smart and Sustainable Built Environment, 11(2), pp. 217-244. ISSN 2046-6099

Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599

Kaming, P F (1996) A productivity audit system for construction management in Indonesia. PhD thesis, University of Wolverhampton, UK.

Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193

Kamm, J D (2017) A study of technological change in the construction industry through understanding the importance of innovation, risk and stakeholder alignment in construction lending. PhD thesis, Indiana State University, USA.

Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304

Kanagaraj, S; Thiyagarajan, H; Vasudevan, A and Moghul, M (2022) Road map for implementing circular construction practices in India: an overview. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 166-175. ISSN 17514304

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, K; Xiao, J and Moon, S (2025) Evaluating safety risks in pedestrian facilities for different ride modes: Application of a deep learning-based 3D scanning system. Journal of Construction Engineering and Management, 151(11): 04025183, ISSN 0733-9364

Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193

Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364

Kao, C-C (2004) The briefing process: an organizational knowledge-creation perspective. PhD thesis, University of Reading, UK.

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.

Kapogiannis, G; Fernando, T and Alkhard, A M (2021) Impact of proactive behaviour antecedents on construction project managers' performance. Construction Innovation, 21(4), pp. 708-722. ISSN 1471-4175

Kapogiannis, G and Sherratt, F (2018) Impact of integrated collaborative technologies to form a collaborative culture in construction projects. Built Environment Project and Asset Management, 8(1), pp. 24-38. ISSN 2044-124X

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Kar, S; Kothari, C and Jha, K N (2021) Developing an optimum material procurement schedule by integrating construction program and budget using NSGA-II. Journal of Construction Engineering and Management, 147(4): 04021017, ISSN 0733-9364

Karacigan, A; Cağlayan, S; Tezel, A and Özorhon, B (2025) Strategic roadmap to achieve successful implementation of blockchain technology in construction contract management. Journal of Construction Engineering and Management, 151(11): 04025185, ISSN 0733-9364

Karadag, I; Güzelci, O Z and Alaçam, S (2023) Edu-ai: A twofold machine learning model to support classroom layout generation. Construction Innovation, 23(4), pp. 898-914. ISSN 1471-4175

Karakhan, A A and Gambatese, J A (2017) Identification, quantification, and classification of potential safety risk for sustainable construction in the United States. Journal of Construction Engineering and Management, 143(7): 04017018, ISSN 0733-9364

Karakhan, A A and Gambatese, J A (2017) Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives. Journal of Construction Engineering and Management, 143(9): 04017069, ISSN 0733-9364

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988

Karamoozian, M. and Zhang, H. (2026) Pushing the boundaries of prefabricated shell building design with building information modeling (BIM) and ultra-high performance concrete (uhpc). Engineering, Construction and Architectural Management, 33(3), pp. 2564-2585. ISSN 0969-9988

Karasu, T; Aaltonen, K and Haapasalo, H (2023) The interplay of IPD and BIM: A systematic literature review. Construction Innovation, 23(3), pp. 640-664. ISSN 1471-4175

Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364

Karatas, A; Stoiko, A and Menassa, C C (2016) Framework for selecting occupancy-focused energy interventions in buildings. Building Research & Information, 44(5-6), pp. 535-551. ISSN 0961-3218

Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599

Karrbom Gustavsson, T (2016) Liminality roles in construction project practice: Opportunities and challenges. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Karri, S K; Ponnada, M R and Veerni, L (2024) Durability and microstructure study of alkali-activated slag concrete with quartz sand subjected to different exposure conditions. Journal of Engineering, Design and Technology, 22(1), pp. 42-59. ISSN 1726-0531

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.

Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(4), pp. 446-466. ISSN 0969-9988

Karunasena, G; Gajanayake, A; Wijeratne, W M P U; Milne, N; Udawatta, N; Perera, S; Crimston, A and Aliviano, P (2024) Liquid waste management in the construction sector: A systematic literature review. International Journal of Construction Management, 24(1), pp. 86-96. ISSN 1562-3599

Karunasena, G; Rathnayake, R M N U and Senarathne, D (2016) Integrating sustainability concepts and value planning for sustainable construction. Built Environment Project and Asset Management, 6(2), pp. 125-138. ISSN 2044-124X

Karunasena, G I (2012) Capacity building for post disaster waste management: Construction and demolition waste. PhD thesis, University of Salford, UK.

Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.

Kasana, D V (2021) Evaluating organizational readiness to implement change within the workplace. PhD thesis, University of North Carolina at Charlotte, USA.

Kasapolu, E (2011) Leadership behaviors in project design offices. Journal of Construction Engineering and Management, 137(5), pp. 356-363. ISSN 0733-9364

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364

Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364

Kashiwagi, D; Chong, N; Costilla, M; McMenimen, F and Egbu, C (2004) Impact of six sigma on construction performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D; Parmar, D and Savicky, J (2004) Traditional low-bid procurement system versus performance information procurement system (pips) in construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.

Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180

Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364

Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(2), pp. 89-101. ISSN 1557-8771

Kashiwagi, D T and Mayo, R E (2001) Best value procurement in construction using artificial intelligence. Journal of Construction Procurement, 7(2), pp. 42-59. ISSN 1358-9180

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, J S (2013) Factors of success in performance information procurement system and performance information risk management system. PhD thesis, Delft University of Technology, Netherlands.

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599

Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.

Kavaarpuo, G; Tiwari, P and Martel, A (2026) Transaction costs and innovation outcomes: Lessons from early adopters of housebuilding innovations. Construction Innovation, 26(1), pp. 236-259. ISSN 1471-4175

Kavishe, N and An, M (2016) Challenges for implementing public private partnership in housing projects in dar es salaam city, Tanzania. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kavishe, N and Chileshe, N (2017) Joint venture housing projects in dar es salaam city: An analysis of challenges and effectiveness. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kavishe, N and Chileshe, N (2018) Motivational factors for adoption of public-private partnerships (PPPs) in housing projects in Tanzania: A qualitative study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kavishe, N W (2018) Improving the delivery of PPP housing projects in developing countries. PhD thesis, University of Birmingham, UK.

Kavuri, A S; Soetanto, R; Goodier, C; Murguia, D and Szczygiel, M (2020) Scenarios for the digitalisation of the construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kayan, B A; Forster, A M and Banfill, P F G (2016) Green maintenance for historic masonry buildings: An option appraisal approach. Smart and Sustainable Built Environment, 5(2), pp. 143-164. ISSN 2046-6099

Kazaz, Billur (2022) Improvements in construction stormwater treatment using flocculants. PhD thesis, Auburn University, USA.

Kazmierczak, A and Bichard, E (2010) Investigating homeowners' interest in property-level flood protection. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 157-172. ISSN 1759-5916

Ke, Y; Hao, W; Ding, H and Wang, Y (2017) Factors influencing the private involvement in urban rail public-private partnership projects in China. Construction Economics and Building, 17(1), pp. 90-106. ISSN 2204-9029

Ke, Y; Wang, S; Chan, A P C and Cheung, E (2009) Research trend of public-private partnership in construction journals. Journal of Construction Engineering and Management, 135(10), pp. 1076-1086. ISSN 0733-9364

Ke, Y; Wang, S; Chan, A P C and Cheung, E (2011) Understanding the risks in China's PPP projects: Ranking of their probability and consequence. Engineering, Construction and Architectural Management, 18(5), pp. 481-496. ISSN 0969-9988

Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.

Keenan, M and Rostami, A (2021) The impact of quality management systems on construction performance in the North West of England. International Journal of Construction Management, 21(9), pp. 871-883. ISSN 1562-3599

Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.

Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387

Kein, A T T; Ofori, G and Briffett, C (1999) ISO 14000: Its relevance to the construction industry of Singapore and its potential as the next industry milestone. Construction Management and Economics, 17(4), pp. 449-461. ISSN 01446193

Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599

Kelly, D J (2015) Investigating the relationships of project performance measures with the use of building information modeling (BIM) and integrated project delivery (IPD). PhD thesis, Eastern Michigan University, USA.

Kelly, S (2004) Making it work and making do: A study of best practice, computing and routine work in building firms. PhD thesis, Lancaster University, UK.

Kelvin Ibrahim, M and Aliu, J O (2026) Bridging the digital divide: Strategies for successful technology implementation in the UK construction sector. International Journal of Construction Management, 26(6), pp. 1017-1032. ISSN 1562-3599

Kenley, R; London, K and Watson, J (2000) Strategic procurement in the construction industry: Mechanisms for public sector clients to encourage improved performance in Australia. Journal of Construction Procurement, 6(1), pp. 4-19. ISSN 1358-9180

Kent, D C and Becerik-Gerber, B (2010) Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), pp. 815-825. ISSN 0733-9364

Keraminiyage, K and Piyatadsananon, P (2013) Achieving success in post-disaster resettlement programmes through better coordination between spatial and socio-economic/cultural factors. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 352-372. ISSN 1759-5916

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology, 17(3), pp. 591-612. ISSN 1726-0531

Keskin, B (2021) A building information modeling (BIM)-centric digital ecosystem for smart airport life cycle management. PhD thesis, Syracuse University, USA.

Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364

Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988

Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007

Keusters, G; Bakker, H and Houwing, E J (2024) Improving the performance of civil engineering projects through the integrated design process. Journal of Engineering, Design and Technology, 22(2), pp. 344-364. ISSN 1726-0531

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khalef, R; Ali, G G; El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective. Construction Management and Economics, 40(4), pp. 313-330. ISSN 01446193

Khalef, R and El-Adaway, I H (2023) Identifying design-build decision-making factors and providing future research guidelines: Social network and association rule analysis. Journal of Construction Engineering and Management, 149(1): 04022151, ISSN 0733-9364

Khalef, R and El-Adaway, I H (2024) Performance of project delivery methods for us airport projects: A holistic quantitative risk-based assessment through perceptions of associated industry experts. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364

Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),

Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.

Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304

Khalife, S; Pourrahimian, E; Didluck, T and Hamzeh, F (2024) Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Architectural Engineering and Design Management, 20(6), pp. 1357-1380. ISSN 1745-2007

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Khalil, A (2018) Developing a strategy for the implementation of sustainable construction practices in Libya. PhD thesis, University of Salford, UK.

Khalil, A; Rathnasinghe, A P and Kulatunga, U (2021) Challenges to the implementation of sustainable construction practices in Libya. Construction Economics and Building, 21(3), pp. 243-261. ISSN 2204-9029

Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.

Khamaksorn, A; Tah, J H M and Kurul, E (2022) Social networks and knowledge transfer in international construction joint venture projects: A case study in Thailand. Journal of Construction in Developing Countries, 27(1), pp. 111-137. ISSN 1823-6499

Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364

Khamseh, A and Marei, P (2020) Designing a model developed to assess the capabilities of technological innovation in Iranian construction of power plant equipment industries. Journal of Engineering, Design and Technology, 18(5), pp. 1241-1249. ISSN 1726-0531

Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems in buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029

Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems for buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029

Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.

Khan, M I; Khan, S; Khan, U and Haleem, A (2023) Modeling the big data challenges in context of smart cities: an integrated fuzzy ISM-DEMATEL approach. International Journal of Building Pathology and Adaptation, 41(2), pp. 422-453. ISSN 23984708

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Khanapure, V U and Shastri, S S (2024) A sustainable-lean implementation methodology: A catalyst for sustainability enhancement of high-rise residential projects. Engineering, Construction and Architectural Management, 31(7), pp. 2585-2603. ISSN 0969-9988

Khandelwal, M and Khanapuri, V (2015) Infrastructure debt fund policy framework in India: issues and challenges. Journal of Financial Management of Property and Construction, 20(1), pp. 4-23. ISSN 1366-4387

Khanh, H D; Minh, N V and Tu, N T (2026) Measuring the overall impact of barriers to BIM adoption in prefabricated construction using a fuzzy synthetic evaluation approach. Construction Economics and Building, 26(1), ISSN 2204-9029

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; a case of construction industry. Engineering, Construction and Architectural Management, 30(6), pp. 2564-2581. ISSN 0969-9988

Khatibi, H; Wilkinson, S; Baghersad, M; Heiman, D; Ramli, H; Suhatril, M; Javanmardi, A and Ghaedi, K (2021) The resilient-smart city development: A literature review and novel frameworks exploration. Built Environment Project and Asset Management, 11(4), pp. 493-510. ISSN 2044-124X

Khatleli, N (2016) The impediments to efficient megaproject implementation in South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499

Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599

Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.

Khodabuccus, R A (2016) Commercialising zero carbon housing design: towards an economic and socio-technically informed approach. EngD thesis, University of Surrey, UK.

Khodadadyan, A (2021) Living and future tools for risk assessment: an examination of the possibilities for fusion. PhD thesis, University of Liverpool, UK.

Khoshfetrat, R; Sarvari, H; Chan, D W M and Rakhshanifar, M (2022) Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, 22(12), pp. 2375-2384. ISSN 1562-3599

Khosravi, M; Mirsaeedie, L and Emami, A (2019) The application of open building principles in popular residential buildings in Iran. Journal of Construction in Developing Countries, 24(1), pp. 125-140. ISSN 1823-6499

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Khosrowshahi, F and Alani, M (2003) Event and effect model of building maintenance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.

Khuc, T Q; Nguyen, V T and Do, S T (2026) Barriers to the adoption of blockchain technology in the construction industry: A total interpretive structural modeling (t ISM) and demat el approach. Construction Innovation, 26(1), pp. 260-285. ISSN 1471-4175

Khural, R A; Ertz, M and Cerchione, R (2024) Moving toward sustainability and circularity in hill road construction: A study of barriers, practices and performance. Engineering, Construction and Architectural Management, 31(4), pp. 1608-1641. ISSN 0969-9988

Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364

Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.

Kibert, C J and Fard, M M (2012) Differentiating among low-energy, low-carbon and net-zero-energy building strategies for policy formulation. Building Research & Information, 40(5), pp. 625-637. ISSN 0961-3218

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kiet, T T (2024) Problematic issues emerging during BIM implementation process in construction organizations. Built Environment Project and Asset Management, 14(6), pp. 892-913. ISSN 2044-124X

Kifokeris, D; Bahnariu, B and Koch, C (2022) A mapping of Swedish lean construction variants in practice: Review and survey. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kifokeris, D and Xenidis, Y (2017) Constructability: Outline of past, present, and future research. Journal of Construction Engineering and Management, 143(8): 04017035, ISSN 0733-9364

Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364

Kim, C (1996) An evaluation of the impact of integration and computerization on construction projects. PhD thesis, Worcester Polytechnic Institute, USA.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. PhD thesis, University of Texas at Austin, USA.

Kim, E (2000) A study on the effective implementation of earned value management methodology. DSc thesis, George Washington University, USA.

Kim, H and Kakimoto, R (2016) An international comparative analysis of local hazard mitigation plan evaluation for flood: The USA, Japan and Korea. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 406-419. ISSN 1759-5916

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, I (1994) Data representations in an integrated architectural design environment: Unified data organisation and management. PhD thesis, University of Strathclyde, UK.

Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.

Kim, J I (2014) Methodology for the application of BIM-based decision support methods to evaluate sustainability metrics for master plans of a large-scale development. DEng thesis, Stanford University, USA.

Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, S and Hammad, A (2024) Decision support system (DSS) for selecting sustainable insulation material using Pareto search and novel fuzzy-modified technique for order of preference by similarity to ideal solution (TOPSIS) approach. International Journal of Construction Management, 24(7), pp. 734-747. ISSN 1562-3599

Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. PhD thesis, University of Texas at Austin, USA.

Kim, S Y and Nguyen, V T (2022) Supply chain management in construction: Critical study of barriers to implementation. International Journal of Construction Management, 22(16), pp. 3148-3157. ISSN 1562-3599

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451

Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(4), pp. 203-208. ISSN 0961-3218

Kineber, A F; Ali, A H; Elshaboury, N; Oke, A E and Arashpour, M (2024) A multi-criteria evaluation and stationary analysis of value management implementation barriers for sustainable residential building projects. International Journal of Construction Management, 24(2), pp. 199-212. ISSN 1562-3599

Kineber, A F; Oke, A E; Ali, A H; Dosumu, O; Fakunle, K and Olanrewaju, O I (2025) Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: The case of Nigeria. Journal of Engineering, Design and Technology, 23(3), pp. 895-916. ISSN 1726-0531

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Buniya, M K (2021) Impact of value management on building projects success: Structural equation modeling approach. Journal of Construction Engineering and Management, 147(4): 04021011, ISSN 0733-9364

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2023) Value management implementation barriers for sustainable building: A bibliometric analysis and partial least square structural equation modeling. Construction Innovation, 23(1), pp. 38-73. ISSN 1471-4175

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), pp. 1380-1400. ISSN 1471-4175

King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.

King, A P; Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: A contractor's perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.

Kirkham, R J; Alisa, M; Silva, A P d; Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988

Kishk, M (2002) Towards effective consideration of non-financial factors in the design and management of construction assets. Journal of Financial Management of Property and Construction, 7(3), pp. 163-174. ISSN 1366-4387

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kishk, M and Al-Hajj, A (2000) Fuzzy modelling of life cycle costs of alternatives with different lives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kishk, M; Al-Hajj, A and Pollock, R (2001) Inclusion of non-financial factors in life-cycle decision-making: A fuzzy approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kishk, M; Al-Hajj, A and Pollock, R (2002) An innovative integrated approach to whole life costing. Journal of Financial Management of Property and Construction, 7(1), pp. 31-40. ISSN 1366-4387

Kishk, M; Al-Hajj, A and Pollock, R (2003) Effective measurement and visualization of whole-life costs of building elements. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(2), pp. 89-98. ISSN 1366-4387

Kishk, M; Laing, R and Pollock, R (2004) A novel approach for selecting finishes: System algorithm and methodology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387

Kissi, E; Aigbavboa, C and Kuoribo, E (2023) Emerging technologies in the construction industry: Challenges and strategies in Ghana. Construction Innovation, 23(2), pp. 383-405. ISSN 1471-4175

Kissi, E; Babon-Ayeng, P; Aigbavboa, C; Duah, D; Danquah-Smith, E and Tannor, R A (2023) Examining green road construction components: The case of Ghana. Built Environment Project and Asset Management, 13(5), pp. 682-699. ISSN 2044-124X

Kissi, E; Boateng, E B; Adjei-Kumi, T and Badu, E (2017) Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries. International Journal of Construction Management, 17(2), pp. 142-150. ISSN 1562-3599

Kit Miyamoto, H; Gilani, A S J and Wada, A (2011) Damage mitigation for school buildings in seismically vulnerable regions. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 8-29. ISSN 1759-5916

Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(2), pp. 99-110. ISSN 1366-4387

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Kjellmark, G; Hjelseth, E; Peñaloza, G A and Riemer-Sørensen, S (2026) Toward construction 5.0: Bridging AI and people through continuous learning. Journal of Construction Engineering and Management, 152(1): 04025227, ISSN 0733-9364

Kjerulf, L and Haugbølle, K (2021) Circular prequalification and bidding practices at contractor firms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.

Klocko, Barbara A (2009) Superintendents as sensemakers in the design of sustainable schools. PhD thesis, Oakland University, USA.

Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.

Knight, T and Boyd, D (2009) Researching property development in interesting times. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Knos, C T (2001) Investigating the effects of insurance industry standards on public building inspection departments in Florida, Georgia, and South Carolina. DPA thesis, University of Georgia, USA.

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988

Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988

Koc, K and Okudan, O (2021) Assessment of life cycle risks of deconstruction in urban regeneration projects. Journal of Construction Engineering and Management, 147(10): 04021137, ISSN 0733-9364

Koch, C and Beemsterboer, S (2017) Making an engine: Performativities of building information standards. Building Research & Information, 45(6), pp. 596-609. ISSN 0961-3218

Koch, C and Bertelsen, N H (2011) The devil in the detail: The story of a sustainable trail blazer. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Koch, C and Buser, M (2003) Innovating mature public private partnerships: Danish municipalities and construction firms in networked public services. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Koch, C; Gottlieb, S C; Rönn, M and Braide, A (2021) The quandaries of design developer competitions. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Koch, C and Roenn, M (2023) Building companies in design build competitions aiming at circularity. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Koch, C and Simonsen, R (2002) Seeping in? Embankment of product innovations in urban renewal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Urup, L (2017) Project performance: An emerging constellation of multiple institutions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, M; Emilsson, K; Lee, J and Johansson, H (2024) Structural barriers to sufficiency: the contribution of research on elites. Buildings & Cities, 5(1), pp. 268-282. ISSN 2632-6655

Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.

Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(4), pp. 226-236. ISSN 0961-3218

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kokkonen, A and Alin, P (2016) Practitioners deconstructing and reconstructing practices when responding to the implementation of BIM. Construction Management and Economics, 34(7-8), pp. 578-591. ISSN 01446193

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(2), pp. 83-95. ISSN 01446193

Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.

Kolawole, O M (2023) A model for improving ethics in construction materials and products supply chain using blockchain. PhD thesis, London South Bank University, UK.

Kolokotroni, M; Robinson-Gayle, S; Tanno, S and Cripps, A (2004) Environmental impact analysis for typical office facades. Building Research & Information, 32(1), pp. 2-16. ISSN 0961-3218

Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988

Komolafe, M O; Oyewole, M O and Kolawole, J T (2016) Extent of incorporation of green features in office properties in Lagos, Nigeria. Smart and Sustainable Built Environment, 5(3), pp. 232-260. ISSN 2046-6099

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Kong, C W; li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(1), pp. 43-54. ISSN 1471-4175

Kongsmobath, B (2021) Enterprise risk management and board decision making: context of Laos construction and tourism industry. PhD thesis, University of the West of Scotland, UK.

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Koo, H J and O’Connor, J T (2022) Building information modeling as a tool for prevention ofdesign defects. Construction Innovation, 22(4), pp. 870-890. ISSN 1471-4175

Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.

Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Koopman, K L (2023) Implementation of technological innovations within the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(4), pp. 315-321. ISSN 01446193

Kordestani Ghalenoeei, N; Saghatforoush, E; Athari Nikooravan, H and Preece, C (2021) Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: A case study of road infrastructure projects. International Journal of Construction Management, 21(2), pp. 140-152. ISSN 1562-3599

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery. PhD thesis, Pennsylvania State University, USA.

Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koskela, L and Vrijhoef, R (2001) Is the current theory of construction a hindrance to innovation? Building Research & Information, 29(3), pp. 197-207. ISSN 0961-3218

Koskela, L J (2000) An exploration towards a production theory and its application to construction. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Kosovac, B (2007) A framework for managing information from heterogeneous, distributed, and autonomous sources in the architecture, engineering, construction, and facilities management domain. PhD thesis, University of British Columbia, Canada.

Kothapally, P R; Gbadamosi, A Q; Delgado, J M D and Mahamadu, A M (2023) An implementation strategy for the application of digital twin for construction progress monitoring using wearable technologies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Koukkari, H (2010) Transformation of a research centre toward an innovation partner in the construction sector. Engineering, Construction and Architectural Management, 17(1), pp. 89-98. ISSN 0969-9988

Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364

Koutsikouri, D (2010) Individual and collective success: the social dynamics of multidisciplinary design teamwork. EngD thesis, Loughborough University, UK.

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.

Kramer, S W and Sommer, J (2013) An initial look at motivations & personality traits of American construction professionals working for international firms. International Journal of Construction Education and Research, 9(1), pp. 39-60. ISSN 1557-8771

Kreider, R G (2013) An ontology of the uses of building information modeling. PhD thesis, Pennsylvania State University, USA.

Kremers, J; Rietjens, B; Voordijk, H and de Boer, S J (2010) Construction contracting and civil-military interaction. Construction Management and Economics, 28(8), pp. 871-883. ISSN 1466433X

Kridan, A B and Goulding, J S (2005) Change management and human resource management as potential success areas for knowledge management implementation within the Libyan banking sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kridan, A B and Goulding, J S (2006) Assessing the role of knowledge management processes in implementing a knowledge management system: An application of the capability maturity model to the Libyan banking sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.

Krishnaraj, L; Kumar, V R P; Balasubramanian, M; Kumar, N and Shyamala, T (2022) Futuristic evaluation of building energy simulation model with comparison of conventional villas. International Journal of Construction Management, 22(1), pp. 31-40. ISSN 1562-3599

Kristiansen, K (2010) Taking care of caretaking. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ku, K and Taiebat, M (2011) BIM experiences and expectations: The constructors' perspective. International Journal of Construction Education and Research, 7(3), pp. 175-197. ISSN 1557-8771

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kugonza, S (2010) Influence of formal and informal institutions on outsourcing of public construction projects in Uganda. PhD thesis, University of Birmingham, UK.

Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531

Kula, B and Ergen, E (2021) Implementation of a BIM-FM platform at an international airport project: Case study. Journal of Construction Engineering and Management, 147(4): 05021002, ISSN 0733-9364

Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.

Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.

Kulchartchai, O and Hadikusumo, B H (2010) Exploratory study of obstacles in safety culture development in the construction industry: A grounded theory approach. Journal of Construction in Developing Countries, 15(1), pp. 45-66. ISSN 1823-6499

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.

Kululanga, G and Kuotcha, W (2010) Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Engineering, Construction and Architectural Management, 17(4), pp. 336-351. ISSN 0969-9988

Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(6), pp. 580-595. ISSN 0969-9988

Kum, Y T; Yap, J B H; Lew, Y L and Lee, W P (2024) Transforming construction health and safety management during COVID-19 pandemic using innovative technologies: PLS-SEM approach. Engineering, Construction and Architectural Management, 31(7), pp. 2770-2808. ISSN 0969-9988

Kumar, A; Srivastava, V; Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): Empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(1), pp. 91-111. ISSN 1366-4387

Kumar, B and Hayne, G (2017) Implementation of level 2 Building Information Modelling strategy for asset procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 190-206. ISSN 17514304

Kumar, D and Zhang, C (2025) Carbon emission reduction in construction industry: Qualitative insights on procurement, policies and artificial intelligence. Built Environment Project and Asset Management, 15(3), pp. 399-414. ISSN 2044-124X

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Kumar Dhar, T; Sk. Maruf Hossain, M and Rubayet Rahaman, K (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(2), pp. 140-157. ISSN 2046-6099

Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X

Kumarasiri, B and Dissanayake, P (2021) Barriers to implementing waste-to-energy projects in Sri Lanka: A pestel analysis. Built Environment Project and Asset Management, 11(4), pp. 544-558. ISSN 2044-124X

Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(5-6), pp. 325-334. ISSN 0969-9988

Kumaraswamy, M; Rowlinson, S and Phua, F (2002) Accelerating cultural changes through innovative procurement processes: A Hong Kong perspective. Journal of Construction Procurement, 8(1), pp. 3-16. ISSN 1358-9180

Kumaraswamy, M M (2006) Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1), pp. 73-94. ISSN 1823-6499

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(2), pp. 38-51. ISSN 1358-9180

Kumaraswamy, M M; Ling, F Y Y; Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPs. Engineering, Construction and Architectural Management, 14(6), pp. 581-596. ISSN 0969-9988

Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364

Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007

Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364

Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364

Kumaraswamy Associate Professor, M; Kong, H and Xue Qing Doctoral, Z (2004) Focusing on best value from a source selection perspective. Construction Economics and Building, 4(1), pp. 21-34. ISSN 2204-9029

Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kurwi, S (2019) Integrating BIM and GIS for design collaboration in railway projects. PhD thesis, Loughborough University, UK.

Kurwi, S; Demian, P; Hassan, T M and Blay, K B (2022) A process model for collaboration at the design stage of rail project delivery. Journal of Construction Engineering and Management, 148(10): 04022105, ISSN 0733-9364

Kusljic, D and Marenjak, S (2012) Evaluating political aspects of success for PPP/PFI sports hall in Croatia. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: Insights from scenario analysis. Construction Management and Economics, 43(5), pp. 381-404. ISSN 0144-6193

Kussl, S; Wald, A and Flak, L S (2025) Change must come from within: Study of digital transformation in construction client organizations. Journal of Construction Engineering and Management, 151(3): 05024017, ISSN 0733-9364

Kusuma, I C (2016) The evolution of culture-climate interplay in temporary multi-organisations: the case of construction alliancing projects. PhD thesis, University College London, UK.

Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(8), pp. 920-934. ISSN 0961-3218

Kwaghsende, F K (2020) Assessment of social networks in informal solid waste recycling activities and sustainable solid waste management, North Central Nigeria. African Journal of Built Environment Research, 4(1), pp. 21-35. ISSN 2414-0236

Kwan, A Y and Ofori, G (2001) Chinese culture and successful implementation of partnering in Singapore's construction industry. Construction Management and Economics, 19(6), pp. 619-632. ISSN 01446193

Kwasafo, O K; Adinyira, E and Agyekum, K (2024) Impact of green construction procurement practices on the success of circular economy in Ghana. Built Environment Project and Asset Management, 14(5), pp. 765-781. ISSN 2044-124X

Kwawu, W; Elhag, T and Ballal, T (2010) Knowledge transfer processes in PFI/PPP: Critical success factors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kwawu, W and Elmualim, A (2011) Sustainability in facilities management: A review of drivers and policy issues. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kwawu, W and Laryea, S (2013) Incentive contracting in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kwawu, W E K (2009) Relational contracting in the UK construction sector. PhD thesis, University of Reading, UK.

Kwawu, W E K and Hughes, W P (2007) Are relational and formal contracts implemented as substitutes in the UK construction industry? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kwofie, T E; Afram, S and Botchway, E (2016) A critical success model for PPP public housing delivery in Ghana. Built Environment Project and Asset Management, 6(1), pp. 58-73. ISSN 2044-124X

Kwofie, T E; Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), pp. 2264-2288. ISSN 0969-9988

Kwofie, T E; Aigbavboa, C O and Mpambela, J S (2018) Improving continuing professional development compliance among construction professionals through integrated strategies in South Africa. Journal of Engineering, Design and Technology, 16(4), pp. 637-653. ISSN 1726-0531

Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X

Kwok, T W and Chang, S (2025) Comprehensive evaluation of digital technology's effects on the supply chain of prefabricated construction. Engineering, Construction and Architectural Management, 32(8), pp. 5350-5370. ISSN 0969-9988

Kwok, C; Young, R J and Kirkham, R J (2010) Risk and asset management in privatization/private finance of public utiliities: A risk investigation of water infrastructure projects in China. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988

Kübler, O (2006) Applied decision-making in civil engineering. DSc thesis, ETH Zürich, Switzerland.

Kürüm Varolgüneş, F and Şeker, İ H (2026) Sustainable urban resettlement in earthquake zones: Evaluating housing and design strategies post-2023 kahramanmaras earthquake. International Journal of Disaster Resilience in the Built Environment, 17(1), pp. 55-79. ISSN 1759-5908

La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.

La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.

Laan, A; Leuven, A v; Kolkman, S and Voordijk, H (2002) It in construction: Aligning it and business strategies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Labaka, L; Hernantes, J and Sarriegi, J M (2015) A framework to improve the resilience of critical infrastructures. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 409-423. ISSN 1759-5916

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364

Ladinski, V (2017) Designing for adaptability: The Gateshead Civic Centre. International Journal of Building Pathology and Adaptation, 35(4), pp. 380-396.

Laepple, E S (2005) Exploring project collaboration systems in the building industry. PhD thesis, Texas A&M University, USA.

Laganakou, G (2020) What feasible macro-scale interventions could stimulate a sustainable growth in the UK housing retrofit industry? An examination of the potential impact from supply-chain innovations on low energy retrofit of pre-1919 housing. PhD thesis, University of Northampton, UK.

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lagos, C I; Herrera, R F and Alarcón, L F (2019) Assessing the impacts of an IT LPS support system on schedule accomplishment in construction projects. Journal of Construction Engineering and Management, 145(10): 04019055, ISSN 0733-9364

Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180

Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X

Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), pp. 57-79. ISSN 1466433X

Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029

Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387

Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(4), pp. 415-427. ISSN 1466433X

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175

Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029

Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),

Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364

Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Critical factors that influence lean premise design implementation: A case of Hong Kong high-rise buildings. Architectural Engineering and Design Management, 20(6), pp. 1612-1628. ISSN 1745-2007

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Lam, H-C R (2003) An investigation into the implementation of safety management systems by Hong Kong construction contractors. PhD thesis, University of Hong Kong, Hong Kong.

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218

Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Lam, P T I; Wong, F W H; Chan, A P C; Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(2), pp. 216-238. ISSN 1471-4175

Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption. PhD thesis, University of the West of England, Bristol, UK.

Lam, T and Gale, K (2014) Highway maintenance: Impact of framework agreements upon project financial performance. Construction Management and Economics, 32(5), pp. 460-472. ISSN 01446193

Lam, T I and Leung, M Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(4), pp. 427-437. ISSN 01446193

Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387

Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.

Lammie, J L and Shah, D P (1984) Construction management: MARTA in retrospect. Journal of Construction Engineering and Management, 110(4), pp. 459-475. ISSN 0733-9364

Lamson-Hall, P and Martin, R (2022) The Ethiopia urban expansion initiative and knowledge exchange. Buildings & Cities, 3(1), pp. 772-791. ISSN 2632-6655

Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.

Landgren, M; Skovmand Jakobsen, S; Wohlenberg, B and Jensen, L M B (2019) Integrated design processes–a mapping of guidelines with Danish conventional 'silo' design practice as the reference point. Architectural Engineering and Design Management, 15(4), pp. 233-248. ISSN 1745-2007

Langford, D; Rowlinson, S and Sawacha, E (2000) Safety behaviour and safety management: Its influence on the attitudes of workers in the UK construction industry. Engineering, Construction and Architectural Management, 7(2), pp. 133-140. ISSN 0969-9988

Langford, D A; Abukhder, J; Murray, M; Hardcastle, C and Vernea, E (2004) Rethinking construction: What about the SMEs? Journal of Construction Procurement, 10(1),

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Langston, C and Crowley, C (2021) Evaluation of transportation infrastructure: A case study of Gold Coast Light Rail stage 1&2. Construction Economics and Building, 21(4), pp. 1-20. ISSN 2204-9029

Languell, J L (2001) Development of a prototype assessment tool to evaluate the potential to successfully implement deconstruction as a regional waste reduction strategy. PhD thesis, University of Florida, USA.

Lansley, P (2001) Building research and the quality-of-life. Building Research & Information, 29(1), pp. 62-74. ISSN 0961-3218

Lansley, P; McCreadie, C; Tinker, A; Flanagan, S and Goodacre, K (2004) Adapting the homes of older people: A case study of costs and savings. Building Research & Information, 32(6), pp. 468-483. ISSN 0961-3218

Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007

Laovisutthichai, V.; Viryasiri, T.; Low, S. P.; Sangnin, K.; Kramomtong, W. and Panjapiyakul, N. (2026) Collaborative architecture, engineering, construction, and operations (aeco) practice model for healthcare facilities in Thailand. International Journal of Construction Management, 26(7), pp. 1170-1190. ISSN 1562-3599

Laovisutthichai, V and Lu, W (2023) Design for manufacture and assembly (dfma) in architectural design meetings: From a case study to knowledge-to-action framework. Smart and Sustainable Built Environment, 12(5), pp. 1117-1134. ISSN 2046-6099

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007

Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Larsen, G D and Whyte, J (2013) Safe construction through design: Perspectives from the site team. Construction Management and Economics, 31(6), pp. 675-690. ISSN 1466433X

Larsson, J; Eriksson, P E; Lingegård, S and Järvenpää, A T (2022) Innovation outcomes and processes in infrastructure projects–a co mparative study of design-build and design-build-maintenance contracts. Construction Management and Economics, 40(2), pp. 142-156. ISSN 01446193

Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193

Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(4-5), pp. 332-341. ISSN 0961-3218

Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X

Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988

Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304

Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304

Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(4), pp. 886-907. ISSN 0969-9988

Laryea, S and Watermeyer, R B (2018) Comparison of two infrastructure project implementation models in a developing country. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 3-17. ISSN 17514304

Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988

Lassandro, P and Cosola, T (2018) Climate change mitigation: Resilience indicators for roof solutions. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 4-17. ISSN 1759-5916

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.

Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988

Lau, E and Lew, V (2011) Empowerment and job characteristics of knowledge workers: The case of Hong Kong construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Laufer, A (1985) On site performance improvement programs. Journal of Construction Engineering and Management, 111(1), pp. 82-97. ISSN 0733-9364

Laufer, A and Cohenca, D (1990) Factors affecting construction-planning outcomes. Journal of Construction Engineering and Management, 116(1), pp. 135-156. ISSN 0733-9364

Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Laurent, J and Leicht, R M (2019) Practices for designing cross-functional teams for integrated project delivery. Journal of Construction Engineering and Management, 145(3): 05019001, ISSN 0733-9364

Lavikka, R; Chauhan, K; Peltokorpi, A and Seppänen, O (2021) Value creation and capture in systemic innovation implementation: Case of mechanical, electrical and plumbing prefabrication in the Finnish construction sector. Construction Innovation, 21(4), pp. 837-856. ISSN 1471-4175

Lavikka, R; Kallio, J; Casey, T and Airaksinen, M (2018) Digital disruption of the AEC industry: Technology-oriented scenarios for possible future development paths. Construction Management and Economics, 36(11), pp. 635-650. ISSN 01446193

Lavikka, R; Seppänen, O; Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation, 20(4), pp. 569-586. ISSN 1471-4175

Lavy, S; Kiss, C W and Fernandez-Solis, J L (2015) Linking design and energy performance in U.S. Military hospitals. Architectural Engineering and Design Management, 11(1), pp. 41-64. ISSN 1745-2007

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.

Lawani, K; Hare, B and Cameron, I (2019) Evaluating wind technicians' performance on safety-critical rescue steps. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 17-24. ISSN 17514304

Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531

Lawani, K; Thomson, C; Hare, B and Duplicki, A (2024) Unpacking the perceptions of high-density living and zoning laws: A case of Philadelphia area, USA. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Lawrence, M (2017) Nomination of subcontractors in the UAE. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 167-171. ISSN 17514304

Lawther, P M (2000) Predictive cost modelling: Investigation utilising a qualitatively biased research methodology. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Lawther, P M and Edwards, P J (2001) Design cost modelling: the way forward. Construction Economics and Building, 1(1), pp. 32-42. ISSN 2204-9029

Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Lazo, A G; Çidik, M S; Rillie, I and Addyman, S (2023) Interrelationships in safety, health and well-being: Concepts, management and perceptions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Le, D A; Dang, C N; Le-Hoai, L and Hoang, V Q (2025) Influences of critical success factors on nonprofit outcomes of oda education construction projects: A case of Vietnam. Journal of Engineering, Design and Technology, 23(5), pp. 1423-1446. ISSN 1726-0531

Le, Ngoc Quyet (2021) Building information modelling (BIM) adoption and implementation: Interaction between BIM specialists and non-BIM specialists in Vietnam. PhD thesis, University of Technology Sydney, Australia.

Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.

Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988

Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Exploring the underlying relationship among risks in BOT transportation projects in developing countries: The case of Vietnam. Journal of Financial Management of Property and Construction, 26(1), pp. 103-125. ISSN 1366-4387

Le, P T; Kirytopoulos, K; Chileshe, N and Rameezdeen, R (2022) Taxonomy of risks in PPP transportation projects: A systematic literature review. International Journal of Construction Management, 22(2), pp. 166-181. ISSN 1562-3599

Leathem, T and Burt, R (2024) Leveraging qualitative analysis software to complement traditional qualitative research approaches for curriculum design: Results of a needs assessment study. International Journal of Construction Education and Research, 20(4), pp. 544-561. ISSN 1557-8771

Lebea, M J; Agumba, J N and Adebowale, O J (2024) Critical success factors in the maintenance strategies of public healthcare facilities. International Journal of Building Pathology and Adaptation, 42(7), pp. 55-75. ISSN 23984708

Leblanc, H; Nitithamyong, P and Thomson, C (2010) Developing a knowledge management framework to promote sustainable social housing refurbishment practices. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lebunu Hewage, U W A; Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 296-311. ISSN 2044-124X

Lee, Y. J. (2026) Integrating patent analytics and employee sentiment: A multi-dimensional methodology for assessing organizational culture and R&D performance by company size in the Korean construction industry. Construction Management and Economics, 44(7), pp. 499-517. ISSN 0144-6193

Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. PhD thesis, University of Salford, UK.

Lee, D; Khan, N and Park, C (2023) Rigorous analysis of safety rules for vision intelligence-based monitoring at construction jobsites. International Journal of Construction Management, 23(10), pp. 1768-1778. ISSN 1562-3599

Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials. PhD thesis, University of Wisconsin - Madison, USA.

Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.

Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lee, Jaeho (2007) A methodology for developing bridge condition rating models based on limited inspection records. PhD thesis, Griffith University, Australia.

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S (2014) Re-examination of the enterprise resource planning success model in cross industry sectors: New statistical findings. PhD thesis, George Washington University, USA.

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lee, S and Yu, J (2016) Comparative study of BIM acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(3): 05015016, ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.

Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.

Lee, Z P; Rahman, R A and Doh, S I (2022) Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers. Built Environment Project and Asset Management, 12(4), pp. 537-555. ISSN 2044-124X

Lees, E (2016) The polluter pays principle and the remediation of the land. International Journal of Law in the Built Environment, 8(1), pp. 2-20. ISSN 1756-1450

Lees, H and Austin, J (2011) The case for behaviour-based safety in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 3-8. ISSN 17514312

Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175

Leghissa, G (2019) Collaboration between construction firms and the supply chain for the implementation of innovation strategies. PhD thesis, Loughborough University, UK.

Leghissa, G; Sage, D and Dainty, A (2016) Collaboration between housebuilding firms and suppliers for the implementation of innovation strategies: A strategy-as-practice approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Legnér, M; Leijonhufvud, G and Tunefalk, M (2020) Energy policy and conservation planning in Sweden: A longitudinal evaluation. International Journal of Building Pathology and Adaptation, 38(4), pp. 555-572. ISSN 23984708

Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193

Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.

Lei, Haoran (2024) Life cycle assessment in circular economy for built environment. PhD thesis, RMIT University, Australia.

Lei, Z; Chen, Q; Altaf, M S and Cao, K (2024) Defining information requirements for off-site construction management: An industry case study from Canada. Journal of Construction Engineering and Management, 150(12): 05024014, ISSN 0733-9364

Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Leicht, R M; Hunter, S T; Saluja, C and Messner, J I (2010) Implementing observational research methods to study team performance in construction management. Journal of Construction Engineering and Management, 136(1), pp. 76-86. ISSN 0733-9364

Leiringer, R (2001) Developing an effective model to support construction companies entering the public-private partnership projects' market. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193

Leiringer, R and Schweber, L (2010) Managing multiple markets: Big firms and PFI. Building Research & Information, 38(2), pp. 131-143. ISSN 0961-3218

Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(2), pp. 197-210. ISSN 1358-9180

Leon, M; Ahiaga-Dagbui, D; Fleming, C and Laing, R (2017) Exploring visual asset management collaboration: Learning from the oil and gas sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Leon, M and Laing, R (2022) A concept design stages protocol to support collaborative processes in architecture, engineering and construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 777-799. ISSN 1726-0531

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364

Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364

Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(2), pp. 157-172. ISSN 1756-1450

Leu, S-S (1992) Object-oriented representation model of construction technology information. PhD thesis, University of Michigan, USA.

Leung, M Y; Bowen, P; Liang, Q and Famakin, I (2015) Development of a job-stress model for construction professionals in south Africa and Hong Kong. Journal of Construction Engineering and Management, 141(2): 04014077, ISSN 0733-9364

Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Leung, M Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Leung, M Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), pp. 11-19. ISSN 01446193

Leung, M Y; Wei, X and Wang, C (2023) Demystifying critical success factors for applying value management in construction projects along the belt and road regions: Focus group study. Journal of Construction Engineering and Management, 149(8): 04023066, ISSN 0733-9364

Leuven, A v and Voordijk, H (2001) Enterprise resource planning in construction: An evaluation of recent implementations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Levitt, R E (2007) CEM research for the next 50 years: Maximizing economic, environmental, and societal value of the built environment. Journal of Construction Engineering and Management, 133(9), pp. 619-628. ISSN 0733-9364

Leviäkangas, P; Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP project. Built Environment Project and Asset Management, 3(2), pp. 165-180. ISSN 2044-124X

Lewis, A (2013) A framework for improving building operations decisions for energy efficiency. PhD thesis, University of Reading, UK.

Lewis, J A; Odeyinka, H and Eadie, R (2011) Innovative construction procurement selection through an artificial intelligence approach. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.

Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(1), pp. 7-23. ISSN 1466433X

Leyland, M R (2016) Patronage and the architectural profession: the country house in nineteenth-century Northamptonshire. PhD thesis, University of Leicester, UK.

Li, H X; Nair, S; Li, Y; Yahaya, A; Timms, W and Owolabi, A B (2026) Evaluating energy performance of educational buildings: A case study in Australia. Engineering, Construction and Architectural Management, 33(15), pp. 137-158. ISSN 0969-9988

Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364

Li, M N; Wang, X; Cheng, R X and Chen, Y (2025) Aided design decision-making framework for engineering projects considering cost and social benefits. Engineering, Construction and Architectural Management, 32(8), pp. 5040-5065. ISSN 0969-9988

Li, Q; Zhang, Q; Shen, Y and Zhang, X (2025) Uncovering the dynamic decision-making behaviours of multiple stakeholders in the community public infrastructure. Journal of Engineering, Design and Technology, 23(5), pp. 1501-1518. ISSN 1726-0531

Li, T; Zhai, H; Wu, W; Deng, J and Wang, F (2026) How AI adoption shapes construction workers' extra-role safety behavior: The mediating roles of responsibility and relational energy. Journal of Construction Engineering and Management, 152(1): 04025219, ISSN 0733-9364

Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599

Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193

Li, B; Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Li, B; Akintoye, A and Hardcastle, C (2001) Risk analysis and allocation in public private partnership projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Li, B and Yao, R (2012) Building energy efficiency for sustainable development in China: Challenges and opportunities. Building Research & Information, 40(4), pp. 417-431. ISSN 0961-3218

Li, F; Phoon, K K; Du, X and Zhang, M (2013) Improved AHP method and its application in risk identification. Journal of Construction Engineering and Management, 139(3), pp. 312-320. ISSN 0733-9364

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(2), pp. 101-106. ISSN 0961-3218

Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364

Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Li, H; Kong, C W; Pang, Y C; Shi, W Z and Yu, L (2003) Internet-based geographical information systems system for e-commerce application in construction material procurement. Journal of Construction Engineering and Management, 129(6), pp. 689-697. ISSN 0733-9364

Li, H; Lv, L; Zuo, J; Su, L; Wang, L and Yuan, C (2020) Dynamic reputation incentive mechanism for urban water environment treatment PPP projects. Journal of Construction Engineering and Management, 146(8): 0001879, ISSN 0733-9364

Li, H; Su, L; Zuo, J; An, X; Dong, G; Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(2), pp. 598-622. ISSN 0969-9988

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.

Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988

Li, J; Zhang, J; Liu, C and Luo, X (2025) What hinders the implementation of carbon emission reduction in the construction industry: Evidence from integrated multi-criteria decision-making in China. Engineering, Construction and Architectural Management, 32(3), pp. 1670-1690. ISSN 0969-9988

Li, J and Zou, P X W (2008) Risk identification and assessment in PPP infrastructure projects using fuzzy analytical hierarchy process and life-cycle methodology. Construction Economics and Building, 8(1), pp. 34-48. ISSN 2204-9029

Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364

Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector. PhD thesis, Northumbria University, UK.

Li, K; Salleh, H B; Wang, R and Yang, Y (2025) How do different policy instruments influence circular economy implementation in the construction sector? Building Research & Information, 53(3), pp. 359-374. ISSN 0961-3218

Li, K; Griffin, M A and Xia, M (2025) How do workforce adaptability and reskilling initiatives drive innovations: The case of western Australian construction industry. Construction Management and Economics, 43(9), pp. 746-763. ISSN 0144-6193

Li, K; Zou, Z; Shrestha, A; Shan, T and Shuai, F (2025) Fostering technological innovation value in rail megaprojects: Powers from the knowledge-collaboration network. Journal of Construction Engineering and Management, 151(11): 04025176, ISSN 0733-9364

Li, M and Yang, J (2014) Analysis of interrelationships between critical waste factors in office building retrofit projects using interpretive structural modelling. International Journal of Construction Management, 14(1), pp. 15-27. ISSN 1562-3599

Li, N and Becerik-Gerber, B (2011) Life-cycle approach for implementing RFID technology in construction: Learning from academic and industry use cases. Journal of Construction Engineering and Management, 137(12), pp. 1089-1098. ISSN 0733-9364

Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.

Li, S D and Xu, Z D (2022) System configuration design of BIM object-oriented database for civil engineering. Journal of Construction Engineering and Management, 148(12): 04022130, ISSN 0733-9364

Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.

Li, T; Li, Z and Cai, J (2024) Antecedents and consequence of intra-organizational diffusion of prefabricated construction technology: A contingency theory perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2932-2951. ISSN 0969-9988

Li, T H Y; Ng, S T and Wong, K K W (2009) A study on the social impact assessment of infrastructure projects in China. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, X; Jin, X; Li, H; Gong, L and Zhou, D (2025) Exploring the impact of policy interventions on project performance through a psm-did approach: Evidence from the Hong Kong construction industry. Engineering, Construction and Architectural Management, 32(2), pp. 1163-1185. ISSN 0969-9988

Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.

Li, Y; Cao, L; Han, Y and Wei, J (2020) Development of a conceptual benchmarking framework for healthcare facilities management: Case study of Shanghai municipal hospitals. Journal of Construction Engineering and Management, 146(1): 05019016, ISSN 0733-9364

Li, Y and Ning, Y (2022) Mitigating opportunistic behaviors in consulting projects: Evidence from the outsourced architectural and engineering design. Journal of Construction Engineering and Management, 148(7): 04022044, ISSN 0733-9364

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Liang, C (2016) Development of a multifunctional building information modelling (BIM) maturity model. PhD thesis, University of Hong Kong, Hong Kong.

Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312

Liang, J (1998) System integration and database management for computer-aided design of tall building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, J S (2023) A knowledge with ontology representation for product life cycle to support eco-design activities. Journal of Engineering, Design and Technology, 21(4), pp. 991-1026. ISSN 1726-0531

Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards. PhD thesis, University of Leeds, UK.

Liang, X; Gidado, K and Painting, N (2004) The identification of key obstacles that hinder foreign private finance investments in highway projects in China. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liang, Y (2012) A study of public private partnership project success factors and risk management integration in mainland China. PhD thesis, University of Hong Kong, Hong Kong.

Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Liang Wong, I; Eames, P and Perera, S (2012) Energy simulations of a transparent-insulated office façade retrofit in London, UK. Smart and Sustainable Built Environment, 1(3), pp. 253-276. ISSN 2046-6099

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Liao, L and Teo, E A L (2019) Managing critical drivers for building information modelling implementation in the Singapore construction industry: An organizational change perspective. International Journal of Construction Management, 19(3), pp. 240-256. ISSN 1562-3599

Liao, L; Teo Ai Lin, E and Low, S P (2020) Assessing building information modeling implementation readiness in building projects in Singapore: A fuzzy synthetic evaluation approach. Engineering, Construction and Architectural Management, 27(3), pp. 700-724. ISSN 0969-9988

Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.

Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988

Liaros, S (2020) Implementing a new human settlement theory: Strategic planning for a network of regenerative villages. Smart and Sustainable Built Environment, 9(3), pp. 258-271. ISSN 2046-6099

Liaros, S (2022) A network of circular economy villages: Design guidelines for 21st century garden cities. Built Environment Project and Asset Management, 12(3), pp. 349-364. ISSN 2044-124X

Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007

Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2025) A guideline for BIM and lean integrated construction practice. Smart and Sustainable Built Environment, 14(4), pp. 1264-1291. ISSN 2046-6099

Lim, J.; Fauzan, F. and Oey, E. (2026) Evaluating green building certification criteria for small health care centre (Puskemas) in Jakarta area: From GREENSHIP to Puske-GREENSHIP framework. Smart and Sustainable Built Environment, 15(3), pp. 1047-1067. ISSN 2046-6099

Lim, M L W; Wong, S Y and Ding, C S (2024) Challenges of industrial revolution 4.0: Quantity surveying students' perspectives. Engineering, Construction and Architectural Management, 31(6), pp. 2496-2512. ISSN 0969-9988

Lim, M S H (2022) The practice of DFS review in Singapore: Industry and organisational level interventions. PhD thesis, National University of Singapore, Singapore.

Lim, S H and Chan, T K (2020) Enhancing student motivation and learning with monetary prizes in a construction management undergraduate subject. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Lima, Rosimeire Midori Suzuki Rosa (2012) Evaluation system of integrated construction and demolition waste management at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, G; Shen, G Q; Sun, M and Kelly, J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. Journal of Construction Engineering and Management, 137(9), pp. 698-706. ISSN 0733-9364

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lin, M-C (2000) Contract design of private infrastructure concessions. PhD thesis, University of California, Berkeley, USA.

Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia. PhD thesis, University of Malaya, Malaysia.

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lin, S S and Zheng, X J (2025) A decision support approach for safety risk analysis and management in large-scale shield cutter head hoisting operations. Journal of Construction Engineering and Management, 151(11): 04025169, ISSN 0733-9364

Lin, Solomon Tung Kit (2021) Brim-based structural life cycle assessment of bridges: Incorporating finite element analysis and real-time sensor measurements. PhD thesis, Monash University, Australia.

Lin, Tong (2025) Offsite construction in the Australian low-rise residential buildings: Application levels and procurement options. PhD thesis, RMIT University, Australia.

Lin, Y-S (1996) Optimal design and probabilistic evaluation of fire egress systems. PhD thesis, Duke University, USA.

Lind, H and Brunes, F (2015) Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), pp. 554-568. ISSN 01446193

Lindblad, H (2016) Translating building information modelling: A study of the BIM implementation process at a large Swedish client organisation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lindblad, H (2019) Black boxing BIM: The public client's strategy in BIM implementation. Construction Management and Economics, 37(1), pp. 1-12. ISSN 01446193

Lindblad, H (2019) BIM in translation exploring client organisations as drivers for change in construction. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lindblad, H and Guerrero, J R (2020) Client's role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(5), pp. 468-482. ISSN 01446193

Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Lindblad, H and Karrbom Gustavsson, T (2021) Public clients ability to drive industry change: The case of implementing BIM. Construction Management and Economics, 39(1), pp. 21-35. ISSN 01446193

Linderoth, H C J (2015) When big visions meet the pragmatic practice: Follow the institutional logic or personal benefits? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Linderoth, H C J (2017) From visions to practice: The role of sensemaking, institutional logic and pragmatic practice. Construction Management and Economics, 35(6), pp. 324-337. ISSN 0144-6193

Lindgren, J (2018) Diffusion of systemic innovations in the construction sector. PhD thesis, Halmstad University, Sweden.

Lindkvist, C and Elmualim, A (2010) An examination of actors that impact technology introduction to FM. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.

Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771

Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771

Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364

Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364

Ling, F Y Y (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(6), pp. 635-649. ISSN 01446193

Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(2), pp. 128-139. ISSN 0961-3218

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Ling, F Y Y; Hartmann, A; Kumaraswamy, M and Dulaimi, M (2007) Influences on innovation benefits during implementation: Client's perspective. Journal of Construction Engineering and Management, 133(4), pp. 306-315. ISSN 0733-9364

Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X

Ling, F Y Y; Kumaraswamy, M M; Dulaimi, M F and Khalfan, M (2011) Public private partnerships: Overcoming pre-contract problems faced by public clients and private providers in infrastructure projects in Singapore. International Journal of Construction Management, 11(1), pp. 63-77. ISSN 1562-3599

Ling, F Y Y; Pham, V M C and Hoang, T P (2009) Strengths, weaknesses, opportunities, and threats for architectural, engineering, and construction firms: Case study of Vietnam. Journal of Construction Engineering and Management, 135(10), pp. 1105-1113. ISSN 0733-9364

Ling, F Y Y; Tan, P C; Ning, Y; Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(2), pp. 169-189. ISSN 0969-9988

Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X

Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364

Ling, Y Y; Khee, H Y and Lim, K S G (2000) The reasons why clients prefer to procure more projects based on design-bid-build than design-and-build. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364

Lingard, H; Graham, P and Smithers, G (2000) Employee perceptions of the solid waste management system operating in a large Australian contracting organization: Implications for company policy implementation. Construction Management and Economics, 18(4), pp. 383-393. ISSN 01446193

Lingard, H and Oswald, D (2020) Safety at the front line: Social negotiation of work and safety at the principal contractor-subcontractor interface. Journal of Construction Engineering and Management, 146(4): 04020024, ISSN 0733-9364

Lingard, H; Oswald, D and Le, T (2019) Embedding occupational health and safety in the procurement and management of infrastructure projects: Institutional logics at play in the context of new public management. Construction Management and Economics, 37(10), pp. 567-583. ISSN 01446193

Lingard, H; Pink, S; Harley, J and Edirisinghe, R (2015) Looking and learning: Using participatory video to improve health and safety in the construction industry. Construction Management and Economics, 33(9), pp. 740-751. ISSN 01446193

Lingard, H and Sublet, A (2002) The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australian civil engineers. Construction Management and Economics, 20(6), pp. 507-521. ISSN 01446193

Lingard, H and Wakefield, R (2013) A voluntary approach to designing for safer construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 249-259. ISSN 17514312

Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193

Lingard, H C; Cooke, T and Blismas, N (2012) Designing for construction workers' occupational health and safety: A case study of socio-material complexity. Construction Management and Economics, 30(5), pp. 367-382. ISSN 1466433X

Linh, T N Q; Hanh, T T T and Shaw, R (2021) COVID-19 initial preparedness and response in Vietnam during the first six months of the pandemic and the lessons for Sendai framework implementation. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 143-155. ISSN 1759-5916

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X

Lisø, K R (2006) Integrated approach to risk management of future climate change impacts. Building Research & Information, 34(1), pp. 1-10. ISSN 0961-3218

Lisø, K R; Aandahl, G; Eriksen, S and Alfsen, K H (2003) Preparing for climate change impacts in norway's built environment. Building Research & Information, 31(3-4), pp. 200-209. ISSN 0961-3218

Littke, H (2016) Becoming biophilic: Challenges and opportunities for biophilic urbanism in urban planning policy. Smart and Sustainable Built Environment, 5(1), pp. 15-24. ISSN 2046-6099

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, Y; Junjia, Y; Wang, H and Alias, A H (2026) Bridging robotics implementation and operational efficiency via agile management: Evidence from commercial residential projects. Journal of Construction Engineering and Management, 152(4): 04026019, ISSN 0733-9364

Liu, Y.; Schmidt, S.; Li, H. and Cao, Y. (2026) A study on the moisture risk assessment path for exterior wall of existing residential building in Shanghai based on hygrothermal simulation analysis. Architectural Engineering and Design Management, 22(2), pp. 340-364. ISSN 1745-2007

Liu, A; Hodgson, G and Lord, W (2010) Innovation in construction education: The role of culture in e-learning. Architectural Engineering and Design Management, 6(2), pp. 91-102. ISSN 1745-2007

Liu, A M M (1997) Developing a research model for project outcome evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Liu, A M M (2003) The quest for quality in public housing projects: A behaviour-to-outcome paradigm. Construction Management and Economics, 21(2), pp. 147-158. ISSN 01446193

Liu, A M M and Fellows, R (2001) An eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(1), pp. 1-19. ISSN 0969-9988

Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007

Liu, Anita Mei-mai (1995) Evaluation of the outcome of construction projects. PhD thesis, University of Hong Kong, Hong Kong.

Liu, B; Xue, B; Meng, J; Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: An empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), pp. 2797-2833. ISSN 0969-9988

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, F (2015) Integrated change and knowledge management for energy efficient retrofit projects. PhD thesis, Pennsylvania State University, USA.

Liu, F; Wang, Y; Li, H and Zhou, X (2021) Influence of cooperative period of municipal PPPs on transaction cost: a case study. Engineering, Construction and Architectural Management, 28(4), pp. 1261-1277. ISSN 0969-9988

Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364

Liu, G W (2003) A framework for implementing value management in China's construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988

Liu, J; Love, P E D; Smith, J; Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(1), pp. 35-51. ISSN 2044-124X

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J; Xie, Q; Xia, B and Bridge, A J (2017) Impact of design risk on the performance of design-build projects. Journal of Construction Engineering and Management, 143(6): 04017010, ISSN 0733-9364

Liu, J; Yan, X and Gao, W (2024) A dualistic perspective of opportunity and risk: The impact of head-mounted augmented reality on construction onsite hazard identification of workers. Journal of Construction Engineering and Management, 150(11): 04024160, ISSN 0733-9364

Liu, L (2017) A systematic approach for major renovation of residential buildings. PhD thesis, Linköping University, Sweden.

Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, N (2010) Analysing functionalities of project extranets in construction: a provision and requirement approach. PhD thesis, University of Salford, UK.

Liu, N; Ruan, L; Jin, R; Chen, Y; Deng, X and Yang, T (2019) Investigation of individual perceptions towards BIM implementation-a Chongqing case study. Engineering, Construction and Architectural Management, 26(7), pp. 1455-1475. ISSN 0969-9988

Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.

Liu, R (2012) BIM-based life cycle information management: Integrating knowledge of facility management into design. PhD thesis, University of Florida, USA.

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Liu, S (2016) An investigation of how information processing impacts boundary spanning activities in managing construction design changes from the perspective of contractors. PhD thesis, University of Hong Kong, Hong Kong.

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, T; Chong, H Y; Zhang, W; Lee, C Y and Tang, X (2022) Effects of contractual and relational governances on BIM collaboration and implementation for project performance improvement. Journal of Construction Engineering and Management, 148(6): 04022029, ISSN 0733-9364

Liu, T; Mao, Y and Lu, S (2023) Fostering participants' collaborative innovation performance in megaprojects: The effects of perceived partners' non-mediated power. Journal of Construction Engineering and Management, 149(1): 04022141, ISSN 0733-9364

Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175

Liu, W; Chan, A P C; Chan, M W; Darko, A and Oppong, G D (2025) Key performance indicators for hospital planning and construction: A systematic review and meta-analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3375-3406. ISSN 0969-9988

Liu, X (2025) From circular to sustainable: The implementation of circular economy in transport infrastructure projects in China and the Netherlands. PhD thesis, Delft University of Technology, Netherlands.

Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.

Liu, Z (2012) Know-how signalling and transfer systems to support integrated supply chains. PhD thesis, University of Manchester, UK.

Liu, Z (2014) Building information modelling (BIM) aided waste minimisation framework. PhD thesis, Loughborough University, UK.

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364

Liyanage, C; Egbu, C and Tookey, J (2005) Investigating the current state of infection control practices in domestics services in the national health service in Scotland: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Liyanage, C and Villalba-Romero, F (2021) Disaster risk reduction compliance framework for public private partnership (PPP) port projects. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 484-499. ISSN 1759-5916

Liyanage, C L and Egbu, C O (2004) Development of a performance management framework for facilities management in the control of infections: An outline of methodology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ljung, E and Tallgren, M V (2024) Can interoperability between disciplines be improved by adding phasing information using standardised coding? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Lloyd-walker, B M; Mills, A J and Walker, D H T (2014) Enabling construction innovation: The role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), pp. 229-245. ISSN 01446193

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lnenicka, M.; Kysela, T. and Horák, O. (2026) Building security and resilience: A guide to implementing effective cybersecurity and data protection measures in smart cities. Smart and Sustainable Built Environment, 15(2), pp. 908-937. ISSN 2046-6099

Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.

Lochau-Emden, G H (1983) A manufacturers' exchange as a source of information for strategic management and an economic stabilising aid in the building and construction sector: A theoretical and empirical study. DBA thesis, University of Pretoria, South Africa.

Locicero, Ryan Charles Robert (2015) Mainstreaming green infrastructure: The nexus of infrastructure and education using the green space based learning (gsbl) approach for bioretention plant selection. PhD thesis, University of South Florida, USA.

Loforte Ribeiro, F (2009) Enhancing knowledge management in construction firms. Construction Innovation, 9(3), pp. 268-284. ISSN 1471-4175

Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599

Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X

Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218

London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(2), pp. 132-152. ISSN 1745-2007

London, K; Singh, V; Taylor, C; Gu, N and Brankovic, L (2008) Building information modelling project decision support framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

London, Kerry (2004) Construction supply chain procurement modelling. PhD thesis, University of Melbourne, Australia.

Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.

Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988

Loosemore, M (2015) Barriers to social enterprise in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Loosemore, M and Alkilani, S (2022) The collaborative challenges of social procurement. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Loosemore, M; Alkilani, S Z and Mathenge, R (2019) Barriers to employment faced by disadvantaged groups targeted by new social procurement policies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M and Denny-Smith, G (2016) Barriers to indigenous enterprise in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 0969-9988

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(2), pp. 189-198. ISSN 0969-9988

Loosemore, M; Keast, R and Alkilani, S (2023) The drivers of social procurement policy adoption in the construction industry: An Australian perspective. Building Research & Information, 51(5), pp. 555-567. ISSN 0961-3218

Loosemore, M; Keast, R and Barraket, J (2023) How are social procurement actors shaping a new field of professional practice in the Australian construction industry? Engineering, Construction and Architectural Management, 30(9), pp. 4192-4209. ISSN 0969-9988

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193

Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364

Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364

Lopez, R; Mascione, D and Liu, H J (2017) Management of issues in the delivery of airport infrastructure within Western Australia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 207-217. ISSN 17514304

Lord, W; Liu, A; Tuuli, M M and Zhang, S (2010) A modern contract: Developments in the UK and China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 151-159. ISSN 17514312

Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.

Lostuvali, B; Alves, T C L and Modrich, R U (2014) Learning from the cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), pp. 160-180. ISSN 1557-8771

Lou, E C W (2012) E-readiness in construction: readiness of UK construction organisations. PhD thesis, University of Salford, UK.

Loudoun, R and Townsend, K (2017) Implementing health promotion programs in the Australian construction industry: Levers and agents for change. Engineering, Construction and Architectural Management, 24(2), pp. 260-274. ISSN 0969-9988

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Love, P; Edwards, D J; Standing, C and Irani, Z (2009) Beyond the Red Queen syndrome: CRM technology and building material suppliers. Engineering, Construction and Architectural Management, 16(5), pp. 459-474. ISSN 0969-9988

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364

Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364

Love, P E D; Edwards, D J; Irani, Z and Sharif, A (2012) Participatory action research approach to public sector procurement selection. Journal of Construction Engineering and Management, 138(3), pp. 311-322. ISSN 0733-9364

Love, P E D; Edwards, D J and Smith, J (2005) Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), pp. 247-259. ISSN 1745-2007

Love, P E D; Edwards, D J and Sohal, A (2004) Total quality management in Australian contracting organisations: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198. ISSN 0969-9988

Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364

Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193

Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364

Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193

Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988

Love, P E D; Teo, P and Morrison, J (2018) Revisiting quality failure costs in construction. Journal of Construction Engineering and Management, 144(2): 05017020, ISSN 0733-9364

Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Low, S P; Liu, J Y; Ng, S H M and Liu, X (2013) Enterprise risk management and the performance of local contractors in Singapore. International Journal of Construction Management, 13(2), pp. 27-41. ISSN 1562-3599

Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193

Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lowe, R (2009) Policy and strategy challenges for climate change and building stocks. Building Research & Information, 37(2), pp. 206-212. ISSN 0961-3218

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Lu, K.; Deng, X. and Zhai, X. (2026) Openbim-based simulation of building operational carbon under different information availability. Smart and Sustainable Built Environment, 15(5), pp. 1751-1780. ISSN 2046-6099

Lu, Z.; Jin, X.; Osei-Kyei, R. and Senaratne, S. (2026) A conceptual framework for realising ESG-centred project value in modern methods of construction. Construction Innovation, pp. 1-19. ISSN 1471-4175

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364

Lu, W (2015) Collaboration in BIM-enabled projects: a socio-technical perspective. PhD thesis, University of Hong Kong, Hong Kong.

Lu, W; Chen, K; Zetkulic, A and Liang, C (2021) Measuring building information modeling maturity: A Hong Kong case study. International Journal of Construction Management, 21(3), pp. 299-311. ISSN 1562-3599

Lu, W; Guo, W and Zhu, Q (2020) Effect of justice on contractor's relational behavior: Moderating role of owner's asset specificity. Journal of Construction Engineering and Management, 146(4): 04020020, ISSN 0733-9364

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Lu, W; Liu, A M M; Rowlinson, S and Poon, S W (2013) Sharpening competitive edge through procurement innovation: Perspectives from Chinese international construction companies. Journal of Construction Engineering and Management, 139(3), pp. 347-351. ISSN 0733-9364

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Lu, W; Ye, K; Flanagan, R and Jewell, C (2014) Nexus between contracting and construction professional service businesses: Empirical evidence from international market. Journal of Construction Engineering and Management, 140(2): 04013049, ISSN 0733-9364

Lu, Y; Liu, J and Yu, W (2024) Social risk analysis for mega construction projects based on structural equation model and bayesian network: A risk evolution perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2604-2629. ISSN 0969-9988

Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599

Lu W, Z D R S (2013) BIM collaboration: A conceptual model and its characteristics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Lucas, A N and Löschke, S K (2025) Towards circular renovation: A comparative review of circular economy integration in sustainable building rating systems. Building Research & Information, 53(3), pp. 375-396. ISSN 0961-3218

Lucas, J and Gajjar, D (2022) Influence of virtual reality on student learning in undergraduate construction education. International Journal of Construction Education and Research, 18(4), pp. 374-387. ISSN 1557-8771

Luck, R (2007) Using artefacts to mediate understanding in design conversations. Building Research & Information, 35(1), pp. 28-41. ISSN 0961-3218

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Luiten, G T and Tolman, F P (1997) Automating communication in civil engineering. Journal of Construction Engineering and Management, 123(2), pp. 113-120. ISSN 0733-9364

Lukhele, T; Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(2), pp. 18-33. ISSN 2204-9029

Lummen, N S; Shirozu, H; Okada, N and Yamada, F (2016) Flood risk management an illustrative approach. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 388-405. ISSN 1759-5916

Lundberg, M; Engström, S and Lidelöw, H (2019) Diffusion of innovation in a contractor company: The impact of the social system structure on the implementation process. Construction Innovation, 19(4), pp. 629-652. ISSN 1471-4175

Lundgren, R.; Kyrö, R.; Toivonen, S. and Tähtinen, L. (2025) Reimagining circularity: Actions for optimising the use of existing buildings. Buildings & Cities, 6(1), pp. 674-694. ISSN 2632-6655

Lundgren, M S (2016) Energy and architectural consequences of Swedish building code. Smart and Sustainable Built Environment, 5(2), pp. 125-142. ISSN 2046-6099

Luo, Q; Sun, C; Dan, Y; Zhao, T and Zhang, G (2026) Unraveling safety risk coupling in prefabricated steel construction via data mining. Journal of Construction Engineering and Management, 152(3): 04025281, ISSN 0733-9364

Luo, Huyuan (2013) Towards green universities: A decision support framework for green roof and living wall implementation. PhD thesis, Queensland University of Technology, Australia.

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. PhD thesis, University of Manchester, UK.

Luo, L Z; Mao, C; Shen, L Y and Li, Z D (2015) Risk factors affecting practitioners' attitudes toward the implementation of an industrialized building system a case study from China. Engineering, Construction and Architectural Management, 22(6), pp. 622-643. ISSN 0969-9988

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lutz, J D; Chang, L M and Napier, T R (1990) Evaluation of new building technology. Journal of Construction Engineering and Management, 116(2), pp. 281-299. ISSN 0733-9364

Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Lv, L; Wang, Z; Li, H; Zhang, C and Qiao, R (2022) Tournament incentive mechanisms design for long-distance water diversion projects incorporating preference heterogeneity. Journal of Construction Engineering and Management, 148(6): 04022036, ISSN 0733-9364

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations. PhD thesis, Pennsylvania State University, USA.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. PhD thesis, University of Manchester, UK.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218

M.E. Sepasgozar, S (2020) Digital technology utilisation decisions for facilitating the implementation of industry 4.0 technologies. Construction Innovation, 21(3), pp. 476-489. ISSN 1471-4175

Ma, C P and Winch, G (2000) It implementation performance and organisational characteristics in Taiwanese contractors. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ma, C-P (2001) IT performance and organisational characteristics in construction firms: the case of Taiwanese contractors. PhD thesis, University College London, UK.

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Ma, G; Wu, M; Jia, J and Yang, W (2021) Two-level quality decision support system for building structural damage prediction and maintenance solution recommendation in the operation and maintenance phase. Journal of Construction Engineering and Management, 147(6): 04021044, ISSN 0733-9364

Ma, J (2016) A data driven study on LEED credits and green building related implications in city planning. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ma, J; Jiang, X; Zheng, D; Liao, X; Lu, J and Zhao, Y (2024) Transwallnet: High-performance semantic segmentation of large-scale and multifeatured point clouds of building gables. Journal of Construction Engineering and Management, 150(8): 04024092, ISSN 0733-9364

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings. PhD thesis, Illinois Institute of Technology, USA.

Ma, L; Lovreglio, R; Yi, W; Yiu, T W and Shan, M (2023) Barriers and strategies for building information modelling implementation: A comparative study between New Zealand and China. International Journal of Construction Management, 23(12), pp. 2067-2076. ISSN 1562-3599

Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.

Ma, Q and Cheung, S O (2025) Augmenting the incentivizing power of target cost contracting in integrated project delivery. Journal of Construction Engineering and Management, 151(7): 04025069, ISSN 0733-9364

Ma, Q; Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(6), pp. 519-535. ISSN 01446193

Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988

Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364

Ma, Q; Li, S; Teo, P X and Ling, F Y Y (2023) Barriers to adopting integrated project delivery practices. Engineering, Construction and Architectural Management, 30(9), pp. 4171-4191. ISSN 0969-9988

Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364

Ma, X; Chan, A P C; Li, Y; Zhang, B and Xiong, F (2020) Critical strategies for enhancing BIM implementation in AEC projects: Perspectives from Chinese practitioners. Journal of Construction Engineering and Management, 146(2): 05019019, ISSN 0733-9364

Ma, X; Darko, A; Chan, A P C; Wang, R and Zhang, B (2022) An empirical analysis of barriers to building information modelling (BIM) implementation in construction projects: Evidence from the Chinese context. International Journal of Construction Management, 22(16), pp. 3119-3127. ISSN 1562-3599

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 0969-9988

Maauf, N A A (2021) The development of a framework to improve materials management on Libyan construction sites. PhD thesis, University of Salford, UK.

MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

MacAskill, K and Guthrie, P (2016) Disaster risk reduction and empowering local government: a case comparison between Sri Lanka and New Zealand. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 318-329. ISSN 1759-5916

MacDonald, J and Mills, J (2013) An IPD approach to construction education. Construction Economics and Building, 13(2), pp. 93-103. ISSN 2204-9029

MacLaren, A J W; Wilson, M; Simmonds, R; Hamilton-Pryde, A; McCarthy, J and Milligan, A (2017) Educating students for the collaborative workplace: Facilitating interdisciplinary learning in construction courses. International Journal of Construction Education and Research, 13(3), pp. 180-202. ISSN 1557-8771

Macdonald, R N (2013) A strategy for materials price risk mitigation. PhD thesis, University of Alabama, USA.

Macit, S (2014) Computer representation of building codes for automated compliance checking. PhD thesis, Izmir Institute of Technology, Turkey.

Macmillan, S (2006) Added value of good design. Building Research & Information, 34(3), pp. 257-271. ISSN 0961-3218

Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Madushika, W H S; Perera, B A K S; Ekanayake, B J and Shen, G Q P (2020) Key performance indicators of value management in the Sri Lankan construction industry. International Journal of Construction Management, 20(2), pp. 157-168. ISSN 1562-3599

Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.

Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.

Maftei, L and Harty, C (2016) Challenging design perceptions in immersive virtual reality environments. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.

Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007

Maghrebi, M; Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(5), pp. 573-590. ISSN 0969-9988

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.

Mahagedara, U I K (2021) Implementation of sustainable supply chain management in UK SMEs in construction industry. PhD thesis, University of the West of Scotland, UK.

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Mahamadu, A M; Mahdjoubi, L; Booth, C and Fewings, P (2015) Integrated delivery of quality, safety and environment through road sector procurement: The case of public sector agencies in Ghana. Journal of Construction in Developing Countries, 20(1), pp. 1-24. ISSN 1823-6499

Mahamadu, A M; Mahdjoubi, L and Booth, C A (2014) Determinants of building information modelling (BIM) acceptance for supplier integration: A conceptual model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahat, N; Tah, J H M and Vidalakis, C (2019) Sustainable construction and residential building developers in Malaysia: Factors affecting the adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916

Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599

Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Mahmood, S; Ahmed, S M; Panthi, K and Kureshi, N I (2014) Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(3), pp. 296-311. ISSN 2044-124X

Mahmood, W Y W and Mohammed, A H (2008) A conceptual framework for the development of quality culture in the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.

Maina, W and van Graan, A (2017) Identifying path-breaking transitions for kenya's marginalised communities in water and sanitation provision. Journal of Engineering, Design and Technology, 15(5), pp. 689-699.

Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599

Maiti, S and Choi, J H (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management, 21(4), pp. 337-352. ISSN 1562-3599

Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175

Majzoub, Omar (2025) A precursor to computation in architecture – an alternative to the current concept design process. PhD thesis, University of New South Wales, Australia.

Makabate, C T; Musonda, I; Okoro, C S and Chileshe, N (2022) Scientometric analysis of BIM adoption by SMEs in the architecture, construction and engineering sector. Engineering, Construction and Architectural Management, 29(1), pp. 179-203. ISSN 0969-9988

Makarfi, U and Udeaja, C (2019) To formulate a conceptual model for innovation: Reframing theoretical constructs of BIM adoption within SME organisations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Makarfi, U U (2022) Digital prototype framework for understanding building information modelling adoption: Nigerian small and medium architectural firms. PhD thesis, University of Salford, UK.

Makarfi Ibrahim, Y; Kaka, A; Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), pp. 388-405. ISSN 1471-4175

Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.

Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.

Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175

Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. PhD thesis, Georgia Institute of Technology, USA.

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Malla, V; K.V, P and Delhi, V S K (2026) Analysing inhibitors to BIM implementation: A social network theoretical perspective. Construction Innovation, 26(1), pp. 198-218. ISSN 1471-4175

Mallaburn, P; Azhari, R; Fawcett, T and Topouzi, M (2021) Australian non-domestic buildings policy as an international exemplar. Buildings & Cities, 2(1), pp. 318-335. ISSN 2632-6655

Mallawaarachchi, H; De Silva, L and Rameezdeen, R (2016) Indoor environmental quality and occupants' productivity: Suggestions to enhance national green certification criteria. Built Environment Project and Asset Management, 6(5), pp. 462-477. ISSN 2044-124X

Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599

Mallisetti, V; Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects: the Indian case. Journal of Financial Management of Property and Construction, 27(2), pp. 179-198. ISSN 1366-4387

Mambwe, M; Mwanaumo, E M; Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), pp. 60-70. ISSN 2521-0165

Mamphey, S A (2024) A framework for the implementation of international construction ethics standards in Sub-Sahara Africa: The case of Ghana. PhD thesis, Nottingham Trent University, UK.

Mamun, M T (2021) Development of a governance framework for delivery of collaborative and security-minded BIM projects. PhD thesis, University of Salford, UK.

Manase, D (2008) An exploratory study of GIS based analysis of health and safety related information. PhD thesis, University of Wolverhampton, UK.

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Mangvwat, J. S.; Spillane, J. P. and Bradley, J. G. (2026) Integrating social value into public procurement: A strategic framework for sustainable construction in Nigerian tertiary institutions. International Journal of Building Pathology and Adaptation, 44(5), pp. 1145-1166. ISSN 2398-4708

Mangvwat, J S and Spillane, J P (2021) Social sustainability in procurement of construction projects: A literature review from a Nigerian perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mangvwat, J S; Spillane, J P and Bradley, J G (2023) Instrumentality of procurement laws to implement social sustainability in Nigeria. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mangvwat, J S; Spillane, J P and Bradley, J G (2024) Unveiling the nexus: The impact of social factors on sustainability in construction procurement. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(3), pp. 230-245. ISSN 0969-9988

Manley, K and Chen, L (2015) Collaborative learning model of infrastructure construction: A capability perspective. Construction Innovation, 15(3), pp. 355-377. ISSN 1471-4175

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988

Mannakkara, S and Wilkinson, S (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 126-139. ISSN 1759-5916

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), pp. 1475-1484. ISSN 1562-3599

Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X

Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599

Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988

Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364

Mansoor, A; Liu, S; Bouferguene, A and Al-Hussein, M (2024) Crane signalman hand-signal classification framework using sensor-based smart construction glove and machine-learning algorithms. Journal of Construction Engineering and Management, 150(8): 04024094, ISSN 0733-9364

Mansoori, S; Harkonen, J and Haapasalo, H (2023) Productization and product structure enabling BIM implementation in construction. Engineering, Construction and Architectural Management, 30(5), pp. 2155-2184. ISSN 0969-9988

Mansor, M; Zakariya, K and Harun, N Z (2019) Challenges on use of recreational parks in Kuala Lumpur. Journal of Construction in Developing Countries, 24(1), pp. 141-162. ISSN 1823-6499

Mansour, H; Aminudin, E and Mansour, T (2023) Implementing industry 4.0 in the construction industry- strategic readiness perspective. International Journal of Construction Management, 23(9), pp. 1457-1470. ISSN 1562-3599

Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Mantzouratos, N; Gardiklis, D; Dedoussis, V and Kerhoulas, P (2004) Concise exterior lighting simulation methodology. Building Research & Information, 32(1), pp. 42-47. ISSN 0961-3218

Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.

Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Manu, P; Asiedu, R O; Mahamadu, A M; Olomolaiye, P O; Booth, C; Manu, E; Ajayi, S and Agyekum, K (2021) Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering, Construction and Architectural Management, 28(10), pp. 3322-3345. ISSN 0969-9988

Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.

Manzoor, B; Antwi-Afari, M F; Alotaibi, K S; Edwards, D J and Posillico, J J (2025) Critical success factors for implementing digital twin technology in construction projects: A systematic and bibliometric approach. Journal of Construction Engineering and Management, 151(12): 03125008, ISSN 0733-9364

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Maqsood, T and Akintoye, A (2002) Supply chain management: More than a new name for management of relationships. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Maqsood, T; Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(1), pp. 94-109. ISSN 0969-9988

Maqsoom, A; Hammad, M; Umer, M; Salman, A and Ashraf, H (2024) From intentions to actions: unveiling the socio-psychological drivers of solar home system adoption in developing nations. Architectural Engineering and Design Management, 20(5), pp. 1019-1036. ISSN 1745-2007

Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marchant, David (2015) Capturing and integrating the design brief in building information models. PhD thesis, University of New South Wales, Australia.

Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.

Marefat, A; Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: Applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(9), pp. 1855-1877. ISSN 0969-9988

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.

Marguet, N; Ross, A and Johnson, D (2009) Developing supply chain procurement systems in social housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X

Marinelli, M (2022) A dfx-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(1), pp. 20-37. ISSN 2044-124X

Marinelli, M; Petroutsatou, K; Fragkakis, N and Lambropoulos, S (2018) Rethinking new public infrastructure value for money in recession times: The Greek case. International Journal of Construction Management, 18(4), pp. 331-342. ISSN 1562-3599

Marinelli, M and Salopek, M (2020) Joint risk management and collaborative ethos: Exploratory research in the UK construction sector. Journal of Engineering, Design and Technology, 18(2), pp. 343-361. ISSN 1726-0531

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(1), pp. 53-70. ISSN 17561469

Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.

Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007

Marques Neto, José da Costa (2009) Study on municipal management of construction and demolition wastes in the turvo grande watershed (urghi-15). PhD thesis, Universidade de São Paulo, Brazil.

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X

Marsh, D; Bryde, D and Graham, A (2014) Perceptions of the value and viability of implementing lean construction with business information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Martabid, J E and Mourgues, C (2015) Criteria used for selecting envelope wall systems in Chilean residential projects. Journal of Construction Engineering and Management, 141(12): 05015011, ISSN 0733-9364

Martin, H; Watson, C and Brooks, T (2025) Synergizing BIM and riba in architectural practice-technology workflow efficiencies, challenges, and insights. Architectural Engineering and Design Management, 21(1), pp. 35-59. ISSN 1745-2007

Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175

Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364

Martinez-Avila, C and Olander, S (2024) Stakeholder participation in the implementation of urban property development projects. Construction Management and Economics, 42(10), pp. 926-941. ISSN 01446193

Martínez Avíla, C (2018) Stakeholder participation in property development. PhD thesis, Lund University, Sweden.

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE. PhD thesis, Heriot-Watt University, UK.

Marx, H J (2011) Key performance indicators measuring contractor satisfaction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Marzouk, M; Elsaay, H and Othman, A A E (2022) Analysing BIM implementation in the Egyptian construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4177-4190. ISSN 0969-9988

Marzouk, M and Zaher, M (2025) Integrated approach for facility management of existing buildings using point cloud segmentation. International Journal of Building Pathology and Adaptation, 43(6), pp. 1439-1465. ISSN 2398-4708

Mashali, A; Elbeltagi, E; Motawa, I and Elshikh, M (2023) Stakeholder management challenges in mega construction projects: Critical success factors. Journal of Engineering, Design and Technology, 21(2), pp. 358-375. ISSN 1726-0531

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Mason, J (1999) The impact of total quality management on construction worker safety. PhD thesis, University of South Florida, USA.

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Masood, R; Roy, K; Gonzalez, V A; Lim, J B P and Nasir, A R (2025) Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand. Smart and Sustainable Built Environment, 14(1), pp. 276-302. ISSN 2046-6099

Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Masterman, J W E (1994) A study of the bases upon which clients of the construction industry choose their building procurement systems. PhD thesis, University of Manchester, UK.

Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364

Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.

Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387

Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.

Matshidze, L B (2021) Developing a Public Private Partnerships (PPP) framework for implementing road maintenance projects in South African rural communities. PhD thesis, Heriot-Watt University, UK.

Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Matsuoka, Y; Takeuchi, Y and Shaw, R (2013) Implementation of Hyogo framework for action in Makati City, Philippines. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 23-42. ISSN 1759-5916

Mattar, S G (1983) Segmental post-tensioned dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(3), pp. 276-285. ISSN 0733-9364

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.

Maull, W M (1998) An investigation into the development of engineering students' conceptual understanding of mathematics. PhD thesis, University of Plymouth, UK.

Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099

Mawed, M (2024) Revolutionizing performance measures and criteria for the facilities management industry in the UAE. Built Environment Project and Asset Management, 14(4), pp. 644-662. ISSN 2044-124X

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988

Mayara Regina, M and Tavares, S F (2021) Materials passport's review: Challenges and opportunities toward a circular economy building sector. Built Environment Project and Asset Management, 11(4), pp. 767-782. ISSN 2044-124X

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mayouf, M; Gerges, M and Cox, S (2019) 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology, 17(3), pp. 537-553. ISSN 1726-0531

Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.

Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531

Mbabu, Alex (2025) Digital twins in lean strategic facility management in the UK healthcare sector: A proposed framework to enabling lean strategic facility management in healthcare operations in the UK. PhD thesis, University of Salford, UK.

Mbachu, J; Egbelakin, T; Rasheed, E O and Shahzad, W M (2017) Influence of key role players on productivity outcomes in the residential building lifecycle. Journal of Engineering, Design and Technology, 15(4), pp. 528-551.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), pp. 39-54. ISSN 1466433X

Mbadugha, L C; Ozumba, A O U and Shakantu, W (2021) Prospects for integrated design process (IDP) in implementing construction waste prevention (CWP) practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

McAdam, B (2010) Building information modelling: the UK legal context. International Journal of Law in the Built Environment, 2(3), pp. 246-259. ISSN 1756-1450

McAleenan, C (2016) Operation analysis and control: a paradigm shift in construction safety management. PhD thesis, University of South Wales, UK.

McAndrew, S T (2009) Collaborative technologies for mobile workers and virtual project teams. EngD thesis, Loughborough University, UK.

McCabe, S and Boyd, D (2004) Quality management 25 years on: What can we learn about initiatives in construction? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

McCain, M L (1986) Skill and deskilling in the English building trades in the nineteenth-century. PhD thesis, Georgetown University, USA.

McCarney, M; Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: A conceptual model. Construction Innovation, 23(3), pp. 587-605. ISSN 1471-4175

McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.

McCarthy, S C (1991) BOT and OMT contracts for infrastructure in developing countries. PhD thesis, University of Birmingham, UK.

McCausland, K (2021) The design, development and evaluation of GIS applications as decision support tools for ecologically aware infrastructure design. EngD thesis, University of Reading, UK.

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

McCutcheon, R (1979) Modern construction technology in low-income housing policy: The case of industrialised building. PhD thesis, University of Sussex, UK.

McDermott, P and Quinn, B (1995) Latham causes conflict: Institutional development in the UK construction industry. Journal of Construction Procurement, 1(2), pp. 150-164. ISSN 1358-9180

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193

McDonnell, A and Sinnott, D (2010) Barriers and enablers to energy efficient retrofitting of dwellings in Ireland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

McEntire, D; Crocker, C G and Peters, E (2010) Addressing vulnerability through an integrated approach. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 50-64. ISSN 1759-5916

McErlane, A; Haran, M; McClements, S and McCord, J (2018) Modelling the drivers for public-private partnerships (PPP) provision of United Kingdom (UK) social infrastructure. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

McGill, G; Sharpe, T; Robertson, L; Gupta, R and Mawditt, I (2017) Meta-analysis of indoor temperatures in new-build housing. Building Research & Information, 45(1-2), pp. 19-39. ISSN 0961-3218

McGilligan, C; Wilde, P and Goodhew, S (2008) An assessment of the potential returns of energy certificates for the UK household sector. Journal of Financial Management of Property and Construction, 13(3), pp. 187-199. ISSN 1366-4387

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McIntosh, G and Sloan, B (2001) The potential impact of electronic procurement and global sourcing within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

McIntosh, J F (1984) The application of the relational data model to computer-aided building design. ArchD thesis, University of Michigan, USA.

McLain, K; Gransberg, D and Loulakis, M (2014) Managing geotechnical risk on us design-build transport projects. Construction Economics and Building, 14(1), pp. 1-19. ISSN 2204-9029

McLean, J and Murray, M (2003) The construction of the new Scottish parliament in edinburgh: An opinion poll of the Scottish public and construction industry professionals. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

McLean, W P (2004) Inspector discretion and industry compliance in the street-level implementation of building codes. PhD thesis, University of New Orleans, USA.

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

McMahon, M (2013) Designed from the inside out: developing capacity for social sustainability in design through collaboration. PhD thesis, Loughborough University, UK.

McMillan, L (2023) Artificial intelligence–enabled self-healing infrastructure systems. PhD thesis, University College London, UK.

McNairney, F (2012) Using images to overcome communication hurdles posed by foreign site operatives. PhD thesis, Glasgow Caledonian University, UK.

McNamara, A J and Sepasgozar, S M E (2020) Developing a theoretical framework for intelligent contract acceptance. Construction Innovation, 20(3), pp. 421-445. ISSN 1471-4175

McNamara, A J; Shirowzhan, S and M.E. Sepasgozar, S (2024) Investigating the determents of intelligent construction contract adoption: A refinement of the technology readiness index to inform an integrated technology acceptance model. Construction Innovation, 24(3), pp. 702-724. ISSN 1471-4175

McNamara, E T (1997) The current perspective of major United Kingdom construction companies on the private finance initiative. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McPeek, K T (2009) Collaborative design pedagogy: A naturalistic inquiry of architectural education. PhD thesis, Texas A&M University, USA.

Md Lasa, Y; Ahmad, N and Takim, R (2015) Critical success factors in obtaining project financing for private finance initiative projects in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.

Medda, F R and Cocconcelli, L (2018) Municipal bonds as a means of accelerating local infrastructure investment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 220-227. ISSN 17514304

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Meglin, R (2022) Economic and environmental assessment of a regional construction and building materials industry in Switzerland: An applied combination of material-flow analysis, life-cycle assessment and input-output analysis. DSc thesis, ETH Zürich, Switzerland.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Mei, T; Wang, Q; Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(3), pp. 514-536. ISSN 0969-9988

Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364

Meifrinaldi, S R C P (2024) Stakeholder readiness for integrated project delivery in public sector construction: The role of maturity models. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Meijon Morêda Neto, H; Bastos Costa, D and Coelho Ravazzano, T (2019) Recommendations for target value design implementation for real estate development in Brazil. Architectural Engineering and Design Management, 15(1), pp. 48-65. ISSN 1745-2007

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Mejlænder-Larsen, Ø (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(1), pp. 39-51. ISSN 1745-2007

Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.

Mell, Ian Caleb (2010) Green infrastructure: Concepts, perceptions and its use in spatial planning. PhD thesis, University of Newcastle upon Tyne, UK.

Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Memari, S; Kocaturk, T; Lozanovska, M; Andrews, F and Tucker, R (2023) Future proofing for hospital building design: From research to practice. Architectural Engineering and Design Management, 19(6), pp. 681-700. ISSN 1745-2007

Memić, N; Tadayon, A; Ishtiaque, T A; Klakegg, O J; Wondimu, P A and Lædre, O (2025) How to find the optimal time for contractor involvement in infrastructure projects? Engineering, Construction and Architectural Management, 32(11), pp. 7651-7677. ISSN 0969-9988

Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.

Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.

Menadue, Vanessa Rachel (2014) Green commercial office buildings: Environmental performance and user perceptions. PhD thesis, University of Adelaide, Australia.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menezes-Firmino, M J; Alencar, L H and Olbina, S (2025) Framework for implementing an agile-BIM in Brazilian public organizations based on the value-focused thinking method. Engineering, Construction and Architectural Management, 32(12), pp. 8021-8055. ISSN 0969-9988

Meng, Q; Zhang, Y; Li, Z; Shi, W; Wang, J; Sun, Y; Xu, L and Wang, X (2020) A review of integrated applications of BIM and related technologies in whole building life cycle. Engineering, Construction and Architectural Management, 27(8), pp. 1647-1677. ISSN 0969-9988

Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Mengistu, D G; Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(6), pp. 1936-1957. ISSN 1726-0531

Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.

Mensah, S; Nani, G and Ayarkwa, J (2022) Contractors' adaptation to environmentally sustainable construction: A micro-level implementation framework. Smart and Sustainable Built Environment, 11(4), pp. 832-851. ISSN 2046-6099

Menzies, B; Emmanuel, R; Thomson, C and Walton, J (2010) Creating the conditions that facilitate the development of equitable, low carbon communities in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180

Merdinger, C J (1949) A history of civil engineering. PhD thesis, University of Oxford, UK.

Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.

Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment. PhD thesis, Brunel University, UK.

Messah, Y; Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), pp. 2221-2229. ISSN 1562-3599

Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Mewomo, M C; Aigbavboa, C and Lesalane, P (2018) An examination of the key drivers of amendments to the standard forms of contract in the South African construction industry. Journal of Construction in Developing Countries, 23(1), pp. 115-124. ISSN 1823-6499

Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193

Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099

Michielsens, E (2016) Contextualising diversity management: challenging the effectiveness of the business case. PhD thesis, University of Westminster, UK.

Mickovski S B, B J D S M J (2013) Innovative use of ECC (NEC) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.

Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364

Mihov, M (2020) Making it fit: The role of institutional work in the transplantation of the anglo-saxon public-private partnership model to Germany. PhD thesis, King's College London, UK.

Mikulić, D; Lovrinčević, Ž and Keček, D (2021) Valorization of economic effects from the programme of energy renovation of public buildings in Croatia. Building Research & Information, 49(5), pp. 561-573. ISSN 0961-3218

Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization. PhD thesis, University of Toronto, Canada.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Miller, A; Radcliffe, D and Isokangas, E (2009) A perception-influence model for the management of technology implementation in construction. Construction Innovation, 9(2), pp. 168-183. ISSN 1471-4175

Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180

Miller, C J M; Packham, G A; Pickernell, D G and McGovern, M (2004) Building for the future: The potential importance of the construction industry in welsh economic development policy. Construction Management and Economics, 22(5), pp. 533-540. ISSN 01446193

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.

Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(5), pp. 669-677. ISSN 01446193

Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Millett, S J; Dainty, A R J; Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Mills, A; Maqsood, T; Khalfan, M and Walker, D (2011) Infrastructure development using alliances: Lessons and observations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.

Mimendi Cruz, Jose Leonel (2021) Digital workflow for the design, construction and management of natural bamboo pole structures. PhD thesis, University College London, UK.

Min, V; Panuwatwanich, K and Matsumoto, K (2025) Evaluating key attributes for enhancing contractors' performance in construction waste management: A multi-criteria decision analysis using the best worst method. International Journal of Construction Management, 25(16), pp. 1968-1981. ISSN 1562-3599

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.

Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364

Mincks, W R (2016) Career success for construction project managers: A qualitative study of construction project managers coping with stress to complete successful projects. PhD thesis, University of Idaho, USA.

Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.

Minh Van, N and Ha, K D (2024) A corporate social responsibility implementation index for architectural design firms in Vietnam. Architectural Engineering and Design Management, 20(1), pp. 65-78. ISSN 1745-2007

Mireku, E. K.; Kissi, E.; Ikuabe, M.; Arkoh-Clayman, E. and Musah, L. (2026) Encumbrances of integrating sustainability concepts and practices in rural community buildings: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(5), pp. 1232-1245. ISSN 2398-4708

Mirmoghtadaee, M; Abdi, M H and Eslamlou, M S (2025) Managing uncertainties in fault avoidance zone of urban areas: A case study of karaj, Iran. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 275-288. ISSN 1759-5908

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988

Mirzaei, M (2018) Cost-effectiveness of outsourcing public architectural/engineering projects in government agencies. PhD thesis, New York University Tandon School of Engineering, USA.

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.

Mis, N B; Joseph, R; Proverbs, D and Lamond, J (2015) Grass-root preparedness against potential flood risk among residential and commercial property holders. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 44-56. ISSN 1759-5916

Mishra, A; Hasan, A and Jha, K N (2024) A holistic evaluation of BIM implementation barriers in the Indian construction industry: Pre- and post-adoption perspectives. International Journal of Construction Education and Research, 20(3), pp. 358-380. ISSN 15578771

Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mitchell, A; Frame, I; Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(3), pp. 297-311. ISSN 0969-9988

Mitropoulos, P (1996) Technology adoption decisions in construction organizations. PhD thesis, Stanford University, USA.

Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364

Mitropoulos, P and Sanchez, R (2016) Criteria and considerations for project work structuring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 124-130. ISSN 17514304

Miyatake, Y and Kangari, R (1993) Experiencing computer integrated construction. Journal of Construction Engineering and Management, 119(2), pp. 307-322. ISSN 0733-9364

Mlitwa, N B W and Birch, D (2011) The role of intrusion detection systems in electronic information security: From the activity theory perspective. Journal of Engineering, Design and Technology, 9(3), pp. 296-312. ISSN 1726-0531

Mmereki, D and Brouwer, D (2022) Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review. Journal of Construction Engineering and Management, 148(8): 04022068, ISSN 0733-9364

Moatazed-Keivani, R; Ghanbari-Parsa, A R and Kagaya, S (1999) ISO 9000 standards: Perceptions and experiences in the UK construction industry. Construction Management and Economics, 17(1), pp. 107-119. ISSN 01446193

Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement. PhD thesis, University of Alberta, Canada.

Moghaddaszadeh Kermani, M (2016) Criticality-based strategic decision-making model for maintenance and asset management. PhD thesis, University of Manchester, UK.

Moghayedi, A. and Awuzie, B. (2026) Unlocking sustainability futures: A framework for digital product passports and material banks in a circular built environment. Construction Innovation, 26(9), pp. 135-166. ISSN 1471-4175

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Mohamad, M I; Nekooie, M A and Al-Harthy, A B S (2012) Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2), pp. 23-44. ISSN 1823-6499

Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.

Mohamad Bohari, Asmah Alia B (2017) Exploring the potential for green-oriented procurement in building projects: A case of the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.

Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.

Mohamed, A H (2016) Lean construction as an innovative approach for minimising risks in mega-Construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Mohamed, M and Tran, D Q (2023) Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, Construction and Architectural Management, 30(7), pp. 2621-2644. ISSN 0969-9988

Mohamed, S (2003) Scorecard approach to benchmarking organizational safety culture in construction. Journal of Construction Engineering and Management, 129(1), pp. 80-88. ISSN 0733-9364

Mohamed, S (2003) Adaptation of the balanced scorecard to measure organizational safety culture. Journal of Construction Research, 4(1), pp. 45-57. ISSN 1609-9451

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(3), pp. 266-281. ISSN 0969-9988

Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.

Mohammadi, Masoud (2023) Development of bridge information model (brim) for digital twinning and management using tls technology. PhD thesis, Western Sydney University, Australia.

Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599

Mohammed, A B (2022) Applying BIM to achieve sustainability throughout a building life cycle towards a sustainable BIM model. International Journal of Construction Management, 22(2), pp. 148-165. ISSN 1562-3599

Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.

Mohammed, S (2022) Effect of political corruption on project failure. A multilevel inquiry on the effects of corruption on public sector construction project failure in emerging and advanced market economies. DBA thesis, Northcentral University, USA.

Mohandes, S R; Singh, A K; Fazeli, A; Banihashemi, S; Arashpour, M; Cheung, C; Ejohwomu, O and Zayed, T (2025) Determining the stationary digital twins implementation barriers for sustainable construction projects. Smart and Sustainable Built Environment, 14(5), pp. 1538-1563. ISSN 2046-6099

Mohd Ishak, S S; Esa, M and Ismail, M H (2017) Social capital, social network and diffusion of BIM practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Mohd Nor, M F I (2019) The development of a pedagogical framework for the integration of building information modelling in the architecture degree programme in Malaysia. PhD thesis, University of Strathclyde, UK.

Mohd Zin, I N (2014) Knowledge sharing approaches in Malaysian construction organisations for improved performance. PhD thesis, University of Salford, UK.

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Mohyin, N A; Dainty, A R J and Carrillo, P M (2009) Managing knowledge workers commitment in small construction professional firms. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Moir, S and Carter, K (2012) Diagrammatic representations of sustainability: A review and synthesis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(3), pp. 222-231. ISSN 0969-9988

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Molad, C and Edward Back, W (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(2), pp. 93-104. ISSN 0969-9988

Molaei, M (2021) In pursuit of success: Evaluating the management of engineering projects, cross-sectoral analysis of project management efforts. PhD thesis, Delft University of Technology, Netherlands.

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364

Molin Valdés, H; Amaratunga, D and Haigh, R (2013) Making cities resilient: From awareness to implementation. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 5-8. ISSN 1759-5916

Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364

Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.

Mollo, L G; Emuze, F and Smallwood, J (2023) A proposed training-within-industry-informed human failure reduction framework for South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 104-112. ISSN 17514304

Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708

Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Monahan, J (2013) Housing and carbon reduction: can mainstream 'eco-housing' deliver on its low carbon promises? PhD thesis, University of East Anglia, UK.

Monahan, J; Coates, R and Clarke-Hagan, D (2014) Overcoming the barriers of green innovation in construction projects through its successful management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects. PhD thesis, University of East Anglia, UK.

Moncaster, A M and Simmons, P (2015) Policies and outcomes for UK sustainable schools. Building Research & Information, 43(4), pp. 452-464. ISSN 0961-3218

Montalbán-Domingo, L; Torres-Machi, C; Sanz-Benlloch, A; Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(9): 04023089, ISSN 0733-9364

Monteiro, Mario Augusto Parente (2015) Intention to recycle solid waste in civil construction companies. PhD thesis, Universidade de Fortaleza, Brazil.

Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Moodley, K; Preece, C and Kyprianou, R (2001) An examination of knowledge management implementation within civil engineering consulting organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Mooney, C and Mooney, E (2014) Risk allocation in construction contracts: Irish public works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 68-74. ISSN 17514304

Moore, D R and Abadi, M (2005) Virtual team working and associated technologies within the UK construction industry. Architectural Engineering and Design Management, 1(1), pp. 21-32. ISSN 1745-2007

Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180

Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvemeent in UK design and build projects: A call for change. Construction Management and Economics, 19(6), pp. 559-562. ISSN 01446193

Moore, D R and Dainty, A R J (2002) Criticizing the 'techniques of communication' approach: A response. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Moore, D R and Fisher, T (2017) Challenges of motivating postgraduate built environment online teaching and learning practice workgroups to adopt innovation. International Journal of Construction Education and Research, 13(3), pp. 225-47. ISSN 1557-8771

Moore, S A; Gelfand, S and Whitsett, D (2015) Epistemological conflict: Modern and non-modern frameworks for sustainability. Building Research & Information, 43(6), pp. 659-674. ISSN 0961-3218

Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(2), pp. 27-40. ISSN 1366-4387

Mootanah, D P (2000) Theory meets practice: Proposal for a dynamic value and risk methodology for project management. Journal of Construction Research, 1(2), pp. 131-138. ISSN 1609-9451

Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.

Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Moradi, S; Hirvonen, J and Sormunen, P (2026) Collaborative and life cycle-based project delivery for environmentally sustainable building construction: Views of Finnish project professionals and building operation and maintenance experts. Smart and Sustainable Built Environment, 15(1), pp. 407-430. ISSN 2046-6099

Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X

Moradi, S; Kähkönen, K; Klakegg, O J and Aaltonen, K (2021) Profile of project managers' competencies for collaborative construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.

Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Morgado, J; Flores-Colen, I; De Brito, J and Silva, A (2017) Maintenance planning of pitched roofs in current buildings. Journal of Construction Engineering and Management, 143(7): 05017010, ISSN 0733-9364

Morgan, B (2017) Organizing for technology in practice: implementing Building Information Modeling in a design firm. PhD thesis, University College London, UK.

Morgan, C; Foster, J A; Poston, A and Sharpe, T R (2017) Overheating in Scotland: Contributing factors in occupied homes. Building Research & Information, 45(1-2), pp. 143-156. ISSN 0961-3218

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Morgan, R E and Morgan, N A (1991) An appraisal of the marketing development in engineering consultancy firms. Construction Management and Economics, 9(4), pp. 355-368. ISSN 01446193

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study. PhD thesis, University of Sheffield, UK.

Morledge, R and Owen, K (1998) Critical success factors in PFI projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morley, J (2026) Energy sufficiency, space temperature and public policy. Buildings & Cities, 7(1), pp. 110-125. ISSN 2632-6655

Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morris, P W G (1972) A study of selected building projects in the context of theories of organization. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Morrison, S; Callaghan, N; Tong, M and Thomson, C (2022) Quantity surveyors incorporating circularity at early project design stage: A literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Morrissey, D; Goodier, C and Demian, P (2024) Offsite construction in ireland’s hospitals: Unveiling the complexities of OSC adoption. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.

Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531

Moskowitz, J M and McCranie, J B (2026) Investigating the impact of army safety and occupational health management system implementation on safety performance indices: Case study of a U.S. Army corps of engineers district. International Journal of Construction Management, 26(5), pp. 840-856. ISSN 1562-3599

Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(8), pp. 845-857. ISSN 1562-3599

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Mostafaeipour, A; Qolipour, M; Rezaei, M; Jahangiri, M; Goli, A and Sedaghat, A (2021) A novel integrated approach for ranking solar energy location planning: A case study. Journal of Engineering, Design and Technology, 19(3), pp. 698-720. ISSN 1726-0531

Motawa, I; Kaka, A and Hong Wong, C (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(2), pp. 143-156. ISSN 1366-4387

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Motawa, I A; Price, A D F and Sher, W (1998) The introduction and management of innovative construction processes and products. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Motawa, I A; Price, A D F and Sher, W (1999) Implementing construction innovations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Moteleb, M (2010) Risk based decision making tools for sewer infrastructure management. PhD thesis, University of Cincinnati, USA.

Motjolopane, B P and van Zyl, R (2009) A review of rectenna models for electromagnetic energy harvesting. Journal of Engineering, Design and Technology, 7(3), pp. 282-292. ISSN 1726-0531

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Mottaki, Z; Hosseini Sabzevari, S A and Aslani, F (2024) Designing post-earthquake temporary shelter in hot and arid climate (case study: Isfahan city, Iran). Architectural Engineering and Design Management, 20(6), pp. 1777-1794. ISSN 1745-2007

Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.

Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364

Mousakhani, E; Yavarkhani, M and Sohrabi, S (2017) Selecting an appropriate alternative for a major infrastructure project with regard to value engineering approach. Journal of Engineering, Design and Technology, 15(3), pp. 395-416.

Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175

Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531

Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), pp. 1-17. ISSN 1823-6499

Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988

Mtunzi, B and Meyer, E L (2015) Design and implementation of a directly cooled PV/T. Journal of Engineering, Design and Technology, 13(3), pp. 369-379.

Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry. PhD thesis, Heriot-Watt University, UK.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Muleya, F; Zulu, S and Nanchengwa, P C (2020) Investigating the role of the public private partnership act on private sector participation in PPP projects: A case of Zambia. International Journal of Construction Management, 20(6), pp. 598-612. ISSN 1562-3599

Mulholland, S M; Boffy-Ramirez, E and Clevenger, C M (2026) Incentives and effort elicitation in construction contracting: Modeling strategic behavior under DBB and CMR/GMP contracts. Construction Management and Economics, 44(2), pp. 143-158. ISSN 0144-6193

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Muller, M (2012) Polycentric governance: Water management in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 193-200. ISSN 17514312

Muller, M (2018) Lessons from transforming a South African special-purpose vehicle into a project implementation agency. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 189-196. ISSN 17514304

Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.

Munaro, M R; Freitas, M D C D; Tavares, S F and Bragança, L (2021) Circular business models: Current state and framework to achieve sustainable buildings. Journal of Construction Engineering and Management, 147(12): 04021164, ISSN 0733-9364

Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175

Mundonde, J (2022) Framework model for financing sustainable water and sanitation infrastructure in Zimbabwe. PhD thesis, University of South Africa, South Africa.

Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(2), pp. 100-114. ISSN 1745-2007

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2021) BIM business value for asset owners: Key issues and challenges. International Journal of Building Pathology and Adaptation, 39(1), pp. 135-151. ISSN 23984708

Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193

Murguia, D; Soetanto, R; Szczygiel, M; Goodier, C I and Kavuri, A (2026) Construction 4.0 implementation for performance improvement: An innovation management perspective. Construction Innovation, 26(3), pp. 843-870. ISSN 1471-4175

Murguia, D (2021) A model of systemic BIM adoption. PhD thesis, Loughborough University, UK.

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364

Murguia, D; Rathnayake, A; Jansen Van Vuuren, T and Middleton, C (2024) Measuring construction productivity across projects: Multilevel three-dimensional framework. Journal of Construction Engineering and Management, 150(11): 04024151, ISSN 0733-9364

Murguia, D; Vasquez, C; Demian, P and Soetanto, R (2023) BIM adoption among contractors: A longitudinal study in Peru. Journal of Construction Engineering and Management, 149(1): 04022140, ISSN 0733-9364

Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.

Murphy, M and Eadie, R (2019) Socially responsible procurement: A service innovation for generating employment in construction. Built Environment Project and Asset Management, 9(1), pp. 138-152. ISSN 2044-124X

Murphy, M; Heaney, G and Perera, S (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(4), pp. 416-440. ISSN 1471-4175

Murphy, M E (2014) Implementing innovation: A stakeholder competency-based approach for BIM. Construction Innovation, 14(4), pp. 433-452. ISSN 1471-4175

Murphy, M E; Perera, S and Heaney, G (2015) Innovation management model: A tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(3), pp. 209-232. ISSN 01446193

Murray, Alex (2018) Returns on public capital investment: Procurement, whole life cost and value in English schools and hospitals, from 1997-2012. PhD thesis, University College London, UK.

Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Murtagh, S R and Brooks, T (2019) Critical success factors for social value in construction procurement in Northern Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 183-196. ISSN 17514304

Murtaza, I; Rashid, M U and Asad, M (2024) Construction safety challenges and opportunities at design stage for building industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 3-15. ISSN 17514304

Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.

Musa, S (2019) A framework of intra-organisational knowledge sharing practices in implementing BIM within the Malaysian construction industry. PhD thesis, University of Salford, UK.

Mushi, F V; Nguluma, H and Kihila, J (2022) A critical review of African green building research. Building Research & Information, 50(6), pp. 610-627. ISSN 0961-3218

Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X

Musonda, I and Smallwood, J (2008) Health and safety (H&S) awareness and implementation in botswana's construction industry. Journal of Engineering, Design and Technology, 6(1), pp. 81-90. ISSN 1726-0531

Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mustaffa, N K; Abdul Kudus, S; Abdul Aziz, M F H and Anak Joseph, V R (2022) Strategies and way forward of low carbon construction in Malaysia. Building Research & Information, 50(6), pp. 628-645. ISSN 0961-3218

Mustaffa, N K; Isa, C M M; Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(3), pp. 99-123. ISSN 2204-9029

Mustapa, F D (2014) Managing immigrant construction workers in peninsular Malaysia: The economic perspective. PhD thesis, Loughborough University, UK.

Mustapa, M (2013) Facilities management knowledge in private finance initiative (PFI) healthcare projects. PhD thesis, Loughborough University, UK.

Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.

Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Muya, M; Mulenga, M N; Bwalya, D C; Edum-Fotwe, F T and Price, A D F (2003) Construction skills requirement issues in Zambia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Muya, M; Price, A D F and Thorpe, A (1999) Implementation of information technology in materials logistics in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Muzondo, F T (2020) The limitations of the South African procurement policies and practices in relation to contractor selection criteria: The importance of technical qualifications and experience of established construction companies. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.

Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety. DPhil thesis, University of Johannesburg, South Africa.

Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.

Mwelu, N; Davis, P R; Ke, Y; Watundu, S and Jefferies, M (2021) Success factors for implementing Uganda's public road construction projects. International Journal of Construction Management, 21(6), pp. 598-614. ISSN 1562-3599

Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499

Mwesigwa, R; Nabwami, R; Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(3), pp. 469-484. ISSN 2044-124X

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

Mzyece, D; Ndekugri, I E; Ankrah, N and Hammond, F (2012) The principal contractor’s role under construction (design and management) regulations 2007: Areas for further research based on a qualitative inquiry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Müller, B (2016) Policy gaps: Future challenges for research. Building Research & Information, 44(3), pp. 338-341. ISSN 0961-3218

N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X

Naanaa, H.; Bril El Haouzi, H.; Derigent, W. and Lezoche, M. (2026) A semantic search system for efficient information retrieval in the construction domain. Smart and Sustainable Built Environment, 15(5), pp. 1781-1807. ISSN 2046-6099

Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.

Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Nagogo, U B (2022) A strategy for stakeholder engagement in public private partnership urban infrastructure provision in Nigeria. PhD thesis, University of Salford, UK.

Nahapiet, H and Nahapiet, J (1985) A comparison of contractual arrangements for building projects. Construction Management and Economics, 3(3), pp. 217-231. ISSN 01446193

Nahmens, I and Mullens, M (2009) The impact of product choice on lean homebuilding. Construction Innovation, 9(1), pp. 84-100. ISSN 1471-4175

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates: lessons learned. Construction Innovation, 13(2), pp. 186-201. ISSN 1471-4175

Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.

Naimi, M (2013) Contract and claim prevention in major projects: a study on petrochemical projects in Iran. PhD thesis, University of Manchester, UK.

Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.

Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Najafzadeh, M; Abbasianjahromi, H and Tabari, P (2025) Integrating sustainable development and ethical engineering in industry 4.0 applications for AEC contract management. Engineering, Construction and Architectural Management, 32(13), pp. 445-476. ISSN 0969-9988

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.

Nam, C H and Tatum, C B (1992) Noncontractual methods of integration on construction projects. Journal of Construction Engineering and Management, 118(2), pp. 385-398. ISSN 0733-9364

Nam, C H and Tatum, C B (1992) Strategies for technology push: Lessons from construction innovations. Journal of Construction Engineering and Management, 118(3), pp. 507-524. ISSN 0733-9364

Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.

Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.

Nanayakkara, L (2004) The motivation of masons in the Sri Lankan construction industry. PhD thesis, University of Reading, UK.

Nanayakkara, L (2005) An empirically grounded framework for human resource management in the Sri Lankan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.

Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement. PhD thesis, Brunel University, UK.

Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364

Naoum, S G and Langford, D (1987) Management contracting: the client's view. Journal of Construction Engineering and Management, 113(3), pp. 369-384. ISSN 0733-9364

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Narbaev, T; De Marco, A and Orazalin, N (2020) A multi-disciplinary meta-review of the public-private partnerships research. Construction Management and Economics, 38(2), pp. 109-125. ISSN 01446193

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Navandar, Y V; Bari, C and Gaikwad, P G (2022) Failure factors–a comparative study of private and government construction firms. Engineering, Construction and Architectural Management, 29(6), pp. 2495-2513. ISSN 0969-9988

Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R; Kelly, P W and Johnston, D W (1993) Human factors in introducing on-site construction automation. Journal of Construction Engineering and Management, 119(4), pp. 801-812. ISSN 0733-9364

Navon, R; Rubinovitz, Y and Coffler, M (1996) Fully automated rebar CAD/CAM system: Economic evaluation and field implementation. Journal of Construction Engineering and Management, 122(2), pp. 101-108. ISSN 0733-9364

Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364

Nawaz, A and Guribie, F L (2024) Impacts of institutional isomorphism on the adoption of social procurement in the Chinese construction industry. Construction Innovation, 24(3), pp. 846-862. ISSN 1471-4175

Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on cuda. Journal of Engineering, Design and Technology, 16(6), pp. 925-937. ISSN 1726-0531

Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.

Nazeer, F S; Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(4), pp. 529-546. ISSN 2044-124X

Nazeer, F S; Kamardeen, I and Hasan, A (2025) Establishment of an end-user engaged building design framework. Built Environment Project and Asset Management, 15(1), pp. 106-124. ISSN 2044-124X

Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304

Ndekugri, I; Ankrah, N A and Adaku, E (2022) The design coordination role at the pre-construction stage of construction projects. Building Research & Information, 50(4), pp. 452-466. ISSN 0961-3218

Ndekugri, I; Ankrah, N A and Adaku, E (2023) Performance barriers for coordination of health and safety during the preconstruction phase of construction projects. Journal of Construction Engineering and Management, 149(7): 04023045, ISSN 0733-9364

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193

Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X

Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364

Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193

Ndlela, W H Z (2022) Dynamic challenges facing SME consulting firms in the built environment sector in Kwazulu-Natal province: The entrepreneurial approach. DBA thesis, University of Liverpool, UK.

Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ndukwe, Chigozie Victor (2023) Impact of globalisation on the construction supply chain: Challenges and responses in Victoria. PhD thesis, University of Melbourne, Australia.

Neeraj, S; Mannakkara, S and Wilkinson, S (2020) Build back better concepts for resilient recovery: A case study of India's 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 280-294. ISSN 1759-5916

Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model. PhD thesis, University of Maryland, College Park, USA.

Negara, Kartika Puspa (2020) Client construction project manager competency in Indonesia. PhD thesis, Queensland University of Technology, Australia.

Negreiros, Iara (2018) Urban retrofitting an approach to support decision-making. PhD thesis, Universidade de São Paulo, Brazil.

Nelson, T N T; Poleacovschi, C; Appelgate, M; Drake, R; Swalwell, K; Jackson, C; Svec, J and Cetin, K (2024) Making social justice central to construction engineering: Testing interventions for educating reflexive engineers. Journal of Construction Engineering and Management, 150(10): 04024122, ISSN 0733-9364

Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.

Nesan Lenin, J (2011) Integrated e-bidding framework for construction. International Journal of Construction Education and Research, 7(4), pp. 243-258. ISSN 1557-8771

Nesensohn C, B D J and Fearon D J, O E G (2013) Combining lean construction with maturity models. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Neshat, N; Hadian, H and Rahimi Alangi, S (2020) Technological learning modelling towards sustainable energy planning. Journal of Engineering, Design and Technology, 18(1), pp. 84-101. ISSN 1726-0531

Neve, H H; Wandahl, S; Kaeseler, S M and Tandrup, A (2017) Integrating IPD and exploring potentials. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Newaz, M T; Davis, P R; Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(3), pp. 462-478. ISSN 0969-9988

Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(2), pp. 211-220. ISSN 1358-9180

Newcombe, R (2000) An investigation into simulating the procurement process in the United Kingdom construction industry. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Newton, S (1983) Analysis of construction economics: a cost simulation model. PhD thesis, University of Strathclyde, UK.

Newton, S; Shirazi, A and Christensen, P (2023) Defining and demonstrating a smart technology configuration to improve energy performance and occupant comfort in existing buildings: A conceptual framework. International Journal of Building Pathology and Adaptation, 41(1), pp. 182-200. ISSN 23984708

Ng, A and Loosemore, M (2006) Risk allocation in public private partnership (PPP) projects: The new southern railway project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ng, C W (2024) Enhancing the performance of the adoption of building information modelling (BIM) and common data environment (CDE) using risk management and performance contract techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ng, F P; Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(2), pp. 141-150. ISSN 01446193

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ng, M S; Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study. Architectural Engineering and Design Management, 19(1), pp. 39-55. ISSN 1745-2007

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T; Chen, S E; McGeorge, D; Lam, K C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(1), pp. 3-13. ISSN 1471-4175

Ng, S T; Kong, H and Luu, C D T (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(1), pp. 32-40. ISSN 2204-9029

Ng, S T; Luu, D T; Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. ISSN 01446193

Ng, S T; Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(3), pp. 264-282. ISSN 0969-9988

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988

Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Nganpet, N G and Biermann, E (2016) Image compression system for a 3U CubeSat. Journal of Engineering, Design and Technology, 14(3), pp. 446-460.

Nghitanwa, E M (2016) Development of practical guidelines to promote occupational health and safety for workers in the construction industry in Windhoek, Namibia. DLittPhil thesis, University of South Africa, South Africa.

Ngoma, S; Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp. 15-33. ISSN 1823-6499

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218

Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(4), pp. 457-474. ISSN 1471-4175

Nguyen, M V; Ha, K D and Nguyen, K V (2026) Linking corporate social responsibility and project performance: Role of collaboration and trust. International Journal of Construction Management, 26(6), pp. 960-973. ISSN 1562-3599

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Nguyen, V. T. and Khuc, T. Q. (2026) How structural modelling of R-principles reveals their interactions and guides circular economy implementation in Vietnam. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988

Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.

Nguyen, B K (2012) Developing a framework for assessing sustainability of tall-building projects. PhD thesis, University of Sheffield, UK.

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, D C; Nguyen, T Q; Jin, R; Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(3), pp. 487-503. ISSN 1471-4175

Nguyen, D T and Le, P L (2022) Twenty-year application of logistics and supply chain management in the construction industry. Construction Management and Economics, 40(10), pp. 796-834. ISSN 01446193

Nguyen, H T and Hadikusumo, B H W (2018) Human resource related factors and engineering, procurement, and construction (EPC) project success. Journal of Financial Management of Property and Construction, 23(1), pp. 24-39. ISSN 1366-4387

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Nguyen, Hai N (2010) The impact of leadership behaviours and organisational culture on knowledge management practices in small and medium enterprises. PhD thesis, Griffith University, Australia.

Nguyen, Loi (2018) Management innovation: Case study of balanced scorecard implementation in Vietnam. PhD thesis, University of Minnesota, USA.

Nguyen, M V (2024) Barriers to corporate social responsibility performance in construction organizations. Engineering, Construction and Architectural Management, 31(4), pp. 1473-1496. ISSN 0969-9988

Nguyen, M V (2024) Investigating the relationship between corporate social responsibility implementation and contractor competitiveness. Engineering, Construction and Architectural Management, 31(10), pp. 3895-3920. ISSN 0969-9988

Nguyen, M V (2025) Assessment of corporate social responsibility performance for Vietnamese construction organizations. Journal of Engineering, Design and Technology, 23(2), pp. 477-500. ISSN 1726-0531

Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X

Nguyen, N T H and Dang, H T (2020) Adaptation of "participatory method" in design "for/with/by" the poor community in Tam Thanh, Quang Nam, Vietnam. Smart and Sustainable Built Environment, 9(3), pp. 272-282. ISSN 2046-6099

Nguyen, P A; Bokel, R and Dobbelsteen, A (2019) Improving energy efficiency in Vietnamese tube houses: A survey of sustainable challenges and potentials. Smart and Sustainable Built Environment, 8(5), pp. 366-390. ISSN 2046-6099

Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364

Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193

Nguyen, Q A (2023) Application of Ji Koutei Kanketsu (JKK) for design risk management in highway construction projects. PhD thesis, University of Huddersfield, UK.

Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599

Nguyen, T; Tran, Q P; Chileshe, N; Thao Huynh, T Y and Hallo, L (2024) Risk prioritization using analytic process network for metro rail implementation projects in developing countries: A typical case study of Vietnam. International Journal of Construction Management, 24(10), pp. 1077-1089. ISSN 1562-3599

Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599

Nguyen, T A; Do, S T; Nguyen, V T; Khuc, T Q and Quach, Q T (2024) Essential strategies for embracing building information modeling (BIM) in public investment projects: A case study in Vietnam. International Journal of Construction Management, 24(15), pp. 1708-1718. ISSN 1562-3599

Nguyen, T A; Le, N M U; Nguyen, S H and Ngo, N V (2024) Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam. Journal of Construction in Developing Countries, 29(2), pp. 157-180. ISSN 1823-6499

Nguyen, T P and Chileshe, N (2015) Revisiting the construction project failure factors in Vietnam. Built Environment Project and Asset Management, 5(4), pp. 398-416. ISSN 2044-124X

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Nguyen, T T N; Anh Nguyen, T; Tien Do, S and Nguyen, V T (2023) Assessing stakeholder behavioural intentions of BIM uses in Vietnam's construction projects. International Journal of Construction Management, 23(13), pp. 2279-2287. ISSN 1562-3599

Nguyen, T T N; Nguyen, T A; Do, S T and Nguyen, V T (2024) Developing a structural model of stakeholders' behavior toward BIM adoption in construction enterprises. International Journal of Construction Management, 24(10), pp. 1038-1053. ISSN 1562-3599

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nguyen T P, C N (2013) Revisiting the critical factors causing failure of construction projects in Vietnam. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364

Nicolini, D; Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(1), pp. 37-47. ISSN 01446193

Nidhin, B K S N; Domingo, N; Bui, T T P and Wilkinson, S (2025) Construction stakeholders' knowledge on zero carbon initiatives in New Zealand. International Journal of Building Pathology and Adaptation, 43(3), pp. 512-527. ISSN 2398-4708

Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X

Nielsen, S B; Hoffmann, B; Quitzau, M B and Elle, M (2009) Mobilizing the courage to implement sustainable design solutions: Danish experiences. Architectural Engineering and Design Management, 5(1-2), pp. 53-61. ISSN 1745-2007

Nielsen, Y; Kumas, N and Ciftci, C (2006) ICT use in Turkish construction sector: Existing laws and regulations. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364

Nigra, M and Dimitrijevic, B (2018) Is radical innovation in architecture crucial to sustainability? Lessons from three Scottish contemporary buildings. Architectural Engineering and Design Management, 14(4), pp. 272-291. ISSN 1745-2007

Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: A road concession in Greece. Built Environment Project and Asset Management, 3(2), pp. 264-278. ISSN 2044-124X

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.

Nikou, T and Klotz, L (2014) Application of multi-attribute utility theory for sustainable energy decisions in commercial buildings: A case study. Smart and Sustainable Built Environment, 3(3), pp. 207-222. ISSN 2046-6099

Nikyema, G A B (2020) Barriers to the adoption of green building materials and technologies in developing countries: The case of Burkina Faso. PhD thesis, Clemson University, USA.

Nilsson Vestola, E; Larsson, J and Hedgren, E (2025) Public clients pursue innovation, but what's going on at the project level? A case study of infrastructure operation and maintenance. Construction Management and Economics, 43(1), pp. 26-39. ISSN 0144-6193

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2001) Constructability implementation: A survey in the Malaysian construction industry. Construction Management and Economics, 19(8), pp. 819-829. ISSN 01446193

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Nimesha Sahani, J; Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(1), pp. 121-137. ISSN 2044-124X

Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364

Ning, Y and Ling, F Y Y (2013) Reducing hindrances to adoption of relational behaviors in public construction projects. Journal of Construction Engineering and Management, 139(11): 4013017, ISSN 0733-9364

Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364

Nirupama, N (2012) Risk and vulnerability assessment: A comprehensive approach. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 103-114. ISSN 1759-5916

Nirupama, N; Popper, T and Quirke, A (2015) Role of social resilience in mitigating disasters. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 363-377. ISSN 1759-5916

Nishida, Y and Hua, Y (2011) Motivating stakeholders to deliver change: Tokyo's cap-and-trade program. Building Research & Information, 39(5), pp. 518-533. ISSN 0961-3218

Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction. PhD thesis, Purdue University, USA.

Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364

Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175

Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Niu, Y; Anumba, C and Lu, W (2019) Taxonomy and deployment framework for emerging pervasive technologies in construction projects. Journal of Construction Engineering and Management, 145(5): 04019028, ISSN 0733-9364

Niu, Y; Li, H; Luo, X and Deng, X (2024) Coopetition configuration and performance of international joint ventures for high-speed rail projects. Engineering, Construction and Architectural Management, 31(9), pp. 3748-3772. ISSN 0969-9988

Niveditha, M. and Palanisamy, T. (2026) Upcycling iron-rich industrial waste into a carbon-sequestering composite binder through optimized carbonation curing for structural applications. International Journal of Construction Management, 26(8), pp. 1471-1489. ISSN 1562-3599

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Nobe, M C and Greenwell, C (2016) Moving operations and maintenance practices of existing buildings beyond sustainability: A case study of the lenses framework during post occupancy. International Journal of Construction Education and Research, 12(2), pp. 122-141. ISSN 1557-8771

Noguchi, M (2004) A choice model for mass customisation of lower-cost and higher-performance housing in sustainable development. PhD thesis, McGill University, Canada.

Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.

Nordby, A S; Berge, B; Hakonsen, F and Hestnes, A G (2009) Criteria for salvageability: The reuse of bricks. Building Research & Information, 37(1), pp. 55-67. ISSN 0961-3218

Norell, M; Stehn, L and Engström, D (2020) Architectural design of vertical extensions of buildings: A risk perspective on complexity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Norton, M and Lane, A (2012) 'New water architecture': An integrated water management model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 159-171. ISSN 17514312

Noruwa, B; Merschbrock, C; Arewa, A O and Agyekum-Mensah, G (2018) Institutional foundations of construction ICT: A view from the West midlands of England. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Nouh, A; Elkasaby, E and Wageh, O (2024) Dynamic approach for investigating delivery system effects on infrastructure project performance. Engineering, Construction and Architectural Management, 31(12), pp. 4791-4808. ISSN 0969-9988

Nouh Meshref, A; Elkasaby, E and Wageh, O (2026) Innovative strategic multicriteria decision-making selection model of infrastructures projects delivery systems using multiobjective optimization, case of Egypt. Construction Innovation, 26(2), pp. 353-368. ISSN 1471-4175

Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Novotny, V (2013) Water-energy nexus: Retrofitting urban areas to achieve zero pollution. Building Research & Information, 41(5), pp. 589-604. ISSN 0961-3218

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ntshwene, K; Essah, E A and Dixon, T J (2014) Investigating the level of awareness of building assessment tools in the construction industry of Botswana. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175

Nunes, M C M (1997) Enabling the use of alternative materials in road construction. PhD thesis, University of Nottingham, UK.

Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadike, A N and Wilkinson, S (2022) An evidence-based framework validation for building code improvement in New Zealand. Engineering, Construction and Architectural Management, 29(8), pp. 3072-3090. ISSN 0969-9988

Nwajei, U O K (2021) How relational contract theory influence management strategies and project outcomes: A systematic literature review. Construction Management and Economics, 39(5), pp. 432-457. ISSN 01446193

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Nwaogu, J M and Chan, A P C (2021) Evaluation of multi-level intervention strategies for a psychologically healthy construction workplace in Nigeria. Journal of Engineering, Design and Technology, 19(2), pp. 509-536. ISSN 1726-0531

Nwaogu, O (2017) A systems approach to the development of an energy benchmarking process model for commercial buildings. DEng thesis, Morgan State University, USA.

Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.

Nyagormey, J J; Baiden, B K; Nani, G and Adinyira, E (2020) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), pp. 2243-2257. ISSN 1562-3599

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.

Nyakala, S; Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), pp. 46-54. ISSN 2521-0165

Nyando, C K and van Breda Strasheim, J A (2012) Assessing labour-based construction works management processes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 239-251. ISSN 17514312

Nyateka, N (2017) An evaluation of the role and effectiveness of simulation-based learning in the occupational health training of construction apprentices. PhD thesis, Loughborough University, UK.

Nyawera, J X and Theodore Conrad, H (2021) Critical drivers towards generative process health and safety culture. Journal of Engineering, Design and Technology, 19(2), pp. 385-411. ISSN 1726-0531

Nyein, T S and Hadikusumo, B H W (2021) Factors influencing the adoption of public-private partnership in low-cost housing development in Myanmar. Journal of Financial Management of Property and Construction, 26(3), pp. 337-365. ISSN 1366-4387

Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Artificial intelligence driven platforms in the construction industry: Implications for companies' business models. Construction Innovation, 25(7), pp. 409-443. ISSN 1471-4175

Nzekwe-Excel, C (2010) Development of an integrated framework for satisfaction assessment of construction project teams. PhD thesis, University of Wolverhampton, UK.

Nørkjaer Gade, P; Nørkjaer Gade, A; Otrel-Cass, K and Svidt, K (2019) A holistic analysis of a BIM-mediated building design process using activity theory. Construction Management and Economics, 37(6), pp. 336-350. ISSN 01446193

O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193

O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364

O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.

O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.

Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988

Oberlender, G D (1984) Development of construction research. Journal of Construction Engineering and Management, 110(4), pp. 486-490. ISSN 0733-9364

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387

Obi, L I; Arif, M; Lamb, S M and Ashayeri, I (2025) Establishing interrelationships and dependencies of critical success factors for implementing offsite construction in the UK. Smart and Sustainable Built Environment, 14(3), pp. 810-834. ISSN 2046-6099

Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.

Obiozo R, S R (2013) The role of 'greening' and an ecosystem approach to enhancing construction ergonomics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.

Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(2), pp. 96-108. ISSN 0144-6193

Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599

Oduro, S; Pittri, H; Baah, B; Simons, B; Gyamfi, J; Botchway, B and Afful, A E (2025) Strategies for the implementation of net zero energy buildings in the Ghanaian construction industry. Built Environment Project and Asset Management, 15(5), pp. 1004-1019. ISSN 2044-124X

Oduyemi, O; Okoroh, M and Dean, A (2014) Barriers to life cycle costing usage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ofori, G (1991) Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Construction Management and Economics, 9(1), pp. 19-38. ISSN 01446193

Ofori, G (2001) Indicators for measuring construction industry development in developing countries. Building Research & Information, 29(1), pp. 40-50. ISSN 0961-3218

Ofori, G (2002) Singapore's construction: Moving toward a knowledge-based industry. Building Research & Information, 30(6), pp. 401-412. ISSN 0961-3218

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: Practices, procedures and performance. Construction Management and Economics, 21(2), pp. 113-125. ISSN 01446193

Ofori, G (2006) Revaluing construction in developing countries: A research agenda. Journal of Construction in Developing Countries, 11(1), pp. 1-16. ISSN 1823-6499

Ofori, G; Briffett, C; Gang, G and Ranasinghe, M (2000) Impact of ISO 14000 on construction enterprises in Singapore. Construction Management and Economics, 18(8), pp. 935-947. ISSN 01446193

Ofori, G and Gang, G U (2001) ISO 9000 certification of Singapore construction enterprises: Its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(2), pp. 145-157. ISSN 0969-9988

Ofori-Boadu, A N; Owusu-Manu, D G; Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(4), pp. 1196-1213. ISSN 0969-9988

Ofori-Boadu, A N; Shofoluwe, M A; Owusu-Manu, D-G; Holt, G D and Edwards, D (2015) Analysis of US commercial buildings' energy efficiency programs. Built Environment Project and Asset Management, 5(4), pp. 349-362. ISSN 2044-124X

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Ogbeifun, E (2011) Training artisans on-site. Construction Economics and Building, 11(3), pp. 83-91. ISSN 2204-9029

Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Fragmentation of capital development projects: A tool for job creation and skill development. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ogbu, C P (2018) Survival practices of indigenous construction firms in Nigeria. International Journal of Construction Management, 18(1), pp. 78-91. ISSN 1562-3599

Ogunbayo, B F; Ohis Aigbavboa, C; Thwala, W D and Akinradewo, O I (2022) Assessing maintenance budget elements for building maintenance management in Nigerian built environment: A Delphi study. Built Environment Project and Asset Management, 12(4), pp. 649-666. ISSN 2044-124X

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.

Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.

Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(2), pp. 187-196. ISSN 1358-9180

Ogunlana, S O; Li, H and Sukhera, F A (2003) System dynamics approach to exploring performance enhancement in a construction organization. Journal of Construction Engineering and Management, 129(5), pp. 528-536. ISSN 0733-9364

Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.

Ogunmakinde, O E (2025) Achieving zero waste: Circular economy strategies in Australian higher education. Construction Economics and Building, 25(2), pp. 1-23. ISSN 2204-9029

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Ogunsanya, O A; Aigbavboa, C O and Thwala, D W (2023) Sustainable procurement model for publicly funded construction projects in developing nations–a structural equation modeling approach. International Journal of Construction Management, 23(3), pp. 449-461. ISSN 1562-3599

Ogunsanya, O A; Aigbavboa, C O; Thwala, D W and Edwards, D J (2022) Barriers to sustainable procurement in the Nigerian construction industry: An exploratory factor analysis. International Journal of Construction Management, 22(5), pp. 861-872. ISSN 1562-3599

Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Ogwueleka, A C and Ikediashi, D I (2021) Exploring the effects of positive organizational behaviour models on occupational eustress amongst construction employees. Journal of Construction Business and Management, 5(1), pp. 38-46. ISSN 2521-0165

Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Ohland, M W (1996) Engineering by design: A methodology for designing creative engineering activities. PhD thesis, University of Florida, USA.

Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction. PhD thesis, Indiana State University, USA.

Ohueri, C C; Bamgbade, J A; Chuin, A L S; Hing, M W N and Enegbuma, W I (2022) Best practices in building information modelling process implementation in green building design: Architects' insights. Journal of Construction in Developing Countries, 27(1), pp. 79-93. ISSN 1823-6499

Ohueri, C C; Enegbuma, W I and Habil, H (2020) MyCREST embedded framework for enhancing the adoption of green office building development in Sarawak. Built Environment Project and Asset Management, 10(2), pp. 215-230. ISSN 2044-124X

Ohueri, C C; Enegbuma, W I; Wong, N H; Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp. 293-304. ISSN 2044-124X

Ohueri, C C; Masrom, M A N; Habil, H and Ambashe, M S (2025) IoT-based digital twin best practices for reducing operational carbon in building retrofitting: A mixed-method approach. Engineering, Construction and Architectural Management, 32(3), pp. 2044-2065. ISSN 0969-9988

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojiako, U; Maseko, L; Root, D; Venkatachalam, S; Marshall, A; AlRaeesi, E and Chipulu, M (2025) Design phase collaborative risk management factors: A case study of a green rating system in South Africa. Engineering, Construction and Architectural Management, 32(9), pp. 6268-6301. ISSN 0969-9988

Ojiako, U; Papadopoulos, T; Stamati, T; Anagnostopoulos, D and Marshall, A (2015) Collaborative governance in Greek infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 135-145. ISSN 17514304

Ojo, L. D.; Chan, A. P. C.; Sing, M. C. P. and Kazeem, K. O. (2026) Impact of integrity-based approach to ethics management on project performance. Journal of Engineering, Design and Technology, ISSN 1726-0531

Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387

Ojo, E M (2016) Assessment of green supply-chain management in South African and Nigerian construction firms. DPhil thesis, University of Johannesburg, South Africa.

Ojo, L D; Ogunsemi, D R; Elyamany, A and Oke, A E (2025) Profound barriers to value management adoption on construction projects in a developing nation. Journal of Engineering, Design and Technology, 23(1), pp. 264-286. ISSN 1726-0531

Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387

Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531

Okanlawon, T T; Oyewobi, L O and Jimoh, R A (2023) Evaluation of the drivers to the implementation of blockchain technology in the construction supply chain management in Nigeria. Journal of Financial Management of Property and Construction, 28(3), pp. 459-476. ISSN 1366-4387

Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988

Oke, A E; Aliu, J; Agbaje, D H; Ebekozien, A; Aghimien, D O; Leo-Olagbaye, F and Clinton, C (2025) Exploring constraints in integrating indoor environmental quality (IEQ) into building designs: A case of Nigerian quantity surveying firms. Construction Innovation, 25(6), pp. 1657-1679. ISSN 1471-4175

Oke, A E; Aliu, J; Ehiosun, L U; Kineber, A F and Stephen, S S (2025) Adoption of distributed ledger technology for construction projects: A study of the challenges in a developing country. Journal of Engineering, Design and Technology, 23(5), pp. 1364-1383. ISSN 1726-0531

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Oke, A E and Aliu, J (2025) Strategies for the implementation of environmental economic practices for sustainable construction in a developing economy. International Journal of Construction Management, 25(5), pp. 542-551. ISSN 1562-3599

Oke, A E; Aliu, J; Fadamiro, P; Akanni, P; Jamir Singh, P S and Shaharudin Samsurijan, M (2025) Unpacking the strategies to promote the implementation of automation techniques in the construction industry. Construction Innovation, 25(2), pp. 381-399. ISSN 1471-4175

Oke, A E; Aliu, J; Fadamiro, P; Jamir Singh, P S; Samsurijan, M S and Yahaya, M (2024) Robotics and automation for sustainable construction: Microscoping the barriers to implementation. Smart and Sustainable Built Environment, 13(3), pp. 625-643. ISSN 2046-6099

Oke, A E; Aliu, J; Fadamiro, P; Leo-Olagbaye, F; Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(6), pp. 913-928. ISSN 2044-124X

Oke, A E; Aliu, J; Ifedolapo Babalola, H; Jamir Singh, P S; Tunji-Olayeni, P and Ukaha Onyeukwu, S (2025) From building blocks to digital networks: Analyzing critical drivers for social media adoption in the construction sector. International Journal of Construction Management, 25(9), pp. 1047-1057. ISSN 1562-3599

Oke, A E; Aliu, J; Jamir Singh, P S; Onajite, S A; Shaharudin Samsurijan, M and Azura Ramli, R (2024) Appraisal of awareness and usage of digital technologies for sustainable wellbeing among construction workers in a developing economy. International Journal of Construction Management, 24(5), pp. 521-529. ISSN 1562-3599

Oke, A E; Aliu, J; Mwanaumo, E M; Odia, O A; Kahanji, C and Tengan, C (2024) From awareness to action: a study of the effectiveness of environmental economic practices for sustainable construction in Nigeria. Smart and Sustainable Built Environment, 13(5), pp. 1194-1212. ISSN 2046-6099

Oke, A E; Aliu, J and Onajite, S A (2024) Barriers to the adoption of digital technologies for sustainable construction in a developing economy. Architectural Engineering and Design Management, 20(3), pp. 431-447. ISSN 1745-2007

Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099

Oke, A E; Farouk Kineber, A; Abdel-Tawab, M; Abubakar, A S; Albukhari, I and Kingsley, C (2023) Barriers to the implementation of cloud computing for sustainable construction in a developing economy. International Journal of Building Pathology and Adaptation, 41(5), pp. 988-1013. ISSN 23984708

Oke, A E; Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(6), pp. 722-737.

Oke, A E; Kineber, A F; Akindele, O and Ekundayo, D (2024) Determining the stationary barriers to the implementation of radio frequency identification (RFID) technology in an emerging construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1894-1912. ISSN 1726-0531

Oke, A E; Kineber, A F; Albukhari, I and Dada, A J (2024) Modeling the robotics implementation barriers for construction projects in developing countries. International Journal of Building Pathology and Adaptation, 42(3), pp. 386-409. ISSN 23984708

Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Okorafor, C and Osuizugbo, I C (2025) Occupant health and safety risk and opportunity in the delivery of building energy retrofits. International Journal of Building Pathology and Adaptation, 43(8), pp. 140-155. ISSN 2398-4708

Okorafor, C; Emuze, F; Das, D; Awuzie, B O and Haupt, T (2020) An artefact for improving the delivery of building energy retrofit project in South Africa. Built Environment Project and Asset Management, 10(4), pp. 619-635. ISSN 2044-124X

Okoro, C S; Nnaji, C and Adediran, A (2023) Determinants of immersive technology acceptance in the construction industry: Management perspective. Engineering, Construction and Architectural Management, 30(7), pp. 2645-2668. ISSN 0969-9988

Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.

Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193

Okoye, P U; Okolie, K C and Odesola, I A (2022) Risks of implementing sustainable construction practices in the Nigerian building industry. Construction Economics and Building, 22(1), pp. 21-46. ISSN 2204-9029

Okpala, I; Nnaji, C; Awolusi, I and Akanmu, A (2021) Developing a success model for assessing the impact of wearable sensing devices in the construction industry. Journal of Construction Engineering and Management, 147(7): 04021060, ISSN 0733-9364

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.

Oladapo, O and Liyanage, C L (2010) Control of healthcare associated infections: A concerted effort. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Oladejo, J (2020) An investigation in the factors affecting the implementation of health and safety management practices by contractors in Nigeria. PhD thesis, University of the West of England, Bristol, UK.

Oladimeji, O and Haddad, A N (2025) Corruption and factors influencing the viability of micro, small and medium scale construction firms (msmcfs). Journal of Financial Management of Property and Construction, 30(3), pp. 477-499. ISSN 1366-4387

Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988

Oladinrin, T O and Ho, C M F (2015) Barriers to effective implementation of ethical codes in construction organizations: An empirical investigation. International Journal of Construction Management, 15(2), pp. 117-125. ISSN 1562-3599

Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165

Oladokun, T T and Komolafe, M O (2017) Drivers of rural housing development in Edo State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 35-46. ISSN 2521-0165

Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), pp. 553-561. ISSN 1466433X

Olanipekun, Ayokunle Olubunmi (2017) Motivating project owners to increase their commitment towards improving the delivery performance of green building projects. PhD thesis, Queensland University of Technology, Australia.

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X

Olanrewaju, O I; Babarinde, S A; Chileshe, N and Sandanayake, M (2021) Drivers for implementation of building information modeling (BIM) within the Nigerian construction industry. Journal of Financial Management of Property and Construction, 26(3), pp. 366-386. ISSN 1366-4387

Olanrewaju, O I; Chileshe, N; Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 2931-2958. ISSN 0969-9988

Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599

Olatunde, N A (2024) Stakeholder management strategies employed on building projects procured by private corporate organisations in south-Western Nigeria. International Journal of Building Pathology and Adaptation, 42(3), pp. 430-447. ISSN 23984708

Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), pp. 819-834. ISSN 2044-124X

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be? Built Environment Project and Asset Management, 5(3), pp. 304-317. ISSN 2044-124X

Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387

Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364

Olawale, O; Oyedele, L; Owolabi, H; Gbadamosi, A Q and Kusimo, H (2022) Project reputation in construction: A process-based perspective of construction practitioners in the UK. International Journal of Construction Management, 22(12), pp. 2267-2278. ISSN 1562-3599

Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X

Olawumi, T O and Chan, D W M (2019) An empirical survey of the perceived benefits of executing BIM and sustainability practices in the built environment. Construction Innovation, 19(3), pp. 321-342. ISSN 1471-4175

Olawumi, T O and Chan, D W M (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(6), pp. 1257-1281. ISSN 0969-9988

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: A comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(3), pp. 1522-1552. ISSN 0969-9988

Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304

Olayinka, R A (2015) A knowledge management framework for reducing the cost of poor quality on construction projects. PhD thesis, University of Wolverhampton, UK.

Olazabal, M and Broto, V C (2022) Institutionalisation of urban climate adaptation: Three municipal experiences in Spain. Buildings & Cities, 3(1), pp. 570-588. ISSN 2632-6655

Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193

Olcar, Ç Ö (2021) A model for exploring evolution of strategic alliances in project-based industries-the case of construction industry. PhD thesis, Izmir Institute of Technology, Turkey.

Oliva, C A; Granja, A D and Picchi, F A (2024) Target value design: Guidelines for implementation in the real estate market in Brazil. Architectural Engineering and Design Management, 20(6), pp. 1323-1334. ISSN 1745-2007

Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oliveira, Iberê Pinheiro de (2023) Criteria for building certification and assessment: An integrated approach to degradation and performance. PhD thesis, Universidade de Brasília, Brazil.

Oliver, M (2013) Evaluation of the planning and implementation of NHS Local Improvement Finance Trust (LIFT) in East London. PhD thesis, University of East London, UK.

Olivera, E L; Booth, C; Agyekum, K; Al-Tarazi, D and Pittri, H (2024) A phenomenological inquiry of Building Information Modelling macro-adoption in Uruguay. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 137-149. ISSN 17514304

Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), pp. 574-589. ISSN 2044-124X

Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387

Ollár, A (2024) Circular building adaptability in multi-residential buildings: The status quo and a conceptual design framework. International Journal of Building Pathology and Adaptation, 42(7), pp. 1-17. ISSN 23984708

Ollár, A (2024) Spatial design for circularity in residential buildings: Exploring the case of the kitchen. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.

Olowa, T; Witt, E and Lill, I (2023) Building information modelling (BIM)–enabled construction education: Teaching project cash flow concepts. International Journal of Construction Management, 23(9), pp. 1494-1505. ISSN 1562-3599

Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.

Olubajo, O O and Daniel, E I (2024) Understanding a worker recruitment as a practice of informality in construction work packages. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Olubukola, C I and Mewomo, M C (2022) Enhancing digital transformation in construction health and safety: A systematic review of the current state of the art. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Olugboyega, O.; Marvellous, O.; Ajayi, A. O. and Ogunniyi, O. O. (2026) Work process attachment forms and styles influencing organizational BIM transformation. Construction Economics and Building, 26(2), ISSN 2204-9029

Olugboyega, O (2024) Differential relationships in the BIM implementation process in a developing country: The role of essential BIM implementation strategies. Engineering, Construction and Architectural Management, 31(8), pp. 3283-3307. ISSN 0969-9988

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165

Olugboyega, O; Binga, B; Oseghale, G E and Aigbavboa, C (2023) Effect of anti-corruption systems' logic on corruption manifestations in project planning and execution in Nigeria. Construction Economics and Building, 23(3-4), pp. 186-207. ISSN 2204-9029

Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175

Olugboyega, O; Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(3), pp. 567-586. ISSN 1471-4175

Olugboyega, O and Windapo, A (2023) Modelling the indicators of a reduction in BIM adoption barriers in a developing country. International Journal of Construction Management, 23(9), pp. 1581-1591. ISSN 1562-3599

Olugboyega, O and Windapo, A O (2022) Structural equation model of the barriers to preliminary and sustained BIM adoption in a developing country. Construction Innovation, 22(4), pp. 849-869. ISSN 1471-4175

Olukayode, Olukemi Temitope (2020) Sustainable construction compliance: Recommending a transformational leader for sustainability policies supervision in the United States construction industry. DBA thesis, Northcentral University, USA.

Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599

Oluwayemi, O (2021) Retrofitting Sustainable Drainage Systems (SUDS) in public buildings in the UK: a cost benefit analysis model. PhD thesis, Birmingham City University, UK.

Omar, I and Makhlomo, S (2003) Energy alternatives for water pumping in rural areas: Using a case study approach. Journal of Engineering, Design and Technology, 1(1), pp. 1-14. ISSN 1726-0531

Omar, M R; Ayob, A; Zakaria, M H; Rahim, N S A; Mokhtar, H; Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 139-162. ISSN 1823-6499

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099

Omer, M M; Moyo, T; Al-Otaibi, A; Alawag, A M; Rizal Alias, A and Rahman, R A (2025) Critical factors affecting workplace well-being at construction sites across countries with different income levels. Construction Innovation, 25(1), pp. 104-130. ISSN 1471-4175

Omer, M M; Moyo, T; Alias, A R and Rahman, R A (2025) Development of workplace well-being indexes at construction sites. Journal of Engineering, Design and Technology, 23(4), pp. 1111-1136. ISSN 1726-0531

Omobhude, O C (2019) Inclusive policy making process for sustainable development: Empirical cases of oil and infrastructure sectors in Nigeria. PhD thesis, National Yang Ming Chiao Tung University, Taiwan R.O.C..

Omoregie, I. I. and Aigbavboa, C. O. (2026) Exploring strategies for strengthening stakeholder communication to advance sustainable construction practices in the Nigerian built environment. Engineering, Construction and Architectural Management, 33(15), pp. 414-431. ISSN 0969-9988

Omoregie, A and Radford, D (2006) Polycentric cultural framework for infrastructure procurement in Nigeria. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Omotayo, M (2020) Developing public-private partnership (PPP) in Nigerian railway corporation: The governance challenge. PhD thesis, University of Manchester, UK.

Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.

Ong, Eric Mei Siang (2008) Trust, commitment, satisfaction and learning in construction project teams. PhD thesis, University of New South Wales, Australia.

Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Onososen, A; Musonda, I; Molusiwa, R and Dzuwa, C (2023) Addressing collaborative challenges in human-robot teams through the development of an immersive virtual environment. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onyali, A (2017) Correlates of project success in the Nigerian real estate construction sector. PhD thesis, Walden University, USA.

Onyenokporo, N C and Ochedi, E T (2019) Low-cost retrofit packages for residential buildings in hot-humid Lagos, Nigeria. International Journal of Building Pathology and Adaptation, 37(3), pp. 250-272. ISSN 23984708

Onyido, T B C; Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(1), pp. 30-45. ISSN 1471-4175

Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029

Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(6), pp. 1044-1052. ISSN 1562-3599

Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708

Opawole, A; Kajimo-Shakantu, K; Alao, O O and Ogbaje, C P (2019) Risk factors associated with procuring university hostel facilities through build-operate-transfer model. Journal of Engineering, Design and Technology, 17(1), pp. 136-154. ISSN 1726-0531

Ophiyandri, T (2013) Project risk management for community-based post-disaster housing reconstruction. PhD thesis, University of Salford, UK.

Ophiyandri, T; Amaratunga, D and Keraminiyage, K (2016) Advantages and limitations of community-based post-disaster housing reconstruction projects. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 420-431. ISSN 1759-5916

Opoku, R A (2026) Antecedents of construction project time overrun in ghana's public sector: The moderating role of political connection. International Journal of Construction Management, 26(4), pp. 537-560. ISSN 1562-3599

Opoku, A and Fortune, C (2011) The implementation of sustainable practices through leadership in construction organizations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(2), pp. 383-401. ISSN 1726-0531

Oraee, M.; Hosseini, M. R. and Edwards, D. J. (2026) Quantitative insights into collaboration in BIM-enabled projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2538-2563. ISSN 0969-9988

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.

Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Orstavik, F and Harty, C (2017) The unexplored brutality of performance recipes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ortiz, S S (2025) Strengthening construction supply chains: An exploration of decision-making frameworks for resilience in the face of black swan event. PhD thesis, Purdue University, Indiana, USA.

Ortlepp, R; Gruhler, K and Schiller, G (2018) Materials in Germany's domestic building stock: Calculation model and uncertainties. Building Research & Information, 46(2), pp. 164-178. ISSN 0961-3218

Osaily, Y; Copping, A and Lo, S (2018) Critical success factors: The development of a conceptual framework for demolition projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Osaily, Y; Copping, A; McCann, S and Uddin, T (2019) Exploring the value of demolition contractor involvement at the design stage of construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.

Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387

Osei-Kyei, R. and Chan, A. P. C. (2017) Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(6), pp. 1222-1245. ISSN 0969-9988

Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Osei-Kyei, R; Chan, A P C and Dansoh, A (2020) Project selection index for unsolicited public-private partnership proposals. International Journal of Construction Management, 20(6), pp. 555-566. ISSN 1562-3599

Osei-Kyei, R; Chan, A P C; Dansoh, A; Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation: A survey of international experts. Journal of Financial Management of Property and Construction, 23(2), pp. 221-238. ISSN 1366-4387

Osei-Tutu, S; Ayarkwa, J; Nani, G; Osei-Asibey, D and Abu, I M A (2025) Stakeholders' role towards circular economy implementation: A scientometric review. Construction Innovation, 25(6), pp. 1633-1656. ISSN 1471-4175

Oshodi, O S; Awuzie, B O; Akotia, J; Ademiloye, A S and Ngowi, A (2020) A bibliometric analysis of recycled concrete research (1978–2019). Built Environment Project and Asset Management, 10(5), pp. 725-736. ISSN 2044-124X

Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.

Osipova, E and Eriksson, P E (2009) The effects of procurement procedures on joint risk management. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Osman, B and Zhu, H (2020) A virtual educational model on a CNC milling machine including and excluding two methods of fuzzy controllers. Journal of Engineering, Design and Technology, 18(5), pp. 1153-1163. ISSN 1726-0531

Osman, I I (2002) Performance measures for contracting companies: a study of the Arab Contractors Company. PhD thesis, Loughborough University, UK.

Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.

Ospina-Alvarado, A; Castro-Lacouture, D and Roberts, J S (2016) Unified framework for construction project integration. Journal of Construction Engineering and Management, 142(7): 4016019, ISSN 0733-9364

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029

Osuizugbo, I C; Oyeyipo, O O and Olojo, A D (2025) Drivers of corporate social responsibility initiatives among construction companies in Nigeria. International Journal of Building Pathology and Adaptation, 43(6), pp. 1595-1611. ISSN 2398-4708

Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531

Osuizugbo, I C (2024) Factors impeding the implementation of buildability assessment in building construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1825-1846. ISSN 1726-0531

Osuizugbo, I C; Fauzi, M A; Omer, M M; Njogo, B O and Orekan, A A (2024) Research trends on early contractor involvement in construction projects: A bibliometric analysis. Construction Economics and Building, 24(4-5), pp. 160-178. ISSN 2204-9029

Osuizugbo, I C and Nnodu, C V (2023) Barriers to environmental impact assessment implementation for construction projects in Nigeria. Built Environment Project and Asset Management, 13(5), pp. 719-737. ISSN 2044-124X

Osuizugbo, I C; Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(3), pp. 879-900. ISSN 1726-0531

Osuizugbo, I C; Okolie, K C and Oyeyipo, O O (2023) Factors influencing buildability assessment implementation in the Nigerian construction industry. Construction Innovation, 23(5), pp. 917-938. ISSN 1471-4175

Osuizugbo, I C; Omer, M M; Rahman, R A and Oshodi, O S (2024) A systematic search and review of early contractor involvement in construction project development. Built Environment Project and Asset Management, 14(6), pp. 835-857. ISSN 2044-124X

Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531

Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.

Otasowie, K and Oke, A (2022) An assessment of exhibited drivers of mentoring in construction professional firms: A case of Nigerian quantity surveying firms. Journal of Construction in Developing Countries, 27(2), pp. 63-86. ISSN 1823-6499

Otasowie, O K and Oke, A E (2024) Drivers of mentoring practices in construction related firms: Nigerian quantity surveying firms' perspective. Engineering, Construction and Architectural Management, 31(3), pp. 997-1015. ISSN 0969-9988

Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708

Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175

Othman, A A; Rahman, S A; Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 644-668. ISSN 0969-9988

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E (2007) Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in abu dhabi, united arab emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159. ISSN 1745-2007

Othman, A A E (2012) A study of the causes and effects of contractors' non-compliance with the health and safety regulations in the South African construction industry. Architectural Engineering and Design Management, 8(3), pp. 180-191. ISSN 1745-2007

Othman, A A E and ElKady, M M (2023) A knowledge management based framework for enhancing the learning culture in architectural design firms in developing countries. Journal of Engineering, Design and Technology, 21(1), pp. 23-57. ISSN 1726-0531

Othman, A A E and Mahmoud, N A (2022) Public-private partnerships as an approach for alleviating risks associated with adaptive reuse of heritage buildings in Egypt. International Journal of Construction Management, 22(9), pp. 1713-1735. ISSN 1562-3599

Othman, A A E and Youssef, L Y W (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. ISSN 1726-0531

Othman, N A (2010) An exploratory study into the implementation of safety management systems of Malaysian contractors in processing plants. PhD thesis, Loughborough University, UK.

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Oti, A H (2014) Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings. PhD thesis, University of Nottingham, UK.

Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.

Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X

Ouma, L A; Castronovo, F; Rupinder, K and Leicht, R (2026) Assessment instrument for lean journeys in integrated project delivery: Lean learning health assessment (llha). Engineering, Construction and Architectural Management, 33(15), pp. 47-71. ISSN 0969-9988

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.

Owen, G and Merna, A (1997) The private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 163-177. ISSN 0969-9988

Owen, R; Amor, R; Palmer, M; Dickinson, J; Tatum, C B; Kazi, A S; Prins, M; Kiviniemi, A and East, B (2010) Challenges for integrated design and delivery solutions. Architectural Engineering and Design Management, 6(4), pp. 232-240. ISSN 1745-2007

Owolabi, A (2004) Development of an integrated product information management system. EngD thesis, Loughborough University, UK.

Owolabi, H; Oyedele, L; Alaka, H; Ajayi, S; Bilal, M and Akinade, O (2020) Risk mitigation in PFI/PPP project finance: A framework model for financiers' bankability criteria. Built Environment Project and Asset Management, 10(1), pp. 28-49. ISSN 2044-124X

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.

Owusu-Manu, D G; Adjei, T K; Sackey, D M; Edwards, D J and Hosseini, R M (2021) Mainstreaming sustainable development goals in Ghana’s energy sector within the framework of public–private partnerships: Challenges, opportunities and strategies. Journal of Engineering, Design and Technology, 19(3), pp. 605-624. ISSN 1726-0531

Owusu-Manu, D G; Debrah, C; Oduro-Ofori, E; Edwards, D J and Antwi-Afari, P (2021) Attributable indicators for measuring the level of greenness of cities in developing countries: lessons from Ghana. Journal of Engineering, Design and Technology, 19(3), pp. 625-646. ISSN 1726-0531

Owusu-Manu, D G; Kukah, A S K; Edwards, D J and Ameyaw, E E (2023) Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1805-1814. ISSN 1562-3599

Oyedele, L; Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: Consultants' perception. Construction Economics and Building, 3(2), pp. 25-32. ISSN 2204-9029

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Oyefusi, O N; Enegbuma, W I and Brown, A (2025) From systematic literature review to performance criteria evaluation: advancing green supply chain management in construction. International Journal of Construction Management, 25(3), pp. 249-264. ISSN 1562-3599

Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708

Oyegoke, A S and Kiiras, J (2004) Two generic perspectives of CM contracting systems: A case of the US, the UK and Finland. Journal of Construction Procurement, 10(2),

Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Oyetunji, A A (2001) Methodology for selecting project delivery and contract strategies for capital projects. PhD thesis, Texas A&M University, USA.

Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364

Oyewobi, L O; Windapo, A O and James, R O B (2015) An empirical analysis of construction organisations' competitive strategies and performance. Built Environment Project and Asset Management, 5(4), pp. 417-431. ISSN 2044-124X

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X

Oyuga, J O; Gwaya, A and Njuguna, M B (2023) Investigation of the current usage of BIM capabilities by large-sized building contractors in Kenya based on theory of innovation diffusion. Construction Innovation, 23(1), pp. 155-177. ISSN 1471-4175

Ozener, O O (2009) Studio education for integrated practice using building information modeling. PhD thesis, Texas A&M University, USA.

Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988

Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

Özkut, D (2004) Reducing risk in 'preservation project management': Re-definition of the 'assessment phase'. PhD thesis, Izmir Institute of Technology, Turkey.

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

O’Neill, T; Hartigan, K and Spillane, J P (2024) Factors inhibiting higher education institutions from addressing industry driven change in Irish construction management programs. International Journal of Construction Education and Research, 20(1), pp. 65-82. ISSN 15578771

Pachnou, D (2003) The effectiveness of bidder remedies for enforcing the EC public procurement rules: a case study of the public works sector in the United Kingdom and Greece. PhD thesis, University of Nottingham, UK.

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Pagani, A; Christie, D; Bourdon, V; Wall Gago, C; Joost, S; Licina, D; Lerch, M; Rozenblat, C; Guessous, I and Viganò, P (2023) Housing, street and health: A new systemic research framework. Buildings & Cities, 4(1), pp. 629-649. ISSN 2632-6655

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Pain, J (1988) Design-build and the traditional approach: A comparative study with particular reference to the JCT 'with contractor's design' 1981 form of contract. PhD thesis, University of Reading, UK.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193

Painting, N; Ashton, P and Gidado, K (2004) PFI in south aast England secondary schools: A school manager's perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains. PhD thesis, Loughborough University, UK.

Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193

Palacios, J L; Gonzalez, V and Alarcón, L F (2014) Selection of third-party relationships in construction. Journal of Construction Engineering and Management, 140(4): B4013005, ISSN 0733-9364

Palagi, S (2020) Achieving risk reduction and livability: Connecting relocation decision making to outcomes at relocation communities. PhD thesis, University of Colorado at Boulder, USA.

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339. ISSN 0733-9364

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Pali, P (2020) Potential for climate change mitigation through low carbon investment in Indian roads and railways: an assessment of obstacles and opportunities for the Asian Development Bank. PhD thesis, University of Manchester, UK.

Palihakkara, A D and Perera, B A K S (2022) Risk management in guaranteed maximum price (gmp) contracts. Smart and Sustainable Built Environment, 11(2), pp. 368-386. ISSN 2046-6099

Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation. PhD thesis, University of Sheffield, UK.

Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916

Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.

Palos, S; Kiviniemi, A and Kuusisto, J (2014) Future perspectives on product data management in building information modeling. Construction Innovation, 14(1), pp. 52-68. ISSN 1471-4175

Pamulu, Muhammad Sapri (2010) Strategic management practices in the construction industry: A study of Indonesian enterprises. PhD thesis, Queensland University of Technology, Australia.

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Pan, Q (2007) System identification of constructed civil engineering structures and uncertainty. PhD thesis, Drexel University, USA.

Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Panagiotakopoulos, P D (2005) A systems and cybernetics approach to corporate sustainability in construction. PhD thesis, Heriot-Watt University, UK.

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Pancholi, J and Devkar, D G (2023) Analyzing the influence of organizational culture in projects using Last Planner System. Construction Economics and Building, 23(3-4), pp. 143-169. ISSN 2204-9029

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pandimani, M R; Ponnada, M R and Geddada, Y (2024) Finite-element modeling of partially prestressed concrete beams with unbonded tendon under monotonic loadings. Journal of Engineering, Design and Technology, 22(1), pp. 235-256. ISSN 1726-0531

Pandithawatta, T P W S I; Zainudeen, N and Perera, C S R (2020) An integrated approach of lean-green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(2), pp. 200-214. ISSN 2044-124X

Panquet, Q; Bourgault, M; Pellerin, R; Danjou, C and Perrier, N (2024) A process-improvement method for implementing earned value-based project management in organizations. Journal of Construction Engineering and Management, 150(12): 04024170, ISSN 0733-9364

Panta, M (2018) Approaches to the resilience and the potential for adaptation through community-driven construction projects in the global South. PhD thesis, University of Brighton, UK.

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.

Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.

Panuwatwanich, Kriengsak (2008) Modelling the innovation diffusion process in Australian architectural and engineering design organisations. PhD thesis, Griffith University, Australia.

Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.

Papadonikolaki, E (2016) Alignment of partnering with construction it: Exploration and synthesis of network strategies to integrate BIM-enabled supply chains. PhD thesis, Delft University of Technology, Netherlands.

Papadonikolaki, E (2017) Grasping brutal and incremental BIM innovation through institutional logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007

Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Papageorgiou, G and Demetriou, G (2020) Investigating learning and diffusion strategies for sustainable mobility. Smart and Sustainable Built Environment, 9(1), pp. 1-16. ISSN 2046-6099

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Pappas, M P (2004) An assessment of implementation requirements for the Tier II construction workforce strategy. PhD thesis, University of Texas at Austin, USA.

Parameswaran, A and Ranadewa, K A T O (2024) Learning-to-learn sand cone model integrated lean learning framework for construction industry. Smart and Sustainable Built Environment, 13(4), pp. 856-882. ISSN 2046-6099

Parami Dewi, Anak Agung Diah (2013) Framework for implementing design build project delivery system in road infrastructure in Indonesia. PhD thesis, Queensland University of Technology, Australia.

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988

Pardalis, G. and Sula, M. (2026) One-stop shops as leverage points for renovation sufficiency. Buildings & Cities, 7(1), pp. 614-632. ISSN 2632-6655

Pardalis, G; Mahapatra, K and Mainali, B (2020) Swedish construction MSEs: Simply renovators or renovation service innovators? Building Research & Information, 48(1), pp. 67-83. ISSN 0961-3218

Parfitt, M K; Syal, M G; Khalvati, M and Bhatia, S (1993) Computer-integrated design drawings and construction project plans. Journal of Construction Engineering and Management, 119(4), pp. 729-742. ISSN 0733-9364

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.

Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599

Park, J (2011) Best-value in Korean public building construction. PhD thesis, University of Southampton, UK.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. PhD thesis, Purdue University, USA.

Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364

Park, J H and Lee, G (2017) Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity. Building Research & Information, 45(6), pp. 631-648. ISSN 0961-3218

Park, M; Ji, S H; Lee, H S and Kim, W (2009) Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), pp. 1125-1137. ISSN 0733-9364

Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364

Park, S H (2009) Whole life performance tender evaluation for design-build in the Korean public sector. PhD thesis, University of Reading, UK.

Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364

Park, T; Mahamadu, A M; Agyekum, K; Adade-Boateng, A O; Manu, P; Adinyira, E and Adukpo, S (2025) An inquiry into the health and safety management practices of construction firms in South Korea. Journal of Engineering, Design and Technology, 23(2), pp. 345-367. ISSN 1726-0531

Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.

Parkinson, T and de Dear, R (2016) Thermal pleasure in built environments: Spatial alliesthesia from contact heating. Building Research & Information, 44(3), pp. 248-262. ISSN 0961-3218

Parmar, D; Kashiwagi, D and Savicky, J (2003) Case study of the dallas independent school district’s construction value. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements. PhD thesis, KTH Royal Institute of Technology, Sweden.

Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.

Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387

Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(3), pp. 276-286. ISSN 0969-9988

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patching, A; Skitmore, M; Rusch, R and Lester, D (2024) Case study of the collaborative design of an integrated BIM, IPD and lean university education program. International Journal of Construction Management, 24(7), pp. 799-808. ISSN 1562-3599

Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988

Patel, D A and Jha, K N (2016) An estimate of fatal accidents in Indian construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Patel, K and Ruparathna, R (2023) Life cycle sustainability assessment of road infrastructure: A building information modeling-(BIM) based approach. International Journal of Construction Management, 23(11), pp. 1837-1846. ISSN 1562-3599

Patel, M and Robinson, H (2010) Impact of governance on project delivery of complex NHS PFI/PPP schemes. Journal of Financial Management of Property and Construction, 15(3), pp. 216-234. ISSN 1366-4387

Patel, S and Hastak, M (2013) A framework to construct post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 95-114. ISSN 1759-5916

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Pathak, C (2021) Electric vehicle infrastructure decision support system. PhD thesis, University of Washington, USA.

Patil, K R; Bhandari, S; Agrawal, A; Ayer, S K; Perry, L A and Hallowell, M R (2023) Analysis of youtube comments to inform the design of virtual reality training simulations to target emotional arousal. Journal of Construction Engineering and Management, 149(9): 04023077, ISSN 0733-9364

Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(2), pp. 161-174. ISSN 1562-3599

Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X

Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Patterson, R L and Trebes, B (2013) NEC contracts for design-build-operate contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 260-268. ISSN 17514312

Patterson, R L and Trebes, B (2015) NEC for DBFO: Taking best practice procurement into PPPs. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 213-219. ISSN 17514304

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution. PhD thesis, Indiana State University, USA.

Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.

Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364

Paulson, B C (2003) Design and construction for the rest of us. Journal of Construction Research, 4(2), pp. 115-127. ISSN 1609-9451

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.

Pavard, A.; de Paula, N. and Poirier, E. (2026) Organizational competencies for BIM adoption: A cross-field analysis in the built asset industry. Construction Innovation, 26(4), pp. 1118-1140. ISSN 1471-4175

Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 195-202. ISSN 0969-9988

Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Peansupap, V (2004) An exploratory approach to the diffusion of ICT in a project environment. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193

Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.

Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988

Peiroavar, M S and Davoudzadeh, T (2026) A stakeholder perspective on the challenges of sustainable material management in construction projects in developing countries: The case of Iran. International Journal of Construction Management, 26(3), pp. 496-510. ISSN 1562-3599

Pekeriçli, M K (2010) A lifecycle information management solution for built environment facilities. PhD thesis, University of Reading, UK.

Pekuri, A; Pekuri, L and Haapasalo, H (2013) The role of business models in Finnish construction companies. Construction Economics and Building, 13(3), pp. 13-23. ISSN 2204-9029

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Penland, J L (2002) Implementation of web-based team collaboration tools in the architectural, engineering and construction industry. PhD thesis, University of Kansas, USA.

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures. PhD thesis, University of Alberta, Canada.

Pereira, Lucas Melchiori (2019) The organizational influence on design quality of built environment. PhD thesis, Universidade de São Paulo, Brazil.

Pereira, N J G (2023) The impact of human errors on the performance to failure of concrete bridges. PhD thesis, Universidade do Minho, Portugal.

Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.

Perera, C S R; Francis, V and Shang, G (2023) Acceptance and adoption of construction 4.0 related technology: A review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Perera, G; Tennakoon, T; Kulatunga, U; Jayasena, H S and Wijewickrama, M (2021) Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(4), pp. 611-626. ISSN 2044-124X

Perera, S; Adeniyi, O; Babatunde, S O and Ginige, K (2018) Mapping built environment professionals' educational needs to international policy frameworks for disaster risk reduction: community stakeholder perspective. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 368-384. ISSN 1759-5916

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perez Jimenez, P A (2019) An investigation into health and safety management by SMEs and the risk of corporate manslaughter prosecution. PhD thesis, University of Wolverhampton, UK.

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Perng, Y H and Chang, C L (2004) Data mining for government construction procurement. Building Research & Information, 32(4), pp. 329-338. ISSN 0961-3218

Perry, J G (1985) The development of contract strategies for construction projects. PhD thesis, University of Manchester, UK.

Perry, J G (1995) The New Engineering Contract: Principles of design and risk allocation. Engineering, Construction and Architectural Management, 2(3), pp. 197-208. ISSN 0969-9988

Persson, M H (2006) Lessons learned in knowledge management: The case of construction. PhD thesis, Lund University, Sweden.

Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.

Petcherdchoo, A (2004) Maintaining condition and safety of deteriorating bridges by probabilistic models and optimization. PhD thesis, University of Colorado at Boulder, USA.

Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193

Peters, R; Whitman, P and Hampson, K (2001) Skill development for innovative procurement environments in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Petersen, D and Kadefors, A (2016) Social procurement and employment requirements in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Petlíková, K (2021) Application of biological algorithms in standardization of construction work. PhD thesis, Czech Technical University, Czech Republic.

Petrescu, D; Petcou, C and Baibarac, C (2016) Co-producing commons-based resilience: Lessons from R-Urban. Building Research & Information, 44(7), pp. 717-736. ISSN 0961-3218

Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.

Pham, Thanh Tung (2021) The transfer of training among Australian construction workers participating in occupational health and safety training. PhD thesis, RMIT University, Australia.

Phan, P T C and Zhou, Z (2024) Implementation of design for construction safety (DfS) in the Vietnam context: awareness, attitude and practices. Journal of Engineering, Design and Technology, 22(6), pp. 1958-1979. ISSN 1726-0531

Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.

Pheng, L S and Hou, C W (2008) Middle management's influence on the effectiveness of ISO 9000 quality management systems in architectural firms. Architectural Engineering and Design Management, 4(3-4), pp. 189-205. ISSN 1745-2007

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Pheng, L S and May, C F (1997) Quality management systems: A study of authority and empowerment. Building Research & Information, 25(3), pp. 158-169. ISSN 0961-3218

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and ohsas 18001 for construction. Journal of Construction Engineering and Management, 129(3), pp. 338-347. ISSN 0733-9364

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Phillips, K C (2010) Monumental change: The St. Louis gateway arch and the integration of craft trades. PhD thesis, Howard University, USA.

Phillips, S; Martin, J; Dainty, A and Price, A (2007) Uncertainty in best value decision making. Journal of Financial Management of Property and Construction, 12(2), pp. 63-72. ISSN 1366-4387

Phillips, S; Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599

Phraknoi, N (2022) Supply chain finance adoption: three is a crowd in entangled relationships. PhD thesis, Lancaster University, UK.

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X

Phua, F T T and Rowlinson, S (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: The case of Hong Kong. Construction Management and Economics, 21(7), pp. 777-785. ISSN 01446193

Phyu, H. T. (2026) A systematic review of transparency in public-private partnerships: Current trends and future research directions. International Journal of Construction Management, 26(9), pp. 1905-1924. ISSN 1562-3599

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pienaar, E J A (1988) A study to identify and evaluate the level of strategic management in the construction industry. DBA thesis, University of Pretoria, South Africa.

Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531

Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988

Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.

Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218

Pietroforte, R and Stefani, T P (2004) Asce journal of construction engineering and management: Review of the years 1983-2000. Journal of Construction Engineering and Management, 130(3), pp. 440-448. ISSN 0733-9364

Pikas, E; Sacks, R and Hazzan, O (2013) Building information modeling education for construction engineering and management II: Procedures and implementation case study. Journal of Construction Engineering and Management, 139(11): 5013002, ISSN 0733-9364

Pim-Wusu, M.; Gyamfi, T. A.; Thwala, W. D. and Aigbavboa, C. O. (2026) Influence of education and training on sustainable construction adaptive capacity in the construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029

Pim-Wusu, M; Aigbavboa, C and Thwala, W D (2023) Adaptability capacity framework for sustainable practices in the Ghanaian construction industry. Built Environment Project and Asset Management, 13(1), pp. 89-104. ISSN 2044-124X

Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities. Unpublished PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities: Focus on the city of Campinas – SP. PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364

Pinti, Lidia (2019) BIM-based facility management: Embedded information management for maintenance: Building information modelling and database integration for the Italian public administration. PhD thesis, Politecnico di Milano, Italy.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Piroozfar, P A E and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(1), pp. 65-81. ISSN 1745-2007

Pirzadeh, P and Lingard, H (2017) Exploring the dynamic social interactions that underpin work health and safety related design decision-making. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Pirzadeh, P; Lingard, H and Blismas, N (2020) A multilevel socio-technical perspective on work health and safety related design decision making. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Pirzadeh, P; Zhang, R P and Lingard, H (2016) Safety climate as a multi-level and dynamic concept: Exploring the variance at different levels over time. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Pirzadeh, Payam (2018) A social network perspective on design for construction safety. PhD thesis, RMIT University, Australia.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771

Pishdad-Bozorgi, P and Beliveau, Y J (2016) A schema of trust building attributes and their corresponding integrated project delivery traits. International Journal of Construction Education and Research, 12(2), pp. 142-160. ISSN 1557-8771

Pishdad-Bozorgi, P and Beliveau, Y J (2016) Symbiotic relationships between integrated project delivery and trust. International Journal of Construction Education and Research, 12(3), pp. 179-192. ISSN 1557-8771

Pishdad-Bozorgi, P and Beliveau, Y J (2016) Symbiotic relationships between integrated project delivery (IPD) and trust. International Journal of Construction Education and Research, 12(3), pp. 179-192. ISSN 1557-8771

Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364

Pitigala Liyana Arachchi, I S; Siriwardana, C; Amaratunga, D and Haigh, R (2022) Evaluation of societal trust on multi-hazard early warning (MHEW) mechanism: Sri Lankan context. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 533-553. ISSN 1759-5916

Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029

Pittri, H; Oduro, S; Atibila, D W; Kwasafo, O K; Abdallah, A and Anteh, E D (2025) Examining the critical barriers to nzebs' implementation in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 23(6), pp. 1898-1918. ISSN 1726-0531

Pittri, H; Agyekum, K; Ayebeng Botchway, E; Opoku, A and Bimpli, I (2024) Design for deconstruction (dfd) implementation among design professionals: Empirical evidence from Ghana. International Journal of Construction Management, 24(13), pp. 1387-1397. ISSN 1562-3599

Pittri, H; Agyekum, K; Botchway, E A; Alencastro, J; Oladinrin, O T and Dompey, A M A (2024) Drivers for design for deconstruction (DfD) implementation among design professionals. Smart and Sustainable Built Environment, 13(5), pp. 1134-1154. ISSN 2046-6099

Plantinga, H; Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager's choice of procurement instruments. Engineering, Construction and Architectural Management, 26(2), pp. 303-320. ISSN 0969-9988

Plantinga H E C, D e A G (2013) Project alliances: An investigation into the logic behind the range of a Dutch public sector client's initiatives. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Platten, A and Gorse, C (2010) Supply chain development for major public sector projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.

Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.

Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Poirier, E; Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting SME. Construction Innovation, 15(1), pp. 42-65. ISSN 1471-4175

Polat, F and Demirkesen, S (2025) Measuring the impact of lean implementation on BIM and project success: Case of construction firms. Engineering, Construction and Architectural Management, 32(9), pp. 5839-5862. ISSN 0969-9988

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.

Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.

Ponton, H (2021) Social interactions in construction design team meetings. PhD thesis, Northumbria University, UK.

Poon, C S; Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(5), pp. 461-470. ISSN 01446193

Poon, C S; Yu, A T W; See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(8), pp. 799-805. ISSN 01446193

Poon, C S; Yu, A T W; Wong, A and Yip, R (2013) Quantifying the impact of construction waste charging scheme on construction waste management in Hong Kong. Journal of Construction Engineering and Management, 139(5), pp. 466-479. ISSN 0733-9364

Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451

Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Poorisat, T.; Aigwi, I. E.; Doan, D. T. and GhaffarianHoseini, A. (2026) Integrating energy efficiency, water efficiency and indoor environmental quality towards advancing sustainable building designs and practices in New Zealand: Stakeholders' perspectives. Construction Innovation, 26(9), pp. 79-114. ISSN 1471-4175

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364

Porter, D S (2018) Spatial abilities of construction and related professionals. PhD thesis, Colorado State University, USA.

Poston, A; Emmanuel, R and Thomson, C (2010) Developing holistic frameworks for the next generation of sustainability assessment methods for the built environment. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988

Potts, M (2017) A participatory study into the creation of a new infrastructure delivery system in the regulated UK water sector. PhD thesis, University of Salford, UK.

Pourezzat, A A; Nejati, M and Mollaee, A (2010) Dataflow model for managing urban disasters: The experience of Bam earthquake. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 84-102. ISSN 1759-5916

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Pouryarmohammadi, M; Ahmadi, H and Salaripour, A (2022) Developing physical resilience strategies in passive defense according to identification of endangered areas of urban environments (case study: Ahvaz city). International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 14-30. ISSN 1759-5916

Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304

Powderham, A J and Tamaro, G J (1995) Mansion House London: Risk assessment and protection. Journal of Construction Engineering and Management, 121(3), pp. 266-272. ISSN 0733-9364

Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029

Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Andric, J; Manu, P and Mzyece, D (2021) An investigation into macro BIM maturity and its impacts: A comparison of qatar and the United Kingdom. Architectural Engineering and Design Management, 17(5-6), pp. 496-515. ISSN 1745-2007

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Booth, C and Aigbavboa, C (2023) Virtual reality utility and usefulness in the furniture, fixture and equipment sector: A validation of interactive and distributed immersion. Smart and Sustainable Built Environment, 12(4), pp. 787-819. ISSN 2046-6099

Prabhu, S P (1980) Effective tendering for large scale overseas turnkey projects. PhD thesis, Aston University, UK.

Prakash, A and Ambekar, S (2026) Barriers to the implementation of enterprise risk management in Indian construction firms. Construction Innovation, 26(2), pp. 440-463. ISSN 1471-4175

Prakash, A (2019) Smart cities mission in India: Some definitions and considerations. Smart and Sustainable Built Environment, 8(4), pp. 322-337. ISSN 2046-6099

Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387

Prasanna, M and Vinodh, S (2013) Lean six sigma in SMEs: An exploration through literature review. Journal of Engineering, Design and Technology, 11(3), pp. 224-250. ISSN 1726-0531

Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.

Praticò, F G (2017) Metrics for management of asphalt plant sustainability. Journal of Construction Engineering and Management, 143(4): 04016116, ISSN 0733-9364

Prayoonhong, C (1995) An integrated information model for the building process. DArch thesis, University of Michigan, USA.

Preece, C; Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: A preliminary case study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Preece, C and Stocking, S (1999) Safety communications management in construction contracting. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Preece, C and Tarawneh, S (1997) Service quality for client satisfaction on design & build projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Preece, C N and Khalil, I I M (2000) Preliminary research into internal marketing as a strategic business philosophy in construction contracting. Journal of Construction Research, 1(1), pp. 9-17. ISSN 1609-9451

Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.

Pribadi, K S; Martek, I and Chan, T K (2023) Inequality and vulnerability of informal employment during the pandemic. Construction Economics and Building, 23(3-4), pp. 25-44. ISSN 2204-9029

Price, A D F (2003) The strategy process within large construction orgnisations. Engineering, Construction and Architectural Management, 10(4), pp. 283-296. ISSN 0969-9988

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193

Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180

Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(8), pp. 878-892. ISSN 0961-3218

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Prieto, A J; Vásquez, V; Silva, A; Horn, A; Alejandre, F J and Macías-Bernal, J M (2019) Protection value and functional service life of heritage timber buildings. Building Research & Information, 47(5), pp. 567-584. ISSN 0961-3218

Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.

Pritchard, C (2005) Skin cancer prevention in the house building industry. PhD thesis, Nottingham Trent University, UK.

Priven, V and Sacks, R (2015) Effects of the last planner system on social networks among construction trade crews. Journal of Construction Engineering and Management, 141(6): 04015006, ISSN 0733-9364

Priyadarshani, K; Karunasena, G and Jayasuriya, S (2013) Construction safety assessment framework for developing countries: A case study of Sri Lanka. Journal of Construction in Developing Countries, 18(1), pp. 33-51. ISSN 1823-6499

Proverbs, D G; Holt, G D and Cheok, H Y (2000) Construction industry problems: The views of UK construction directors. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pryke, S D (2004) Analytical methods in construction procurement and management: A critical review. Journal of Construction Procurement, 10(1),

Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.

Pu, W; Xu, F; Chen, R and Marques, R C (2020) PPP project procurement model selection in China: Does it matter? Construction Management and Economics, 38(2), pp. 126-139. ISSN 01446193

Puddicombe, M S (1997) Designers and contractors: Impediments to integration. Journal of Construction Engineering and Management, 123(3), pp. 245-252. ISSN 0733-9364

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Pulhez, Magaly Marques (2014) The management arrangement: State, engineering companies and architects in the daily management of the housing policy in São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.

Qadir, N; Brooks, T and Quigg, E (2023) Potential for construction statutory adjudication in Pakistan: taking lessons from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 91-102. ISSN 17514304

Qi, J (2011) Integration of construction worker fall safety in design through the use of building information modeling. PhD thesis, University of Florida, USA.

Qi, L; Wong, P S P and Holdsworth, S (2024) Towards understanding the impact of the perceptions about construction innovation on advanced technology adoption. International Journal of Construction Management, 24(14), pp. 1521-1529. ISSN 1562-3599

Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.

Qian, J.; Siriwardana, C.; Shahzad, W. M. and Gunasekara, C. (2026) Integrating environmental, social and governance (ESG) principles into public sector construction procurement: A New Zealand case analysis of evaluation weightings and criteria. International Journal of Building Pathology and Adaptation, 44(5), pp. 1167-1190. ISSN 2398-4708

Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218

Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364

Quaigrain, R A and Issa, M H (2023) Comparative analysis of leading and lagging indicators of construction disability management performance: An exploratory study. International Journal of Construction Management, 23(7), pp. 1205-1213. ISSN 1562-3599

Quaigrain, R A; Owusu-Manu, D G; Edwards, D J; Hammond, M; Hammond, M and Martek, I (2024) Occupational health and safety orientation in the oil and gas industry of Ghana: Analysis of knowledge and attitudinal influences on compliance. Journal of Engineering, Design and Technology, 22(3), pp. 795-812. ISSN 1726-0531

Quaigrain, R A; Winter, J and Issa, M H (2014) A critical review of the literature on disability management in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.

Quirke, P and Wall, J (2007) The use of public private partnerships in the delivery of capital projects in higher education in Ireland. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175

Rachid, Ali Hassan (2021) Development of a framework to support embedding BIM within undergraduate architectural programmes in Lebanon. PhD thesis, University of Salford, UK.

Rad, A A; Asnaashari, E; Knight, A and Hurst, A (2010) ICT utilization in administrative tasks in Iranian construction organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.

Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364

Raed, H (1999) Empowerment via progressive participation: Jordanian experience of the low income housing production. PhD thesis, University College London, UK.

Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599

Rafieyan, A; Sarvari, H; Beer, M and Chan, D W M (2024) Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: Results of a fuzzy Delphi survey. International Journal of Construction Management, 24(7), pp. 748-760. ISSN 1562-3599

Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364

Rahat, R; Pradhananga, P and ElZomor, M (2024) Evaluation of safe-to-fail flood solution alternatives and integration of safe-to-fail concept in AEC education to develop resilient coastal cities. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 244-258. ISSN 1759-5916

Raheem, A A (2014) Developing a framework for a reciprocal safety implementation system (RSIS) in the pakistani construction industry. PhD thesis, University of Florida, USA.

Rahimian, A; Ahmed, R R; Fazeli, A; Aghdam, E; Kumar Singh, A; Naji, M; Mohandes, S R; Fordjour Antwi-Afari, M and Zayed, T (2025) Examining the barriers to the adoption of IoT-based technologies in green buildings. Journal of Construction Engineering and Management, 151(3): 04024211, ISSN 0733-9364

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation. PhD thesis, Queensland University of Technology, Australia.

Rahman, A; Bridge, A J; Rowlinson, S and Kwowk, T (2012) Multinational contracting into Australia: Developing dunning’s theory and case study design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Rahman, A and Sainati, T (2021) Adapting standard forms of contract to facilitate building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 110-118. ISSN 17514304

Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahman, M M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(2), pp. 217-233. ISSN 2044-124X

Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193

Rahman, M M and Kumaraswamy, M M (2012) Multicountry perspectives of relational contracting and integrated project teams. Journal of Construction Engineering and Management, 138(4), pp. 469-480. ISSN 0733-9364

Rahman, Muzibur (2022) Constructors' decision-support framework for nzeb projects. PhD thesis, Oklahoma State University, USA.

Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007

Rahmani, F; Khalfan, M M A and Maqsood, T (2016) Lessons learnt from the use of relationship-based procurement methods in Australia: Clients' perspectives. Construction Economics and Building, 16(2), pp. 1-13. ISSN 2204-9029

Rahmani, F and Leifels, K (2018) Abductive grounded theory: A worked example of a study in construction management. Construction Management and Economics, 36(10), pp. 565-583. ISSN 01446193

Rahmani, F; Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(4), pp. 593-609. ISSN 0969-9988

Rahmani, F; Scott-Young, C; Tadayon, A and van der Walt, J D (2022) Team composition in relational contracting (RC) in large infrastructure projects: A belbin's team roles model approach. Engineering, Construction and Architectural Management, 29(5), pp. 2027-2046. ISSN 0969-9988

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Raisbeck, P (2009) Considering design and PPP innovation: A review of design factors in PPP research. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Raisbeck, P (2016) The architect as gleaner: Design practice as performance in the architectural office. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Raisbeck, P (2017) Tribes, warlords and transformers: An institutional logics model of the architectural profession. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Rajan, T; Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: A case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(1), pp. 21-40. ISSN 1366-4387

Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364

Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.

Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988

Rajeh, M A; Tookey, J E and Rotimi, J O B (2015) Developing a procurement path determination chart SEM-based approach. Construction Management and Economics, 33(11-12), pp. 921-941. ISSN 01446193

Rajendran, S (2007) Sustainable construction safety and health rating system. PhD thesis, Oregon State University, USA.

Rajendran, S and Gambatese, J A (2009) Development and initial validation of sustainable construction safety and health rating system. Journal of Construction Engineering and Management, 135(10), pp. 1067-1075. ISSN 0733-9364

Rajendran, S; Gambatese, J A and Behm, M G (2009) Impact of green building design and construction on worker safety and health. Journal of Construction Engineering and Management, 135(10), pp. 1058-1066. ISSN 0733-9364

Rajhans, K and Bhavsar, V (2023) Impending need of sustainable human resource management practices in construction industry: Evidence from India. International Journal of Construction Management, 23(13), pp. 2249-2259. ISSN 1562-3599

Rajiv, P; Logesh, R; Vinodh, S and Rajanayagam, D (2014) Financial feasibility and value engineering principles integrated quality function deployment for a manufacturing organization: A case study. Journal of Engineering, Design and Technology, 12(1), pp. 71-88. ISSN 1726-0531

Ramage, K L (2018) Scope management strategies for engineering leaders to improve project success rates. PhD thesis, Walden University, USA.

Ramalingam Rethnam, O and Thomas, A (2024) Urban building energy modelling-based framework to analyze the effectiveness of the community-wide implementation of national energy conservation codes. Smart and Sustainable Built Environment, 13(5), pp. 1213-1239. ISSN 2046-6099

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Ramanayaka, C D E; Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(1), pp. 75-88. ISSN 1562-3599

Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988

Ramantswana, T.; Awuzie, B.; Mompati, L. and Khafiso, T. (2026) Embedding ESG in facility management practices: A South African corporate real estate perspective. International Journal of Building Pathology and Adaptation, 44(5), pp. 1246-1266. ISSN 2398-4708

Rameezdeen, R; Chileshe, N; Hosseini, M R and Lehmann, S (2016) A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. International Journal of Construction Management, 16(3), pp. 185-196. ISSN 1562-3599

Rameezdeen, R; Gunarathna, N and Assistant, R (2003) Organisational culture in construction: An employee perspective. Construction Economics and Building, 3(1), pp. 19-30. ISSN 2204-9029

Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029

Ramos, M A P (2023) Determining factors and strategies to promote construction and demolition waste management on a local scale. PhD thesis, Universidade NOVA de Lisboa, Portugal.

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Ranadewa, K; Sandanayake, Y G and Siriwardena, M (2021) Enabling lean through human capacity building: An investigation of small and medium contractors. Built Environment Project and Asset Management, 11(4), pp. 594-610. ISSN 2044-124X

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(2), pp. 165-174. ISSN 01446193

Ranasinghe, Rajeshkumar (2023) Identifying factors that influence adoption, deployment and optimisation of project management methodologies within the Australian local government sector. PhD thesis, RMIT University, Australia.

Ranasinghe, U; Ruwanpura, J and Liu, X (2012) Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of Construction Engineering and Management, 138(6), pp. 697-706. ISSN 0733-9364

Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 477-490. ISSN 2044-124X

Randall, T (2011) Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management, 137, pp. 797-805. ISSN 0733-9364

Ranganath, N; Sarkar, D; Patel, P and Patel, S (2022) Application of fuzzy TOPSIS method for risk evaluation in development and implementation of solar park in India. International Journal of Construction Management, 22(14), pp. 2764-2774. ISSN 1562-3599

Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655

Rankin, J H (2000) Computer-assisted construction planning. PhD thesis, University of British Columbia, Canada.

Rankohi, S; Bourgault, M and Iordanova, I (2023) The new-normal challenges and IPD solutions: A Canadian case study. Built Environment Project and Asset Management, 13(1), pp. 20-35. ISSN 2044-124X

Rankohi, S; Bourgault, M and Iordanova, I (2023) The latest operational, contractual and organizational trends in IPD literature: Review and future directions. Engineering, Construction and Architectural Management, 30(9), pp. 4339-4357. ISSN 0969-9988

Rankohi, S; Bourgault, M and Iordanova, I (2024) The concept of integration in an IPD context: A grounded theory review. Engineering, Construction and Architectural Management, 31(1), pp. 48-72. ISSN 0969-9988

Rantsatsi, N P (2021) Improving construction health and safety agent collaboration and health and safety performance in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Rantshilo, K; Mahamadu, A M; Agyekum, K; Cheung, C; Manu, P and Yunusa-Kaltungo, A (2024) Design for safety among design professionals in the Botswanan construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 27-38. ISSN 17514304

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Rapheal, O; Afolabi, A; Oyeyipo, O and Olugbenro, O (2024) Modelling client and construction firm barriers hindering social client relationship management system implementation in the built environment. Architectural Engineering and Design Management, 20(1), pp. 102-119. ISSN 1745-2007

Rasanjali, W A; Mendis, A P K D; Perera, B A K S and Disaratna, V (2024) Implementing enterprise resource planning for lean waste minimisation: Challenges and proposed strategies. Smart and Sustainable Built Environment, 13(2), pp. 330-353. ISSN 2046-6099

Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.

Rashed, A and Mutis, I (2023) Trends of integrated project delivery implementations viewed from an emerging innovation framework. Engineering, Construction and Architectural Management, 30(3), pp. 989-1014. ISSN 0969-9988

Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020'. PhD thesis, Nottingham Trent University, UK.

Rashid, K B A and Morledge, R (1998) Construction procurement processes in Malaysia: Constraints and strategies. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Rashid, K B A and Morledge, R (1998) Constraints in resources and functions within the process of construction procurement in Malaysia. Journal of Construction Procurement, 4(1), pp. 27-44. ISSN 1358-9180

Rashid, K B A and Morledge, R (1999) Strategies to remove or alleviate constraints affecting the processes of construction procurement in Malaysia. Journal of Construction Procurement, 5(1), pp. 27-41. ISSN 1358-9180

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

Rashid Alteneiji, H; Ahmed, V and Saboor, S (2021) A qualitative approach to investigate emergency preparedness state for the built environment in the UAE. Engineering, Construction and Architectural Management, 28(7), pp. 2005-2022. ISSN 0969-9988

Rashidi, A; Woon, G L; Dasandara, M; Bazghaleh, M and Pasbakhsh, P (2025) Smart personal protective equipment for intelligent construction safety monitoring. Smart and Sustainable Built Environment, 14(3), pp. 835-858. ISSN 2046-6099

Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007

Rashidian, S; Drogemuller, R; Omrani, S and Banakar, F (2024) A review of the interrelationships and characteristics of building information modeling, integrated project delivery and lean construction maturity models. Smart and Sustainable Built Environment, 13(3), pp. 584-608. ISSN 2046-6099

Rashidian, Sara (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. PhD thesis, Queensland University of Technology, Australia.

Raslan, R and Davies, M (2012) Legislating building energy performance: Putting EU policy into practice. Building Research & Information, 40(3), pp. 305-316. ISSN 0961-3218

Raslan, R M S (2010) Performance based regulations: the viability of the modelling approach as a methodology for building energy compliance demonstration. PhD thesis, University College London, UK.

Rasmussen, G M G; Jensen, P L and Gottlieb, S C (2017) Frames, agency and institutional change: The case of benchmarking in Danish construction. Construction Management and Economics, 35(6), pp. 305-323. ISSN 01446193

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Ratcliffe, J S (2001) Built environment futures: A general examination of the role of future studies in built environment policy formulation, with a particular appraisal of the use of the foresight principal through scenario planning techniques in the framing, testing and imp. PhD thesis, Ulster University, UK.

Rathi, R N; Tulasi Devi, S L and Rajamalla, A P (2025) Evaluating the impact of lockdowns and interest rate cuts on construction stock price returns: A did approach. International Journal of Construction Management, 25(16), pp. 2051-2062. ISSN 1562-3599

Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175

Rathnayake, D K; Kularatne, D; Abeysinghe, S; Shehara, I; Fonseka, T; Edirisinghe Mudiyanselage, S D J; Kamalrathne, W G C T; Siriwardana, C; Alagiyawanna Mohotti Appuhamilage, C S B and Dissanayake, R (2020) Barriers and enablers of coastal disaster resilience: lessons learned from tsunami in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 275-288. ISSN 1759-5916

Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599

Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage. PhD thesis, Concordia University, Canada.

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Razak, D S A; Mills, G and Roberts, A (2016) External failure cost in construction supply chains. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Razia, B; Larkham, P and Thurairajah, N (2019) Risk assessment and risk engagement in the construction industry within conflict zones. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Razmak, J and Farhan, W (2026) A proposed digital transformation model for implementation by digital leaders. Smart and Sustainable Built Environment, 15(1), pp. 92-119. ISSN 2046-6099

Ready to deleteÓ Broin, E (2016) Modelling drivers of energy demand in the European union building sector. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Redmond, A and West, R (2012) The use of cloud enabled building information models: an expert analysis. Construction Economics and Building, 12(4), pp. 53-67. ISSN 2204-9029

Reed, H L M (2012) Culture shock of alliance projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Reed, W G and Gordon, E B (2000) Integrated design and building process: What research and methodologies are needed? Building Research & Information, 28(5-6), pp. 325-337. ISSN 0961-3218

Rees, J V (1986) Reforming the workplace: A study of self-regulation in occupational safety. PhD thesis, University of California, Berkeley, USA.

Regan, M; Smith, J and Love, P (2014) Government institutions and infrastructure skills development. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Reichert, J (2005) Will change management master the challenge of introducing the Eurocodes to the UK? PhD thesis, University of London, University College London, UK.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Reid, S and Loosemore, M (2017) Motivations and barriers to social procurement in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Reinoso, E; Jaimes, M A and Torres, M A (2016) Evaluation of building code compliance in Mexico city: Mid-rise dwellings. Building Research & Information, 44(2), pp. 202-213. ISSN 0961-3218

Reischl, J N (2009) Toward a theory of morality: An empirical study of cognitive moral development in market channel dyads in the construction industry using the defining issues test. DBA thesis, Nova Southeastern University, USA.

Reja, V. K.; Yin, M.; Davletshina, D.; Wei, R.; Fauth, J.; Perrotta, F. and Brilakis, I. (2026) Establishing and fulfilling information requirements for computer vision-enabled digital twin-based control of roadside vegetation. Journal of Construction Engineering and Management, 152(9): 04026147, ISSN 0733-9364

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Ren, Z; Carter, C D; Hassan, T M and Anumba, C J (2005) Trust building for SMEs through an e-engineering hub. Journal of Construction Procurement, 11(1),

Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X

Renault, B Y; Agumba, J N and Ansary, N (2020) Establishing core factors of risk management influencing performance outcome of small and medium firm's construction projects in Gauteng. Journal of Construction in Developing Countries, 25(2), pp. 93-127. ISSN 1823-6499

Renukappa, S and Akintoye, A (2011) Potential opportunities for the UK construction industry in the water sector. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Renukappa, S; Suresh, S; Abdalla, W; Shetty, N; Yabbati, N and Hiremath, R (2024) Evaluation of smart village strategies and challenges. Smart and Sustainable Built Environment, 13(6), pp. 1386-1407. ISSN 2046-6099

Renukappa, S; Suresh, S and Alosaimi, H (2021) Knowledge management-related training strategies in Kingdom of Saudi Arabia construction industry: An empirical study. International Journal of Construction Management, 21(7), pp. 713-723. ISSN 1562-3599

Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387

Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364

Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175

Reynoso Vanderhorst, H (2022) A framework for adoption of drones in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364

Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.

Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.

Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ribeiro, F J L T (1995) Assessment of applications for the house renovations grants system: An IT support framework. PhD thesis, University of Salford, UK.

Ribeiro, F L (2001) BOT model: The Portuguese case. Journal of Construction Procurement, 7(2), pp. 72-86. ISSN 1358-9180

Ricci, D; Leiwakabessy, C; van Wieringen, S; de Koning, P and Konstantinou, T (2025) Co-creating justice in housing energy transitions through energy living labs. Buildings & Cities, 6(1), pp. 747-766. ISSN 2632-6655

Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.

Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Richter, S M and Bixler, R P (2022) Complexifying urban expansion: An exploratory, gradient-based approach. Buildings & Cities, 3(1), pp. 792-807. ISSN 2632-6655

Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.

Rigby, E T; McCoy, A P and Garvin, M J (2012) Toward aligning academic and industry understanding of innovation in the construction industry. International Journal of Construction Education and Research, 8(4), pp. 243-259. ISSN 1557-8771

Riggio, M; Alhariri, N and Hansen, E (2020) Paths of innovation and knowledge management in timber construction in North America: A focus on water control design strategies in CLT building enclosures. Architectural Engineering and Design Management, 16(1), pp. 58-83. ISSN 1745-2007

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction companies in 1992 european community. Journal of Construction Engineering and Management, 117(4), pp. 773-790. ISSN 0733-9364

Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364

Riley, M J (2001) Re-engineering the construction procurement process. PhD thesis, University of Southampton, UK.

Riley, S (2022) Assessing barriers to green infrastructure for flood mitigation. PhD thesis, University of Hawai'i at Manoa, USA.

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Riza, R (2014) Integration of wind catchers in modern residential buildings in the uae as a means of providing thermal comfort. PhD thesis, British University in Dubai, UAE.

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Rob Danie Raijmakers, S V and Remko Cremers, A D (2023) Two paths colliding at one road: Integrating split municipal climate action agendas. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Robert, O K; Dansoh, A and Ofori-Kuragu, J K (2014) Reasons for adopting public-private partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14(4), pp. 227-238. ISSN 1562-3599

Roberts, C; Edwards, D J; Sing, M C P and Aigbavboa, C (2023) Post-occupancy evaluation: Process delineation and implementation trends in the UK higher education sector. Architectural Engineering and Design Management, 19(2), pp. 125-147. ISSN 1745-2007

Roberts, C J; Edwards, D J; Hosseini, M R; Mateo-Garcia, M and Owusu-Manu, D G (2019) Post-occupancy evaluation: A review of literature. Engineering, Construction and Architectural Management, 26(9), pp. 2084-2106. ISSN 0969-9988

Roberts, J (1987) The business roundtable construction industry cost effectiveness task force. Construction Management and Economics, 5(2), pp. 95-100. ISSN 01446193

Robertson, B (2020) On-site installation flexibility for disruption management in modular off-site construction systems. PhD thesis, University of Cambridge, UK.

Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.

Robin, R O A (2023) Building information modelling (BIM) performance evaluation model in the Malaysian construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.

Robinson, A; Austin, S and Gibb, A (2011) Efficiencies in design and manufacturing for construction using shipping containers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Robinson, H S; Carrillo, P M; Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(4), pp. 203-217. ISSN 1471-4175

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2001) Linking knowledge management strategy to business performance in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2004) Developing a business case for knowledge management: The IMPaKT approach. Construction Management and Economics, 22(7), pp. 733-743. ISSN 01446193

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(5), pp. 431-445. ISSN 0969-9988

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Robinson, W; Chan, P and Lau, T (2015) How do technological niches emerge? A case analysis of servitization in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Robinson, W G; Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(1), pp. 4-20. ISSN 01446193

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364

Rockett, P and Hathway, E A (2017) Model-predictive control for non-domestic buildings: A critical review and prospects. Building Research & Information, 45(5), pp. 556-571. ISSN 0961-3218

Rodger, D; Callaghan, N and Thomson, C (2018) Are retrofitted social houses sufficiently reflecting the holistic health and wellbeing requirements of older people? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Rodger, D; Callaghan, N and Thomson, C S (2020) The loosening control of social housing: Creating a holistic retrofit system for an ageing population through the lens of governmentality. Construction Management and Economics, 38(12), pp. 1101-1121. ISSN 01446193

Rodrigo, N; Omrany, H; Chang, R and Zuo, J (2024) Leveraging digital technologies for circular economy in construction industry: A way forward. Smart and Sustainable Built Environment, 13(1), pp. 85-116. ISSN 2046-6099

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador. PhD thesis, University of Florida, USA.

Rogerson, R J; Giddings, B and Jefferies, M (2024) Constructing the future of the city centre: Realizing visions. Construction Management and Economics, 42(2), pp. 129-145. ISSN 01446193

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Rohman, M A; Doloi, H and Heywood, C A (2017) Success criteria of toll road projects from a community societal perspective. Built Environment Project and Asset Management, 7(1), pp. 32-44. ISSN 2044-124X

Rohman, M A and Wiguna, I P A (2021) Evaluation of road design performance in delivering community project social benefits in Indonesian PPP. International Journal of Construction Management, 21(11), pp. 1130-1142. ISSN 1562-3599

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.

Rokooei, S; Shojaei, A and Ly, R (2025) Faculty development program to enhance teaching quality in construction. International Journal of Construction Management, 25(1), pp. 89-98. ISSN 1562-3599

Ronny, R and Ptak, J S (2012) Localised solutions developed to suit South African challenges. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 5-11. ISSN 17514312

Rooke, J and Seymour, D (1995) The NEC and the culture of the industry: Some early findings regarding possible sources of resistance to change. Engineering, Construction and Architectural Management, 2(4), pp. 287-305. ISSN 0969-9988

Rooke, J A and Kagioglou, M (2007) Criteria for evaluating research: The unique adequacy requirement of methods. Construction Management and Economics, 25(9), pp. 979-987. ISSN 1466433X

Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X

Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Roosli, R and O'Keefe, P (2013) Post-disaster housing and management in Malaysia: A literature review. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 168-181. ISSN 1759-5916

Root, D; Fernie, S and Baldwin, A N (1999) The languages of product and service: Barriers to the integration of construction and design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Root, D S; Thorpe, A; Thomson, D S; Austin, S A and Hammond, J W (2003) Design chains: Introducing supply chain management into the construction design process. Journal of Construction Procurement, 9(2), pp. 29-39. ISSN 1358-9180

Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193

Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Rose, Colin (2019) Systems for reuse, repurposing and upcycling of existing building components. PhD thesis, University College London, UK.

Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(3), pp. 252-267. ISSN 0969-9988

Rose, T; Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain? Construction Innovation, 19(2), pp. 212-235. ISSN 1471-4175

Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364

Rosenfeld, Y (1994) Innovative construction methods. Construction Management and Economics, 12(6), pp. 521-541. ISSN 01446193

Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: Some false benefits and inherent drawbacks. Construction Management and Economics, 9(5), pp. 481-490. ISSN 01446193

Rosner, J W; Thal Jr, A E and West, C J (2009) Analysis of the design-build delivery method in Air Force construction projects. Journal of Construction Engineering and Management, 135(8), pp. 710-717. ISSN 0733-9364

Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. PhD thesis, University of Salford, UK.

Ross, N; Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: Lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(5), pp. 433-449. ISSN 1466433X

Rostami, A (2015) Risk management in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Rostami, A; Khodadadyan, A; Sommerville, J and Wong, I L (2015) Training provisions for risk management in SMEs in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Rostami, A; Sommerville, J; Wong, I L and Lee, C (2015) Risk management implementation in small and medium enterprises in the UK construction industry. Engineering, Construction and Architectural Management, 22(1), pp. 91-107. ISSN 0969-9988

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Rotimi, E O O; Rotimi, F E; Silva, C W C and Aigwi, I E (2024) BIM knowledge transfer in construction industry: A partial least square analysis. Journal of Engineering, Design and Technology, 22(4), pp. 1393-1411. ISSN 1726-0531

Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029

Rotimi, J O B and Wilkinson, S (2014) Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 23-37. ISSN 1759-5916

Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.

Roulet, C A; Flourentzou, F; Foradini, F; Bluyssen, P; Cox, C and Aizlewood, C (2006) Multicriteria analysis of health, comfort and energy efficiency in buildings. Building Research & Information, 34(5), pp. 475-482. ISSN 0961-3218

Roumboutsos, A and Anagnostopoulos, K P (2008) Public private partnership projects in Greece: Risk ranking and preferred risk allocation. Construction Management and Economics, 26(7), pp. 751-763. ISSN 1466433X

Roumboutsos, A and Chiara, N (2010) A strategic partnering framework analysis methodology for public-private partnerships. Journal of Financial Management of Property and Construction, 15(3), pp. 235-246. ISSN 1366-4387

Roumboutsos, A and Macário, R M R (2013) Public private partnerships in transport: Theory and practice. Built Environment Project and Asset Management, 3(2), pp. 160-164. ISSN 2044-124X

Roumboutsos, A; Suárez Alemán, A and Ågren, R (2017) Construction firms in public-private partnerships: A place to grow. Construction Management and Economics, 35(10), pp. 627-640. ISSN 0144-6193

Rounds, J L and Chi, N Y (1985) Total quality management for construction. Journal of Construction Engineering and Management, 111(2), pp. 117-128. ISSN 0733-9364

Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.

Rousseau, D and Chen, Y (2001) Sustainability options for China's residential building sector. Building Research & Information, 29(4), pp. 293-301. ISSN 0961-3218

Rowbotham, A (2018) Designing for fluid transitions to sustainable infrastructure: the case of the Bedford & Milton Keynes Waterway. PhD thesis, Open University, UK.

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X

Rowlinson, S (2017) Building information modelling, integrated project delivery and all that. Construction Innovation, 17(1), pp. 45-49. ISSN 1471-4175

Rowlinson, S; Matthews, J; Phua, F; McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.

Rowlinsson, S and Yates, D (2003) Ndcad: A virtual change agent for professions and procurement systems? Construction Management and Economics, 21(8), pp. 849-857. ISSN 01446193

Ruan, X (2007) Inter-organizational knowledge integration on construction projects: a social network approach. PhD thesis, Northumbria University, UK.

Rubio, F J (2018) Maintaining and widening the M25 motorway, UK: A private finance case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 197-206. ISSN 17514304

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364

Ruge, G and McCormack, C (2017) Building and construction students' skills development for employability: reframing assessment for learning in discipline-specific contexts. Architectural Engineering and Design Management, 13(5), pp. 365-383. ISSN 1745-2007

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193

Ruiz, A; Vinke-de Kruijf, J; Santos, J; Volker, L and Dorée, A (2023) Sustainable innovation processes in the asphalt paving sector: A system innovation approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193

Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193

Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(4), pp. 277-301. ISSN 01446193

Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.

Russo, J G (1981) Construction marketing in the USA: A viable system for success and control. Construction Papers, 1(2), pp. 29-35. ISSN 0144-8587

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ruwanpura, U D R E; Perera, B A K S and Ranadewa, T (2025) Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. Construction Innovation, 25(4), pp. 1287-1314. ISSN 1471-4175

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(6), pp. 435-445. ISSN 0961-3218

Rwelamila, P D (2012) Research contribution to innovation in infrastructure development in Africa: Assessing the status. Journal of Construction in Developing Countries, 17(S1), pp. 43-56. ISSN 1823-6499

Rwelamila, P D and Hall, K A (1995) Total systems intervention: An integrated approach to time, cost and quality management. Construction Management and Economics, 13(3), pp. 235-241. ISSN 01446193

Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988

Rwelamila, P M D and Purushottam, N (2015) Green campus initiatives as projects: Can creating conducive internal university project environment a key to success? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ryall, P (2012) Implementation and the effectiveness of quality management systems within the construction industry and organisational change management in this process. PhD thesis, University of South Wales, UK.

Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304

Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.

Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193

Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ríos-Fernández, J C (2022) Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities. Engineering, Construction and Architectural Management, 29(2), pp. 739-754. ISSN 0969-9988

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Saad, S; Alaloul, W S; Ammad, S and Qureshi, A H (2022) A qualitative conceptual framework to tackle skill shortages in offsite construction industry: A scientometric approach. Engineering, Construction and Architectural Management, 29(10), pp. 3917-3947. ISSN 0969-9988

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Sabet, P; Jonescu, E; Chong, H Y and Ramanyaka, C E (2025) Interacting possibilities between building information modelling and off-site manufacturing for performance improvement. Construction Economics and Building, 25(1), pp. 221-243. ISSN 2204-9029

Sabitu Oyegoke, A (2001) UK and US construction management contracting procedures and practices: A comparative study. Engineering, Construction and Architectural Management, 8(5-6), pp. 403-417. ISSN 0969-9988

Sabri, B K M; Ujang, N; Arif, A M M and Aripin, S (2017) Measures in curbing poor compliance to building control regulation among renovated terrace houses. International Journal of Law in the Built Environment, 9(3), pp. 256-271. ISSN 1756-1450

Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.

Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.

Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364

Sacks, R; Whyte, J; Swissa, D; Raviv, G; Zhou, W and Shapira, A (2015) Safety by design: Dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(1), pp. 55-72. ISSN 01446193

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X

Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.

Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Sadek, S M A (2016) Managing standard construction contractual forms modifications in the Middle East: overview and recommendations. PhD thesis, University of Salford, UK.

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 0969-9988

Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304

Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.

Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599

Saghatforoush, E; Hosseini Nourzad, S H; Zareravasan, A and Jadidoleslami, S (2023) Enablers for BIM application in architectural design: A robust exploratory factor analysis approach. International Journal of Construction Management, 23(9), pp. 1549-1559. ISSN 1562-3599

Saghatforoush, Ehsan (2014) Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Said, H M and Reginato, J (2018) Impact of design changes on virtual design and construction performance for electrical contractors. Journal of Construction Engineering and Management, 144(1): 04017097, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saidi, K (2002) Possible applications of handheld computers to quantity surveying. PhD thesis, University of Texas at Austin, USA.

Saied al Surf, M; Trigunarsyah, B and Susilawati, C (2013) Saudi Arabia's sustainable housing limitations: The experts' views. Smart and Sustainable Built Environment, 2(3), pp. 251-271. ISSN 2046-6099

Saifi, S and Anandakumar, R M (2025) Web-based visualization and rendering of aerial lidar point cloud for urban flood simulation. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 260-274. ISSN 1759-5908

Saini, M; Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(1), pp. 15-33. ISSN 1471-4175

Saini, V (2009) Endogenous asymmetries in dynamic procurement auctions. PhD thesis, Johns Hopkins University, USA.

Saka, A B and Chan, D W M (2023) BIM divide: An international comparative analysis of perceived barriers to implementation of BIM in the construction industry. Journal of Engineering, Design and Technology, 21(5), pp. 1604-1632. ISSN 1726-0531

Saka, A B; Chan, D W M and Ajayi, S O (2024) Institutional isomorphism and adoption of building information modelling (BIM) in small and medium-sized enterprises (SMEs) of the Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 179-199. ISSN 0969-9988

Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364

Sal Moslehian, A; Kocaturk, T; Andrews, F and Tucker, R (2023) The nature of innovation in hospital building design: A mixed grounded theory study. Construction Innovation, 23(4), pp. 792-814. ISSN 1471-4175

Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.

Salama, M; Aziz, H A E; Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, M and Hana, A R (2010) Green buildings and sustainable construction in the United Arab Emirates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Salama M, A T (2013) Imposing green building regulations in Dubai. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salama M, H A R (2013) UAE green building strategic model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.

Salameh, M; Touqan, B and Suliman, A (2024) Enhancing student satisfaction and academic performance through school courtyard design: A quantitative analysis. Architectural Engineering and Design Management, 20(4), pp. 911-927. ISSN 1745-2007

Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Salcedo, R T B and Straub, A (2016) The role of the architect using integrated contracts for social housing renovation projects. Journal of Engineering, Design and Technology, 14(4), pp. 802-817.

Salcedo Rahola, T B (2015) Integrated project delivery methods for energy renovation of social housing. PhD thesis, Delft University of Technology, Netherlands.

Saleem, M; Elshami, M M and Najjar, M (2017) Development, testing, and implementation strategy of a translucent concrete-based smart lane separator for increased traffic safety. Journal of Construction Engineering and Management, 143(5): 04016129, ISSN 0733-9364

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.

Salehudin, Muhamad Syafiq Bin (2012) Developing sustainable resorts in developing countries: A proposed new generation rating framework for Malaysia. PhD thesis, University of New South Wales, Australia.

Salem, M A (1985) Motivation of national and expatriate construction workers in Jordan. PhD thesis, University of Michigan, USA.

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364

Salih, A (2020) Project management information system introduction: Challenges and remedies in a construction context. PhD thesis, University of Liverpool, UK.

Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364

Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364

Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099

Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364

Salman, A F M; Skibniewski, M J and Basha, I (2007) BOT viability model for large-scale infrastructure projects. Journal of Construction Engineering and Management, 133(1), pp. 50-63. ISSN 0733-9364

Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Salter, A and Torbett, R (2003) Innovation and performance in engineering design. Construction Management and Economics, 21(6), pp. 573-580. ISSN 01446193

Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.

Salvaraji, L.; Toha, H. R.; Mohd Aris, N.; Hanafi, N. S.; Kumareswaran, S.; Abd Razak, M. F. and Ibrahim, M. F. (2026) A community-based disaster risk management framework for chemical emergency preparedness in Johor, Malaysia. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 389-405. ISSN 1759-5908

Sam, Mahya (2023) Exploring the relationship between human-robot collaboration (HRC) and the resilience of construction work processes. PhD thesis, University of Florida, USA.

Samarakkody, A and Perera, B A K S (2023) Application of soft landings concept in Sri Lanka to narrow the building performance gap, enablers and barriers. Smart and Sustainable Built Environment, 12(1), pp. 156-180. ISSN 2046-6099

Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531

Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.

Samasoni, J C (2017) Evaluating the feasibility of implementing a risk-based inspection scheme by building consent authorities in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Samman, R A and Graham, I (2007) The six sigma project management strategy. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.

Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304

San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364

Sanboskani, H (2024) The implementation of integrated delivery and management in large government-owned engineering construction projects. PhD thesis, Arizona State University, USA.

Sanchez X, A; Lehtiranta, L; Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(2), pp. 153-169. ISSN 2046-6099

Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sandanayake, M S; Vrcelj, Z; Bouras, Y; Chau, H W and Hastings, P (2024) Simplified rating tool to evaluate sustainable practices of small-scale infrastructure projects in Australia – a comparative review. Smart and Sustainable Built Environment, 13(5), pp. 1260-1280. ISSN 2046-6099

Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sankaran, B and O'Brien, W J (2018) Bayesian second-order factor model for maturity assessment of CIM technologies and practices at highway agencies. Journal of Construction Engineering and Management, 144(4): 04018015, ISSN 0733-9364

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sanni, A O (2016) Factors determining the success of public private partnership projects in Nigeria. Construction Economics and Building, 16(2), pp. 42-55. ISSN 2204-9029

Sanseverino, Anna (2023) Application of BIM methodology for structural inspection and maintenance eco-systems: Semi-automated monitoring procedures to implement different kinds of data into enriched cooperative systems. PhD thesis, Università degli Studi di Salerno, Italy.

Santhosh, C (2019) Impact of determinants on early internationalization: An exploratory study of Indian engineering SMEs. Journal of Engineering, Design and Technology, 17(5), pp. 1018-1034. ISSN 1726-0531

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.

Sanvido, V E and Medeiros, D J (1990) Applying computer-integrated manufacturing concepts to construction. Journal of Construction Engineering and Management, 116(2), pp. 365-379. ISSN 0733-9364

Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364

Saoud, E A B (1996) Expert systems for management training in the construction industry. PhD thesis, University of Edinburgh, UK.

Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499

Saqib, G; Hassan, M U; Zubair, M U and Choudhry, R M (2023) Investigating the acceptance of an electronic incident reporting system in the construction industry: An application of the technology acceptance model. Journal of Construction Engineering and Management, 149(5): 04023021, ISSN 0733-9364

Saradara, S M; Lara, J C F; Swarnakar, V; Rauf, A; Qureshi, R; Fadel, M E and Khalfan, M M A (2024) Construction and demolition waste management in the United Arab Emirates through the 3R principle. Engineering, Construction and Architectural Management, 31(13), pp. 430-454. ISSN 0969-9988

Sarah Slaughter, E and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(3), pp. 269-280. ISSN 01446193

Sargent, A C (2018) Building modern India: Transformations of labor in the Indian construction industry. PhD thesis, University of Chicago, USA.

Sarhan, J; Xia, B; Fawzia, S; Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(2), pp. 246-272. ISSN 1471-4175

Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029

Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988

Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study. PhD thesis, Nottingham Trent University, UK.

Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sari, K (2019) A framework for lean implementation in infrastructure construction in the UK. PhD thesis, University of Salford, UK.

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarkar, A; Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(1), pp. 51-58. ISSN 0961-3218

Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599

Sarkar, D and Sheth, A (2023) Public private partnership model for sustainable bus rapid transit system in Ahmedabad, India. International Journal of Construction Management, 23(7), pp. 1233-1243. ISSN 1562-3599

Sarosa, W (2001) Infrastructure -based community development: Theory and practice of sustainable development at the local level with a participant-observation of three pilot projects in rural villages of Java, Indonesia. PhD thesis, University of California, Berkeley, USA.

Sarpin, Norliana (2015) Developing people capabilities for the promotion of sustainability in facility management practices. PhD thesis, Queensland University of Technology, Australia.

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988

Sarvari, H; Chan, D W M; Banaitiene, N; Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(1), pp. 52-70. ISSN 2044-124X

Sarvari, H; Parsa, A; Olawumi, T O; Chan, D W M; Rashidi, A and Beer, M (2024) Perceived barriers to implementing building information modeling in Iranian small and medium-sized enterprises (SMEs): A Delphi survey of construction experts. Architectural Engineering and Design Management, 20(3), pp. 673-693. ISSN 1745-2007

Sathkumara, T M; Waidyasekara, A S and Victar, H C (2025) The feasibility of transparent solar panels for high-rise building façade in Sri Lanka. Construction Innovation, 25(4), pp. 1127-1152. ISSN 1471-4175

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Sauer, A D (2013) Sustainable building codes: How the perceptions of building code officials influence their intent to adopt the international green construction code. PhD thesis, Indiana State University, USA.

Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(1), pp. 22-30. ISSN 0969-9988

Sauni, M; Luomala, H; Kolisoja, P and Vaismaa, K (2022) Framework for implementing track deterioration analytics into railway asset management. Built Environment Project and Asset Management, 12(6), pp. 871-886. ISSN 2044-124X

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193

Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988

Savicky, J (2023) Exploration of solicitation optimization within the built environment. PhD thesis, Arizona State University, USA.

Savva, C (2023) Lessons that can be learnt using action research strategies within TfL. PhD thesis, University of Liverpool, UK.

Sawan, R; Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(8), pp. 974-988. ISSN 0969-9988

Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.

Sayce, S; Ellison, L and Parnell, P (2007) Understanding investment drivers for UK sustainable property. Building Research & Information, 35(6), pp. 629-643. ISSN 0961-3218

Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X

Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988

Scanlon, Jane (2011) Sustainability governance in the delivery phase of infrastructure: Two case studies from the urban rail sector. PhD thesis, Western Sydney University, Australia.

Schaefer, K K (2024) Community insurance as a flood management element in California. PhD thesis, University of California, Davis, USA.

Schafer, D W (2014) A conceptual framework for resilience engineering in construction safety. PhD thesis, Michigan State University, USA.

Scharpff, J; Schraven, D; Volker, L; Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(2), pp. 99-116. ISSN 01446193

Schaufelberger, J E and Wipadapisut, I (2003) Alternate financing strategies for build-operate-transfer projects. Journal of Construction Engineering and Management, 129(2), pp. 205-213. ISSN 0733-9364

Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218

Schexnayder, C and Anderson, S (2011) Construction engineering education: History and challenge. Journal of Construction Engineering and Management, 137, pp. 730-739. ISSN 0733-9364

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Schmidt, M; Crawford, R H and Warren-Myers, G (2020) Integrating life-cycle GHG emissions into a building's economic evaluation. Buildings & Cities, 1(1), pp. 361-378. ISSN 2632-6655

Schoenwitz M, G J and Naim M, P A (2013) How to build what buyers want: Unveiling customer preferences for prefabricated homes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599

Scott, B O B (1995) Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(2), pp. 83-92. ISSN 0969-9988

Scott, D (1997) An intelligent approach to the engineering management of housing subsidence cases. PhD thesis, Teesside University, UK.

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193

Scully, R E M (2012) An implementation roadmap for knowledge sharing for small and micro companies (SMC) in Ireland. PhD thesis, University of Salford, UK.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Sear, E A; Hartland, T G; Abdel-Wahab, M S and Miller, C G (2008) Implementing customer relationship management at constructionskills. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(2), pp. 255-266. ISSN 1609-9451

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), pp. 176-187. ISSN 0969-9988

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Sebastian, R and Van Berlo, L (2010) Tool for benchmarking BIM performance of design, engineering and construction firms in the Netherlands. Architectural Engineering and Design Management, 6(4), pp. 254-263. ISSN 1745-2007

Seboni, L and Tutesigensi, A (2014) Allocating project managers to projects in a multi-project environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Selberherr, J (2015) Sustainable life cycle offers through cooperation. Smart and Sustainable Built Environment, 4(1), pp. 4-24. ISSN 2046-6099

Selvam, G.; Kamalanandhini, M.; Velpandian, M.; Hariharan, R.; Mohanakrishna, S. and Thirumurugan, V. (2026) Integrated statutory waste management framework for the sustainable built environment. Engineering, Construction and Architectural Management, 33(5), pp. 4078-4097. ISSN 0969-9988

Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599

Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988

Senaratne, S and Hapuarachchi, A (2009) Construction project teams and their development: Case studies in Sri Lanka. Architectural Engineering and Design Management, 5(4), pp. 215-224. ISSN 1745-2007

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving LEED certification in a green building project. Built Environment Project and Asset Management, 5(2), pp. 170-183. ISSN 2044-124X

Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499

Senaratne, S and Kuruwita, S (2010) Resistance to organisational change: A case study in Sri Lankan construction organisation. International Journal of Construction Management, 10(1), pp. 61-73. ISSN 1562-3599

Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(1), pp. 50-63. ISSN 1745-2007

Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X

Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007

Senawi, A and Osmadi, A (2024) Property tax reassessment among local authorities: The implementation and its key challenges. Journal of Financial Management of Property and Construction, 29(1), pp. 152-167. ISSN 1366-4387

Senescu, R R (2011) Design process communication methodology. PhD thesis, Stanford University, USA.

Seneviratne, K and Michael, G V (2020) Disputes in time bar provisions for contractors' claims in standard form of contracts. International Journal of Construction Management, 20(4), pp. 335-346. ISSN 1562-3599

Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.

Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.

Sengupta Dasgupta, P (2013) Interventions to reduce ergonomic exposures during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Seo, J (1998) Graphical interface design for equipment control in unstructured environments. PhD thesis, University of Texas at Austin, USA.

Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Sepasgozar, S M E; Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(2), pp. 158-176. ISSN 0969-9988

Sepasgozar, Samad (2015) Technology adoption in construction. PhD thesis, University of New South Wales, Australia.

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Serag-Eldin, Gamil M (2010) A conflict management model for architectural design collaboration. PhD thesis, University of California, USA.

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Sergeeva, N and Radosavljevic, M (2010) Radicality of ideas: Challenging radical versus incremental changes in construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sergeeva, N and Radosavljevic, M (2012) Idea contribution in construction: In search for evidence of the interface between idea generation and its implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Setiawan, H (2015) Corporate entrepreneurship capability model for contractors. PhD thesis, Heriot-Watt University, UK.

Setiawan, H and Erdogan, B (2020) Key factors for successful corporate entrepreneurship: A study of Indonesian contractors. International Journal of Construction Management, 20(3), pp. 252-268. ISSN 1562-3599

Setiawan, H; Erdogan, B and Ogunlana, S O (2012) Corporate entrepreneurship for contracting companies: The current issue. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Seydel, J F (1991) Development and implementation of multiple criteria approaches to optimization in construction bidding. PhD thesis, Texas A&M University, USA.

Seyed-Alangi, F; Parchami-Jalal, M and Noorzai, E (2026) The challenges of risk and reward sharing in the implementation of integrated project delivery contracts in the Iranian construction industry. International Journal of Construction Education and Research, 22(1), pp. 72-95. ISSN 1557-8771

Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364

Seyman Guray, T and Kismet, B (2023) VR and ar in construction management research: Bibliometric and descriptive analyses. Smart and Sustainable Built Environment, 12(3), pp. 635-659. ISSN 2046-6099

Seyman-Guray, T and Kismet, B (2024) Drivers and barriers on implementing XR technologies in the construction industry in Turkey. International Journal of Construction Management, 24(9), pp. 959-974. ISSN 1562-3599

Seymour, D E and Rooke, J D (1998) Construction management research and the attempt to build a social science. Journal of Construction Procurement, 4(1), pp. 59-73. ISSN 1358-9180

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.

Sha, K (2011) Vertical governance of construction projects: An information cost perspective. Construction Management and Economics, 29(11), pp. 1137-1147. ISSN 1466433X

Sha, K (2019) Incentive strategies for construction project manager: A common agency perspective. Construction Management and Economics, 37(8), pp. 461-471. ISSN 01446193

Shaaban, S M (2004) A user-centric approach for the development and evaluation of a visual interface to online information in the construction industry. PhD thesis, University of Newcastle upon Tyne, UK.

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364

Shabbir, A (2015) Corruption in infrastructure procurement: a study based on procurement of infrastructure projects in Pakistan. PhD thesis, University of Manchester, UK.

Shabha, G; Barber, F and Laycock, P (2023) A qualitative assessment of the impact of smart homes and environmentally beneficial technologies on the UK 2050 net-zero carbon emission target. Smart and Sustainable Built Environment, 12(2), pp. 341-360. ISSN 2046-6099

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.

Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.

Shah, M A; Kumar, S; Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(2), pp. 250-273. ISSN 1366-4387

Shah, Mohammad Aminur Rahman A R (2017) Decision support framework for sustainability assessment of flood mitigation projects. PhD thesis, Griffith University, Australia.

Shah R, W S R A (2013) Challenges and solutions for management of FRP usage in the UK rail sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364

Shahin, Y; Eid, M S; Ahmed, H and Elhakeem, A (2025) Towards a more stable Construction Joint Venture agreement: individual rationality vs. fairness. International Journal of Construction Management, 25(2), pp. 161-170. ISSN 1562-3599

Shahrin, F; Mahmood, K and Hassan, F (2021) Project cost overruns and risk allocation in public funded projects in Malaysia. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shahruddin, S; Zairul, M and Haron, A T (2021) Redefining the territory and competency of architectural practitioners within a BIM-based environment: A systematic review. Architectural Engineering and Design Management, 17(5-6), pp. 376-410. ISSN 1745-2007

Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988

Shaked, O and Warszawski, A (1995) Knowledge-based system for construction planning of high-rise buildings. Journal of Construction Engineering and Management, 121(2), pp. 172-182. ISSN 0733-9364

Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. PhD thesis, University of Manchester, UK.

Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771

Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771

Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364

Shams, A. and Marzouk, M. (2026) Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5180-5209. ISSN 0969-9988

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Shang, G; Low, S P and Lim, X Y V (2023) Prospects, drivers of and barriers to artificial intelligence adoption in project management. Built Environment Project and Asset Management, 13(5), pp. 629-645. ISSN 2044-124X

Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 0969-9988

Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.

Shaofeng, L; Jincai, F; Pinghua, Z and Xiang, L (2018) Stability analysis of two parallel closely spaced tunnels based on convergence-confinement principle. Journal of Construction Engineering and Management, 144(6): 04018041, ISSN 0733-9364

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Shapira, A; Shahar, Y and Raz, Y (2001) Design and construction of high multitier shoring towers: Case study. Journal of Construction Engineering and Management, 127(2), pp. 108-115. ISSN 0733-9364

Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process. PhD thesis, University of Newcastle upon Tyne, UK.

Sharar, M; Agyekum, K; Manu, P; Che Ibrahim, C K I; Mahamadu, A M; Antwi-Afari, M F and Danso, F O (2024) Design for safety in construction: A study of design professionals in Kuwait. International Journal of Building Pathology and Adaptation, 42(4), pp. 596-617. ISSN 23984708

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context. PhD thesis, Nottingham Trent University, UK.

Sharma, N and Laishram, B (2025) Understanding the relevance and impact of the cost of quality in the construction industry: A systematic literature review using prisma. Construction Innovation, 25(6), pp. 1707-1726. ISSN 1471-4175

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, H; Sohani, N and Yadav, A (2023) Structural modeling of lean supply chain enablers: A hybrid AHP and ISM-MICMAC based approach. Journal of Engineering, Design and Technology, 21(6), pp. 1658-1689. ISSN 1726-0531

Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool. PhD thesis, Northumbria University, UK.

Sharma, N and Laishram, B (2025) Unveiling the path to the cost of quality implementation in the construction industry: Multivariate analysis. Journal of Construction Engineering and Management, 151(2): 04024202, ISSN 0733-9364

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment. PhD thesis, University of Alberta, Canada.

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Sharma, V; Caldas, C H and Mulva, S P (2021) Development of metrics and an external benchmarking program for healthcare facilities. International Journal of Construction Management, 21(6), pp. 615-630. ISSN 1562-3599

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175

Sharpe, T (2019) Ethical issues in domestic building performance evaluation studies. Building Research & Information, 47(3), pp. 318-329. ISSN 0961-3218

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.

Shaw, C (2023) Understanding the need for a comparative framework when selecting an appropriate building technology for sustainable human settlements in South Africa. PhD thesis, University of Pretoria, South Africa.

Shaw, C; de Andrade Pereira, F; Farghaly, K; Hoare, C; Hartmann, T and O'Donnell, J (2024) Life cycle cost analysis at scale: a reference architecture-based approach. Built Environment Project and Asset Management, 14(5), pp. 713-733. ISSN 2044-124X

She, L (2013) Trust, mistrust and distrust in alliancing. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.

Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387

Sheffer, D A (2011) Innovation in modular industries: Implementing energy-efficient innovations in us buildings. PhD thesis, Stanford University, USA.

Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shehu, Z (2008) The framework for effective adoption and implementation of programme management within the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X

Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175

Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988

Shen, Z; Wang, G; Ali, A; Wei, X; Zang, X and Ye, Y (2025) Study on the cooperation model of infrastructure projects in the third-party market of the belt and road. International Journal of Construction Management, 25(13), pp. 1609-1625. ISSN 1562-3599

Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364

Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364

Shen, L; Lee, R K H and Zhang, Z (1996) Application of BOT system for infrastructure projects in China. Journal of Construction Engineering and Management, 122(4), pp. 319-323. ISSN 0733-9364

Shen, L Y; Bao, H J; Wu, Y Z and Lu, W S (2007) Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management, 133(5), pp. 385-392. ISSN 0733-9364

Shen, L Y; Li, H and Li, Q M (2002) Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 128(4), pp. 326-330. ISSN 0733-9364

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Shen, L Y; Wu, G W C and Ng, C S K (2001) Risk assessment for construction joint ventures in China. Journal of Construction Engineering and Management, 127(1), pp. 76-81. ISSN 0733-9364

Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364

Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.

Shen, Q; Wang, H and Tang, B S (2014) A decision-making framework for sustainable land use in Hong Kong's urban renewal projects. Smart and Sustainable Built Environment, 3(1), pp. 35-53. ISSN 2046-6099

Shen, W; Tang, W; Wang, S; Duffield, C F; Hui, F K P and You, R (2017) Enhancing trust-based interface management in international engineering-procurement-construction projects. Journal of Construction Engineering and Management, 143(9): 04017061, ISSN 0733-9364

Shen, X (2017) Location-based leading indicators in BIM for construction safety. PhD thesis, University of Alabama, USA.

Sheng, Boyuan (2022) Enhancing green infrastructure management for flood-drought resilience in brisbane, Australia: An integrated approach. PhD thesis, Queensland University of Technology, Australia.

Shepherd, S (2006) Evaluation of an engineering intervention to prevent silica exposures in construction. ScD thesis, University of Massachusetts Lowell, USA.

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sherif, K F (2010) Total quality management and construction project management in Libya. PhD thesis, University of Plymouth, UK.

Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.

Sheriff, A (2011) Improvements in the effectiveness of information management in construction organisations. EngD thesis, Loughborough University, UK.

Sheriff, A; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2013) Seven lessons for effective information management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 205-211. ISSN 17514312

Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in Western India. Journal of Construction in Developing Countries, 25(2), pp. 129-151. ISSN 1823-6499

Sheth, A Z (2011) A refurbishment framework with an emphasis on energy consumption of existing healthcare facilities. EngD thesis, Loughborough University, UK.

Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. PhD thesis, University of Maryland, Baltimore County, USA.

Shi, Q; Yao, L; Bi, C and Zhu, J (2025) Dynamic incentive mechanisms in mega project-risk management considering the participation of the insurance company. Engineering, Construction and Architectural Management, 32(9), pp. 5792-5813. ISSN 0969-9988

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shi, J J and Halpin, D W (2003) Enterprise resource planning for construction business management. Journal of Construction Engineering and Management, 129(2), pp. 214-221. ISSN 0733-9364

Shi, L; He, Y and Onishi, M (2023) Effect of the internal agency problem on risk-sharing incentive contracts in public-private partnership projects. Journal of Construction Engineering and Management, 149(12): 04023126, ISSN 0733-9364

Shi, Q; Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: A Chinese case study. Construction Management and Economics, 30(6), pp. 425-440. ISSN 1466433X

Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.

Shi-Dong, L and Zhao-Dong, X (2024) Logical object structure and system implementation for BIM database in civil infrastructures. Architectural Engineering and Design Management, 20(3), pp. 448-470. ISSN 1745-2007

Shih, N J and Wang, P H (2004) Plumbing locator in an as-built building form. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364

Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364

Shikweni, S (2018) Talent management in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Shirzad Talatappeh, S and Lakzi, A (2020) Developing a model for investigating the impact of cloud-based systems on green supply chain management. Journal of Engineering, Design and Technology, 18(4), pp. 741-760. ISSN 1726-0531

Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988

Shiue, I (2016) Future urban design strategies for health and wellbeing: Proposal of DIDID action plan and design mapping. Journal of Engineering, Design and Technology, 14(1), pp. 104-114.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(2), pp. 93-101. ISSN 01446193

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(7), pp. 681-692. ISSN 01446193

Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364

Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193

Shohet, I M; Wei, H H; Skibniewski, M J; Tak, B and Revivi, M (2019) Integrated communication, control, and command of construction safety and quality. Journal of Construction Engineering and Management, 145(9): 04019051, ISSN 0733-9364

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(4), pp. 1726-1745. ISSN 0969-9988

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Leading UK construction companies’ strategies to tackle BIM training and skills challenges. International Journal of Construction Education and Research, 19(4), pp. 383-404. ISSN 1557-8771

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Shokri, S; Ahn, S; Lee, S; Haas, C T and Haas, R C G (2016) Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2): 04015070, ISSN 0733-9364

Shokri-Ghasabeh, M and Chileshe, N (2014) Knowledge management: Barriers to capturing lessons learned from Australian construction contractors' perspectives. Construction Innovation, 14(1), pp. 108-134. ISSN 1471-4175

Shoniwa, Kuda John (2024) The use of integrated project delivery (IPD) to reduce construction claims in South African mining capital projects. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Shook, S R (1997) Innovation and the United States residential construction industry: An integrated model of determinants of firm innovativeness for engineered wood products. PhD thesis, University of Washington, USA.

Shooshtarian, S; Caldera, S; Maqsood, T; Ryley, T and Khalfan, M (2022) An investigation into challenges and opportunities in the Australian construction and demolition waste management system. Engineering, Construction and Architectural Management, 29(10), pp. 4313-4330. ISSN 0969-9988

Short, C A and Al-Maiyah, S (2009) Design strategy for low-energy ventilation and cooling of hospitals. Building Research & Information, 37(3), pp. 264-292. ISSN 0961-3218

Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.

Shrahily, R; Medjdoub, B; Klalib, H; Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), pp. 2966-2986. ISSN 1562-3599

Shrestha, Asheem (2015) Risk allocation in public private partnerships: A principal agent approach. PhD thesis, University of Melbourne, Australia.

Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988

Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364

Shrestha, P P; O'Connor, J T and Gibson Jr, G E (2012) Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1), pp. 1-13. ISSN 0733-9364

Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988

Shrimant, P B (2013) Implementation of total quality management: An exploratory study of Indian construction industry. PhD thesis, Swami Ramanand Teerth Marathwada University, India.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shrivastava, S and Chini, A (2012) Using building information modeling to assess the initial embodied energy of a building. International Journal of Construction Management, 12(1), pp. 51-63. ISSN 1562-3599

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.

Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shukra, Z A and Zhou, Y (2021) Holistic green BIM: A scientometrics and mixed review. Engineering, Construction and Architectural Management, 28(9), pp. 2273-2299. ISSN 0969-9988

Shupe-Diggs, C; Diko, S K and Santo, C A (2020) An integrated social vulnerability assessment of riverine flood hazards in Shelby County, Tennessee. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 308-321. ISSN 1759-5916

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Sica, G (2014) Groundborne vibrations caused by railway construction and operation in buildings: Design, implementation and analysis of measurement for assessment of human exposure. PhD thesis, University of Salford, UK.

Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Sidwell, A C (1983) An evaluation of management contracting. Construction Management and Economics, 1(1), pp. 47-55. ISSN 01446193

Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175

Sidwell, T and Kennedy, R (2004) Re-valuing construction through project delivery. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Siebelink, S; Voordijk, H J T; Endedijk, M D and Adriaanse, A M (2025) Exploring strategies for managing maturity variations among project partners: From underperformance and controlling weak links to stretching capabilities. Construction Management and Economics, 43(4), pp. 243-261. ISSN 0144-6193

Siebelink, S; Voordijk, J T and Adriaanse, A (2018) Developing and testing a tool to evaluate BIM maturity: Sectoral analysis in the Dutch construction industry. Journal of Construction Engineering and Management, 144(8): 05018007, ISSN 0733-9364

Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.

Siemons, J C M M (1992) Occupational safety and health policy implementation: A comparison between Japan and the Netherlands. PhD thesis, University of Twente, Netherlands.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), pp. 37-55. ISSN 1823-6499

Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218

Siew, R Y J (2015) Health and safety communication strategy in a Malaysian construction company: A case study. International Journal of Construction Management, 15(4), pp. 310-320. ISSN 1562-3599

Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Silva, A; Neves, L C; Gaspar, P L and de Brito, J (2016) Probabilistic transition of condition: Render facades. Building Research & Information, 44(3), pp. 301-318. ISSN 0961-3218

Silva, E N; Brasil de Brito Mello, L C and Pinto, G O (2023) Challenges for lean construction adoption in the Brazilian industry: A study in construction companies, universities and class organizations. Construction Innovation, 23(5), pp. 1130-1150. ISSN 1471-4175

Silva, P M; Domingo, N and Ameer Ali, N A N (2025) An interactive pre-contract dispute avoidance toolkit for New Zealand construction industry. Construction Innovation, 25(7), pp. 268-291. ISSN 1471-4175

Silva, P M; Domingo, N and Ali, N A N A (2025) Pre-contract measures to avoid potential disputes in the New Zealand construction industry. Construction Economics and Building, 25(2), pp. 235-252. ISSN 2204-9029

Silva, Tássia Farssura Lima da (2022) BIM and risk management interface in the design phase: A multi-method approach. PhD thesis, Universidade de São Paulo, Brazil.

Silva, Vanessa Gomes da (2003) Sustainability assessment of office buildings in Brazil: Guidelines and methodological basis. PhD thesis, Universidade de São Paulo, Brazil.

Silverio, A K; Suresh, S; Renukappa, S and Heesom, D (2023) Status of BIM implementation in the Dominican Republic construction industry: an empirical study. Journal of Engineering, Design and Technology, 21(2), pp. 417-441. ISSN 1726-0531

Silverio Fernández, M A (2019) Implementation of smart devices in the construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio Rodriguez, A K (2020) Implementation of building information modelling in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio-Fernandez, M A; Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry: An empirical study in the Dominican Republic. Engineering, Construction and Architectural Management, 26(8), pp. 1625-1640. ISSN 0969-9988

Silverio-Fernández, M A; Renukappa, S and Suresh, S (2021) Strategic framework for implementing smart devices in the construction industry. Construction Innovation, 21(2), pp. 218-243. ISSN 1471-4175

Silvestri, A; Paraciani, N and Villani, T (2021) Performance evaluation of textile materials for lightweight envelopes in minor sports facilities and their impact on indoor comfort. Architectural Engineering and Design Management, 17(3-4), pp. 347-359. ISSN 1745-2007

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(2), pp. 113-125. ISSN 0969-9988

Simmonds, D M (2015) Information technology and sustainability: An empirical study of the value of the building automation system. PhD thesis, University of South Florida, USA.

Simon, D; Bellinson, R and Smit, W (2022) Transformational climate action at the city scale: Comparative South–North perspectives. Buildings & Cities, 3(1), pp. 1000-1018. ISSN 2632-6655

Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599

Simpeh, F.; Appau, M. W. and Attakora-Amaniampong, E. (2026) Technological compliance and usefulness of heating and cooling systems in on-campus student housing in Ghana. Smart and Sustainable Built Environment, 15(3), pp. 1068-1084. ISSN 2046-6099

Simpeh, E and Smallwood, J (2018) Field diagnosis of challenges and facilitators to the adoption of green building principles in multi-purpose office facilities. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Simpeh, E K; Smallwood, J J; Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(2), pp. 286-296. ISSN 1562-3599

Simpeh, F; Bamfo-Agyei, E and Amoah, C (2022) Barriers to the implementation of COVID-19 safety regulations: Insight from Ghanaian construction sites. Journal of Engineering, Design and Technology, 20(1), pp. 47-65. ISSN 1726-0531

Simukonda, W (2019) Occupational health and safety practices among contractors in Malawi: A generic overview. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 118-124. ISSN 17514304

Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165

Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.

Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771

Sing, M C P; Cao, N; Liu, H J and Choy, Y N (2025) Digitalization in Hong Kong building surveying: Advancements in building plan scrutiny process. Built Environment Project and Asset Management, 15(4), pp. 827-843. ISSN 2044-124X

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singer, H and Özşahin, Ş (2022) Prioritization of laminate flooring selection criteria from experts' perspectives: A spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(6), pp. 911-926. ISSN 1745-2007

Singh, A. K.; Mohandes, S. R.; Awuzie, B. O.; Omotayo, T.; Kumar, V. R. P. and Kidd, C. (2026) A roadmap for overcoming barriers to implementation of blockchain-enabled smart contracts in sustainable construction projects. Smart and Sustainable Built Environment, 15(2), pp. 570-596. ISSN 2046-6099

Singh, P K; Saxena, D and Kakade, V (2025) Identification of success clusters using principal component analysis for oil and gas industry. International Journal of Construction Management, 25(14), pp. 1675-1690. ISSN 1562-3599

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988

Singh, A; Kumar, V; Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(1), pp. 67-105. ISSN 1471-4175

Singh, A K and Kumar, V (2024) Establishing the relationship between the strategic factors influencing blockchain technology deployment for achieving sdg and esg objectives during infrastructure development: An ism-MICMAC approach. Smart and Sustainable Built Environment, 13(3), pp. 711-736. ISSN 2046-6099

Singh, E and Singh, D P (2017) Architectural profession in India: Perception towards service marketing. Journal of Engineering, Design and Technology, 15(5), pp. 574-590.

Singh, S (2021) Stakeholder management within BIM implemented projects in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Singh, V (2014) BIM and systemic ICT innovation in AEC: Perceived needs and actor's degrees of freedom. Construction Innovation, 14(3), pp. 292-306. ISSN 1471-4175

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364

Singhaputtangkul, N (2017) A decision support tool to mitigate decision-making problems faced by a building design team. Smart and Sustainable Built Environment, 6(1), pp. 2-18. ISSN 2046-6099

Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988

Sinkala, A; Lindelani, M and Root, D (2024) Resolving the paradox of unsolicited PPP proposals for infrastructure projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988

Siriwardhana, S and Moehler, R (2024) Mastering the skills of construction 4.0: A review of the literature using science mapping. Smart and Sustainable Built Environment, 13(4), pp. 989-1014. ISSN 2046-6099

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Siva, J; Gajendran, T; Toinpre, O and Vaughan, J (2025) Driving the zero-carbon construction strategy: Key barriers and enablers. Built Environment Project and Asset Management, 15(3), pp. 380-398. ISSN 2044-124X

Sivam, Alpana (1999) An approach to improved housing delivery in large cities of less developed countries. PhD thesis, University of Melbourne, Australia.

Skea, J (2012) Research and evidence needs for decarbonisation in the built environment: A UK case study. Building Research & Information, 40(4), pp. 432-445. ISSN 0961-3218

Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.

Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(1), pp. 39-49. ISSN 01446193

Skibniewski, M J and Ghosh, S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management, 135(10), pp. 965-978. ISSN 0733-9364

Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988

Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X

Skitmore, R M and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(1), pp. 71-89. ISSN 01446193

Slater, K R and Robinson, J B (2023) Transformational climate actions by cities. Buildings & Cities, 4(1), pp. 74-82. ISSN 2632-6655

Slater, K R; Ventura, J; Robinson, J B; Fernandez, C; Dutfield, S and King, L (2022) Assessing climate action progress of the city of Toronto. Buildings & Cities, 3(1), pp. 1059-1074. ISSN 2632-6655

Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029

Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364

Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(1), pp. 2-17. ISSN 0961-3218

Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Small-Warner, K (2022) Adopting sustainable business models in small island developing states (SIDS): buildings and construction sector. PhD thesis, De Montfort University, UK.

Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Smallwood, J and Allen, C (2023) Practitioners' perceptions of the potential impact of industry 4.0 on construction health and safety. Journal of Engineering, Design and Technology, 21(2), pp. 486-501. ISSN 1726-0531

Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(1), pp. 57-69. ISSN 2204-9029

Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smallwood, J J; Allen, C J and Deacon, C H (2020) The role of industry 4.0 in construction occupational health (OH). In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531

Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smith, J; Mills, A and Iyer-Raniga, U (2004) Benchmarking the implementation of continuing professional development in the victorian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smith, P (2001) Information technology and the QS practice. Construction Economics and Building, 1(1), pp. 1-21. ISSN 2204-9029

Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007

Smith, S A (1986) Iron and steel in long-span construction 1847-1890: A study of change and innovation. PhD thesis, Imperial College London, UK.

Smith, S D; Sherratt, F and Oswald, D C (2017) The antecedents and development of unsafety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 59-67. ISSN 17514304

Smith, V R R (2008) Impact to alternative contracting methods using multivariate analysis in the regulatory environment. PhD thesis, Georgia Institute of Technology, USA.

Smith, W N; Smith, J and Bingham, E D (2022) Current state of practice associated with the use of building information modeling (BIM) in the custom home building industry. International Journal of Construction Education and Research, 18(3), pp. 251-269. ISSN 1557-8771

Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218

Smyth, H; Anvuur, A M and Kusuma, I (2017) Integrated solutions for total asset management through "RIVANS". Built Environment Project and Asset Management, 7(1), pp. 5-18. ISSN 2044-124X

Smyth, H; Duryan, M and Kusuma, I (2019) Service design for marketing in construction: Tactical implementation in the "business development management". Built Environment Project and Asset Management, 9(1), pp. 87-99. ISSN 2044-124X

Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193

So, K L (2021) Integrated life-cycle management of highway bridges. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Soares, Bruno Cesarino (2021) Use of building information modeling to support built environment management. PhD thesis, Universidade Federal de Minas Gerais, Brazil.

Sodangi, M (2021) Overcoming the constraints to the adoption of sustainable civil engineering practices. International Journal of Construction Management, 21(5), pp. 490-507. ISSN 1562-3599

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988

Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.

Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.

Soetanto, R; Childs, M; Poh, P; Austin, S and Hao, J (2014) Virtual collaborative learning for building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 25-34. ISSN 17514304

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X

Soetanto, R; Dainty, A R J; Price, A D F and Glass, J (2003) Utilizing socio-technical systems design principles to implement new ICT systems. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988

Sohail, M (1997) An investigation into the procurement of urban infrastructure in developing countries. PhD thesis, Loughborough University, UK.

Sohal, K; Renukappa, S; Suresh, S; Georgakis, P and Stride, N (2025) The uptake of digital twins in delivering infrastructure sector projects. Smart and Sustainable Built Environment, 14(3), pp. 794-809. ISSN 2046-6099

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Soibelman, L; Liu, L Y; Kirby, J G; East, E W; Caldas, C H and Lin, K Y (2003) Design review checking system with corporate lessons learned. Journal of Construction Engineering and Management, 129(5), pp. 475-484. ISSN 0733-9364

Solanki, A; Sarkar, D and Shah, D (2024) Evaluation of factors affecting the effective implementation of internet of things and cloud computing in the construction industry through waspas and TOPSIS methods. International Journal of Construction Management, 24(2), pp. 226-239. ISSN 1562-3599

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193

Solnosky, R; Parfitt, M K and Holland, R (2015) Delivery methods for a multi-disciplinary architectural engineering capstone design course. Architectural Engineering and Design Management, 11(4), pp. 305-324. ISSN 1745-2007

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Soltani, M; Aouag, H and Mouss, M D (2020) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology, 18(1), pp. 211-229. ISSN 1726-0531

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Sommerville, J and McCarney, M (2003) Cross-border holdings in the UK construction industry: The influence on micro-enterprises and entrepreneurs. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sompolgrunk, A; Banihashemi, S; Hosseini, M R; Golzad, H and Hajirasouli, A (2023) An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). Engineering, Construction and Architectural Management, 30(5), pp. 2048-2074. ISSN 0969-9988

Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364

Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499

Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 0969-9988

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, J; Song, D and Zhang, D (2015) Modeling the concession period and subsidy for BOT waste-to-energy incineration projects. Journal of Construction Engineering and Management, 141(10): 04015033, ISSN 0733-9364

Song, S (2017) Construction equipment travel path visualization and productivity evaluation. PhD thesis, University of Alabama, USA.

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364

Song, Y (2022) Resilience bonds and the financing of resilient infrastructure. PhD thesis, University College London, UK.

Songer, A D; Diekmann, J and Pecsok, R S (1997) Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(4), pp. 377-382. ISSN 01446193

Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Songer, A D; Hays, B and North, C (2004) Multidimensional visualization of project control data. Construction Innovation, 4(3), pp. 173-190. ISSN 1471-4175

Songer, A D; Ibbs, C W and Napier, T R (1994) Process model for public sector design-build planning. Journal of Construction Engineering and Management, 120(4), pp. 857-874. ISSN 0733-9364

Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364

Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180

Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Soni, M S M and Smallwood, J (2024) Understanding corruption in the South African construction industry. Journal of Construction Business and Management, 7(1), pp. 45-56. ISSN 2521-0165

Soni, M S M and Smallwood, J J (2024) Perceptions of corruption in the South African construction industry. International Journal of Construction Education and Research, 20(1), pp. 43-64. ISSN 15578771

Sonson, S J (2018) Performance measurement and management within construction firms in Saint Lucia. PhD thesis, University of Salford, UK.

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Sorsa, F. T.; Mengistu, D. G. and Tadesse, S. T. (2026) Professionals' performance appraisal practice in construction companies. International Journal of Construction Education and Research, 22(2), pp. 308-330. ISSN 1557-8771

Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531

Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499

Sospeter, N G; Rwelamila, P D and Gimbi, J (2020) Critical success factors for managing post-disaster reconstruction projects: The case of Angola. Construction Economics and Building, 20(3), pp. 37-55. ISSN 2204-9029

Sossah, J Y; Osei-Poku, G and Dorhetso, S N (2026) Exploring the feasibility of adopting autonomous drones for construction progress monitoring in Ghana. International Journal of Construction Management, 26(3), pp. 412-427. ISSN 1562-3599

Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.

Sourani, A and Sohail, M (2013) Enabling sustainable construction in UK public procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 297-312. ISSN 17514312

Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Souza, Fernando da Silva (2021) Reinsertion of construction and demolition waste into the production chain of civil construction in Rio Branco, Acre. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.

Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007

Souza, Roberto de (1997) Methodology for development and implementation of quality management systems in small and medium size building companies. PhD thesis, Universidade de São Paulo, Brazil.

Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.

Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364

Spence, R (2004) Risk and regulation: Can improved government action reduce the impacts of natural disasters? Building Research & Information, 32(5), pp. 391-402. ISSN 0961-3218

Spentzou, E; Cook, M J and Emmitt, S (2022) Low-energy cooling and ventilation refurbishments for buildings in a mediterranean climate. Architectural Engineering and Design Management, 18(4), pp. 473-494. ISSN 1745-2007

Sphelele, K M and Amoah, C (2024) Challenges of black contractors with the South African public procurement system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sporrong, J (2014) Selecting architectural and engineering consultants: Municipal practices in Sweden. PhD thesis, Chalmers University of Technology, Sweden.

Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218

Spottiswoode, B H and MacKellar, D C R (2013) The role and effect of technical review panels. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 103-108. ISSN 17514312

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Sridarran, P and Fernando, N G (2016) Change management framework to enable sustainable outsourcing of facilities management services. Built Environment Project and Asset Management, 6(3), pp. 317-331. ISSN 2044-124X

Srivastava, M (2020) Cooperative learning in design studios: A pedagogy for net-positive performance. Buildings & Cities, 1(1), pp. 594-609. ISSN 2632-6655

Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.

Ssenyange, K and Kudakwashe, C (2023) The impact of leadership styles on government construction project success: A structural equation modeling approach. Journal of Construction Business and Management, 6(2), pp. 11-26. ISSN 2521-0165

Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599

Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.

Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.

Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364

Stanitsa, A; Hallett, S H and Jude, S (2024) The challenges of implementing evidence-based strategies to inform building and urban design decisions: A view from current practice. Journal of Engineering, Design and Technology, 22(4), pp. 1099-1118. ISSN 1726-0531

Stanitsas, M and Kirytopoulos, K (2022) Underlying factors for successful project management to construct sustainable built assets. Built Environment Project and Asset Management, 12(2), pp. 129-146. ISSN 2044-124X

Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029

Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(2), pp. 124-149. ISSN 1358-9180

Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Staples, Warren (2010) Public value in public sector infrastructure procurement. PhD thesis, RMIT University, Australia.

Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(6), pp. 968-987. ISSN 0969-9988

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Stein, M (2012) Decision making with implementation dependent feedback. PhD thesis, National University of Singapore, Singapore.

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Sterner, E (2002) 'Green procurement' of buildings: A study of Swedish clients' considerations. Construction Management and Economics, 20(1), pp. 21-30. ISSN 01446193

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stewart, P (2001) The role of e-commerce systems for the construction industry. Construction Economics and Building, 1(2), pp. 24-36. ISSN 2204-9029

Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stewart, R A and Mohamed, S (2001) Utilizing the balanced scorecard for IT/IS performance evaluation in construction. Construction Innovation, 1(3), pp. 147-163. ISSN 1471-4175

Stewart, R A; Mohamed, S and Marosszeky, M (2004) An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry. Construction Innovation, 4(3), pp. 155-171. ISSN 1471-4175

Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193

Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Stopforth, R; Proctor-Parker, C and Davrajh, S (2019) Analysis of a low-cost anthropomorphic sensory platform for the world first minibus test. Journal of Engineering, Design and Technology, 17(2), pp. 434-455. ISSN 1726-0531

Strahorn, S; Brewer, G and Gajendran, T (2017) The influence of trust on project management practice within the construction industry. Construction Economics and Building, 17(1), pp. 1-19. ISSN 2204-9029

Strahorn, S; Gajendran, T and Brewer, G (2015) The influence of trust in traditional contracting: Investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(2), pp. 81-101. ISSN 2204-9029

Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218

Straub, M (2014) A new framework for designing and developing cost-effective logistic chains for long items. PhD thesis, University of Gloucestershire, UK.

Stukhart, G (1984) Contractual incentives. Journal of Construction Engineering and Management, 110(1), pp. 34-42. ISSN 0733-9364

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Sturges, J and Bates, M (2001) Data integration and construction contracting: Barriers to implementation. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.

Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.

Styhre, A and Gluch, P (2010) Managing knowledge in platforms: Boundary objects and stocks and flows of knowledge. Construction Management and Economics, 28(6), pp. 589-599. ISSN 1466433X

Su, L; Cao, Y; Li, H and Zhang, C (2024) Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(2), pp. 866-890. ISSN 0969-9988

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Subchan, B R; Tayeh, B A; Widayanto, E and Wiswamitra, K A (2024) Bamboo's evolution as a sustainable material: A comprehensive exploration and practical integration as a structural element in concrete, bridge frameworks, and architectural perspectives. Architectural Engineering and Design Management, 20(6), pp. 1566-1588. ISSN 1745-2007

Subedi, J; Ghimire, R M; Neupane, R P and Amatya, S (2016) Cost difference of buildings in Kathmandu constructed with and without earthquake safer features. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 444-459. ISSN 1759-5916

Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Succar, B; Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), pp. 120-142. ISSN 1745-2007

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.

Sugar, K; Mose, T M; Nolden, C; Davis, M; Eyre, N; Sanchez-Graells, A and van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings & Cities, 3(1), pp. 895-911. ISSN 2632-6655

Sugiyantoro (2021) Homebuyers' strategies for progressive residential infrastructure improvement in Bandung, Indonesia. PhD thesis, University College London, UK.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.

Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.

Sujan, S F (2020) A holistic and systemic model of collaboration in the AED industry. PhD thesis, University of Liverpool, UK.

Sujan, Sujesh Francis (2020) A holistic and systemic model of collaboration in the AEC industry. PhD thesis, University of Liverpool, UK.

Suk, Sung Joon (2012) Analysis of project management attributes for the successful delivery of capital facility projects. PhD thesis, University of Texas at Austin, USA.

Sukmara, R B; Ariyaningsih, A and Bachtiar, R (2024) Understanding the stakeholders' interests and role toward climate change adaptation (case study of Indonesia). International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 571-590. ISSN 1759-5916

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.

Sulaiman, N F (2002) The development of a dual phase approach to embracing a total quality culture in the Malaysian construction industry. PhD thesis, Glasgow Caledonian University, UK.

Sulaimon, I A; Alaka, H; Olu-Ajayi, R; Ahmad, M; Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(3), pp. 1030-1056. ISSN 1726-0531

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Sumanarathna, N; Duodu, B; Memon, S A and Rowlinson, S (2025) Exploring innovation deployment of construction contracting firms through the lens of exploratory–exploitative learning: A Hong Kong case study. Construction Innovation, 25(2), pp. 641-664. ISSN 1471-4175

Sumanarathna, N and Rowlinson, R (2019) Examining construction contractors' innovation through the lens of exploration and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Sumner, M and Slattery, D (2010) The impact of leadership effectiveness and team processes on team performance in construction. International Journal of Construction Education and Research, 6(3), pp. 179-201. ISSN 1557-8771

Sun, Y; Wang, L; Zhao, Y and Tiong, R L K (2026) Appraising institutional quality drivers of private capital participation in public–private partnership by dynamic qualitative comparative analysis. International Journal of Construction Management, 26(6), pp. 1078-1096. ISSN 1562-3599

Sun, C; Xu, H and Jiang, S (2020) Understanding the risk factors of BIM technology implementation in the construction industry: An interpretive structural modeling (ISM) approach. Engineering, Construction and Architectural Management, 27(10), pp. 3289-3308. ISSN 0969-9988

Sun, H; Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(7), pp. 1406-1423. ISSN 0969-9988

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Sun, M (1993) Technology transfer, architectural design and integrated building design systems. PhD thesis, University of Newcastle upon Tyne, UK.

Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information. PhD thesis, University of Florida, USA.

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sunarharum, Tri Mulyani (2016) Collaborative planning for disaster resilience: The role of community engagement for flood risk management. PhD thesis, Queensland University of Technology, Australia.

Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.

Sundaraj, G and Eaton, D (2011) The anticipated robustness factors in a PFI project environment from the granting authority s perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(1), pp. 26-52. ISSN 1366-4387

Sunding, L (2015) On problems, joint problem solving and change: A human behavioural approach in a construction sector context. PhD thesis, Lund University, Sweden.

Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175

Sundling, R; Blomsterberg, Å and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(1), pp. 2-14. ISSN 1471-4175

Sundquist, V; Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(3), pp. 358-373. ISSN 0969-9988

Sundquist, V; Leto, A D; Gustafsson, M; Johansson, M and Roupé, M (2020) BIM in construction production: Gains and hinders for firms, projects and industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Sunikka-Blank, M; Galvin, R and Behar, C (2018) Harnessing social class, taste and gender for more effective policies. Building Research & Information, 46(1), pp. 114-126. ISSN 0961-3218

Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sunindijo, R Y and Zou, P X W (2012) Political skill for developing construction safety climate. Journal of Construction Engineering and Management, 138(5), pp. 605-612. ISSN 0733-9364

Sunindijo, R Y and Zou, P X W (2013) The roles of emotional intelligence, interpersonal skill, and transformational leadership on improving construction safety performance. Construction Economics and Building, 13(3), pp. 97-113. ISSN 2204-9029

Sunindijo, Riza (2012) Skills for developing safety climate in construction projects. PhD thesis, University of New South Wales, Australia.

Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Sunusi, B; Hashim, A H; Samah, A A and Ahmad, N (2021) The moderating effect of privacy in the relationships between residential livability and residents' life satisfaction. Journal of Construction in Developing Countries, 26(1), pp. 45-62. ISSN 1823-6499

Supriadi, L S R (2014) Implementing business continuity management (bcm) using a knowledge based decision support system (kbdss) for indonesian contractors. PhD thesis, National University of Singapore, Singapore.

Supriadi, L S R and Pheng, L S (2013) Business continuity management for Indonesian contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 31-42. ISSN 17514304

Suprun, E V and Stewart, R A (2015) Construction innovation diffusion in the Russian federation: Barriers, drivers and coping strategies. Construction Innovation, 15(3), pp. 278-312. ISSN 1471-4175

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451

Suresh, M and Arun Ram Nathan, R B (2020) Readiness for lean procurement in construction projects. Construction Innovation, 20(4), pp. 587-608. ISSN 1471-4175

Suresh, S; Olayinka, R; Chinyio, E and Renukappa, S (2017) Impact of knowledge management on construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 27-43. ISSN 17514304

Suresh, S; Renukappa, S; Abdul-Aziz, A R; Paloo, Y and Jallow, H (2021) Developments in the UK road transport from a smart cities perspective. Engineering, Construction and Architectural Management, 28(4), pp. 845-862. ISSN 0969-9988

Suresh, S; Renukappa, S; Stride, M; Nicola Toor, R and Khan, A (2025) Women in the UK construction industry: Are we still clinging to the "old boys club"? Engineering, Construction and Architectural Management, 32(1), pp. 214-236. ISSN 0969-9988

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Sutrisna, M; Pellicer, E; Torres-Machi, C and Picornell, M (2020) Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage. International Journal of Construction Management, 20(1), pp. 1-12. ISSN 1562-3599

Sutrisna, M; Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), pp. 761-781. ISSN 1471-4175

Sutterby, P; Wang, X; Li, H X and Ji, Y (2023) The impact of COVID-19 on construction supply chain management: An Australian case study. Engineering, Construction and Architectural Management, 30(8), pp. 3098-3122. ISSN 0969-9988

Svatoš-Ražnjević, H; Boeva, Y; Kropp, C and Menges, A (2025) Trajectories from standard to incremental and pioneering innovation in timber construction: Multi-storey timber buildings in Germany, Austria, and Switzerland. Building Research & Information, 53(6), pp. 734-758. ISSN 0961-3218

Sverlinger, P-O M (2000) Managing knowledge in professional service organizations: Technical consultants serving the construction industry. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Swallow, M and Zulu, S L (2025) Investigating the implementation of immersive technologies within on-site construction safety processes. Journal of Engineering, Design and Technology, 23(1), pp. 323-343. ISSN 1726-0531

Swan, W; Cooper, R; McDermott, P and Wood, G (2001) A review of social network analysis for the IMI Trust in Construction Project. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Swan, W C (2002) Construct IT: An exploratory case study of a knowledge network supported by an intermediary. PhD thesis, University of Salford, UK.

Sward, A (2006) Relations as a key resource. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Swaris, N; Halwatura, R U and Amaratunga, D (2024) Policy coherence for resilience in Sri Lanka coherence of climate change adaptation (CCA) disaster risk reduction (DRR) and sustainable development goals (SDGs). International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 450-473. ISSN 1759-5916

Swarnadhipathi, K and Boyd, D (2007) An investigation of construction project performance in Botswana using time predictability. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Sweis, G J; Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), pp. 446-459. ISSN 1471-4175

Sweis, R; Moarefi, A; Hoseini-Amiri, S M and Moarefi, S (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation, 37(1), pp. 69-86. ISSN 23984708

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation. PhD thesis, University of Texas at Austin, USA.

Sylvie, J R; Thomas, S R; Lee, S H; Chapman, R E and Smith, R T (2013) Development and interpretation of the security rating index. Journal of Construction Engineering and Management, 139(2), pp. 185-194. ISSN 0733-9364

Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.

Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sánchez, F A S; Peláez, G I C and Alís, J C (2017) Integral diagnosis of occupational health and safety management in colombian construction companies. Journal of Construction in Developing Countries, 22(2), pp. 101-116. ISSN 1823-6499

Sørensen, N L; Rasmussen, F N; Øien, T B and Frandsen, A K (2020) Holistic sustainability: Advancing interdisciplinary building design through tools and data in Denmark. Construction Economics and Building, 20(2), pp. 25-44. ISSN 2204-9029

Tabatabaee, S; Ashour, M; Mohandes, S R; Sadeghi, H; Mahdiyar, A; Hosseini, M R and Ismail, S (2022) Deterrents to the adoption of green walls: A hybrid fuzzy-based approach. Engineering, Construction and Architectural Management, 29(9), pp. 3460-3479. ISSN 0969-9988

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(3), pp. 261-274. ISSN 1466433X

Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Taheriattar, Reza (2018) Sustainability and adaptable/flexible infrastructure. PhD thesis, University of New South Wales, Australia.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.

Tajani, F; Anelli, D; Di Liddo, F and Morano, P (2024) An innovative methodology for the assessment of the social discount rate: An application to the European states for ensuring the goals of equitable growth. Smart and Sustainable Built Environment, 13(5), pp. 1281-1309. ISSN 2046-6099

Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Talla, A and McIlwaine, S (2024) Industry 4.0 and the circular economy: Using design-stage digital technology to reduce construction waste. Smart and Sustainable Built Environment, 13(1), pp. 179-198. ISSN 2046-6099

Tallant, D J (1993) Privatization in a developing economy: Lessons from the Turkish cement industry. PhD thesis, Cornell University, USA.

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Tam, C M; Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: The supervision plan. Construction Management and Economics, 19(4), pp. 393-403. ISSN 01446193

Tam, C M; Tam, V W Y and Zeng, S X (2002) Environmental performance evaluation (EPE) for construction. Building Research & Information, 30(5), pp. 349-361. ISSN 0961-3218

Tam, C M; Tam, V W Y and Zeng, S X (2004) Environmental performance assessment in China and Hong Kong. Building Research & Information, 32(2), pp. 110-118. ISSN 0961-3218

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, G C K (2018) Managing project sustainability: a study of the construction industry in Hong Kong. PhD thesis, London South Bank University, UK.

Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tam, V W Y; Zhang, X; Lee, W W Y and Shen, L Y (2011) Applications of extensive green-roof systems in contributing to sustainable development in densely populated cities: A Hong Kong study. Construction Economics and Building, 11(1), pp. 15-25. ISSN 2204-9029

Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304

Tambwe, O.; Aigbavboa, C. and Akinradewo, O. (2026) Influence of data longevity on data management in the South African construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.

Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.

Tan, Loke Mun (1992) The development of group self build housing in Victoria. PhD thesis, University of Melbourne, Australia.

Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193

Tan, R R and Chang, D S (1993) The formulation of performance indicators in evaluating the implementation of automation in the construction industry. Construction Management and Economics, 11(5), pp. 398-403. ISSN 01446193

Tan, T; Mills, G; Ma, X and Papadonikolaki, E (2024) Adoption challenges of building information modelling (BIM) and off-site construction (OSC) in healthcare construction: are they fellow sufferers? Engineering, Construction and Architectural Management, 31(13), pp. 390-410. ISSN 0969-9988

Tan, T; Graser, K; Walzer, A N; Ng, M S and Hall, D (2025) Exploring the implementation of digital fabrication in construction: Combining system approaches and a revelatory case study from Switzerland. Journal of Construction Engineering and Management, 151(12): 05025016, ISSN 0733-9364

Tan, Y; Langston, C; Wu, M and Ochoa, J J (2015) Grey forecasting of construction demand in Hong Kong over the next ten years. International Journal of Construction Management, 15(3), pp. 219-228. ISSN 1562-3599

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.

Taneja, P (2013) The flexible port. PhD thesis, Delft University of Technology, Netherlands.

Tang, X.; Zhang, S.; Wang, M. and Sepasgozar, S. M. E. (2026) Understanding the construction digital technology assimilation process in AEC companies: Exploration based on grounded theory and verification of SEM. Journal of Construction Engineering and Management, 152(9): 04026143, ISSN 0733-9364

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Tang, Y H and Ogunlana, S O (2003) Selecting superior performance improvement policies. Construction Management and Economics, 21(3), pp. 247-256. ISSN 01446193

Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Tangrungruengyoo, K (2018) The impact of environmental impact assessment on new housing development: a case study of Bangkok, Thailand. PhD thesis, King's College London, UK.

Tangwe, S and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(2), pp. 456-470. ISSN 1726-0531

Tangwe, S L; Simon, M and Meyer, E L (2016) Design of a heat pump water heater performance monitoring system: To determine performance of a split type system. Journal of Engineering, Design and Technology, 14(4), pp. 739-751.

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Tanko, B L; Essah, E A; Elijah, O; Zakka, W P and Klufallah, M (2023) Bibliometric analysis, scientometrics and metasynthesis of internet of things (IoT) in smart buildings. Built Environment Project and Asset Management, 13(5), pp. 646-665. ISSN 2044-124X

Tansey, P and Spillane, J P (2014) Government influence on the construction industry during the economic recession 2007-2013. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.

Tantiprabha, P (1990) Acquisition of strategic management concepts from construction project data: An inductive learning approach. PhD thesis, University of Texas at Austin, USA.

Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.

Tao, L; Wu, C; Chiang, Y H; Wong, F K W and Liang, S (2017) Generational perceptions of freedom-related work values: Hong Kong's implementation of a no-saturday-site-work policy in construction. Journal of Construction Engineering and Management, 143(7): 06017002, ISSN 0733-9364

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Taofeeq, M D; Adeleke, A Q and Lee, C K (2020) Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), pp. 1543-1569. ISSN 1726-0531

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.

Tarawneh, S A (1999) Service quality and its relationship with client satisfaction and behavioural intentions in UK construction: The case of design and build contracting services. PhD thesis, University of Leeds, UK.

Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364

Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.

Tariq, S and Zhang, X (2022) A critical analysis of water PPP failures in Sub-Saharan Africa. Engineering, Construction and Architectural Management, 29(8), pp. 3157-3180. ISSN 0969-9988

Tarr, K R (2024) Incorporating sustainability in infrastructure design: A case study of phoenix, Arizona. PhD thesis, Arizona State University, USA.

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988

Tasantab, J C; Gajendran, T; von Meding, J K and Maund, K (2020) Perceptions and deeply held beliefs about responsibility for flood risk adaptation in Accra Ghana. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 631-644. ISSN 1759-5916

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits. PhD thesis, University of Maryland, College Park, USA.

Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175

Tatum, C B (1983) Issues in professional construction management. Journal of Construction Engineering and Management, 109(1), pp. 112-119. ISSN 0733-9364

Tatum, C B (1987) Improving constructibility during conceptual planning. Journal of Construction Engineering and Management, 113(2), pp. 191-207. ISSN 0733-9364

Tatum, C B (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), pp. 602-617. ISSN 0733-9364

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B (2018) Construction engineering research: Integration and innovation. Journal of Construction Engineering and Management, 144(3): 04018005, ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916

Tavakolan, M and Mohammadi, A (2018) Risk management workshop application: A case study of Ahwaz Urban Railway project. International Journal of Construction Management, 18(3), pp. 260-274. ISSN 1562-3599

Tavakoli, A and Tulumen, S C (1990) Construction industry in Turkey. Construction Management and Economics, 8(1), pp. 77-87. ISSN 01446193

Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(2), pp. 157-171. ISSN 01446193

Tavakoli, P; Yitmen, I; Sadri, H and Taheri, A (2024) Blockchain-based digital twin data provenance for predictive asset management in building facilities. Smart and Sustainable Built Environment, 13(1), pp. 4-21. ISSN 2046-6099

Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599

Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029

Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387

Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364

Tayeh, B A; Hallaq, K A; Zahoor, H and Al Faqawi, A H (2019) Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. Engineering, Construction and Architectural Management, 26(7), pp. 1424-1436. ISSN 0969-9988

Taylor, D D J (2018) Tools for managing intermittent water supplies. PhD thesis, Massachusetts Institute of Technology, USA.

Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks. PhD thesis, Stanford University, USA.

Taylor, J E (2007) Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks. Journal of Construction Engineering and Management, 133(12), pp. 993-1002. ISSN 0733-9364

Taylor, J E; Levitt, R and Villarroel, J A (2009) Simulating learning dynamics in project networks. Journal of Construction Engineering and Management, 135(10), pp. 1009-1015. ISSN 0733-9364

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Taylor-Lewis, D (2012) Entrepreneurial support for black (afro-caribbean) and Asian construction businesses: Can it enhance their growth? PhD thesis, Oxford Brookes University, UK.

Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.

Tchumtcha Wembe, P (2022) Managing stakeholders in epcm projects in Africa by Western project managers. International Journal of Construction Management, 22(12), pp. 2279-2289. ISSN 1562-3599

Tea, S; Panuwatwanich, K; Ruthankoon, R and Kaewmoracharoen, M (2022) Multiuser immersive virtual reality application for real-time remote collaboration to enhance design review process in the social distancing era. Journal of Engineering, Design and Technology, 20(1), pp. 281-298. ISSN 1726-0531

Teale, Allan F (2022) The relationship between transparency, public private partnerships and delivery outcomes in major transport infrastructure. PhD thesis, University of Technology Sydney, Australia.

Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects' perspective. Journal of Construction in Developing Countries, 28(2), pp. 329-352. ISSN 1823-6499

Tehranchi, H (2008) Stakeholders' attitudes to systematic risk management in infrastructure projects: A comparative study of projects in Iran and Sweden. PhD thesis, University of Reading, UK.

Teicholz, P and Fischer, M (1994) Strategy for computer integrated construction technology. Journal of Construction Engineering and Management, 120(1), pp. 117-131. ISSN 0733-9364

Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.

Tellam, I (2024) Culture change in the UK construction industry: an anthropological perspective. Buildings & Cities, 5(1), pp. 620-628. ISSN 2632-6655

Tembo, M; Kahanji, C and Mwanaumo, E M (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), pp. 16-33. ISSN 2521-0165

Tembo, M; Mwanaumo, E M u and Kahanji, C (2023) An investigation into construction tender-price inflation. Journal of Construction Business and Management, 6(1), pp. 17-32. ISSN 2521-0165

Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(4), pp. 321-334. ISSN 1562-3599

Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.

Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304

Tene Nengou, C B (2019) Framework for the effective implementation of building regulations and policies: The case of Sub-Sahara African countries. PhD thesis, University of Nottingham, UK.

Teng, Y; Li, X; Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(1), pp. 32-45. ISSN 1562-3599

Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531

Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Mixed methods framework for implementation research in the architecture, engineering, construction and operations industry. International Journal of Construction Management, 26(2), pp. 204-218. ISSN 1562-3599

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Enhancing supply chain resilience in offsite construction through the procurement strategy: A systematic literature review. Construction Innovation, 26(1), pp. 63-82. ISSN 1471-4175

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tennant, S and Fernie, S (2011) An alternative form of supply chain governance: Construction clans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(2), pp. 209-220. ISSN 0961-3218

Tennant, S and Fernie, S (2013) Organizational learning in construction supply chains. Engineering, Construction and Architectural Management, 20(1), pp. 83-98. ISSN 0969-9988

Tennant, S and Fernie, S (2014) Theory to practice: A typology of supply chain management in construction. International Journal of Construction Management, 14(1), pp. 56-66. ISSN 1562-3599

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teo, E A L; Ofori, G; Tjandra, I K and Kim, H (2015) The potential of building information modelling (BIM) for improving productivity in Singapore construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Terwel, K C (2014) Structural safety: Study into critical factors in the design and construction process. PhD thesis, Delft University of Technology, Netherlands.

Tetteh, M O; Chan, A P C; Darko, A; Torku, A and Nani, G (2021) Critical barriers to international construction joint ventures success: Multiexpert views and contextual disparities. Journal of Construction Engineering and Management, 147(8): 04021081, ISSN 0733-9364

Tetteh, M O; Chan, A P C; Darko, A; Yevu, S K; Boateng, E B and Nwaogu, J M (2022) Key drivers for implementing international construction joint ventures (icjvs): Global insights for sustainable growth. Engineering, Construction and Architectural Management, 29(9), pp. 3363-3393. ISSN 0969-9988

Tetteh, M O; Chan, A P C; Mohandes, S R and Agyemang, D Y (2023) Diagnosing critical barriers to international construction joint ventures success in the developing country of Ghana. Construction Innovation, 23(5), pp. 1151-1185. ISSN 1471-4175

Tezel, B A (2011) Visual management: an exploration of the concept and its implementation in construction. PhD thesis, University of Salford, UK.

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.

Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(3), pp. 16-30. ISSN 2204-9029

Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: A case study. Building Research & Information, 29(5), pp. 394-408. ISSN 0961-3218

Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175

Thiruvenghadam, T S and Prakash, A (2025) Emerging paradigms and practices in construction equipment management. Journal of Construction Engineering and Management, 151(5): 03125003, ISSN 0733-9364

Thneibat, M; Thneibat, M and Al-Tamimi, B (2022) Establishing the synergy between the perceptions of construction professionals and the phases of value management. Engineering, Construction and Architectural Management, 29(4), pp. 1835-1860. ISSN 0969-9988

Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193

Thomas, K (2002) The exploitation of information technology (IT) in the Irish architecture/engineering/construction (AEC) industry. PhD thesis, University College Cork, Ireland.

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S and Munns, A K (2004) Successfully implementing system innovations within the construction project environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thomson, D S (2000) The development of packaged, reusable building services components: A pilot study in the UK National Health Service. PhD thesis, Heriot-Watt University, UK.

Thorpe, A; Dainty, A R J and Hatfield, H (2003) The realities of being preferred: Specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(1), pp. 47-55. ISSN 1358-9180

Thorpe, D (2003) Online remote construction management trials in Queensland department of main roads: A participant's perspective. Construction Innovation, 3(2), pp. 65-79. ISSN 1471-4175

Thorpe, D; Ryan, N and Charles, M B (2009) Innovation and small residential builders: An Australian study. Construction Innovation, 9(2), pp. 184-200. ISSN 1471-4175

Thorpe, T and Mead, S (2001) Project-specific web sites: Friend or foe? Journal of Construction Engineering and Management, 127(5), pp. 406-413. ISSN 0733-9364

Thu, K and Akintoye, A (2007) Structure of the public private partnership/private finance initiative market in the UK construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Thwala, W D (2009) Experiences and challenges of community participation in urban renewal projects: The case of Johannesburg, South Africa. Journal of Construction in Developing Countries, 14(2), pp. 37-54. ISSN 1823-6499

Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218

Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364

Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.

Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218

Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988

Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988

Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165

Tijani, B; Jin, X and Osei-Kyei, R (2024) Effect of project organization elements on the mental health of project management practitioner in AEC projects. Engineering, Construction and Architectural Management, 31(1), pp. 73-114. ISSN 0969-9988

Tijani, Bashir (2022) Developing a framework for mental health management of project management practitioners in architecture, engineering and construction project organizations. PhD thesis, Western Sydney University, Australia.

Tijhuis, W (1996) Contractors at work or into conflict? Lessons from international collaboration: Dutch experiences into German construction industry. PhD thesis, Eindhoven University of Technology, Netherlands.

Tilde, A (2023) An investigation of energy saving behaviour for residential buildings in Nigeria. PhD thesis, University of Salford, UK.

Timm, J F G; Maciel, V G and Passuello, A (2023) Green public procurement model for environmental assessment of constructive systems. International Journal of Construction Management, 23(4), pp. 718-728. ISSN 1562-3599

Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771

Tiong, R L; Yeo, K T and McCarthy, S C (1992) Critical success factors in winning BOT contracts. Journal of Construction Engineering and Management, 118(2), pp. 217-228. ISSN 0733-9364

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364

Tiong, R L K (1995) Impact of financial package versus technical solution in a BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 304-311. ISSN 0733-9364

Tiong, R L K (1995) Risks and guarantees in BOT tender. Journal of Construction Engineering and Management, 121(2), pp. 183-188. ISSN 0733-9364

Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175

Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), pp. 219-228. ISSN 0969-9988

Tobin, N Y (2017) A framework for knowledge capture and recovery in whole life costing practice. PhD thesis, Robert Gordon University, UK.

Tobolski, M J (2010) Improving the design and performance of concrete bridges in seismic regions. PhD thesis, University of California, San Diego, USA.

Toh, Y Z; Goh, Y M and Guo, B H W (2017) Knowledge, attitude, and practice of design for safety: Multiple stakeholders in the Singapore construction industry. Journal of Construction Engineering and Management, 143(5): 04016131, ISSN 0733-9364

Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation: in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(3), pp. 749-776. ISSN 1726-0531

Toladun, Olawale (2025) Sustainable procurement of infrastructure projects in the Australian construction industry: The perceptions of consultants. PhD thesis, University of New South Wales, Australia.

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Tolstoy, D and Axelsson, B (2018) The development of international purchasing capabilities: A comparative study of the four largest Swedish construction firms. International Journal of Construction Management, 18(2), pp. 163-176. ISSN 1562-3599

Toma, H M; El-Sayed, S; Ibrahim, A H and Badawy, M (2025) Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts. International Journal of Construction Management, 25(7), pp. 750-759. ISSN 1562-3599

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364

Tong, K; Mills, G and Çidik, M S (2023) Value of modularisation in healthcare buildings: An exploration of the nucleus programme. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Tong, R; Zhang, N; Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: The mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), pp. 3155-3170. ISSN 0969-9988

Tookey, J E; Murray, M; Hardcastle, C and Langford, D (2001) Construction procurement routes: Re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), pp. 20-30. ISSN 0969-9988

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X

Toor, S U R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(2), pp. 149-167. ISSN 1471-4175

Torbica, Z M (1997) Total quality management and customer satisfaction in homebuilding. PhD thesis, University of Florida, USA.

Torbica, Z M and Stroh, R C (1999) Impact of total quality management on home-buyer satisfaction. Journal of Construction Engineering and Management, 125(3), pp. 198-203. ISSN 0733-9364

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Toriola-Coker, L; Owolabi, H; Alaka, H; Bello, W A and Pathirage, C (2023) Critical success factors (CSFs) for motivating end-user stakeholder's support for ensuring sustainability of PPP projects in Nigerian host communities. Journal of Engineering, Design and Technology, 21(3), pp. 902-926. ISSN 1726-0531

Toriola-Coker, L O; Alaka, H; Agbali, M; Bello, W A; Pathirage, C and Oyedele, L (2022) Marginalization of end-user stakeholder's in public private partnership road projects in Nigeria. International Journal of Construction Management, 22(11), pp. 2098-2107. ISSN 1562-3599

Torku, A; Chan, A P C and Yung, E H K (2021) Implementation of age-friendly initiatives in smart cities: Probing the barriers through a systematic review. Built Environment Project and Asset Management, 11(3), pp. 412-426. ISSN 2044-124X

Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771

Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.

Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193

Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364

Toussaint, C D (2019) Modes of humanities and social thought in entry level civil engineering. PhD thesis, University of Minnesota, USA.

Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.

Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531

Trach, R; Pawluk, K and Lendo-Siwicka, M (2022) The assessment of the effect of BIM and IPD on construction projects in Ukraine. International Journal of Construction Management, 22(10), pp. 1844-1851. ISSN 1562-3599

Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.

Tran, C N N; Pham, P T; Tran, T T M; Tam, V W Y and Illankoon, I M C S (2025) A practical approach to promoting sustainable development in the construction industry through the use of the LOTUS-Vietnamese green-building assessment tool. International Journal of Construction Management, 25(11), pp. 1288-1299. ISSN 1562-3599

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tran, D Q; Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(5), pp. 774-787. ISSN 0969-9988

Tran, D Q; Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(6), pp. 1319-1336. ISSN 0969-9988

Tran, T X M; Malano, H M and Thompson, R G (2003) Application of the analytic hierarchy process to prioritise irrigation asset renewals: The case of the la khe irrigation scheme, Vietnam. Engineering, Construction and Architectural Management, 10(6), pp. 382-390. ISSN 0969-9988

Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(4), pp. 421-443. ISSN 0969-9988

Trani, M L; Cassano, M; Minotti, M and Todaro, D (2014) Construction site BIM requirements. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Treloar, G J; Love, P E D and Smith, J (1999) Streamlined life cycle assessment: A method for considering environmental impact of road construction. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Trethewy, R W (2003) OHS performance: improved indicators for construction contractors. Journal of Construction Research, 4(1), pp. 17-27. ISSN 1609-9451

Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(2), pp. 109-115. ISSN 1726-0531

Trethewy, Ross (2002) Influences on subcontractor OHS management outcomes in construction. PhD thesis, University of New South Wales, Australia.

Trigunarsyah, B (2004) A review of current practice in constructability improvement: Case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580. ISSN 01446193

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193

Trigunarsyah, B (2004) Constructability practices among construction contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669. ISSN 0733-9364

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(2), pp. 207-215. ISSN 1466433X

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Trill, J E (2003) The application of occupational performance standards in the construction industry: 'Factors influencing their use'. PhD thesis, University of Sussex, UK.

Trinder, L; Browne, J and Brocklebank, K (2018) A client's perspective of design for manufacture and assembly in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 141-151. ISSN 17514304

Troiani, E; Mahamadu, A M; Manu, P; Kissi, E; Aigbavboa, C and Oti, A (2020) Macro-maturity factors and their influence on micro-level BIM implementation within design firms in Italy. Architectural Engineering and Design Management, 16(3), pp. 209-226. ISSN 1745-2007

Troje, D (2018) Rhetorical strategies to diffuse social procurement in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Troje, D (2020) Can I get some help down here? Inter-project support for creating social value through social procurement. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Troje, D and Gluch, P (2020) Populating the social realm: New roles arising from social procurement. Construction Management and Economics, 38(1), pp. 55-70. ISSN 01446193

Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364

Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.

Tsai, S L; Ochiai, C; Deng, C Z and Tseng, M H (2022) A sustainable post-disaster housing development framework for an indigenous hao-cha community in Taiwan: Considering culture and livelihood in housing extensions. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 583-600. ISSN 1759-5916

Tse, R Y C and Raftery, J (2001) Infrastructure policy and economic growth: Case of Hong Kong. Construction Economics and Building, 1(1), pp. 66-79. ISSN 2204-9029

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Tserng, H P; Yin, S Y L; Skibniewski, M J and Lee, M H (2010) Developing an Aris-house-based method from existing information systems to project-based enterprise resource planning for general contractor. Journal of Construction Engineering and Management, 136(2), pp. 199-209. ISSN 0733-9364

Tsionas, I; Llaguno-Munitxa, M and Stephan, A (2025) Environmental effects of urban wind energy harvesting: A review. Buildings & Cities, 6(1), pp. 1-24. ISSN 2632-6655

Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988

Tu, H and Jin, S (2024) A group decision-making model for architectural programming in megaprojects. Engineering, Construction and Architectural Management, 31(13), pp. 342-368. ISSN 0969-9988

Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X

Tucker, R C; Liyanage, C; Robinson, S J; Montebon, D R; Gotangco Gonzales, C K; Olpoc, J C; Patacsil, L B; Tantanee, S; Buranajarukorn, P; Apichayaku, O S; Weerasinghe, R N and Dissanayake, R (2025) Understanding university enterprise collaboration for disaster resilience in South-East Asia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 104-128. ISSN 1759-5908

Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Tumbare, M J (2013) Sedimentation of small and medium sized dams: Discussion issues. Journal of Engineering, Design and Technology, 11(2), pp. 112-128. ISSN 1726-0531

Tunji-Olayeni, P; Kajimo-Shakantu, K and Osunrayi, E (2020) Practitioners' experiences with the drivers and practices for implementing sustainable construction in Nigeria: A qualitative assessment. Smart and Sustainable Built Environment, 9(4), pp. 443-465. ISSN 2046-6099

Turksezer, Z I; Iacovino, C; Giordano, P F and Limongelli, M P (2021) Development and implementation of indicators to assess bridge inspection practices. Journal of Construction Engineering and Management, 147(12): 04021165, ISSN 0733-9364

Turner, J R (2004) Farsighted project contract management: Incomplete in its entirety. Construction Management and Economics, 22(1), pp. 75-83. ISSN 01446193

Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(3), pp. 197-200. ISSN 0961-3218

Tutesigensi, A and Hj Mohammad, S A (2008) A framework for introducing the private finance initiative in the Brunei darussalam construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tutesigensi, A and Pleim, V (2008) Why small and medium construction enterprises do not employ six sigma. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tutt D, H C (2013) Journeys through the cave: The use of 3D immersive environments for client engagement practices in hospital design. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tyler, J and Singh, A (2011) Enhancing post-earthquake disaster resilience. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 103-117. ISSN 1759-5916

Tymvios, N and Gambatese, J A (2016) Perceptions about design for construction worker safety: Viewpoints from contractors, designers, and university facility owners. Journal of Construction Engineering and Management, 142(2): 04015078, ISSN 0733-9364

Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.

Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193

Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 0969-9988

Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.

Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(4), pp. 1278-1294. ISSN 0969-9988

Uddin, M N; Anwer, S; Wei, H H; Chi, H L; Ni, M and Tamanna, N (2021) Energy efficient behavioural trends in residential sectors for low-income cultural background: A case-study of slums in chittagong, Bangladesh. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Uddin, S M J; Albert, A and Karakhan, A A (2024) Leveraging YouTube to aid Construction Hazard Prevention through Design (CHPtD). Construction Management and Economics, 42(9), pp. 847-865. ISSN 01446193

Udeaja, C and Aziz, Z (2015) A case study of fostering multidisciplinary in built environment using BIM. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.

Udomdech, P (2021) Project-based innovation learning mechanisms in the built environment. PhD thesis, University College London, UK.

Udomdech, P; Papadonikolaki, E and Davies, A (2018) An alternative project-based learning model for building information modelling using teams. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Uduwage Don, N L S; Panuwatwanich, K and Waidyasekara, K G A S (2025) Multicriteria selection practices in public tender evaluation process: The case of Sri Lanka. Built Environment Project and Asset Management, 15(3), pp. 733-751. ISSN 2044-124X

Ugwu, O O; Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(3), pp. 211-224. ISSN 0969-9988

Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988

Ullah, F; Olatunji, O and Qayyum, S (2026) A scoping review of green internet of things in construction and smart cities: Current applications, adoption strategies and future directions. Smart and Sustainable Built Environment, 15(1), pp. 294-318. ISSN 2046-6099

Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599

Ullal, André (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings. PhD thesis, University of Melbourne, Australia.

Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.

Umar, A A; Zawawi, N A W A and Abdul Aziz, A R (2024) Do regional characteristics influence PPP contract governance skills requirements? Engineering, Construction and Architectural Management, 31(10), pp. 4146-4161. ISSN 0969-9988

Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.

Umar, T (2020) Key factors influencing the implementation of three-dimensional printing in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(3), pp. 104-114. ISSN 17514304

Umar, T (2022) Challenges of BIM implementation in gcc construction industry. Engineering, Construction and Architectural Management, 29(3), pp. 1139-1168. ISSN 0969-9988

Umar, T; Egbu, C; Honnurvali, M S; Saidani, M and Al-Bayati, A J (2019) Briefing: Status of occupational safety and health in GCC construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 137-141. ISSN 1751-4304

Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Underwood, J; Alshawi, M A; Aouad, G; Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(4), pp. 373-388. ISSN 0969-9988

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms. Engineering, Construction and Architectural Management, 10(2), pp. 128-145. ISSN 0969-9988

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Uniacke, H (2001) Design of a low cost ventilated photovoltaic cladding. PhD thesis, Cardiff University, UK.

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.

Upadhyaya, D and Malek, M S S (2024) An exploratory factor analysis approach to investigate health and safety factors in Indian construction sector. Construction Economics and Building, 24(1-2), pp. 29-49. ISSN 2204-9029

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2015) Developing a sustainability assessment tool to aid organisational learning in construction SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(4), pp. 407-427. ISSN 0969-9988

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Ur Rehman, H S; Raza, M A; Masood, R; Khan, M A; Alamgir, S; Javed, M A; Roy, K and Lim, J B P (2023) A multi-facet BIM based approach for green building design of new multi-family residential building using LEED system. International Journal of Construction Management, 23(12), pp. 2024-2038. ISSN 1562-3599

Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531

Ustadi, A M A (2013) The prospects of introducing the private finance initiative in the UAE construction industry. PhD thesis, British University in Dubai, UAE.

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.

Vafaie, F; Remøy, H and Gruis, V (2025) From theory to practice: Evaluating success factors of adaptive reuse through a case study. Built Environment Project and Asset Management, 15(3), pp. 432-449. ISSN 2044-124X

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Vahabi, Ali (2018) Investigating the impact of project scope definition on design-build project performance: A system dynamics approach. PhD thesis, Queensland University of Technology, Australia.

Vahdatmanesh, M and Firouzi, A (2018) Price risk management in BOT railroad construction projects using financial derivatives. Journal of Financial Management of Property and Construction, 23(3), pp. 349-362. ISSN 1366-4387

Vahidi, A (2025) Towards circular concrete: The implementation of circular concrete in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.

Vakeva-Baird, S; Tahmasebi, F; Williams, J J and Mumovic, D (2025) Effective interdisciplinary stakeholder engagement in net zero building design. Buildings & Cities, 6(1), pp. 654-673. ISSN 2632-6655

Vakola, M (1999) Business process re-engineering and organisational change: Evaluation of implementation strategies. PhD thesis, University of Salford, UK.

Valente, C P; Brandalise, F M P and Formoso, C T (2019) Model for devising visual management systems on construction sites. Journal of Construction Engineering and Management, 145(2): 04018138, ISSN 0733-9364

Valizadeh, M.; Azizi, M.; Hosseini, M. R. and Mahoor, P. (2026) A hybrid analysis of reverse logistics barriers in Iranian construction. Smart and Sustainable Built Environment, 15(3), pp. 1225-1254. ISSN 2046-6099

Valizadeh, R and Elmi, M (2010) Feasibility studies for optimum establishment of rural occupancy in mountainous regions. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 221-240. ISSN 1759-5916

Van Den Berg, M; Voordijk, H; Adriaanse, A and Hartmann, T (2017) Experiencing supply chain optimizations: A serious gaming approach. Journal of Construction Engineering and Management, 143(11): 04017082, ISSN 0733-9364

Van Den Bossche, N; Blommaert, A and Daniotti, B (2023) The impact of demographical, geographical and climatological factors on building defects in Belgium. International Journal of Building Pathology and Adaptation, 41(3), pp. 549-573. ISSN 23984708

Van Egmond-De Wilde De Ligny, E L C and Mohammadi, M (2011) Innovations in domotics: Fulfilling potential or hampered by prevailing technological regime? Construction Innovation, 11(4), pp. 470-492. ISSN 1471-4175

Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), pp. 199-217. ISSN 1823-6499

Van Tam, N; Quoc Toan, N; Phong, V V and Durdyev, S (2023) Impact of BIM-related factors affecting construction project performance. International Journal of Building Pathology and Adaptation, 41(2), pp. 454-475. ISSN 23984708

Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175

Van Zyl, I J (1986) The role of standardization in the building industry. DSc thesis, University of Pretoria, South Africa.

Van der Heijden, J J (2009) Building regulatory enforcement regimes: Comparative analysis of private sector involvement in the enforcement of public building regulations. PhD thesis, Delft University of Technology, Netherlands.

Van der Zwart, J (2014) Building for a better hospital: Value-adding management and design of healthcare real estate. PhD thesis, Delft University of Technology, Netherlands.

VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.

Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vanelslander, T; Chomat, G; Roumboutsos, A and Bonnet, G (2014) Cross-sectoral comparison of concessions in transport: Urban, road and port pre-fuzzy assessment. Built Environment Project and Asset Management, 4(1), pp. 22-39. ISSN 2044-124X

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Vargas, G; Lawrence, R and Stevenson, F (2017) The role of lobbies: Short-term thermal transitions. Building Research & Information, 45(7), pp. 759-782. ISSN 0961-3218

Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364

Vass, S and Karrbom Gustavsson, T (2017) Challenges when implementing BIM for industry change. Construction Management and Economics, 35(10), pp. 597-610. ISSN 0144-6193

Vassallo, J M (2007) Implementation of quality criteria in tendering and regulating infrastructure management contracts. Journal of Construction Engineering and Management, 133(8), pp. 553-561. ISSN 0733-9364

Vassigh, S; Davis, D; Behzadan, A H; Mostafavi, A; Rashid, K; Alhaffar, H; Elias, A and Gallardo, G (2020) Teaching building sciences in immersive environments: A prototype design, implementation, and assessment. International Journal of Construction Education and Research, 16(3), pp. 180-196. ISSN 1557-8771

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364

Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Vaz-Serra, P and Edwards, P (2021) Addressing the knowledge management "nightmare" for construction companies. Construction Innovation, 21(2), pp. 300-320. ISSN 1471-4175

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.

Venkataraman, V (2017) Investigating the impact of project management factors on green building project delivery using link analysis and system dynamics techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Venkatesh, P and Ergan, S (2023) Classification of challenges in achieving BIM-based safety-requirement checking in vertical construction projects. Journal of Construction Engineering and Management, 149(12): 04023131, ISSN 0733-9364

Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.

Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175

Venu Jaya, S.; Swarnakar, V.; Acquaye, A.; Khalfan, M. and El Fadel, M. (2026) Unlocking 3r-driven value engineering potential in sustainable construction: An empirical analysis of drivers, challenges, benefits, tools and techniques. Journal of Engineering, Design and Technology, 24(6), ISSN 1726-0531

Venugopal, M (2011) Formal specification of industry foundation class concepts using engineering ontologies. PhD thesis, Georgia Institute of Technology, USA.

Verma, M (2012) Public private partnerships in road transport infrastructure in India: A governance perspective. PhD thesis, University of Manchester, UK.

Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.

Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.

Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.

Vernikos, V K; Goodier, C I; Gibb, A G F; Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.

Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.

Vidalakis, C; Abanda, F H and Oti, A H (2020) BIM adoption and implementation: focusing on SMEs. Construction Innovation, 20(1), pp. 128-147. ISSN 1471-4175

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Vieira, Luiz de Brito Prado (2020) Analysis of technologies for recycling the waste generated in concrete production in ready mixed concrete plants. PhD thesis, Universidade de São Paulo, Brazil.

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.

Vilasini, N; Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), pp. 625-640. ISSN 01446193

Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.

Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X

Vinci, F (2022) Project-based networks in the delivery of infrastructure projects and programmes. PhD thesis, University College London, UK.

Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.

Vinodh, S; Kamala, V and Jayakrishna, K (2015) Application of fuzzy axiomatic design methodology for selection of design alternatives. Journal of Engineering, Design and Technology, 13(1), pp. 2-22.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(2), pp. 255-275. ISSN 1726-0531

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vinodh, S; Selvaraj, T and Praveen, T (2012) Design and development of agile product development cycle for rotary switches. Journal of Engineering, Design and Technology, 10(3), pp. 380-396. ISSN 1726-0531

Vinodh, S; Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(2), pp. 129-141. ISSN 1726-0531

Vinodh, S; Sundararaj, G; Devadasan, S R; Kuttalingam, D; Jayaprakasam, J and Rajanayagam, D (2009) Agility through the interfacing of CAD and cam. Journal of Engineering, Design and Technology, 7(2), pp. 143-170. ISSN 1726-0531

Vishwanathan, S S; Fragkos, P; Fragkiadakis, K; Paroussos, L and Garg, A (2019) Energy system transitions and macroeconomic assessment of the Indian building sector. Building Research & Information, 47(1), pp. 38-55. ISSN 0961-3218

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988

Voelker, C; Permana, A; Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(1), pp. 18-34. ISSN 1366-4387

Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Volker, L (2012) Procuring architectural services: Sensemaking in a legal context. Construction Management and Economics, 30(9), pp. 749-759. ISSN 1466433X

Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Volmink, P (2018) The treatment of non-responsive bids in South African public procurement law. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Vols, M; Tassenaar, P G and Jacobs, J P A M (2015) Anti-social behaviour and European protection against eviction. International Journal of Law in the Built Environment, 7(2), pp. 148-161. ISSN 1756-1450

Voordijk, H; Van Leuven, A and Laan, A (2003) Enterprise resource planning in a large construction firm: Implementation analysis. Construction Management and Economics, 21(5), pp. 511-521. ISSN 01446193

Vorasubin, P and Chareonngam, C (2007) Strategic assets driving financial capability of Thai construction firms. Journal of Financial Management of Property and Construction, 12(2), pp. 87-94. ISSN 1366-4387

Vorobjev, O.; Uotila, U.; Joensuu, T. and Saari, A. (2026) Design for disassembly: A review of public policy proposals. Buildings & Cities, 7(1), pp. 775-790. ISSN 2632-6655

Vosman, L; Coenen, T B J; Volker, L and Visscher, K (2023) Collaboration and innovation beyond project boundaries: Exploring the potential of an ecosystem perspective in the infrastructure sector. Construction Management and Economics, 41(6), pp. 457-474. ISSN 01446193

Votano, S and Sunindijo, R Y (2014) Client safety roles in small and medium construction projects in Australia. Journal of Construction Engineering and Management, 140(9): 04014045, ISSN 0733-9364

Vásquez-Hernández, A; Alarcón, L F; Pellicer, E and Barkokebas, B (2025) Construction industrialization: A mosaic of definitions. Journal of Construction Engineering and Management, 151(3): 03124010, ISSN 0733-9364

Wadu Mesthrige, J and Kwong, H Y (2018) Criteria and barriers for the application of green building features in Hong Kong. Smart and Sustainable Built Environment, 7(3-4), pp. 251-276. ISSN 2046-6099

Wafa, M A (1986) An investigation into the factors influencing the success of decision support systems in the construction industry. PhD thesis, Clemson University, USA.

Wagner, H E (2015) Hiring goals: Are they assisting more women to enter and remain in the building trades? PhD thesis, University of Minnesota, USA.

Wahab, A; Wang, J; Shojaei, A and Ma, J (2023) A model-based smart contracts system via blockchain technology to reduce delays and conflicts in construction management processes. Engineering, Construction and Architectural Management, 30(10), pp. 5052-5072. ISSN 0969-9988

Walker, A. and Kalinowski, M. (1994) An anatomy of a Hong Kong project - organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 0144-6193

Walker, A; Greenwood, D and Johansen, E (2010) User engagement and quality in the design of UK schools. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Walker, A and Kalinowski, M (1994) An anatomy of a Hong Kong project: organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 01446193

Walker, A and Kwong Wing, C (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(2), pp. 166-176. ISSN 0969-9988

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988

Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Walker, D H T (2002) Enthusiasm, commitment and project alliancing: An Australian experience. Construction Innovation, 2(1), pp. 15-31. ISSN 1471-4175

Walker, D H T; Harley, J and Mills, A (2015) Performance of project alliancing in Australasia: A digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(1), pp. 1-18. ISSN 2204-9029

Walker, D H T; Peters, R J; Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: A project alliancing case study. Construction Innovation, 1(4), pp. 211-225. ISSN 1471-4175

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(2), pp. 158-184. ISSN 1471-4175

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988

Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.

Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Walter, T and Mathew, P (2021) GHG policy impacts for seattle's buildings: Targets, timing, and scope. Buildings & Cities, 2(1), pp. 283-301. ISSN 2632-6655

Walton, D (2023) Impact of big data implementation on decision-making and organizational outcomes in the real estate construction enterprises. EdD thesis, Pepperdine University, USA.

Walzer, A N; Tan, T; Graser, K and Hall, D M (2025) Bug or feature? Institutional misalignments between construction technology and venture capital. Construction Management and Economics, 43(2), pp. 130-152. ISSN 0144-6193

Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304

Wamuziri, S (2023) Legislative framework for public-private partnerships in the Sultanate of Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 150-156. ISSN 17514304

Wamuziri, S and Abu-Shaaban, N (2005) Potential of reverse auctions in construction procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wamuziri, S and Madan, S (2009) Improvement and innovation through collaborative partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 17-27. ISSN 17514312

Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wan, S K M and Kumaraswamy, M M (2012) Improving building services coordination at the pre-installation stage. Engineering, Construction and Architectural Management, 19(3), pp. 235-252. ISSN 0969-9988

Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364

Wang, K; Guo, F; Zhang, C; Hao, J and Wang, Z (2025) Unlocking determinants of smart construction: An integrated model of utaut2, ttf, and perceived risk for IoT acceptance in AEC industry. Engineering, Construction and Architectural Management, 32(8), pp. 5394-5428. ISSN 0969-9988

Wang, K.; Xu, X.; Mao, P.; Deng, X. and Cao, D. (2026) Digital transformation and organizational readiness: Evidence from Chinese construction SMEs with a dynamic managerial capabilities lens. Engineering, Construction and Architectural Management, 33(7), pp. 5783-5819. ISSN 0969-9988

Wang, M.; Mahdiyar, A. and Mustafa Kamal, E. (2026) Risk assessment in digital twin implementation: A general cybernetic best-worst method approach. Engineering, Construction and Architectural Management, 33(7), pp. 5522-5539. ISSN 0969-9988

Wang, M; Shaari, N; Abidin, S Z and He, Y (2025) Service design in the context of sustainable production and consumption: A case study of elderly fall-protection clothing. Journal of Engineering, Design and Technology, 23(6), pp. 1919-1939. ISSN 1726-0531

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007

Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988

Wang, C; Shen, W; Cui, B and Zeng, Y (2025) Numerical study on the thermal environment of the vertical greening system based on infrared thermal imaging. Architectural Engineering and Design Management, 21(2), pp. 315-337. ISSN 1745-2007

Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193

Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.

Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach. PhD thesis, University of Hong Kong, Hong Kong.

Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364

Wang, J (2004) Hybrid genetic algorithms for reliability assessment of structural system. PhD thesis, City University of New York, USA.

Wang, J (2023) Direct policy search for adaptive management of flood risk. PhD thesis, Purdue University, USA.

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599

Wang, J; Liu, J and Huang, L (2007) Study on the professional liability insurance system of the supervision engineer in China. Construction Management and Economics, 25(7), pp. 801-810. ISSN 1466433X

Wang, J; Shou, W and Wang, X (2015) A framework of total constraint management for improving work flow in liquefied natural gas construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193

Wang, J; Xu, Y; Fang, D and Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9): 04025125, ISSN 0733-9364

Wang, K; Guo, F; Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Construction Innovation, 24(4), pp. 1085-1116. ISSN 1471-4175

Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.

Wang, M; Wang, C C; Zlatanova, S; Shen, X and Brilakis, I (2024) A streamlined laser scanning verticality check method for installation of prefabricated wall panels. Journal of Construction Engineering and Management, 150(11): 04024159, ISSN 0733-9364

Wang, Mudan (2023) Digital technology adoption for improving efficiency of prefabrication construction in China: An application of laser scanning. PhD thesis, University of New South Wales, Australia.

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, P; Wang, K; Huang, Y and Fenn, P (2024) A contingency approach for time-cost trade-off in construction projects based on machine learning techniques. Engineering, Construction and Architectural Management, 31(11), pp. 4677-4695. ISSN 0969-9988

Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988

Wang, Q; Appolloni, A and Liu, J (2024) Does "low-carbon pilot policy" affect the carbon intensity of construction industry? Exploring the implementation mechanism and effectiveness in China. Engineering, Construction and Architectural Management, 31(8), pp. 3222-3248. ISSN 0969-9988

Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364

Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications. PhD thesis, University of Washington, USA.

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: Analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(3), pp. 311-320. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(2), pp. 197-207. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of political risks in China's BOT projects. Journal of Construction Engineering and Management, 126(3), pp. 242-250. ISSN 0733-9364

Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364

Wang, W; Zhang, S and Pasquire, C (2018) Factors for the adoption of green building specifications in China. International Journal of Building Pathology and Adaptation, 36(3), pp. 254-267. ISSN 23984708

Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.

Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.

Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.

Wang, Y; Gong, E; Zhang, Y; Yao, Y and Zhou, X (2024) Risk assessment of infrastructure reits projects based on cloud model: A case study of China. Engineering, Construction and Architectural Management, 31(11), pp. 4330-4352. ISSN 0969-9988

Wang, Y; Liu, J; Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(1), pp. 168-185. ISSN 0969-9988

Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.

Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364

Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175

Wang, Z; Zhou, Y; Jin, X; Zhao, N and Sun, J (2023) Risk allocation and benefit distribution of PPP projects for construction waste recycling: A case study of China. Engineering, Construction and Architectural Management, 30(9), pp. 3927-3956. ISSN 0969-9988

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2016) Healthcare designers' use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(6), pp. 427-441. ISSN 1745-2007

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.

Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X

Ward, S C; Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(4), pp. 343-353. ISSN 01446193

Ward, S C; Curtis, B and Chapman, C B (1991) Advantages of management contracting: critical analysis. Journal of Construction Engineering and Management, 117(2), pp. 195-211. ISSN 0733-9364

Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Warren-Myers, G; Judge, M and Paladino, A (2018) Sustainability ratings in residential development: A worthwhile endeavour? International Journal of Building Pathology and Adaptation, 36(4), pp. 353-372. ISSN 23984708

Warren-Myers, G and McRae, E (2017) Volume home building: The provision of sustainability information for new homebuyers. Construction Economics and Building, 17(2), pp. 24-40. ISSN 2204-9029

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(2), pp. 153-163. ISSN 1466433X

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Warszawski, A (1984) Construction management program. Journal of Construction Engineering and Management, 110(3), pp. 297-310. ISSN 0733-9364

Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364

Warszawski, A and Navon, R (1998) Implementation of robotics in building: Current status and future prospects. Journal of Construction Engineering and Management, 124(1), pp. 31-41. ISSN 0733-9364

Warwick, E (2015) Policy to reality: Evaluating the evidence trajectory for English eco-towns. Building Research & Information, 43(4), pp. 486-498. ISSN 0961-3218

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Watanabe, R; Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in japan's bidding system: A dynamic stackelberg game theoretical analysis. Construction Management and Economics, 43(9), pp. 657-684. ISSN 0144-6193

Watermeyer, R B (2012) A framework for developing construction procurement strategy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 223-237. ISSN 17514312

Waters, B L; Dixit, M K and Pariafsai, F (2023) Architects' ranking of professional design services. Architectural Engineering and Design Management, 19(6), pp. 620-641. ISSN 1745-2007

Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364

Watson, K J and Whitley, T (2017) Applying social return on investment to the built environment. Building Research & Information, 45(8), pp. 875-891. ISSN 0961-3218

Watson, P and Chileshe, N (1998) Total quality management (TQM) and the importance of the post-modernist paradigm. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.

Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.

Watts, G (2023) No winter for social value: The continued growth of a value focused construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Watts, G (2024) Authenticity and negativism: Social value in UK construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Watts, G; Dainty, A and Fernie, S (2015) Making sense of CSR in construction: Do contractor and client perceptions align? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Watts, G; Dainty, A and Fernie, S (2019) Measuring social value in UK construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Watts, N; Watson, P A and Griffith, A (1999) Building procurement: The partnering paradigm. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.

Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218

Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165

Webb, R M; Smallwood, J and Haupt, T C (2004) The potential of 4d cad as a tool for construction management. Journal of Construction Research, 5(1), pp. 43-60. ISSN 1609-9451

Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines. PhD thesis, Colorado State University, USA.

Weber, S L (1999) A dynamic, integrated data management system for the 21st century construction company. PhD thesis, Arizona State University, USA.

Weddikkara, C and Devapriya, K (2001) Demand and supply trends and construction industry development: A case study in the Sri Lankan construction industry. Construction Economics and Building, 1(1), pp. 91-105. ISSN 2204-9029

Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599

Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599

Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531

Wei, F; Hwang, B G; Zainal, N S B and Zhu, H (2024) Trust, team effectiveness, and strategies: A comparative study between virtual and face-to-face teams. Journal of Construction Engineering and Management, 150(7): 04024065, ISSN 0733-9364

Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364

Weippert, A; Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: A case study analysis. Construction Innovation, 2(2), pp. 103-116. ISSN 1471-4175

Weisheng, L; Liu, A M M; Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(6), pp. 543-562. ISSN 0969-9988

Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.

Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193

Wells, J and Hawkins, J (2010) Increasing 'local content' in infrastructure procurement. Part 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 65-70. ISSN 17514312

Wen, Q (2021) Strategic international human resource management in MNEs from an emerging market: case evidence from a Chinese multinational construction enterprise. PhD thesis, University of Manchester, UK.

Wennstroem, A; Havenvid, M I; Eriksson, P E and Larsson, J (2023) Incentivising supplier innovation in mega infrastructure projects: Exploring the result of innovation bonuses. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499

Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.

Wesonga, R; Tutesigensi, A and Moodley, K (2024) A comparative review of energy aggregation policies for prosumerisation of green energy in the construction phase in UK and Uganda. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.

Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.

Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988

Whang, S W; Park, K S and Kim, S (2019) Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), pp. 2432-2446. ISSN 0969-9988

Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451

Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

White, C; Lees, J M and MacAskill, K (2026) Bridging the information gap using targeted digital transformation: Process mapping large-scale concrete activity. Building Research & Information, 54(1), pp. 24-43. ISSN 0961-3218

White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599

White III, R J (2014) Application of social impact bonds in built infrastructure sustainability projects. PhD thesis, Texas A&M University, USA.

Whiteman, D E (2002) The application of total quality management in construction field operations. PhD thesis, University of Florida, USA.

Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X

Whitmore, D; Krystallis, I; Papadonikolaki, E; Ford, J; Cleaver, M and Alexander, D (2024) Digital twins in the asset life cycle: are we there yet? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 184-192. ISSN 17514304

Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.

Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655

Whyte, A and Cammarano, C (2012) Value management in infrastructure projects in western Australia: Techniques and staging. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Whyte, J (2000) Virtual reality applications in the house-building industry. PhD thesis, Loughborough University, UK.

Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: A comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(1), pp. 3-13. ISSN 1471-4175

Whyte, J; Bouchlaghem, D and Thorpe, T (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(5-6), p. 371. ISSN 0969-9988

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364

Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364

Wickenberg, J (2004) Exploring the shadows of project management. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Widén, K (2006) Innovation diffusion in the construction sector. PhD thesis, Lund University, Sweden.

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wijayarathne, N; Gunawan, I and Schultmann, F (2024) Dynamic capabilities in digital transformation: A systematic review of their role in the construction industry. Journal of Construction Engineering and Management, 150(11): 03124008, ISSN 0733-9364

Wijekoon, K (2020) Optimising the adoption of building information modeliing (BIM) in facilities mnagement (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Wijekoon, K A D N C (2019) Optimising the adoption of building information modelling (BIM) in facilities management (FM): A model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Wijekoon, K A D N C (2020) Optimising the adoption of building information modelling in facilities management: a model for value enhancement. PhD thesis, Liverpool John Moores University, UK.

Wijewansha, A S; Tennakoon, G A; Waidyasekara, K and Ekanayake, B J (2021) Implementation of circular economy principles during pre-construction stage: The case of Sri Lanka. Built Environment Project and Asset Management, 11(4), pp. 750-766. ISSN 2044-124X

Wijewickreme, S P (2016) A framework for providing a lifelong social security system for the operational workforce in the construction industry in Sri Lanka. PhD thesis, University of Salford, UK.

Wijnia, Y C (2016) Processing risk in asset management: Exploring the boundaries of risk based optimization under uncertainty for an energy infrastructure asset manager. PhD thesis, Delft University of Technology, Netherlands.

Wilkinson, S; Noktehdan, M; Shahbazpour, M and Cameron, R (2017) Creating an opportunity to innovate during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Willan, C M (2019) Life in the gap: how does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willan, Catherine M (2019) Life in the gap: How does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099

Willar, D; Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(2), pp. 114-133. ISSN 0969-9988

Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980. PhD thesis, University of Newcastle upon Tyne, UK.

Williams, J; Fugar, F; Adinyira, E and Danso, H (2024) A framework towards health and safety knowledge transfer from the construction industry to the community in developing countries: A case study of Ghana. International Journal of Construction Management, 24(7), pp. 771-783. ISSN 1562-3599

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, P (2014) Growing houses and trees: Integrating biodiversity conservation and urbanisation: An Australian case study. International Journal of Law in the Built Environment, 6(1-2), pp. 152-173. ISSN 1756-1450

Williams, P J and Williams, A M (2016) Sustainability and planning law in Australia: Achievements and challenges. International Journal of Law in the Built Environment, 8(3), pp. 226-242. ISSN 1756-1450

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Williams, R E (2000) Using a new paradigm to evaluate urban infrastructure models. PhD thesis, University of Florida, USA.

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Williams, T; Bernold, L and Lu, H (2007) Adoption patterns of advanced information technologies in the construction industries of the United States and Korea. Journal of Construction Engineering and Management, 133(10), pp. 780-790. ISSN 0733-9364

Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.

Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.

Willis, C J and Rankin, J H (2010) Measuring the maturity of Guyana's construction industry using the construction industry macro maturity model. Journal of Construction in Developing Countries, 15(2), pp. 87-116. ISSN 1823-6499

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Wilson, A J and Walker, D H T (2004) The strategy of information and communication technology diffusion. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wilson, B; An, M and Evdorides, H (2006) The effects of building and planning regulations on construction and demolition waste management. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wilson, N C (1978) Responsibility for building construction (with particular reference to a standard form of building contract as published for the Joint Contracts Tribunal). PhD thesis, University of Leeds, UK.

Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193

Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193

Wilson, P M (2001) Strategic decision-making in a professional service firm. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Wilson Jr, J M and Koehn, E (2000) Safety management: Problems encountered and recommended solutions. Journal of Construction Engineering and Management, 126(1), pp. 77-79. ISSN 0733-9364

Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.

Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Construction Innovation, 18(3), pp. 350-370. ISSN 1471-4175

Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings: A study of design and construction practices in Indonesia. International Journal of Construction Management, 10(1), pp. 75-86. ISSN 1562-3599

Winarno, S; Griffith, A and Stephenson, P (2010) Reducing earthquake risk to non-engineered buildings in Indonesia. Construction Innovation, 10(4), pp. 421-434. ISSN 1471-4175

Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599

Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218

Winch, G M (2000) Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155. ISSN 0961-3218

Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304

Windapo, A and Moghayedi, A (2018) Building material price differentiation across geographic locations in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 243-254. ISSN 17514304

Windapo, A O and Goulding, J S (2015) Understanding the gap between green building practice and legislation requirements in South Africa. Smart and Sustainable Built Environment, 4(1), pp. 67-96. ISSN 2046-6099

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X

Windapo, A O; Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs' growth. Journal of Financial Management of Property and Construction, 25(3), pp. 423-446. ISSN 1366-4387

Wingrove, K; Heffernan, E and Daly, D (2024) Increased home energy use: unintended outcomes of energy efficiency focused policy. Building Research & Information, 52(5), pp. 577-595. ISSN 0961-3218

Winkler, C (2024) Implementing solar photovoltaic systems in buildings: A case of systemic innovation in the construction sector. Construction Innovation, 24(7), pp. 102-123. ISSN 1471-4175

Winkler, C; Perez Vico, E and Widén, K (2024) Challenges to business ecosystem alignment when implementing solar photovoltaic systems in the Swedish built environment. Building Research & Information, 52(5), pp. 497-514. ISSN 0961-3218

Wirahadikusumah, R; Abduh, M; Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(9), pp. 932-944. ISSN 1562-3599

Wirahadikusumah, R D and Pribadi, K S (2011) Licensing construction workforce: Indonesia's effort on improving the quality of national construction industry. Engineering, Construction and Architectural Management, 18(5), pp. 431-443. ISSN 0969-9988

Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.

Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.

Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364

Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.

Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Woju, U W and Balu, A S (2020) Time-dependent safety performance of reinforced concrete structures. Journal of Engineering, Design and Technology, 18(5), pp. 1103-1120. ISSN 1726-0531

Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects. PhD thesis, University of Texas at Austin, USA.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wondimu, P A; Klakegg, O J; Lohne, J and Lædre, O (2020) Experiences with best-value procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(5): 05020001, ISSN 0733-9364

Wondimu, P A; Lohne, J and Lædre, O (2018) Competitive dialogue in Norwegian public infrastructure projects. Journal of Construction Engineering and Management, 144(10): 05018011, ISSN 0733-9364

Wong, K. K. W.; Chan, J. H. L. and Ng, T. S. T. (2025) KPIs for engineering and construction contract of new engineering contract in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 29-40. ISSN 1751-4304

Wong, A K D; Wong, F K W and Nadeem, A (2010) Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4), pp. 288-302. ISSN 1745-2007

Wong, A K D; Wong, F K W and Nadeem, A (2011) Government roles in implementing building information modelling systems: Comparison between Hong Kong and the United States. Construction Innovation, 11(1), pp. 61-76. ISSN 1471-4175

Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175

Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Wong, C H and Sloan, B (2004) Use of ICT for e-procurement in the UK construction industry: A survey of smes readiness. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, F (1997) Implementation of safety policy and safety system for construction companies in Hong Kong: Senior management's perspective. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wong, F K W (2000) Construction safety in Hong Kong: The development of models for the safety performance assessment of major contractors. PhD thesis, London South Bank University, UK.

Wong, F K W; Chan, A P C; Yam, M C H; Wong, E Y S; Tse, K T C; Yip, K K C and Cheung, E (2009) Findings from a research study of construction safety in Hong Kong: Accidents related to fall of person from height. Journal of Engineering, Design and Technology, 7(2), pp. 130-142. ISSN 1726-0531

Wong, F K W and Kong, L S P (1998) Marketization of state-owned housing in China: Comfortable housing project in Beijing. Journal of Financial Management of Property and Construction, 3(1), pp. 27-42. ISSN 1366-4387

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Wong, S S Y (2018) A review on the execution method for building information modelling projects in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 100-110. ISSN 17514304

Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, Y F (2002) The occupational health and safety in Taiwan, 1987-1999. PhD thesis, University of Wales College of Cardiff, UK.

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. PhD thesis, Texas A&M University, USA.

Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Wood, G; Davis, P and Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. ISSN 1366-4387

Wood, G and McDermott, P (2001) Building on trust: A co-operative approach to construction procurement. Journal of Construction Procurement, 7(2), pp. 4-14. ISSN 1358-9180

Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193

Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029

Woodward, A and Heesom, D (2021) Implementing HBIM on conservation heritage projects: Lessons from renovation case studies. International Journal of Building Pathology and Adaptation, 39(1), pp. 96-114. ISSN 23984708

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.

Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364

Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599

Worlobah, A M (2025) Investigating the implementation of building information modeling in the construction sector in Liberia. PhD thesis, National University, USA.

Wright, G B and Jack, L B (2013) Property-level stormwater drainage systems: Integrated flow simulation and whole-life costs. Building Research & Information, 41(2), pp. 223-236. ISSN 0961-3218

Wroe, B (1986) Contractors and computers, why systems succeed or fail: a grounded theory study of the development of microcomputer-based information systems in ten small companies in the construction industry. PhD thesis, Loughborough University, UK.

Wronska, M (2023) Designing and evaluating a participatory workplace nutrition intervention to improve the health and wellbeing of blue-collar (construction) workers. PhD thesis, University of Salford, UK.

Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099

Wu, Z; Zhang, S; Xue, H and Li, V (2025) Identifying the policy configurational conditions for off-site construction development: A case of China. Engineering, Construction and Architectural Management, 32(12), pp. 8524-8547. ISSN 0969-9988

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.

Wu, H; Qian, Q K; Straub, A and Visscher, H (2021) Stakeholder perceptions of transaction costs in prefabricated housing projects in China. Journal of Construction Engineering and Management, 147(1): 04020145, ISSN 0733-9364

Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988

Wu, H; Zhang, P; Li, H; Zhong, B; Guo, S; Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(6): 04024039, ISSN 0733-9364

Wu, H; Zhong, W; Zhong, B; Li, H; Guo, J and Mehmood, I (2025) Barrier identification, analysis and solutions of blockchain adoption in construction: A fuzzy DEMATEL and TOE integrated method. Engineering, Construction and Architectural Management, 32(1), pp. 409-426. ISSN 0969-9988

Wu, Hongjuan (2021) Challenges of prefabricated housing in China: Supply chain, stakeholders, and transaction costs. PhD thesis, Delft University of Technology, Netherlands.

Wu, J; Kumaraswamy, M M and Soo, G (2011) Regulative measures addressing payment problems in the construction industry: A calculative understanding of their potential outcomes based on gametric models. Journal of Construction Engineering and Management, 137(8), pp. 566-573. ISSN 0733-9364

Wu, J; Liu, H J; Sing, M C P; Humphrey, R and Zhao, J (2020) Public-private partnerships: Implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(9), pp. 2253-2269. ISSN 0969-9988

Wu, Kai (2012) The dynamics of enterprise resource planning implementation in a complex organizational and environmental context. PhD thesis, University of New South Wales, Australia.

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.

Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 0969-9988

Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.

Wu, Su Kon (2021) Innovation management planning: Design of a maintenance concept innovation management system. EngD thesis, University of Twente, Netherlands.

Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. I: Background, framework, and initial development. Journal of Construction Engineering and Management, 144(8): 04018065, ISSN 0733-9364

Wu, Z; Yang, K; Wu, Z; Xue, H; Li, S and Antwi-Afari, M F (2024) Investigating the mechanism of developers' willingness to adopt prefabricated housing using an integrated DEMATEL-SD framework. Engineering, Construction and Architectural Management, 31(6), pp. 2392-2414. ISSN 0969-9988

Wu W, I R (2013) Impacts of BIM on talent acquisition in the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Wuni, I Y and Shen, G Q (2020) Critical success factors for modular integrated construction projects: A review. Building Research & Information, 48(7), pp. 763-784. ISSN 0961-3218

Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599

Wuni, I Y; Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(1), pp. 213-228. ISSN 1471-4175

Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wuni, I Y; Shen, G Q; Osei-Kyei, R and Agyeman-Yeboah, S (2022) Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2013-2026. ISSN 1562-3599

Wuni, I Y; Wu, Z and Shen, G Q (2023) Exploring the challenges of implementing design for excellence in industrialized construction projects in China. Building Research & Information, 51(3), pp. 301-315. ISSN 0961-3218

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(2), pp. 273-292. ISSN 1609-9451

Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364

Xia, B and Chan, A P C (2012) Measuring complexity for building projects: A Delphi study. Engineering, Construction and Architectural Management, 19(1), pp. 7-24. ISSN 0969-9988

Xia, B; Chan, A P C and Yeung, J F Y (2009) Identification of key competences of design-builders in the construction market of the people's Republic of China (PRC). Construction Management and Economics, 27(11), pp. 1141-1152. ISSN 1466433X

Xia, N; Griffin, M A; Xie, Q and Hu, X (2023) Antecedents of workplace safety behavior: Meta-analysis in the construction industry. Journal of Construction Engineering and Management, 149(4): 04023009, ISSN 0733-9364

Xia, X and Xiang, P (2023) Dynamic network analysis of stakeholder-associated social risks of megaprojects: A case study in China. Engineering, Construction and Architectural Management, 30(10), pp. 4541-4568. ISSN 0969-9988

Xiahou, X; Li, Z; Zuo, J; Wang, Z; Li, K and Li, Q (2024) Critical success factors for the implementation of urban regeneration reits in China: A tism–MICMAC based approach. Engineering, Construction and Architectural Management, 31(1), pp. 363-385. ISSN 0969-9988

Xiahou, X; Yuan, J; Xie, H; Skibniewski, M J and Li, Q (2022) Exploring driving factors of smart city development under the physical-human society-cyber (p-h-c) space model. International Journal of Construction Management, 22(14), pp. 2753-2763. ISSN 1562-3599

Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.

Xiang, Y; Opoku, A and Florez-Perez, L (2021) Carbon emissions optimisation in prefabrication construction: A review of current design integrated approaches. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364

Xiao, H.; Proverbs, D. G.; Joseph, R. and Adedeji, T. (2026) Property flood resilience (PFR): Exploring the experiences of commercial property owners. International Journal of Building Pathology and Adaptation, 44(4), pp. 935-949. ISSN 2398-4708

Xiao, F (2007) Game-theoretic models for competitive pricing and network design problems. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiao, H and Hao, S (2023) Public participation in infrastructure projects: An integrative review and prospects for the future research. Engineering, Construction and Architectural Management, 30(2), pp. 456-477. ISSN 0969-9988

Xiao, H and Noble, T (2014) Bim's impact on the project manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xiao, H and Proverbs, D G (2003) Cost certainty and time certainty: An international investigation. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Xiao, Y; Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(4), pp. 317-328. ISSN 1562-3599

Xie, L L; Luo, Y; Hou, L and Yu, J (2025) Determinants for megaproject knowledge innovation management: A Bayesian network analysis. Engineering, Construction and Architectural Management, 32(9), pp. 5885-5912. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, L; Ju, T; Han, T and Hou, L (2023) A meta-network-based management framework for megaproject social responsibility behaviour in China. Engineering, Construction and Architectural Management, 30(9), pp. 4415-4434. ISSN 0969-9988

Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988

Xie, L L; Yang, Y; Hu, Y and Chan, A P C (2014) Understanding project stakeholders' perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(2), pp. 224-240. ISSN 0969-9988

Xin, X (2020) Semantic intelligence for knowledge-based compliance checking of underground utilities. PhD thesis, Purdue University, USA.

Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.

Xing, M; Cao, J and Cao, D (2023) Impacts of policy mix comprehensiveness on BIM implementation: Moderating effects of environmental state and response uncertainty. Journal of Construction Engineering and Management, 149(2): 04022171, ISSN 0733-9364

Xiong, B; Skitmore, M; Xia, P; Ballesteros-Pérez, P; Ye, K and Zhang, X (2019) Impact of corporate credit scoring on construction contractors in China. Journal of Construction Engineering and Management, 145(4): 05019002, ISSN 0733-9364

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xu, D; Agyekum, K; Manu, P; Cheung, C; Che Ibrahim, C K I; Mahamadu, A M and Perez, P A (2026) Design for safety (dfs) implementation in the construction industry: A study of design professionals in Northern China. Journal of Engineering, Design and Technology, 24(1), pp. 1-23. ISSN 1726-0531

Xu, Y; Wu, H; Chi, M; Lee, C Y; Chong, H Y and Skitmore, M (2026) Blockchain-enabled value co-creation in construction projects: Evidence from a moderated mediation model in China. Building Research & Information, 54(2), pp. 198-215. ISSN 0961-3218

Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364

Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364

Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Xu, N; Liang, Y; Guo, C; Meng, B; Zhou, X; Hu, Y and Zhang, B (2025) Entity recognition in the field of coal mine construction safety based on a pre-training language model. Engineering, Construction and Architectural Management, 32(4), pp. 2590-2613. ISSN 0969-9988

Xu, S; Liu, K and Tang, L C M (2015) Incorporation of expert reasoning into the BIM-based cost estimating process. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708

Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988

Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364

Xue, H; Zhang, S; Wu, Z and Zhang, L (2025) How to improve the smart construction technology usage behavior of construction enterprise employees? TOE framework based on configuration study. Engineering, Construction and Architectural Management, 32(2), pp. 785-804. ISSN 0969-9988

Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364

Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099

Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499

Yaghi, M A F (1980) Organizational decision making in a public organization: A case study of the new york state facilities design and construction group. DPA thesis, State University of New York at Albany, USA.

Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.

Yakubu, S U-N (2017) The barriers to the implementation and enforcement of the Building Code Standards Structural Provisions for mid-rise residential buildings: the case of Nigeria. PhD thesis, University of Strathclyde, UK.

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yalciner, S (2018) Sustainable architecture and the influence of global assessment tools. PhD thesis, University of Manchester, UK.

Yamaguchi, H; Uher, T E and Runeson, G (2001) Risk allocation in PFI projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Yamaguchi, H; Uher, T E and Runeson, G (2002) Negotiation analysis of risk allocation for PFI projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Yamaguchi, Hiroaki (2002) Risk allocation in privately financed projects. PhD thesis, University of New South Wales, Australia.

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988

Yang, H (2001) A web-based collaborative decision making system for construction project teams using fuzzy logic. PhD thesis, Loughborough University, UK.

Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988

Yang, K; Sunindijo, R Y; Wang, C C and Zhang, S (2024) Key leadership competencies in different management levels for digital transformation in construction organisations. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Yang, L; Li, Q and Pan, W (2024) A domain model for geometric modeling in support of the automated BIM modeling. Engineering, Construction and Architectural Management, 31(12), pp. 4897-4919. ISSN 0969-9988

Yang, R J; Gunarathna, C L; McDermott, V; Lingard, H; Zhao, H and Liu, C (2020) Opportunities for improving construction health and safety using real-time H&S management innovations: A socio-technical-economic perspective. International Journal of Construction Management, 20(5), pp. 534-554. ISSN 1562-3599

Yang, R J; Zou, P X W and Wang, J (2014) Stakeholder-associated risk networks in green buildings: China versus Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Yang, X; Zhong, H; Wang, Z; Du, P; Zhou, K; Zhou, H; Lai, X; Lau, Y L; Song, Y and Tang, L (2024) BEKG: A built environment knowledge graph. Building Research & Information, 52(1-2), pp. 19-37. ISSN 0961-3218

Yang, Y; Zhang, S; Oti-Sarpong, K and Chow, V (2024) A conceptual framework of building information modelling capabilities: An infrastructure owner perspective. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yanita, R and Mochtar, K (2021) Legal aspect of value engineering implementation in Jakarta (Indonesia) construction projects. International Journal of Construction Management, 21(2), pp. 131-139. ISSN 1562-3599

Yankah, J E (2018) An integrated framework of marketing in construction contracting enterprises in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364

Yap, J. B. H.; Tan, Z. Y.; Skitmore, M.; Loo, S. C. and Yong, F. Y. Y. (2026) Unmasking green procurement: What drives adoption in developing-country construction? Construction Management and Economics, 44(5), pp. 337-358. ISSN 0144-6193

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.

Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007

Yap, J B H; Skitmore, M; Lim, Y W; Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(6), pp. 2415-2436. ISSN 0969-9988

Yap, J B H; Teh, Y H; Loo, S C and Sulaiman, Z B (2024) Benefits of green procurement: Perspectives from the Malaysian construction industry. International Journal of Construction Management, 24(14), pp. 1530-1539. ISSN 1562-3599

Yap, J B H and Toh, H M (2020) Investigating the principal factors impacting knowledge management implementation in construction organisations. Journal of Engineering, Design and Technology, 18(1), pp. 55-69. ISSN 1726-0531

Yapa Mudiyanselage, S. D. Y. B.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Adaptability of design out waste concept to minimise waste in modular construction: A qualitative delphi study. Smart and Sustainable Built Environment, pp. 1-33. ISSN 2046-6099

Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.

Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364

Yates, J K and Battersby, L C (2003) Master builder project delivery system and designer construction knowledge. Journal of Construction Engineering and Management, 129(6), pp. 635-644. ISSN 0733-9364

Yatmo, Y A; Atmodiwirjo, P; Saginatari, D P and Harahap, M M Y (2021) Development of modular school design as a permanent solution for post-disaster reconstruction in Indonesia. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 101-113. ISSN 1759-5916

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Ye, M (2018) The impacts of institutional distance on corporate social responsibility "glocalisation" : evidence from international construction. PhD thesis, University of Hong Kong, Hong Kong.

Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364

Ye, S and Tiong, R K L (2000) Government support and risk-return trade-off in China's BOT power projects. Engineering, Construction and Architectural Management, 7(4), pp. 412-422. ISSN 0969-9988

Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Ye, X; Shi, S; Chong, H Y; Fu, X; Liu, L and He, Q (2018) Empirical analysis of firms' willingness to participate in infrastructure PPP projects. Journal of Construction Engineering and Management, 144(1): 04017092, ISSN 0733-9364

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Ye, Y; You, H and Du, J (2024) Real-time muscle-level haptic feedback for enhanced welding learning: An semg-based approach. Journal of Construction Engineering and Management, 150(12): 04024178, ISSN 0733-9364

Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029

Yean, F; Ling, Y; Fu, E and Leong, K (2002) Performance of design-build projects in terms of cost, quality and time: Views of clients, architects and contractors in Singapore. Construction Economics and Building, 2(1), pp. 37-46. ISSN 2204-9029

Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 0969-9988

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Yeh, H H; Hsieh, T Y and Chen, J H (2017) Managing complex engineering interfaces of urban mass rapid transit projects. Journal of Construction Engineering and Management, 143(6): 05017001, ISSN 0733-9364

Yembi Renault, B; Agumba, J N and Ansary, N (2021) Regression analysis of the influence of demographic characteristics using risk management practices within South African small and medium construction enterprises. Journal of Engineering, Design and Technology, 19(6), pp. 1505-1529. ISSN 1726-0531

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Yeung, H C; Ridwan, T; Tariq, S and Zayed, T (2022) Beam plus implementation in Hong Kong: Assessment of challenges and policies. International Journal of Construction Management, 22(14), pp. 2830-2844. ISSN 1562-3599

Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599

Yevu, S K and Yu, A T W (2020) The ecosystem of drivers for electronic procurement adoption for construction project procurement: A systematic review and future research directions. Engineering, Construction and Architectural Management, 27(2), pp. 411-440. ISSN 0969-9988

Yevu, S K; Yu, A T W and Darko, A (2023) Barriers to electronic procurement adoption in the construction industry: A systematic review and interrelationships. International Journal of Construction Management, 23(6), pp. 964-978. ISSN 1562-3599

Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364

Yevu, S K; Yu, A T W; Darko, A; Nani, G and Edwards, D J (2023) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management, 30(10), pp. 5133-5159. ISSN 0969-9988

Yevu, S K; Yu, A T W; Nani, G; Darko, A and Tetteh, M O (2022) Electronic procurement systems adoption in construction procurement: A global survey on the barriers and strategies from the developed and developing economies. Journal of Construction Engineering and Management, 148(1): 04021186, ISSN 0733-9364

Yevu, S K; Yu, A T W; Tetteh, M O and Antwi-Afari, M F (2022) Analytical methods for information technology benefits in the built environment: Towards an integration model. International Journal of Construction Management, 22(8), pp. 1383-1394. ISSN 1562-3599

Yfanti, S (2015) An investigation of critical success factors for the creation of clusters within micro companies working in the construction sector. PhD thesis, Glasgow Caledonian University, UK.

Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects. PhD thesis, University of Wisconsin - Madison, USA.

Yi, Yanqing (2025) New model for integration life cycle assessment and system dynamics to support the process of construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Ying, F J; Zhao, N and Tookey, J (2022) Achieving construction innovation in best value procurement projects: New Zealand mega projects study. Construction Innovation, 22(2), pp. 388-403. ISSN 1471-4175

Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yitmen, I.; Almusaed, A. and Alizadehsalehi, S. (2026) Facilitating construction 5.0 for smart, sustainable and resilient buildings: Opportunities and challenges for implementation. Smart and Sustainable Built Environment, 15(2), pp. 729-764. ISSN 2046-6099

Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(6), pp. 609-630. ISSN 0969-9988

Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364

Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Yong, K T and Pheng, L S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(3), pp. 237-248. ISSN 1466433X

Yong, Y C and Mustaffa, N E (2011) Clients, consultants and contractors' perception of critical success factors for construction projects in Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Yong, Y C and Mustaffa, N E (2012) Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(5), pp. 543-556. ISSN 0969-9988

Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Yoon, S; Weidner, T and Hastak, M (2021) Erratum: Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0001956). Journal of Construction Engineering and Management, 147(7): 08221001, ISSN 0733-9364

Yoon, S; Weidner, T and Hastak, M (2021) Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution. Journal of Construction Engineering and Management, 147(3): 04020185, ISSN 0733-9364

Yorston, N and Chileshe, N (2014) Lessons learned from building the education revolution (BER) program by the South Australia construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yousefi, Y; Jahangiri, M; Alidadi Shamsabadi, A and Raeesi Dehkordi, A (2019) Designing a mediator space and the study of its effect on the energy consumption of a residential building using EnergyPlus software in Savadkuh, Iran. Journal of Engineering, Design and Technology, 17(4), pp. 833-846. ISSN 1726-0531

Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(2), pp. 102-120. ISSN 2204-9029

Youssef, M; Mohamed, M S E and Balah, A A S (2024) Fuzzy model for Libyan construction projects delivery system selection. International Journal of Construction Management, 24(6), pp. 643-650. ISSN 1562-3599

Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(6), pp. 1081-1091. ISSN 0969-9988

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Yu, J; Chan, A; Wang, B; Liu, Y and Wang, J (2023) A mixed-methods study of the critical success factors in the development of assembled buildings in steel structure projects in China. International Journal of Construction Management, 23(13), pp. 2288-2297. ISSN 1562-3599

Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364

Yu, K Q (2002) Computer integrated construction based on total project systems framework. PhD thesis, University of British Columbia, Canada.

Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.

Yu, T; Liang, X and Wang, Y (2020) Factors affecting the utilization of big data in construction projects. Journal of Construction Engineering and Management, 146(5): 04020032, ISSN 0733-9364

Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364

Yu, W D; Lin, T C; Liu, S J and Chang, P L (2013) Is the knowledge management system truly cost effective? Case study of km-enabled engineering problem solving. Journal of Construction Engineering and Management, 139(2), pp. 216-224. ISSN 0733-9364

Yu, W D and Wang, K W (2012) Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 138(1), pp. 128-134. ISSN 0733-9364

Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.

Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yu, Yifei (2024) Circular construction ecosystems: Designing a circularity information platform for the built environment. PhD thesis, University of Twente, Netherlands.

Yuan, H and Yang, Y (2020) BIM adoption under government subsidy: Technology diffusion perspective. Journal of Construction Engineering and Management, 146(1): 4019089, ISSN 0733-9364

Yuan, Mei (2011) An integrated knowledge management framework for managing sustainability knowledge in the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Yuan, X (2016) A cyber-physical systems (CPS) approach to temporary structures monitoring. PhD thesis, Pennsylvania State University, USA.

Yuan, Z; Fang, Y; Hong, J; Zhang, Q; Zhang, Z and Ni, G (2022) Coupling relationship between capabilities and benefits of lean construction for precast buildings from a multivariable moderation perspective. Journal of Construction Engineering and Management, 148(5): 04022011, ISSN 0733-9364

Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yumarni, T and Amaratunga, D (2018) Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction. Built Environment Project and Asset Management, 8(5), pp. 544-556. ISSN 2044-124X

Yun, G C (2008) The utility of knowledge mapping as an approach to improving corporate and project performance: a case study of a large South Korean consulting firm. PhD thesis, University of Salford, UK.

Yung, P (2009) Institutional arrangements and construction safety in China: An empirical examination. Construction Management and Economics, 27(5), pp. 439-450. ISSN 1466433X

Yunus, R and Yang, J (2012) Critical sustainability factors in industrialised building systems. Construction Innovation, 12(4), pp. 447-463. ISSN 1471-4175

Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.

Yusuf, A O; Opawole, A; Musa, N A; Kadiri, D S and Ebunoluwa, E I (2024) Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1058-1083. ISSN 2398-4708

Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.

Yépez, F and Villacreses, J P (2023) Temporary sheltering areas in case of earthquakes: Engineering design, implementation and policy experiences. The case of quito: Ecuador. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 655-668. ISSN 1759-5916

Yılmaz, M B and Rızvanoğlu, K (2022) Understanding users' behavioral intention to use voice assistants on smartphones through the integrated model of user satisfaction and technology acceptance: A survey approach. Journal of Engineering, Design and Technology, 20(6), pp. 1738-1764. ISSN 1726-0531

Zaalouk, A and Han, S (2021) Parameterized design optimization framework for worker-friendly workplaces in modular construction. Journal of Construction Engineering and Management, 147(5): 04021030, ISSN 0733-9364

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499

Zadeh Kazemi, M (2022) Essays on sustainability reporting quality, sustainability-oriented innovation, disruptive technologies and resilience in the construction sector: The case of the UAE. PhD thesis, Brunel University, UK.

Zadok, Y (2020) Project-based learning in robotics meets junior high school. Journal of Engineering, Design and Technology, 18(5), pp. 941-958. ISSN 1726-0531

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175

Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X

Zahiroddiny, S (2016) Understanding the impact of building information modelling (BIM) on construction projects' communication patterns. PhD thesis, University of Northumbria at Newcastle, UK.

Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zailani, M B; Abubakar, M and Muhammad, A (2019) Assessment of barriers to risk management implementation in small construction projects in Nigeria. African Journal of Built Environment Research, 3(1), pp. 15-28. ISSN 2414-0236

Zainab S, P W and Goodhew S, F A (2013) Stakeholders perspective on sustainable technology selection to achieve zero carbon retail buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zainon, N; Skitmore, M and Mohd-Rahim, F A (2022) Critical success factors in implementing flexible IT infrastructure in the Malaysian construction industry. International Journal of Construction Management, 22(11), pp. 2166-2177. ISSN 1562-3599

Zainuddin, F K and Mustapa, F D (2024) Transaction cost economics framework development for Malaysian housing development. Journal of Construction in Developing Countries, 29(2), pp. 77-105. ISSN 1823-6499

Zairi, A (2013) An empirical study of quality culture in the construction industry: A GCC context. PhD thesis, University of Salford, UK.

Zairi, A (2013) An empirical study of quality culture in the construction industry: a Gulf Cooperation Council context. PhD thesis, University of Salford, UK.

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708

Zakharova, J; Afefy, H M; Hamood, A; Hampton, P; Gowayed, M A; Ragab, M and Abouali, M G (2025) Can the degree apprenticeship become the degree of difference in Egypt? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 76-82. ISSN 17514304

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zamenian, H; Choi, J; Sadeghi, S A and Naderpajouh, N (2017) Systematic approach for asset management of urban water pipeline infrastructure systems. Built Environment Project and Asset Management, 7(5), pp. 506-517. ISSN 2044-124X

Zaneldin, E (2000) An information model for improving design coordination in building projects. PhD thesis, University of Waterloo, Canada.

Zaneldin, E; Hegazy, T and Grierson, D (2001) Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127(4), pp. 330-336. ISSN 0733-9364

Zanni, M; Ruikar, K and Soetanto, R (2020) Systematising multidisciplinary sustainable building design processes utilising BIM. Built Environment Project and Asset Management, 10(5), pp. 637-655. ISSN 2044-124X

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Zapata-Poveda, G (2012) Detailed design ethnography: Architects embedding low carbon performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Zarei, F and Nik-Bakht, M (2024) Extending CityGML with public input: social ADE. Built Environment Project and Asset Management, 14(4), pp. 547-561. ISSN 2044-124X

Zarghami, S A and Dumrak, J (2026) Integrating cascading effects into risk assessment of metaverse implementation in the built environment. Building Research & Information, 54(2), pp. 216-236. ISSN 0961-3218

Zarghami, S A (2024) Anatomy of interactions among risk factors influencing implementation of building information modeling (BIM): A system dynamics approach. Engineering, Construction and Architectural Management, 31(11), pp. 4398-4416. ISSN 0969-9988

Zavari, M and Afshar, M R (2023) The role of site manager transformational leadership in the construction project success. International Journal of Building Pathology and Adaptation, 41(5), pp. 1067-1085. ISSN 23984708

Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zeb, J (2022) A level of service framework for service-centric asset management planning. Built Environment Project and Asset Management, 12(2), pp. 147-162. ISSN 2044-124X

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175

Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms. PhD thesis, University of Maryland, College Park, USA.

Zerjav, V; Hartmann, T and Javemick-Will, A (2012) Internal governance of design and engineering: The case of the multinational firm. Journal of Construction Engineering and Management, 138(1), pp. 135-143. ISSN 0733-9364

Zeynalian, M; Trigunarsyah, B and Ronagh, H R (2013) Modification of advanced programmatic risk analysis and management model for the whole project life cycle's risks. Journal of Construction Engineering and Management, 139(1), pp. 51-59. ISSN 0733-9364

Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364

Zhai, X (2010) The role of human resource practices in enhancing employees' behaviours and organisational learning in Chinese construction organisations. PhD thesis, Loughborough University, UK.

Zhai, X; Reed, R and Mills, A (2014) Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1-2), pp. 40-52. ISSN 01446193

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) Erratum for: An integrated approach to assessing digitalization of integrated digital delivery projects (journal of construction engineering and management DOI: 10.1061/jcemd4.Coeng-16149). Journal of Construction Engineering and Management, 151(10): 08225001, ISSN 0733-9364

Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364

Zhang, K.; Shaheen, Q. H. and Cui, Q. (2026) Understanding structured project finance for US transportation public-private partnerships: What maximizes financing capacity? Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364

Zhang, Y.; Guo, Y.; Li, Y. and Wang, M. (2026) ESG practices and megaproject management performance: The roles of environmental dynamism and munificence. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988

Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599

Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364

Zhang, D (2015) An analysis of building information modelling (BIM) implementation from a planned behavior perspective. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Zhang, H M; Chong, H Y; Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(6), pp. 2503-2522. ISSN 0969-9988

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599

Zhang, J; Zhou, N; Hinge, A; Feng, W and Zhang, S (2016) Governance strategies to achieve zero-energy buildings in China. Building Research & Information, 44(5-6), pp. 604-618. ISSN 0961-3218

Zhang, K and Cui, Q (2020) Does P3 favour large companies? From equity financing to social equity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.

Zhang, L (2012) Ontology-based web services framework for building information modeling. PhD thesis, University of Florida, USA.

Zhang, L (2021) Artificial neural network intelligent technique and multiple nonlinear regression for prediction and optimization of the transmittance of lightpipes and implementation in BIM. PhD thesis, University of Nottingham, UK.

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.

Zhang, L; Cheng, J and Fan, W (2016) Party selection for integrated project delivery based on interorganizational transactive memory system. Journal of Construction Engineering and Management, 142(3): 04015089, ISSN 0733-9364

Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988

Zhang, L and El-Gohary, N M (2016) Discovering stakeholder values for axiology-based value analysis of building projects. Journal of Construction Engineering and Management, 142(4): 04015095, ISSN 0733-9364

Zhang, L and El-Gohary, N M (2016) Epistemology-based context-aware semantic model for sustainable construction practices. Journal of Construction Engineering and Management, 142(3): 04015084, ISSN 0733-9364

Zhang, L; He, J and Zhou, S (2013) Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), pp. 795-804. ISSN 0733-9364

Zhang, L; Hu, H; Fang, Y; Qiang, Z and Cai, Y (2023) Preliminary CSI specification localization methodology matrix in China. International Journal of Construction Management, 23(6), pp. 935-944. ISSN 1562-3599

Zhang, N; Hwang, B G; Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: Current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), pp. 3115-3133. ISSN 0969-9988

Zhang, N; Hwang, B G; Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 919-938. ISSN 0969-9988

Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364

Zhang, Q; Liu, Z and Yang, S (2025) Enhancing construction workers' health and safety: Mechanisms for implementing construction 4.0 technologies in construction organizations. Engineering, Construction and Architectural Management, 32(13), pp. 68-103. ISSN 0969-9988

Zhang, Q; Oo, B L and Lim, B T H (2022) Corporate social responsibility practices by leading construction firms in China: A case study. International Journal of Construction Management, 22(8), pp. 1420-1431. ISSN 1562-3599

Zhang, Q; Oo, B L and Lim, B T H (2023) Key practices and impact factors of corporate social responsibility implementation: Evidence from construction firms. Engineering, Construction and Architectural Management, 30(5), pp. 2124-2154. ISSN 0969-9988

Zhang, Q; Oo, B L and Lim, B T H (2024) Modeling influence mechanism of factors on corporate social responsibility implementation: Evidence from Chinese construction firms. Engineering, Construction and Architectural Management, 31(1), pp. 324-362. ISSN 0969-9988

Zhang, Q W; Chong, H Y; Liao, P C and Wan, Y L (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), pp. 3031-3050. ISSN 0969-9988

Zhang, Qian (2021) Key influencing factors of corporate social responsibility implementation in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Zhang, S; Liu, X; Gao, Y and Ma, P (2019) Effect of level of owner-provided design on contractor's design quality in DB/EPC projects. Journal of Construction Engineering and Management, 145(1): 04018121, ISSN 0733-9364

Zhang, S; Loosemore, M; Sunindijo, R Y and Gu, D (2023) An investigation of safety climate in Chinese major construction projects. International Journal of Construction Management, 23(8), pp. 1365-1375. ISSN 1562-3599

Zhang, W R; Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(4), pp. 399-409. ISSN 0969-9988

Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364

Zhang, X (2004) Improving concessionaire selection protocols in public/ private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670-679. ISSN 0733-9364

Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364

Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364

Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364

Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364

Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.

Zhang, X (2010) Competitiveness for real estate developers: a China study. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.

Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175

Zhang, X and Liu, J (2022) Incentive mechanism and value-added in PPP projects considering financial institutions' early intervention. Journal of Construction Engineering and Management, 148(4): 4022001, ISSN 0733-9364

Zhang, X; Liu, T; Rahman, A and Zhou, L (2023) Blockchain applications for construction contract management: A systematic literature review. Journal of Construction Engineering and Management, 149(1): 03122011, ISSN 0733-9364

Zhang, X Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhang, X Q and Kumaraswamy, M M (2001) Procurement protocols for public-private partnered projects. Journal of Construction Engineering and Management, 127(5), pp. 351-358. ISSN 0733-9364

Zhang, X Q; Kumaraswamy, M M; Zheng, W and Palaneeswaran, E (2002) Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong. Journal of Construction Engineering and Management, 128(2), pp. 155-163. ISSN 0733-9364

Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364

Zhang, Y and Tan, W (2019) The leading small group: An institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(2), pp. 291-301. ISSN 2044-124X

Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599

Zhao, C E (2007) Financial risk management of PPP projects in the UK and China: A comparative study. PhD thesis, University of London, University College London, UK.

Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.

Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects. PhD thesis, Northumbria University, UK.

Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988

Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.

Zhao, N and Ying, F (2019) Method selection: A conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), pp. 214-232. ISSN 2044-124X

Zhao, X (2014) Enterprise risk management in Chinese construction firms operating overseas. PhD thesis, National University of Singapore, Singapore.

Zhao, X; Hwang, B G and Low, S P (2013) Developing fuzzy enterprise risk management maturity model for construction firms. Journal of Construction Engineering and Management, 139(9), pp. 1179-1189. ISSN 0733-9364

Zhao, X; Hwang, B G and Low, S P (2014) Investigating enterprise risk management maturity in construction firms. Journal of Construction Engineering and Management, 140(8): 05014006, ISSN 0733-9364

Zhao, X; Hwang, B G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), pp. 347-366. ISSN 0969-9988

Zhao, X; Hwang, B G; Pheng Low, S and Wu, P (2015) Reducing hindrances to enterprise risk management implementation in construction firms. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zhao, Y (2021) Modernizing log construction system: A study on technology advancement and design strategy. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application. PhD thesis, Brunel University, UK.

Zhao, Y; Hao, S; Chen, Z; Zhou, X; Zhang, L and Guo, Z (2025) Critical factors influencing the internet of things technology adoption behavior of construction companies: Evidence from China. Engineering, Construction and Architectural Management, 32(2), pp. 760-784. ISSN 0969-9988

Zheng, J; Gu, Y; Li, P; Luo, L and Wu, G (2025) Research evolution and thematic breakthroughs in project leadership: A bibliometric analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1970-2002. ISSN 0969-9988

Zheng, S and Tiong, R L K (2010) First public-private-partnership application in taiwan's wastewater treatment sector: Case study of the nanzih BOT wastewater treatment project. Journal of Construction Engineering and Management, 136(8), pp. 913-922. ISSN 0733-9364

Zheng, X; Chen, J; Xia, B; Skitmore, M and Zeng, S (2023) Understanding the megaproject social responsibility network among stakeholders: A reciprocal-exchange perspective. Journal of Construction Engineering and Management, 149(11): 04023105, ISSN 0733-9364

Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988

Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364

Zheng, Y; Debs, L; Besiktepe, D and Oh, H J (2025) Insights for key professional competencies of us entry-level construction positions: A structural topic modeling approach. Journal of Construction Engineering and Management, 151(8): 04025103, ISSN 0733-9364

Zhikun, D; Fungfai, N G and Jiayuan, W (2010) Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), pp. 1-11. ISSN 1562-3599

Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364

Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387

Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into PFI projects: An analysis of financial incentives and associated risks. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhou, X (2011) Three essays on construction procurement industry and public policies. PhD thesis, University of Oklahoma, USA.

Zhou, Y (2012) Construction knowledge mining and application of generalized fuzzy network in construction decision management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Zhou, Y; Yang, Y and Yang, J B (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(3), pp. 554-574. ISSN 0969-9988

Zhou, Z; Li, Q and Wu, W (2012) Developing a versatile subway construction incident database for safety management. Journal of Construction Engineering and Management, 138(10), pp. 1169-1180. ISSN 0733-9364

Zhu, K; Xiang, Y; Bu, J and Zhang, H (2021) The design and construction of public service building in developing rural regions during the post COVID-19 period: Cased on a Chinese village centre. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.

Zhu, Y (1999) Web-based construction document processing through a "malleable frame". PhD thesis, University of Florida, USA.

Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364

Zhuang, J; Wang, Y; Yan, Z and Liu, J (2026) Evolutionary game analysis on the cooperative mechanism of government subsidies and market-based risk mitigation institutions in managing ecosustainable projects' default risks. Journal of Construction Engineering and Management, 152(3): 04025270, ISSN 0733-9364

Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.

Zin, I N M and Egbu, C (2009) A literature review on the challenges associated with implementing knowledge management strategies in construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zin, I N M and Egbu, C (2010) Readiness of organizations to implement a knowledge management strategy: A construction industry overview. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Zin, Z M I; Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(5), pp. 508-520. ISSN 2044-124X

Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Khalilzadeh, M; Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(2), pp. 716-738. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

Zolkafli, U K; Zakaria, N; Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: Owners' perspectives. International Journal of Building Pathology and Adaptation, 37(1), pp. 186-195. ISSN 23984708

Zomer, T (2021) Institutional pressures and decoupling in projects: the case of BIM Level 2 and coercive isomorphism in the UK's construction sector. PhD thesis, University of Cambridge, UK.

Zomer, T; Neely, A and Parlikad, A (2020) Institutional pressures and decoupling in construction projects: An analysis of building information modelling implementation. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Zomer, T; Neely, A; Sacks, R and Parlikad, A (2020) Exploring the influence of socio-historical constructs on BIM implementation: An activity theory perspective. Construction Management and Economics, 39(1), pp. 1-20. ISSN 01446193

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387

Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.

Zou, W and Kumaraswamy, M (2009) Game theory based understanding of dynamic relationships between public and private sectors in PPPs. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X

Zou R R, F R and Jewell C, T L C M (2013) An exploratory study of information maturity in construction and developing a decision-making model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.

Zulkifli, A R; Ibrahim, C K I C and Belayutham, S (2018) Activation trigger for organisational BIM learning: Views from Malaysian construction stakeholders. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zulu, E; Mutwale, J; Zulu, S L; Musonda, I; Kavishe, N and Moobela, C (2025) Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: Evidence from Zambia. Journal of Engineering, Design and Technology, 23(2), pp. 386-405. ISSN 1726-0531

Zulu, S and Brown, A (2004) Quality of the project management process: An integrated approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Zulu, S L; Zulu, E; Chabala, M and Chunda, N (2023) Drivers and barriers to sustainability practices in the Zambian construction industry. International Journal of Construction Management, 23(12), pp. 2116-2125. ISSN 1562-3599

Zuofa, T; Ochieng, E and Burns, A (2015) Appraising knowledge management perceptions among construction practitioners. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 89-98. ISSN 17514304

Zuofa, T; Ochieng, E G and Ode-Ichakpa, I (2023) An evaluation of determinants influencing the adoption of circular economy principles in Nigerian construction SMEs. Building Research & Information, 51(1), pp. 69-84. ISSN 0961-3218

af Hällström, A and Bosch-Sijtsema, P (2019) Early contractor involvement in the construction industry: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) Creating collaboration: The use of collaborative space in large-scale infrastructure development. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A; Bosch-Sijtsema, P and Poblete, L (2025) Challenges with collaboration: The interaction of formal and informal ties in infrastructure construction. Construction Management and Economics, 43(1), pp. 7-25. ISSN 0144-6193

af Hällström, A; Bosch-Sijtsema, P; Poblete, L; Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(9), pp. 723-738. ISSN 01446193

al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175

da Rocha, C G and Kemmer, S (2018) Integrating product and process design in construction. Construction Management and Economics, 36(9), pp. 535-543. ISSN 01446193

da Silva, M B C; Moschen, S D A; Cecatto, B and Larentis, F (2022) Perceived attributes and dimensions of accessibility in adapted bathrooms. Building Research & Information, 50(1-2), pp. 60-73. ISSN 0961-3218

de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218

de Lemos, T; Almeida, L; Betts, M and Eaton, D (2003) An examination on the sustainable competitive advantage of private finance initiative projects. Construction Innovation, 3(4), pp. 249-259. ISSN 1471-4175

de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.

de Marco, A; Mangano, G and Zou, X Y (2012) Factors influencing the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 2(1), pp. 70-85. ISSN 2044-124X

de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007

de Ridder, H and Vrijhoef, R (2008) Developing a strategy for 'living buildings': Beyond cradle to cradle with living building concept. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007

de Valence, Gerard (2010) Innovation, procurement and construction industry development. Construction Economics and Building, 10(4), pp. 50-59. ISSN 2204-9029

de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.

den Otter, A F and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(3), pp. 162-173. ISSN 0969-9988

jadidoleslami, S; Saghatforoush, E and Zare Ravasan, A (2021) Constructability obstacles: An exploratory factor analysis approach. International Journal of Construction Management, 21(3), pp. 312-325. ISSN 1562-3599

ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387

li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175

ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 0969-9988

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

van Manen, M; olde Scholtenhuis, L and Voordijk, H (2022) Empirically validating five propositions regarding 3D visualizations for subsurface utility projects. Engineering, Construction and Architectural Management, 29(6), pp. 2535-2553. ISSN 0969-9988

van Nguyen, M V and Khanh, K D (2025) Exploring the relationship between corporate social responsibility and innovation performance in architectural design firms. International Journal of Construction Management, 25(12), pp. 1454-1462. ISSN 1562-3599

van Tonder, F and Rwelamila, P D (2024) A comparison of low-cost housing units for varying climatic regions in South Africa: A knowledge management approach. Smart and Sustainable Built Environment, 13(5), pp. 1310-1329. ISSN 2046-6099

van Wyk, L; Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 410-429. ISSN 23984708

van den Adel, J F; Al-Jibouri, S H; Karim, U F A and Mawdesley, M (2003) Integrated foundation design of buildings: Case demonstration of a prototype expert system. Journal of Engineering, Design and Technology, 1(1), pp. 55-74. ISSN 1726-0531

van den Berg, M; Voordijk, H and Adriaanse, A (2021) BIM uses for deconstruction: An activity-theoretical perspective on reorganising end-of-life practices. Construction Management and Economics, 39(4), pp. 323-339. ISSN 01446193

van der Heijden, J (2024) Public governance in the context of construction 4.0: A systematic and comprehensive literature review. Smart and Sustainable Built Environment, 13(3), pp. 737-756. ISSN 2046-6099

von Malmborg, F; Rohdin, P and Wihlborg, E (2024) Climate declarations for buildings as a new policy instrument in Sweden: a multiple streams perspective. Building Research & Information, 52(4), pp. 479-496. ISSN 0961-3218

zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988

zu Ermgassen, S O S E (2022) Hard questions, concrete solutions: Mitigating the ecological impacts of the global infrastructure boom. PhD thesis, University of Kent, UK.

Çetin, Sultan (2023) Towards a circular building industry through digitalisation: Exploring how digital technologies can help narrow, slow, close, and regenerate the loops in social housing practice. PhD thesis, Delft University of Technology, Netherlands.

Öberg, V; Jockwer, R; Goto, Y and Al-Emrani, M (2025) Design for structural adaptation: Economic feasibility of an implementation for Swedish timber buildings. Building Research & Information, 53(6), pp. 759-776. ISSN 0961-3218

Özdoganm, I D and Talat Birgönül, M (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(3), pp. 343-353. ISSN 01446193

Özener, O Ö (2024) Context-based learning for BIM: Simulative role-playing games for strategic business implementations. Smart and Sustainable Built Environment, 13(4), pp. 908-933. ISSN 2046-6099

Özçekici Olcar, Ç (2021) A model for exploring evolution of strategic alliances in project-based industries: The case of construction industry. PhD thesis, Izmir Institute of Technology, Turkey.

Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364

Ürge-Vorsatz, D; Harvey, L D D; Mirasgedis, S and Levine, M D (2007) Mitigating CO2 emissions from energy use in the world's buildings. Building Research & Information, 35(4), pp. 379-398. ISSN 0961-3218

Ürge-Vorsatz, D; Koeppel, S and Mirasgedis, S (2007) Appraisal of policy instruments for reducing buildings' CO2 emissions. Building Research & Information, 35(4), pp. 458-477. ISSN 0961-3218

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

This list was generated on Sun Aug 23 04:18:28 2026 UTC.